HSE-PRO-09-D01 0.2 - Interested Party Needs and Expectations 2020 HSE (NEW ONE)
HSE-PRO-09-D01 0.2 - Interested Party Needs and Expectations 2020 HSE (NEW ONE)
Owner Name: Panagiotis Christodoulou Project: Central Facility Yard-Cyprus Date: 19 Mar 2018 (Workshop date)
S/N Interested parties Internal/External Needs and expectations Evidence Compliance Obligations Notes
Owner Name: Panagiotis Christodoulou Project: Central Facility Yard-Cyprus Date: 19 Mar 2018 (Workshop date)
S/N Interested parties Internal/External Needs and expectations Evidence Compliance Obligations Notes
Documented Complaints
Acceptable performance due to proximity, No
Health and Safety Training
nuisance from dust, noise, odour, smoke etc.,
Attendance, 01029-HSE-PRO-
6.a Neighbor: VTTV Oil Terminal External Health and Safety None
04-F06
Services to terminal ( supply of skilled labour
Training Assessments, HSE-
and equipment )
PRO-04-F09
Owner Name: Panagiotis Christodoulou Project: Central Facility Yard-Cyprus Date: 19 Mar 2018 (Workshop date)
S/N Interested parties Internal/External Needs and expectations Evidence Compliance Obligations Notes
Acceptable performance due to proximity, No
nuisance from dust, noise, odour, etc. Health
and Safety Support
Neighbor: Electricity Authority Power for the maintenance of the single point
6.c External Documented Complaints None
Plant mooring -SPM ( supply of skilled labour and
equipment ) as per EAC standards within the
timeframe . Comply with COVID-19
requirements
Acceptable performance due to proximity, No
6.d Neighbor: Petrolina Oil Company External Documented Complaints None
nuisance from dust, noise, odour, etc.
Acceptable performance due to proximity, No
Neighbor: Fish Farms (Telia and Blue
6.e External nuisance from dust, noise, odour, Marine Documented Complaints None
Island)
water contamination prevention.
Applicable
Improvement proposals, Compliance and Improvement proposals, Compliance and requirements are
8 Steering Committee Internal Minutes of Meeting
performance updates performance updates included in the 09018-
HSE-PRO-09-F02
Applicable
External certification bodies for Compliance to ISO14001 Environmental Compliance to ISO14001 Environmental requirements are
9 External Third party audit reports
ISO14001 standards standards included in the 09018-
HSE-PRO-09-F02
Owner Name: Panagiotis Christodoulou Project: Central Facility Yard-Cyprus Date: 19 Mar 2018 (Workshop date)
S/N Interested parties Internal/External Needs and expectations Evidence Compliance Obligations Notes
Owner Name: Panagiotis Christodoulou Project: Central Facility Yard-Cyprus Date: 19 Mar 2018 (Workshop date)
S/N Interested parties Internal/External Needs and expectations Evidence Compliance Obligations Notes
Maintenance and repair works execution Maintenance and repair works execution
Trainings, Toolbox talks
smoothly and on time without smoothly and on time without
Dry Docking services for the projects ,Drills, Minutes of Meeting, ARCO IMS
17 Internal incidents/accidents. Health and Safety Comply incidents/accidents. Comply with covid-19
preparations ( ARCO Vessels ) Safety Representative Requirements
with covid-19 requirements as per ministry of requirements as per ministry of health,
Meeting
health, government instructions. government instructions.
Applicable
External certification bodies for Compliance to ISO45001 International Compliance to ISO45001 International requirements are
18 External Third party audit reports
ISO45001 Standards standards Standards included in the 09018-
HSE-PRO-09-F02
Invoices Aggrements
19 Naval Base External Support for Naval Base Army . ,equipment transfer , Support for Naval Base Army
inspection report
ARCHIRODON CONSTRUCTION ( OVERSEAS ) COMPANY LIMITED
Health, Safety & Environment (HSE)
Integrated Management System Rev
Issued For Internal Use Only
Reference No. 09018-HSE-PRO-09-D01 0.2
DOCUMENT TEMPLATE Serial No. 20200519-01 0.3
Interested Party needs and expectations Page
Owner Name: Panagiotis Christodoulou Project: Central Facility Yard-Cyprus Date: 19 Mar 2018 (Workshop date)
S/N Interested parties Internal/External Needs and expectations Evidence Compliance Obligations Notes
Owner Name: Panagiotis Christodoulou Project: Central Facility Yard-Cyprus Date: 19 Mar 2018 (Workshop date)
S/N Interested parties Internal/External Needs and expectations Evidence Compliance Obligations Notes