This document is a risk assessment from Gama For Trading and Contracting Co. for unloading materials by forklift. It identifies potential health and safety hazards, their effects, initial risk level, existing control measures, and residual risk level after controls. Key hazards include miscommunication leading to incorrect work, untrained forklift operators, personnel being struck, speeding, equipment failure, and dropped items during unloading. Control measures include proper permitting, trained operators, speed limits, pre-start checks, secured loads, barricades, and PPE. Implementation of controls reduces the risk level of all identified hazards to low or medium.

Uploaded by

mohamed ghaly
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
997 views2 pages

Risk Assessment Forklift

This document is a risk assessment from Gama For Trading and Contracting Co. for unloading materials by forklift. It identifies potential health and safety hazards, their effects, initial risk level, existing control measures, and residual risk level after controls. Key hazards include miscommunication leading to incorrect work, untrained forklift operators, personnel being struck, speeding, equipment failure, and dropped items during unloading. Control measures include proper permitting, trained operators, speed limits, pre-start checks, secured loads, barricades, and PPE. Implementation of controls reduces the risk level of all identified hazards to low or medium.

Uploaded by

mohamed ghaly
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Gama For Trading and Contracting Co.

‫شــــــركــــــــــــة جــــــــــــامـــــا للتــجارة والمقــــــــاوالت‬


RISK ASSESSMENT

Initial Risk
Activity

(With existing Residual Risk


Job Steps Health and Safety Hazards Effect controls) Control Measures
Risk Risk
S P R S P R
Level Level
Ensure all
necessary permits Miscommunication resulting in Asset /  Supervisor/ Foreman to discuss with discipline
are approved incorrect work type and duty equipment / 2 2 4 L supervisor(s) what works requirements are needed 2 1 2 L
prior to starting being built personal for the tasks to be performed
work.
 Supervisor to ensure only trained and authorised
Asset /
Untrained or inexperienced personnel operate such forklift.
equipment / 3 3 9 M 3 2 6 L
operators of forklift  A site inducted employee is to accompany or guide
personal
the forklift out of the construction site.
Personnel struck by moving
Unloading by Forklift

plant resulting from lack of  Operators are to check adequate clearance.


Personal 4 2 8 M 4 1 4 L
attention or being unable to  Co-ordinate personnel and forklift movements.
hear due to background noise
Asset /  Site inducted personnel to ensure driver complies
Speeding forklift equipment / 3 2 6 L with site speed limit 15km/h. 3 1 3 L
personal  Comply with speed limits at all times
 Conduct pre-start checks on forklift prior to
commencing work. Report any faults to
Equipment Failure Equipment 2 2 4 L Supervisor / Supervision shall not instruct or permit 1 2 2 L
any unauthorized personnel to be involved in
forklift working area.
 All items to be secured before unlading items.
 The height of the materials which will be
downloading not exceed the vision of forklift
Dropped items during Personal / operator.
2 3 6 L 2 2 4 L
unloading Equipment  Area to be closed and barricaded preventing
unauthorised entry of unloading activity.
 All personnel to wear PPE (helmet, safety shoes, hi-
vest, glasses, ……etc.)

Severity (S) Values: 1-5 Probability (P) Values: 1-5 Note: Use the RAM when determining the values of S and P
Risk (R) = S x P Risk Ranking: 1 – 6 = Low (L) 8 – 12 = Medium (M) 15 – 25: High (H) Page 1 of 2
Gama For Trading and Contracting Co.
‫شــــــركــــــــــــة جــــــــــــامـــــا للتــجارة والمقــــــــاوالت‬
RISK ASSESSMENT

Initial Risk
Activity

(With existing Residual Risk


Job Steps Health and Safety Hazards Effect controls) Control Measures
Risk Risk
S P R S P R
Level Level

Severity (S) Values: 1-5 Probability (P) Values: 1-5 Note: Use the RAM when determining the values of S and P
Risk (R) = S x P Risk Ranking: 1 – 6 = Low (L) 8 – 12 = Medium (M) 15 – 25: High (H) Page 2 of 2