Welding Procedure - Arc Welding Machine - Method Statement HQ

This document outlines welding procedures for pipe work and qualification testing for arc welders. It describes preparing pipe joints, fitting pipes together, and welding requirements. The supervisor must ensure welders are qualified and verify that welding meets quality standards by following inspection checklists and test plans. Welding must be done according to applicable codes and specifications.

Uploaded by

Saaed Ellala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
395 views

Welding Procedure - Arc Welding Machine - Method Statement HQ

This document outlines welding procedures for pipe work and qualification testing for arc welders. It describes preparing pipe joints, fitting pipes together, and welding requirements. The supervisor must ensure welders are qualified and verify that welding meets quality standards by following inspection checklists and test plans. Welding must be done according to applicable codes and specifications.

Uploaded by

Saaed Ellala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ

Welding Procedure | Arc Welding Machine


By Web Master | October 12, 2016 0 Comment

Like

This welding procedure or Method statement describes in detail the welding process for pipe work and the welder’s
quali cation test procedures. This includes addressing programs for  implementing commitments regarding the
quality of welding works.
Get found with
Google advertising. Scope and Purpose
This document outlines the method for executing welding procedure for pipe work and  welding procedure
Start now quali cation test for ARC Welder. This method statement covers all  piping welding works for Project either shop
fabricated or site installed.
With 300 AED credit.*
The procedure provides guidance for assessing the activities for jointing mechanical piping system. This guidance is
based on the requirements set forth in the Safety Requirement Document (SRD) and The Quality Assurance Program
(QAP).

Objectives
This document provides guidance in implementing an e ective program for pipe welding works. This includes addressing programs for the following:

implementing commitments regarding the quality of the weld joints;


managing and providing oversight to ensure installation and related quality control have been adequately addressed by speci cations, drawings, and procedures;
managing and providing supervision and control to assure quali cation of arc welder or tig welder
recording tig / arc welding works and test activities.

This procedure is one component of a complete construction and inspection program.

                                               Arc Welding Machine

This and other procedures will be used, as needed, to provide assurance that construction  activities are being conducted as required by the speci cation and
manufacturer procedures. It is not expected that completion of the entire procedure will be accomplished during any one inspection and/or every time the inspection
procedure is used.This
Privacy & Cookies: It issite
a continuing activity
uses cookies. until alltopiping
By continuing networks
use this website, are
you installed and use.
agree to their tested.
Close and accept
To nd out more, including how to control cookies, see here: Cookie Policy

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 1/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
Inspection and Recording Requirements
The engineer should verify that the supervisor/foreman with construction  responsibilities for the pipe welding works is familiar with this method statement and
is  issued with copies of the inspection checklists and test plans.  The engineer should satisfy procedures provided by QA/QC inspections to ensure the  pipe welding
works meet speci ed engineering requirements and drawings. As part of  the assessment, the QC Inspection Procedures, must ensure a quantitative or
qualitative acceptance criteria for determining the prescribed activities have been accomplished satisfactorily.

The QC inspection personnel, in coordination with Site Supervisor, should verify that the quality of the pipe welding works and related testing activities are within the
project  design speci cations requirements.  The Supervisor should verify that the pipe welding works is accomplished in  accordance with the speci cations and the
manufacturer’s procedures.  The Supervisor should verify any as-built record of pipe welding works and testing, and  con rm that the information meets the project
requirements.

Inspection Guidance
Pipe welding works need to follow strictly established codes and safety procedures.  Care should be taken to ensure that applicable codes and standards be strictly
adhered to during pipe welding works. The Supervisor can choose to follow the most appropriate welding technique applicable at such a given time and in coordination
with the construction progress, QA/QC  inspection and testing requirements. The Engineers should use judgment in determining  sample selection focusing on
examination of the most important aspects of the particular welding activity being inspected. The intent is to establish a high level of assurance that the end product
meets the project requirements. Review the implementing procedures and safety standards for the pipe welding works provided by the QA/QC. The QA/QC inspectors
should verify that the procedures are approved, and specify the requirements of the design and/or from the manufacture’s technical manual(s) and codes or standards
prescribed by the Client.

Training and Quali cation of Arc Welder

The Supervisor should verify that the personnel have su cient knowledge of the  procedure requirements. The Supervisor should review any training and
quali cation records for those individuals who shall do the task to determine whether they are skilled enough to follow the procedure before the actual work is carried
out.

Preparation of Materials and Execution of Works for welding procedure:


• General
• Pipe Joint Preparation
• Pipe to Pipe Fit Up
• 45° Elbow to Pipe Fit Up
• 90° Elbow to Pipe Fit Up
• Tee to Pipe Fit Up
• Flange to Pipe Fit Up

Welding Procedure Quali cation Test Requirements


• Welding Process
• Base Metals
• Filler Metals
• Position of Groove & Weld Progression
• Temperature Requirements
• Postweld Heat Treatment
• Type of Gas
• Electrical Characteristics
• Travel Speed & Passes
• Laboratory Test Results

Description of Activities

General

Check all pipes and ttings to be used for joint are free from defects, dents or deformities and are straight. Remove pipes and  ttings with defects and replace
with acceptable materials.
Remove foreign matter or dirt from inside of the pipe and ttings before t up.
For longer work breaks, place suitable stoppers to prevent debris, earth or water from entering pipe open ends.
Welding electrodes shall be stored and handled as per Manufacturer’s instructions.

Pipe Joint Preparation

Cut the pipes to the required length using an appropriate pipe cutter, or pro le cutter (Oxy-Acetylene), allowing for provision of pipe tting later. Works shall be
carried out in accordance with the approved shop drawings.
Privacy & Cookies:
The This be
pipes shall sitechecked
uses cookies.
by theBy assigned
continuingforeman
to use thisfor
website, you agreeand
its squareness to their use.
straightness, after being cut to the correct angle and site requirements,
Closeasand
peraccept
sample
To nd out more, including how to control cookies, see here: Cookie Policy
of welding details in Figure

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 2/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
shown below.

Pipe to Pipe Fit Up

Lay the two pipes on top of the pipe stand or adjustable support, with each pipe ends aligned near each other using adjustable bolt stopper as shown on Figure 2 below.

Note : For larger sizes only, 4”dia. and above

Level one length of pipe using spirit level.


Bring lengths together leaving only a small welding gap. In normal practice, a welding electrode of 2.4 mm Ø size, removed of its covering and bent in the middle
at an angle of 30° is inserted between the two pipes to obtain a perfect welding gap. It is recommended to weld adjustable bolt stoppers (small piece of plate
about 12 mm thick with an M-16 hexagon bolt and nut welded at one end as shown in Figure 2) for perfect and easy alignment.
Remove the adjustable bolt stoppers after t up and grind ush all tack welded points making sure that there is no over grinding of the base metal.
Place the spirit level over both pipes as shown on Figure 2 and maneuver until both pipes are leveled. Adjusting the pipe support can easily do this. Ensure that
there is no high-low situation or misalignment between the two outside surfaces.
Tack weld at the top and bottom.
Rotate the pipes 90°.
Repeat the same procedure.

45° Elbow to Pipe Fit Up


Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To nd out more, including how to control cookies, see here: Cookie Policy
Close and accept

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 3/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ

Lay one pipe on top of the adjustable pipe support.


Level the pipe using spirit level.
Place the 45° elbow to the end of the pipe leaving a small welding gap, similar to item 4.3.3 for Pipe to Pipe t up.
Place a 45° spirit level on the face of the elbow until bubble is centered and ensure that there is no high-low situation or misalignment between the two outside
surfaces.
Tack weld in place both the pipe and the elbow
Note : For larger sizes only, 4”dia. and above

90° Elbow to Pipe Fit Up

Lay one pipe on top of the adjustable pipe supports.


Level the pipe using spirit level.
Place the 90° elbow to end of the pipe leaving a small welding gap the same as item 4.3.3 for Pipe to Pipe Fit up.
Place a spirit level on the face of the elbow and maneuver the elbow until it is leveled and ensure that there is no high-low situation or misalignment between the
two outside surfaces.
Tack weld in place both the pipe and elbow.
Figure 4 – 90° Elbow to Pipe Fit Up
Note : For larger sizes only, 4”dia. and above

Tee to Pipe Fit-Up

Lay one pipe on top of the on the adjustable Pipe supports.


Level the pipe using spirit level.
Place the tee at the end of the pipe leaving a small welding gap the same as item 4.3.3 for Pipe to Pipe t up.
Place a spirit level on the face of the tee and maneuver the tee until leveled and ensure that there is no high-low situation or misalignment between the two
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To ndoutside surfaces.
out more, including how to control cookies, see here: Cookie Policy
Close and accept

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 4/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
Tack weld in place both the pipe and tee.
Figure 5 – Tee to Pipe Fit Up
Note : For larger sizes only, 4”dia. and above

Flange to Pipe Fit-Up

Lay one pipe on top of the adjustable pipe support.


Level the pipe using spirit level.
Bring the ange at the end of the pipe leaving a small welding gap the same as item 4.3.3 for Pipe to Pipe t-up (In case a Weld neck type of ange is used). If a
slip-on type of  ange is to be used, insert the pipe to the ange bore up to 5mm depth from the ange face to give enough space for a  llet weld.
Align the top two (2) holes of the ange with the spirit level.
Tack weld in place the pipe and ange.

Figure  – Flange to Pipe Fit Up

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To nd out more, including how to control cookies, see here: Cookie Policy
Close and accept

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 5/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ

TYPICAL DETAILS OF ADJUSTABLE BOLT STOPPER USE FOR PIPE FIT UP and ALIGNMENT
Note : For larger sizes only, 4”dia. and above

List of Main Welding Equipment, Tools, Instruments

A. Boom truck
B. Chain blocks (1Ton – 5Ton Cap.)
C. A-frame (steel fabricated)
D. Nylon sling or straps (New and tested)
E. Set of shackles
F. Adjustable bolt stopper
G. Adjustable pipe supports
H. Spirit level
I. Alignment Tools (Plumb Bob, Chalk line, Nylon String Line, Felt Tip Marker)
J. Welding Personnel Protective Equipments
K. Hand tools
M. Steel measuring tape
N. Angle & Straight Grinders
O. Welding Machines
P. Steel Sca olding and Ladders

Health, Safety and Environment Measures


Preparation
Notify
Privacyall concerned
& Cookies: Thisin site
site forcookies.
uses the dateByof materialtodelivery.
continuing use this website, you agree to their use.
Close and accept
–To
Coordinate withincluding
nd out more, Safety Department
how to controlfor delivery
cookies, see trucks accessPolicy
here: Cookie routes.

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 6/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ
– Ensure all workers involved in the hauling operation put on PPE all times.
– Brief individual worker the roles and responsibilities of each.
– Ensure transporter route is cleared of obstruction.
– Coordinate with Construction Department for Pipe Hoisting area.
– Ensure designated hoisting area is cleared of obstruction.
– The lorry transporting the pipes will be guided to the designated hoisting area and released all the latching belts only after the lorry parked rmly.
Pipe Lifting
– Ensure safe work procedure for lifting operation is observed.
– Ensure proper lifting method – with the correct equipments are used.
– Ensure the pipes are rmly placed on the designated location before releasing the hoisting hook.
During Site Execution
– Ensure workers are distributed to each designated place.
– Ensure workers at all times to be in proper gear where required.
– Ensure all workers assigned are involved in its particular task.
– Brief individual worker the roles and responsibilities before start work.
– Ensure the pipe lengths to suit site routes into designated work area.
– Ensure pipe support systems are installed accordingly as required.
– Ensure all tools to be used have been inspected and tag by Safety Dept.
– Ensure work areas are clearly marked to restrict access to authorized personnel only.
– Ensure that equipments to be used are properly tagged and checked.
– Ensure that arc welders are quali ed, with the correct PPEs, and well versed on the job at hand with the latest revised drawing/s.
Housekeeping
– Maintain cleanliness and orderly stocking of materials & tools.
– Pick up and dispose wastes & other debris prior to leaving site area.
– Remove safety yellow tape or other warning devices that were used to control access to the work area.
– Store tools, equipment and unused materials properly at the end of the workday.

Safety Inspections
– It shall be responsibility of the Supervisor to routinely inspect the physical  areas under their control in pipe welding procedure. This inspection shall  include
determining if pipes, supports, sca olds and ladders are appropriately installed and/or use, and if the job site is cleaned up after the day’s work.

INSPECTION CHECKLIST FOR WELDING MONITORING


Report No. :…………
Contractor’s Name :….… ………….
Description of Works : ..…Pipe Welding……….
Reference No. : …………………………….
Date Prepared : ……………………………
Speci c Location……………………………… Inspection Requested : Date …………… Time
…………….
ITEMS TO BE PERFORMED Accept Reject Hold Remarks
1. WELDING ELECTRODES & CONSUMABLES
1.1 Type of Consumables
1.2 Type used is per approved submittal (Yes/No)
1.3 Storage condition & handling satisfactory

2. WELDING PROCEDURE MONITORING


2.1 Type of Joint
2.2 Joint Alignment
2.3 Champer uniform & free of ripples or notches
2.4 Root Face ( height per approved WPS )
2.5 Tack welds
2.6 Root gap and free from foreign matter
2.7 Interpass cleaning & slag removal
2.8 Root Pass inspection
2.9 Interpass temperature
2.10 Electrical requirements
2.11 Welding speed & number of passes
2.12 Welding Process (SMAW/GTAW/SAW/GMAW)

3. VISUAL WELDING INSPECTION


3.1 Welder stamp identi ed (Hard Stamped)
3.2 Joint Number
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
3.3 Welds acceptability per code Close and accept
To nd out more, including how to control cookies, see here: Cookie Policy
3.4 Width & height of capping pass acceptable

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 7/8
4/22/2019 Welding Procedure | Arc Welding Machine - Method Statement HQ

1 (ً‫ )ﻣﺟﺎﻧﺎ‬PDF ‫ﺗﻧزﯾل‬

ّ ،PDF ‫ﻟﻌرض ﻣﻠف‬


FromDocToPDF ‫ﻧزﻟﮫ ﻣن ھﻧﺎ‬

2 Download Template (Free)

Find Templates, Download Now FreeTemplateFinder

Join Our Blog for Latest Method Statements.

Enter your email address: JOIN

Related

Types of Welding WPS, CWB Arc Welding Tig METHOD STATEMENT FOR BRAZING & JOINTING Download Welding Procedure Speci cation WPS &
Welding OF COPPER PIPES Procedure Quali cation Record PQR
In “Method Statements” In “HVAC Building Construction Method In “Construction Method Statements”
Statements”

Like

Category: Method Statements Piping Works Tags: arc welding , pqr , welder , welding procedure , welding supplies , wps

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To nd out more, including how to control cookies, see here: Cookie Policy
Close and accept

https://methodstatementhq.com/welding-procedure-arc-welding-machine.html 8/8

You might also like