The document discusses construction joints which are used to join sections of concrete but are not intended to accommodate movement. Proper preparation of the first concrete section is important to enhance adhesion, and involves removing surface laitance without disturbing aggregate particles. If done correctly without contamination, a construction joint can retain liquid without a waterstop.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
25 views
Pages From Liquid-Retaining-Structures-2-5
The document discusses construction joints which are used to join sections of concrete but are not intended to accommodate movement. Proper preparation of the first concrete section is important to enhance adhesion, and involves removing surface laitance without disturbing aggregate particles. If done correctly without contamination, a construction joint can retain liquid without a waterstop.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3
CONSTRUCTION JOINTS
Steel continuity
Concrete joint surface prepared
for subsequent continuity CONSTRUCTION JOINTS Construction joints are not intended to accommodate movement across the joint but, due to the discontinuity of the concrete, some slight shrinkage may occur. This is reduced by proper preparation of the face of the first placed section of concrete to enhance adhesion between the two concrete faces. Joint preparation consists in removing the surface laitance from the concrete without disturbing the particles of aggregate. ※ CONSTRUCTION JOINTS It is preferable to carry out the treatment when the concrete is at least 5 days old, either by sandblasting or scabbling with a small air tool. The use of retarders painted on the formwork is not recommended, because of the possibility of contamination of the reinforcement passing through the end formwork. The face of construction joint must be flat. If a construction joint has been properly designed, prepared and constructed, it will retain liquid without a water-stop .※