0% found this document useful (0 votes)
100 views5 pages

Resume: Chitti Babu.K Plot No: J1 1

Chitti Babu is seeking a challenging career utilizing 20 years of experience in auto manufacturing. He has held various roles such as Manager of Production Planning and Logistics at Royal Enfield, overseeing production targets and quality. As Senior Engineer at Valeo Clutch, he reduced inventory levels and implemented an MPS system. Chitti Babu aims to effectively manage production through lean concepts and achieve targets.

Uploaded by

Swet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views5 pages

Resume: Chitti Babu.K Plot No: J1 1

Chitti Babu is seeking a challenging career utilizing 20 years of experience in auto manufacturing. He has held various roles such as Manager of Production Planning and Logistics at Royal Enfield, overseeing production targets and quality. As Senior Engineer at Valeo Clutch, he reduced inventory levels and implemented an MPS system. Chitti Babu aims to effectively manage production through lean concepts and achieve targets.

Uploaded by

Swet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

RESUME

CHITTI BABU.K Plot No: J1 1st floor, Kailash Empire,


Mobile No: +91 9884866242 Nathaji Nagar, Thirumullivoyal,
Email ID: [email protected] Chennai – 62.

Objective:

Seeking challenging career to utilize my skill and ability in areas of Production


Planning Control and Logistics which offers a professional growth while be resourceful,
innovation & flexible.
Carrier Profile:

Having 20 years of experience manufacturing in Auto Ancillary.


Good knowledge in Vehicle Assembly line, Painting process, Powder coating, Plating
shop, CKD & Packing Child Parts PRODUCTION PLANNING IN DAY WAYS and TPM,
PPM CONCEPT, ISO/TS-16949, KANBAN, LEAN PRODUCTION MANUFACTURING,
POKEYOKA.
Educational Qualification:

Diploma in Mechanical Engineering (DME) 77% First Class with Honours April 2001.
Computer skills:

SAP (System Application product and data Process)

Design & Drafting in AUTO CAD2000

Good Internet Exposure

MS OFFICE & MS Excel

Details of Professional Experience:

1. MARCH 2012 TO TILL DATE

MANAGER – Production Planning Control & Logistics - REPORTING to GROUP


MANAGER

Royal Enfield Motor LTD, Chennai. ISO/TS 16949, ISO 14001 OHSAS
18001 certified company. This company manufacturing for two wheelers in 350CC,
500CC and 535CC
Roles and Responsibilities:

Preparing Master sheet for Monthly Production Plan based on marketing indent.

Preparing Model wise loading Plan for every shift.

Planning for a targeted production output per day according to the MPS plan.

Monitoring model-wise bikes roll-off (Colour mixup), Quality clearness, and hand
over to Marketing department.

Every month Production plan Vs actual detail preparing and present in the MIS
meeting.

Daily monitoring critical parts and Receipt average details.

Responsible for zero line stoppage and WIP inventory control.

Export bikes packing and dispatch monitoring.

Material MRP raising in SAP as per monthly production plan.

WIP rejection monitoring and 5S maintenance.

Key role in SAP system correction process in the following segments – BOM
creation, Back flashing, Production sequences entry, Inventory receipts, GRN
process monitoring, etc.

2. JANUARY 2011 TO FEBRUARY 2012

SENIOR ENGINEER – PRODUCTION PLANNING CONTROL & LOGISTICS -


REPORTING TO LOGISTICS HEAD

Amalgamations Valeo Clutch Pvt Ltd, Chennai & France. ISO/TS 16949, ISO 14001,
OHSAS 18001 certified company. OE Manufacturers and suppliers of Automotive clutch
system to esteem customers like Hyundai, TML, MUL, FORD, Nissan, Ashok Leyland, M
& M and TAFA.

Roles and Responsibilities:

Preparing Master Production Schedule (MPS) with respect to customer requirements.

Preparing Machine wise loading Plans for the day–to–day.

Planning for a targeted production output per day according to the MPS plan

Monitoring of dispatches with respect to customer requirements


Scheduling and follow-up for local materials such as turned parts, stamping parts &
Heat treatment parts.

Responsible to reduce customer DPM (Delivery per Million).

Responsible for zero line stoppage, inventory control, Zero premium freight.

Team member in periodic internal audit for process, product, TPM, 3C, 5S and
Quality management system.
Monitor stock levels for customers on a daily basis to ensure optimum levels while
adhering the to delivery schedule.

Achievements:

Effective FIFO implementation is done by introducing dynamic racks.

Visual kanban introduced.

Inventory reduction from 6 days to 3 days.

Effective implementation was done on the Master production Schedule system (MPS)

A Key role played in the SAP system correction process in the following segments –
BOM creation, Production entry, Inventory receipts, GRN process, etc.

3. SEPTEMBER 2008 – DECEMBER 2010

EXECTIVE – PPC, RANE NSK STEERING SYSTEM LTD & REPORTING TO PPC
MANAGER.

Joint venture between Rane, Guduvanchery and NSK, Japan. Rane NSK was
one of the Tier - I supplier of car and Heavy vehicle steering system. Customers like
TML, MUL, TOYOTA, FORD, NISSAN, Ashok Leyland, M&M AND EICHER
MOTORS.

Roles and Responsibilities:

Hands-on experience in managing the production of Sub Assembly and Welding lines

Effectively handling the Manpower and giving training to the operators related to
Production, Quality and System.

Good Exposure to manufacturing shop floor practices like 3“C”, 5“S” and 3M”

Working on SMED Concept for reducing Press shop and Assembly line

To Monitor inventory on a daily basis & Right action

Analyze monthly sales and derive at production requirements

Based on available capacity decide on the make (or) buy plans


Material requisition raising in SAP as per daily production plan

Ensure that daily supply of subcontract Materials

Achievements:

Implementation of LPS in Assembly Line

To introduce sun raise meeting and discuss for daily production plan

Key team member for QRQC implementation

4. AUGUST 2006 to SEPTEMBER 2008

SHIFT INCHARGE - CREST CAM MANUFACTURING SYSTEM, CHENNAI.

Is an Indian Based Company, Manufacturing Automotive JCB cylinder parts for


WIPRO INFRASTRUCTURE PVT LTD.

CERST CAM MANUFACTURING SYSTEM in manufacturing of automotive different


types of cylinders making. Production will be carried out in different departments like
Machine shop, welding shop and Assembly shop. We have the capacity to manufacture
1800 cylinders per day.

Roles and Responsibilities:

Productivity Improvement and achieving Monthly targets.

Periodic review of rejections trends thru B.O.C. Key charts.

Improved the production levels from 1-day inventory to 2 days inventory by


improving the productivity.

Reduced the customer line stoppages from > 20 hours to “Zero” hours.

To ensure the monthly procurement of consumable items.

Time study and work study.

Achievements:

Implementation of 5’S activities.

100 PPM achieved in customer end.


To train the Operators for Shop floor maintenance and Quality System.
5. JUN 2001 to JUN 2006

SHIFT INCHARGE - WONJIN AUTO PARTS INDIA PVT.LTD

Is a Korean Based Company, Manufacturing Automotive car A/C core assembly


parts for VISTEON AUTOMOTIVE PVT LTD.

Roles and Responsibilities:

Managing Assembly line effectively and responsible for achieving department goals.
Man power planning and control for the regular production Activity
Conducting Process Audit and Product Audit (Final and Receipt stage)
Skill analysis will be done on every Team member and competency record will be
maintained.
Strengths:

Commitment to honor the objectives on time

Eager to learn new things

Good Problem solving ability through PDCA approach

Hard worker

Self Confidence

PERSONAL INFORMATION:

1. Father's name : G.Karunanithi

2. D.O.B : 03-06-1982

3. Pass Port No : E 8557794

4. Languages Known : Tamil, English, (To speak, Read & write)

5. Marital status : Married

6. Notice Period   : Three Months

Declaration:

I hereby declare that information and facts stated above are true and correct to the
best of my knowledge and belief.

Thanking You

Place: Chennai  Yours truly,


Date:        
 (K.CHITTI BABU)

You might also like