JOB TITLE / AIM: JSA for concrete pouring using crane and concrete bucket includes night works
JSA DATE: 03/07/06 JSA NO./ REVISION: 122
SUPERVISOR/ JSA LEADER: Zafar Iqbal SCRIBE: Hernand Suyom
PARTICIPANTS : M. Ramzan, Abdul Khalique, Imtiaz Ghani
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of equipment & workers
- Crane
- Transit mixer
- Bucket
- Wire rope & shackle
2. QC inspection for concrete quality prior to pouring
3. Concrete pouring using crane includes transit mixer concrete unloading to concrete bucket
4. Night working
5. Demobilization
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE, S: First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment & Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
workers site that the E &P Personnel & BHP got inspected the
equipment. Checklist are in equipment
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
Ensure bringing of materials are secured and not
overloaded
Ensure a preparation area to keep the access clear
Workers starting the job unfit to work All personnel must undergo the fitness exam from
DEL company doctor & if not fit to work shall not
be allowed to work at the project site.
Workers starting the job without permit JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting
discussion. Persons signed at the back of JSA
Equipment failure Ensure equipment are being inspected prior to use
& on a daily basis
Ensure that banks person was provided prior to
mobilization
Equipment crane/transit mixer overturn
Ensure outrigger is fully extended, stable with
outrigger pad in place.
Ensure that bucket are check without leakage
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Ensure area to be secured and barricaded during
preparation and placement of extendable hose
Unauthorised operator Ensure that enough man power was provided
during preparation
Ensure that operator are trained and experience in
the concrete pump operation
Ensure that no unauthorised person shall operate
the machine and stay near the machine
Ensure that no leakage from the chute, the tire has
been choke to ensure no movement will take place
during concrete pouring
No other person shall stay under the concrete
bucket during pouring
Ensure tag line was in place
Ensure a experienced rigger who will be the one
man signal man during bucket positioning and
pouring
Bucket failure Ensure that the bucket pad eye are inspected and
no sign of defects
Ensure that bucket locking device are safe and
secured prior to lifting
Ensure to established loading area for bucket and
transit mixer
Ensure that are was secured and barricaded
unauthorised person should not be at the working
area
Uncertified lifting gears Ensure that lifting gears are certified and
inspected
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Traffic Ensure that traffic movement has been establish to
allow smooth movement of vehicle and eliminate
equipment collision
Ensure to establish a standby parking area to
eliminate the traffic
Ensure that transit mixer driver are being oriented
about the traffic flow and follow the site seatbelt
policy/speed limit policy
Ensure that MSDS for cement are available at
Doctors office
Equipment stuck up Ensure that equipment shall not access through
uneven/compacted soil
2 QC inspection for concrete quality Dust Ensure proper wetting of soil and workers are
prior to pouring wearing dust mask
Establish a check point for QC inspection
Heat Stress/Exhaustion Ensure that enough man power are present during
cement testing
Ensure enough ventilation and lighting are
available in testing area
Equipment failure
Ensure that concrete debris are contained in one
area
Ensure that a communication radio is available at
Miscommunication the area
Ensure that designated traffic man shall manage
the transit mixer movement and testing piece
sample preparation
No unauthorised person shall not allowed at the
testing area
Eye irritation/skin irritation Ensure workers are wearing hand gloves
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Ensure potable water/sufficient shelter is
available each area where workers are doing the
job. First aid kit available at site.
Ensure that equipment was inspected by
equipment supervisor & equipment inspection
Personnel & equipment interface
was in the equipment
5. Demobilization Poor Housekeeping Ensure that area was left clean and tidy