Hazard Assessment and Control Report Template
Hazard Assessment and Control Report Template
Frequency (3) – How often is the task Likelihood (4) – How likely is it that the exposure will result Consequence (5) – How severe will the
performed? in loss such as illness, injury or property damage? loss be if no controls are in place?
Description Value Description Value Description Value
Continuous Task occurs multiple 5 Expected Known to occur multiple times a 5 Fatality Fatal injury 5
times per day year
Frequent Task occurs once per 4 Likely Known to occur once a year 4 Major Long-term disability 4
day (permanent)
Infrequent Task occurs at least 3 Occasional Known to occur once every 5 years 3 Moderate Short-term 3
once per week disability (lost-time
injury)
Occasional Task occurs at least 2 Not likely Known to occur once every 10 2 Minor Medical aid without 2
once per month years loss of time
Rare Task occurs once per 1 Unexpected Should never happen 1 First Aid First aid injury 1
year or less
2019-02-14 1 of 3
After you have completed the risk analysis, use the ratings below to complete columns 6 and 7 (Degree and Classification of risk). This is the
pre-control risk rating. i.e. with no controls in place, what are the risks.
This hazard classification established the priority for the implementation of control measures.
In column 8, identify what control measure(s) are in place to minimize the risk of the hazard. Examples of different types of control measures are
outlined in the following definitions.
Control(s) (8)
Engineering This type of control eliminates the hazard by modifying the equipment, chemical or process. Or, it substitutes, isolates,
encloses, guards or ventilates the hazard. (e.g. fume hood)
Administrative This is a process to control hazards that are not eliminated by engineering controls (e.g. training, standard operating
procedures)
Personal Protective Equipment Equipment used or clothing worn by personnel to protect them from safety hazards associated with conditions at the
workplace (e.g. gloves, hard hat)
2019-02-14 2 of 3
Hazard Assessment and Control Report
Position/Process Title:
Department:
Completed By:
Date:
Participants: (List individuals who took part in this process, First Last Name)
PRE-CONTROL (3-7)
Control in
TASKS (1) POTENTIAL HAZARDS (2) FxLxC Risk Rating Risk CONTROL(S) (8)
Place (Y/N) (9)
(3) (4) (5) (6) Classification
(7)