0% found this document useful (0 votes)
41 views

CoCU 3

Uploaded by

ksina 1052
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

CoCU 3

Uploaded by

ksina 1052
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

CURRICULUM of COMPETENCY UNIT (CoCU)

Sub Sector CCTV SYSTEM


Job Area CCTV SYSTEM INSTALLATION & MAINTENANCE

Unit of Competency Title CCTV SYSTEM TESTING & COMMISSIONING


The person who is competent in this CU shall be able to compile the documents required for testing &
commissioning CCTV system equipment. Upon completion of this competency unit, trainees will be able to :-
 Compile checklists for inspection, testing and commissioning.
Learning Outcome
 Requisition tools and equipment for inspection, testing and commissioning.
 Perform inspection and/or testing and commissioning.
 Compile inspection, test and commissioning results.
Training Credit
Unit of Competency Code XX-XXX-XX Level 03 200 Hours
Duration Hours

Attitude / Training
Delivery Assessment
Work Activities Related Knowledge Related Skills Safety / Hours
Mode Criteria
Environmental
1. Compile check- i. Inspection checklist i. Obtain individual 20 Lecture i. Testing require-
list for inspec- ii. Testing checklist CCTV test result ments determ-
tion, testing iii. Testing requirement ii. ined
Obtain inspection
iv. Understand data ii. Schematic
and commis- checklist
v. Commissioning diagram
sioning iii. Interpret data determined
requirements
iii. CCTV system
30 faults listed out
Attitude & Safety Demonstration
and
 Adhere the Observation
procedure and
instruction
according
operational
manual
33
Attitude / Training
Delivery Assessment
Work Activities Related Knowledge Related Skills Safety / Hours
Mode Criteria
Environmental
Attitude / Safety Training Delivery Assessment
Work Activities Related Knowledge Related Skills
/ Environmental Hours Mode Criteria
2. Requisition i. Tools for visual 20 Lecture i. Tools and
tools and inspection equipment for
equipment for ii. Equipment for testing,
inspection, inspection inspection and
testing and iii. Tools for testing commissioning
commissioning iv. Equipment for are identified.
testing ii. Tools and
equipment
functionality
checked.
iii. Testing and
i. Select correct tools Attitude & Safety 30 Demonstration inspection
and equipment and checklist
ii. Ensure tools and  Handle wiring Observation prepared.
equipment tools,
functionality equipment
iii. Prepare checklist for and testing
inspection tools with
iv. Prepare checklist for care
testing  Ensure tools
and
equipment in
good working
condition

34
Attitude / Safety Training Delivery Assessment
Work Activities Related Knowledge Related Skills
/ Environmental Hours Mode Criteria
3. Perform in- i. CCTV system 20 Lecture i. Tools for
spection and/or visual inspection visual inspection
testing and  Location used.
adjustment ii. Visual inspec-
commissioning
ii. Functional test tion is performed.
 Image and sound iii. Testing and
output commissioning is
 Pan and tilt testing performed using
 Camera zoom test appropriate tools
& equipment.
iv. Proprietary
i. Use of visual Attitude & Safety 30 Demonstration tools and equip-
inspection tools and ments used for in-
Observation spection and
 Binoculars  Check
commissioning.
ii. Use of testing thoroughly for
equipment electrical fault
 Multimeter  Use
 Oscilloscope appropriate
 Hand held PPE (glove,
monitor goggle, safety
iii. Use of proprietary boot) during
hardware & carry out
software inspection

35
Attitude / Safety Training Delivery Assessment
Work Activities Related Knowledge Related Skills
/ Environmental Hours Mode Criteria
4. Compile i. Visual inspection 20 Lecture i. Inspection
inspection, test recording report secured.
and ii. CCTV system ii. Inspection /
commissioning equipment testing and
results functional test and commissioning
settings report compiled.
iii. Handover iii. All reports
documentation are handed over.

i. Compile visual 30 Demonstration


inspection report and
Observation
ii. Prepare final report
of inspection
iii. Handover
acceptance
certificate

36
Employability Skills

Core Abilities Social Skills

01.01 Identify and gather information 1. Communication skills


01.04 Analyze information 2. Conceptual skills
01.07 Utilize database applications to locate and process information 3. Interpersonal skills
02.01 Interpret and follow manuals, instructions and SOP’s 4. Learning skills
02.04 Prepare brief reports and checklist using standard form 5. Leadership
03.05 Demonstrate safety skills 6. Multitasking and Prioritizing
06.02 Comply with and follow chain of command 7. Self-discipline
06.01 Understand system 8. Teamwork
06.03 Identify and highlight problems
06.05 Analyze technical systems

Tools, Equipment and Materials (TEM)

ITEMS RATIO ( ITEM : TRAINEES)


1. Schematic diagram 1:1
2. Block Diagram 1:1
3. Measuring and Test Instruments 1:1
4. Components/Parts Specification 1:1
5. Lighting Equipment 1:1
6. Electrical Mechanical tools 1:1
7. Electrical hand tools 1:1
8. Electrical power tools 1:1
9. Lighting Accessories 1:1

37
References

REFERENCES

1. CCTV Installation guidelines – Salford City Council


2. Joshi. (2008). Residential, Commercial and Industrial Electrical Systems: Protection, testing and commissioning. Tata McGraw-Hill Education.
3. Keith Harker. (1998). Power System Commissioning And Maintenance Practice. IET
4. Undang-Undang Malaysia. 2005. Akta Bekalan Elektrik 1990 dan Peraturan-Peraturan Elektrik 1994, Pindaan sehingga 2005. MDC Publisher Sdn
Bhd Malaysia. 
5. CCTV for Security Professionals – Alan Matchett

38