Eil Daily Safety Checklist
Eil Daily Safety Checklist
5) Has the work surface area been cleaned of grease, paint, etc.?
6) Have combustible floors been wet down, covered with damp sand or
covered with fire resistant sheets?
11) Have all containers been purged of flammable liquids and vapors?
12) Will fire watch be provided during and for 60 minutes after work,
including coffee and/or lunch breaks?
13) Has fire watch been provided with suitable fire extinguishing
devices?
14) Has the fire watch person been trained in use of fire extinguishing
devices & in sounding alarm or other emergency communications?
15) Has additional fire watch been assigned to adjoining areas, above
and below?
16) Hot work area will be monitored for 4 hours after completion of
work?
18) Sprinkler heads and smoke detectors in close proximity to the hot
work are covered.
Above items have been checked & compliance has been found in place. Hence work is permitted to
start / continue at the above-mentioned location. Work shall not start till identified lapses rectified.
Time Reviewer
Issued By
Verification by (EIL / Owner)
Date (Site Engr./RCM (Safety Officer of
From To of Main Main Contractor)
Contractor)
Remarks with date
CLOSING OF PERMIT
Certified that the subject work has been completed / stopped and area cleared.
Signature
Name
Date
Time
Designation Engineer/RCM of Main Contractor Safety Officer of Main Contractor