This welding procedure or Method statement describes in detail the welding process for pipe work and the welder’s
quali cation test procedures. This includes addressing programs for implementing commitments regarding the
quality of welding works.
Get found with
Google advertising. Scope and Purpose
This document outlines the method for executing welding procedure for pipe work and welding procedure
Start now quali cation test for ARC Welder. This method statement covers all piping welding works for Project either shop
fabricated or site installed.
With 300 AED credit.*
The procedure provides guidance for assessing the activities for jointing mechanical piping system. This guidance is
based on the requirements set forth in the Safety Requirement Document (SRD) and The Quality Assurance Program
(QAP).
Objectives
This document provides guidance in implementing an e ective program for pipe welding works. This includes addressing programs for the following:
This and other procedures will be used, as needed, to provide assurance that construction activities are being conducted as required by the speci cation and
manufacturer procedures. It is not expected that completion of the entire procedure will be accomplished during any one inspection and/or every time the inspection
procedure is used.This
Privacy & Cookies: It issite
a continuing activity
uses cookies. until alltopiping
By continuing networks
use this website, are
you installed and use.
agree to their tested.
Close and accept
To nd out more, including how to control cookies, see here: Cookie Policy
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 1/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
Inspection and Recording Requirements
The engineer should verify that the supervisor/foreman with construction responsibilities for the pipe welding works is familiar with this method statement and
is issued with copies of the inspection checklists and test plans. The engineer should satisfy procedures provided by QA/QC inspections to ensure the pipe welding
works meet speci ed engineering requirements and drawings. As part of the assessment, the QC Inspection Procedures, must ensure a quantitative or
qualitative acceptance criteria for determining the prescribed activities have been accomplished satisfactorily.
The QC inspection personnel, in coordination with Site Supervisor, should verify that the quality of the pipe welding works and related testing activities are within the
project design speci cations requirements. The Supervisor should verify that the pipe welding works is accomplished in accordance with the speci cations and the
manufacturer’s procedures. The Supervisor should verify any as-built record of pipe welding works and testing, and con rm that the information meets the project
requirements.
Inspection Guidance
Pipe welding works need to follow strictly established codes and safety procedures. Care should be taken to ensure that applicable codes and standards be strictly
adhered to during pipe welding works. The Supervisor can choose to follow the most appropriate welding technique applicable at such a given time and in coordination
with the construction progress, QA/QC inspection and testing requirements. The Engineers should use judgment in determining sample selection focusing on
examination of the most important aspects of the particular welding activity being inspected. The intent is to establish a high level of assurance that the end product
meets the project requirements. Review the implementing procedures and safety standards for the pipe welding works provided by the QA/QC. The QA/QC inspectors
should verify that the procedures are approved, and specify the requirements of the design and/or from the manufacture’s technical manual(s) and codes or standards
prescribed by the Client.
The Supervisor should verify that the personnel have su cient knowledge of the procedure requirements. The Supervisor should review any training and
quali cation records for those individuals who shall do the task to determine whether they are skilled enough to follow the procedure before the actual work is carried
out.
Description of Activities
General
Check all pipes and ttings to be used for joint are free from defects, dents or deformities and are straight. Remove pipes and ttings with defects and replace
with acceptable materials.
Remove foreign matter or dirt from inside of the pipe and ttings before t up.
For longer work breaks, place suitable stoppers to prevent debris, earth or water from entering pipe open ends.
Welding electrodes shall be stored and handled as per Manufacturer’s instructions.
Cut the pipes to the required length using an appropriate pipe cutter, or pro le cutter (Oxy-Acetylene), allowing for provision of pipe tting later. Works shall be
carried out in accordance with the approved shop drawings.
Privacy & Cookies:
The This be
pipes shall sitechecked
uses cookies.
by theBy assigned
continuingforeman
to use thisfor
website, you agreeand
its squareness to their use.
straightness, after being cut to the correct angle and site requirements,
Closeasand
peraccept
sample
To nd out more, including how to control cookies, see here: Cookie Policy
of welding details in Figure
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 2/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
shown below.
Lay the two pipes on top of the pipe stand or adjustable support, with each pipe ends aligned near each other using adjustable bolt stopper as shown on Figure 2 below.
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 3/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 4/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
Tack weld in place both the pipe and tee.
Figure 5 – Tee to Pipe Fit Up
Note : For larger sizes only, 4”dia. and above
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To nd out more, including how to control cookies, see here: Cookie Policy
Close and accept
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 5/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
TYPICAL DETAILS OF ADJUSTABLE BOLT STOPPER USE FOR PIPE FIT UP and ALIGNMENT
Note : For larger sizes only, 4”dia. and above
A. Boom truck
B. Chain blocks (1Ton – 5Ton Cap.)
C. A-frame (steel fabricated)
D. Nylon sling or straps (New and tested)
E. Set of shackles
F. Adjustable bolt stopper
G. Adjustable pipe supports
H. Spirit level
I. Alignment Tools (Plumb Bob, Chalk line, Nylon String Line, Felt Tip Marker)
J. Welding Personnel Protective Equipments
K. Hand tools
M. Steel measuring tape
N. Angle & Straight Grinders
O. Welding Machines
P. Steel Sca olding and Ladders
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 6/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
– Ensure all workers involved in the hauling operation put on PPE all times.
– Brief individual worker the roles and responsibilities of each.
– Ensure transporter route is cleared of obstruction.
– Coordinate with Construction Department for Pipe Hoisting area.
– Ensure designated hoisting area is cleared of obstruction.
– The lorry transporting the pipes will be guided to the designated hoisting area and released all the latching belts only after the lorry parked rmly.
Pipe Lifting
– Ensure safe work procedure for lifting operation is observed.
– Ensure proper lifting method – with the correct equipments are used.
– Ensure the pipes are rmly placed on the designated location before releasing the hoisting hook.
During Site Execution
– Ensure workers are distributed to each designated place.
– Ensure workers at all times to be in proper gear where required.
– Ensure all workers assigned are involved in its particular task.
– Brief individual worker the roles and responsibilities before start work.
– Ensure the pipe lengths to suit site routes into designated work area.
– Ensure pipe support systems are installed accordingly as required.
– Ensure all tools to be used have been inspected and tag by Safety Dept.
– Ensure work areas are clearly marked to restrict access to authorized personnel only.
– Ensure that equipments to be used are properly tagged and checked.
– Ensure that arc welders are quali ed, with the correct PPEs, and well versed on the job at hand with the latest revised drawing/s.
Housekeeping
– Maintain cleanliness and orderly stocking of materials & tools.
– Pick up and dispose wastes & other debris prior to leaving site area.
– Remove safety yellow tape or other warning devices that were used to control access to the work area.
– Store tools, equipment and unused materials properly at the end of the workday.
Safety Inspections
– It shall be responsibility of the Supervisor to routinely inspect the physical areas under their control in pipe welding procedure. This inspection shall include
determining if pipes, supports, sca olds and ladders are appropriately installed and/or use, and if the job site is cleaned up after the day’s work.
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 7/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
Related
Types of Welding WPS, CWB Arc Welding Tig METHOD STATEMENT FOR BRAZING & JOINTING Download Welding Procedure Speci cation WPS &
Welding OF COPPER PIPES Procedure Quali cation Record PQR
In “Method Statements” In “HVAC Building Construction Method In “Construction Method Statements”
Statements”
Like
Category: Method Statements Piping Works Tags: arc welding , pqr , welder , welding procedure , welding supplies , wps
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To nd out more, including how to control cookies, see here: Cookie Policy
Close and accept
https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 8/8