Lab 2
Lab 2
1 2 3 4 5 6 7 8
Length
Total
Area served Pop density
From MH To MH
Sr. No. area
On line Previous (5+6)
ft
WATER SUPPLY AND WASTE WATER ENGINNERING LAB BY ALEENA AZ
9 10 11 12 13 14 15 16 17 18
Peak dry
Total pop Design
Pop served Infilt. (5-10 weather flow
Av. daily
Other pop. % of Av. Peak factor Storm flow V full
sewage flow
(9+10) Day) (q) flow
(7x8) (13+15+16)
Persons Persons Persons cusec cusec cusec cusec cusec cusec ft/sec
B BY ALEENA AZAM ( 2019-EN-5)
19 20 21 22 23 24 25 26 27 28
d
Dia
v
Ground level
Slope Q full q/Qfull d/D v / Vfull
U/E
Inch cusec Inches ft/sec ft ft
29 30 31