Eil Daily Safety Checklist

Uploaded by

Avesh Chauahan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
287 views2 pages

Eil Daily Safety Checklist

Uploaded by

Avesh Chauahan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB SPECIFICATION FOR HEALTH, JOB SPECIFICATION No.

SAFETY & ENVIRONMENT MANAGEMENT


B224/B229-6-82-0001Rev. 0
AT RAJSTHAN REFINERY PROJECT
SITES Page 95 of 96

FORMAT NO. : HSE-20 REV 0

HOT WORK PERMIT

Permit No…………….. Exact Location of work……………………………………………………


Name of Main Contractor………. Name of work executing agency/sub agency/vendor……………….
Date…………………… Duration of work (from) …………..…hrs (to) ………............hrs.
Nature of work ……………………………………..……………………………………………………………..

SL. Compliance Status


Description of Item
No. Yes No NA

1) Are water hoses or fire extinguishers available and in good repair?

2) Is hot work equipment in good repair?

3) Have flammable liquids, combustible materials & oily deposits within


10m been removed?

4) Have explosive atmosphere been eliminated? Test results:

5) Has the work surface area been cleaned of grease, paint, etc.?

6) Have combustible floors been wet down, covered with damp sand or
covered with fire resistant sheets?

7) Have surface areas below work area been protected?

8) Have access ways below work area been barricaded?

9) Are UV shields in place?

10) Has enclosed equipment been cleansed of all combustibles?

11) Have all containers been purged of flammable liquids and vapors?

12) Will fire watch be provided during and for 60 minutes after work,
including coffee and/or lunch breaks?

13) Has fire watch been provided with suitable fire extinguishing
devices?

14) Has the fire watch person been trained in use of fire extinguishing
devices & in sounding alarm or other emergency communications?

15) Has additional fire watch been assigned to adjoining areas, above
and below?

16) Hot work area will be monitored for 4 hours after completion of
work?

17) Dangerous simultaneous operations like painting, etc. are prohibited


near-by?

18) Sprinkler heads and smoke detectors in close proximity to the hot
work are covered.

19) Any other precaution:

20) Any other precaution:

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved


JOB SPECIFICATION FOR HEALTH, JOB SPECIFICATION No.
SAFETY & ENVIRONMENT MANAGEMENT B224/B229-6-82-0001Rev. 0
AT RAJASTHAN REFINERY PROJECT
SITES Page 96 of 96

Above items have been checked & compliance has been found in place. Hence work is permitted to
start / continue at the above-mentioned location. Work shall not start till identified lapses rectified.

Work Permit issued by Verification by Review by EIL

Contractor Engineer/RCM Contractor Safety Officer Field Engineer/Safety officer

GRANT OF PERMIT AND EXTENSIONS

Time Reviewer
Issued By
Verification by (EIL / Owner)
Date (Site Engr./RCM (Safety Officer of
From To of Main Main Contractor)
Contractor)
Remarks with date

CLOSING OF PERMIT

Certified that the subject work has been completed / stopped and area cleared.

Signature

Name
Date
Time
Designation Engineer/RCM of Main Contractor Safety Officer of Main Contractor

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved