0% found this document useful (0 votes)
12 views

4

The document discusses a contractor's quality management system and resources for a construction project. It outlines requirements for senior management reviews, notifying the company of review results, designating quality managers, and providing qualifications of quality personnel.

Uploaded by

Riaz Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

4

The document discusses a contractor's quality management system and resources for a construction project. It outlines requirements for senior management reviews, notifying the company of review results, designating quality managers, and providing qualifications of quality personnel.

Uploaded by

Riaz Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE "Q" CONTRACT NO.

6600041347

to ensure that the System is suitable, adequate and effective. Senior


Management reviews as a minimum, addressing the interactions of the
items provided in Paragraph 7.1.1 of this Schedule "Q", shall be scheduled
events included in the quality audit schedule Approved by the Company
Representative as provided in Paragraph 7.3.2 of this Schedule "Q".

4.2 Within two (2) weeks after the scheduled review date, CONTRACTOR shall
advise the COMPANY Representative in writing of the results and
recommended actions of such reviews. Changes to the Quality
Management System that result from CONTRACTOR's Senior
Management reviews shall be incorporated in the project Quality Plans, with
the approval of the COMPANY Representative.

5 RESOURCE MANAGEMENT

5.1 CONTRACTOR shall provide sufficient resources to implement the Quality


Management System as set forth in this Contract. For all procurement,
construction, Pre-Commissioning and Commissioning activities, sufficient
COMPANY-Approved Quality personnel shall be on-site prior to the start of
the applicable WORK. As a minimum, the ratio of the CONTRA~
Subcontractors skilled manpower to the ~ion personnel is to 1:50
for Civil and Architectural disciplines, an~,or other disciplines.

5.2 CONTRACTOR shall designate the QAlQC Manager for this Contract within
seven (7) calendar days of the Effective Date of this Contract. The QAlQC
Manager shall be assIgned to the WORK through Project Completion.

5.3 A Procurement Quality Control Manager or Supervisor shall be assigned to ft2..s


the WORK within thirty (30) days of the Effective Date of the Contract and
shall be assigned to the WORK through Project Completion.

5.4 CONTRACTOR, Subcontractors and third party agency Quality personnel


assigned to the WORK shall meet the minimum qualification requ irements
set forth in Paragraph 8 of this Schedule "Q", and must be technically
competent to perform their duties.

5.5 CONTRACTOR shall verify and provide resumes and all associated
certifications in legible format of all CONTRACTOTt and Subcontractor
Uuahty personnel to COMPANY for review and Approval prior to the start
of work for each individual. COMPANY shall have the right to interview
and/or test assigned inspectors. COMPANY has the right to reject
proposed candidates if they do not comply with the requirements in
Paragraph 8 of this Schedule "Q" or if COMPANY has had prior poor
experience with such candidates. - ,

Q-4
MP-CV-LSTK, MP-CV-IK-LSPB 12/15