0% found this document useful (0 votes)
86 views

w0167 Pre

self contained douplex

Uploaded by

Kandeke Davies
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

w0167 Pre

self contained douplex

Uploaded by

Kandeke Davies
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ELECTRICAL LEGEND GENERAL NOTES:

SYMBOL DESCRIPTION QUANTITY * COPYRIGHTS RESERVED.


* DESIGN OR DRAWING NOT TO BE USED WITHOUT WRITTEN
1 Pole Light switch 1240 above floor level.
PERMISSION
2 Pole Light switch 1240 above floor level.
* NO DIMENSIONS ARE TO BE SCALED FROM THIS DRAWING
3 Pole Light switch 1240 above floor level.
* WHERE DISCREPANCIES OCCUR BETWEEN THE PROJECT
Two-way light switch 1240 above floor level. DRAWINGS OR SPECIFICATIONS, THESE SHOULD BE REPORTED
Ceiling mounted down light fitting. IMMEDIATELY TO THE ARCHITECT.
Ceiling mounted light fitting.
Top of Truss Level +3.900 CONSTRUCTION NOTES:
Damp-proof light fitting.
ENSUITE FLEMISH LIGHT- Solid brass
parapet wall TRUSSED TIMBER RAFTERS TO ENG'S parapet wall FOUNDATIONS
1. Excavations for foundations to be approved by engineer before casting of
Wall mounted light fitting with day light switch. DETAILS AND SPECIFICATIONS. concrete

1.182
G Suspended Double fluorescent light fitting. 2. All foundations to be built on firm in-situ soil.
PATIO 15 Amp Plugpoint 300 above ffl. 3. All foundation walls to be filled with concrete with brickforce every course.
Double 15 Amp Plugpoint 300 above floor level. Bottom Truss Level +2.722
BATH 15 Amp Plugpoint 1200 above floor level. FLOOR CONSTRUCTION

0.230 0.388
KITCHEN BEDROOM 01 MS BEDROOM PATIO Double 15 Amp Plugpoint 1200 above floor level

3.900
FHR M
parapet wall Ceiling: +2.330 1. 30mm average layer of clear river sand on 150mm layer of well selected
Stove Plower point 1200 above floor level Window/Door Level 6.4mm Gypsum plasterboards with taped joints on +2.100 hardcore all to be satisfactory ant proofed.
B 38x38mm branders at 400 c/c
Distribution board (16-Ways) 1600 above floor level. 2. Gunplas USB green continuous damp proof membrane under surface bed
230x230mm beam to eng's 230x230mm beam to eng's 230x230mm beam to eng's
Sub-Distribution board (12-Ways) 1600 above floor level. pecs Roof Detail 01 with orange hyperlastic vertival damp proof membrane with 115mm
pecs pecs protecting wall to every change in level.
M
Meter Box
CO2
PASSAGE G
Geyser BEDROOM 01 PASSAGE BEDROOM 02 3. 150mm thick concrete surface bed with ref. 193 mesh wire.

2.100
2 CAR GARAGE Shave Plug
Door frame as per Door
4. 30mm thick screed to suit vinyl tiles.
5. Meranti skirting (150x19mm)
T.V. Point schedule
Door frame as per Door Window frame as per Window
Telephone / Internet schedule R.C. Apron to 1:12 Fall STRUCTURAL NOTES
schedule
Intercon R.C. Apron to 1:12 Fall away from building 1. Walls to have brickforce every third course.
NB: away from building
2. Window to have two courses of brickforce under cills.

0.100
ALL external lights to be damp-proof and to be connected to
MS DRESS Ground Floor Level F.F.L F.F.L ±0.000 3. Internal doors to have concrete lintels over.
BEDROOM 02 daylight switches [positioning to be determined by Electrical
G.F.L
Engineer/Electrician on site]. For proper wiring, refere to Elect. G.F.L
ROOF CONSTRUCTION

0.600
DINNING Engineer's/Electrician's spec/recomendations i.e. right wire

0.950
LOUNGE thickness for appropriate fitting THROUGHOUT the structure EARTH FILL TO BE APPROVED 1.CHROMADEK Roof Sheets to be as per roof specialist's details and specifications
complete with all the necessary fitings as required.

0.250
FIRE RETICULATION LEGEND AND TERMITE TREATED Floor finish (to spec.) on 25mm screed on 100mm
2. Concrete work to engineer's details and specifications.
SYMBOL DESCRIPTION QUANTITY 0.700 0.700 0.700 0.700 Concrete slab with 193 steel Ref. mesh laid on 250 0.700

0.050
micron DPM on top of 40mm sand blinding spread on 3. Soffit plastered and painted.
CO2
9 kg Carbon Dioxide Fire Extinguishers Footings to engineer's details and specs. Footings to engineer's details and specs. 100mm min. well compacted hardcore fill to 95 Footings to engineer's details and specs. 4. Polyurethane moulded cornice to Client's choice.
B Fire Blankets MODAASHTO 5. R.C Water proof Gutters and downpipes not to be visible from exterior,well encased in

FHR 30m Fire-Hose Reel Section A-A Foundation Detail 02 drainage ducts see detail and elevations.

PATIO NB:
Fire & Safety escape signage throughout 1:100
ALL Fire escape doors as per door shedule
ALL Water reticulation are to details & specifications INTERNAL FINISH
*1 Fire-Hose Reel per 30m 1. Render and set plaster with steel float finish.
*1 Fire Extinguisher per 10m max. 2. Interior quality PVA coats to provide final cover with all necessary
undercoats.
Electrical Layout LEGEND
1:25 Drainage pipes EXTERNAL FINISH
Cold water pipes 1. Render and set plaster with steel float finish.
Hot water pipes 2. Exterior quality PVA coats to provide final cover with all necessary
Note : Allow 150mm clearence at the
Over Flow top of saftey valve and 600mm at the undercoats.
115x 38mm trussed rafters @ electrical element and thermostat for
1200mm c/c Geyser servicing purposes. DRAINAGE
2 x 50 x 75mm Beams to 1,430mm (L), 570mm (B) ,200 Litres 3-4KW, 75kg Decoration to eng' pecs
0.075

1. 100mm diameter PVC drainage pipes laid in a one pipe system to min. fall
Accormodate Geyser parapet wall
1:40
2. Manholes to be constructed in 230 \mm blockwork plastered inside a
0.100

2 x 50 x100mm Breares at Tie Beams


Note : The geyser should be placed in 75mm concrete base. Invert level to be determined on site.
approx. 600mm c/c
an appropriate area where it is central Decoration to eng' pecs 100mm Concrete slab with 193 3. 100mm diameter SVP
Geyser Insulation Detail to all fittings and easy to reach Vacuum breaker
Vacuum breaker
steel Ref. mesh 4. Wate and soil to have reseal traps.
Scale 1:50 HOT WATER COLD WATER 5. All drainage to connect to existing public main sewer pipes.
Safety Valve
20mm thick cement screed DPC
STORM WATER
Emengen R.C. Apron to 1:12 Fall away
300mm Minimum

Electric Water Heater cy overfl 1. At all times the ground to be graded away from the building and
1,430mm (L), 570mm (B) ,200 Litres 3-4KW, 75kg
ow to ou
tside 114x38mm timber wallplate 50mm Sand blinding from building
50x75mm timber purlins not exceeding stormwater to be directed away from the building.
Drain cock
900mm centre to centre 2. Allow for necessary cuttings and building up levels retaining walls,
Roof Sheeting Electrical connection to element and thermostat
Note : It is recommended to place pressure control valves 100mm Selected fill material stone pitching etc where necessary.
HOT WATER

and relief valves outside in a box rather than in the roof. All well compacted & termite
t LIGHTNING PROTECTION
g h geysers manufactured after 1976 must have a safety valve. Ceiling: treated

0.850
n l i Thermostat 1. The whole roof is to be satisfactory protected in accordance with
Roof truss 6.4mm Gypsum plasterboards with
S tou specialist details
Salar Panel Electric heating element

1.100
and specifications taped joints S.A.BS.034 1976(or latest edition) and must consist of bonding down
Geyser Vacuum breaker Shower Mixer taps 230mm Conc. filled blockwork conductors, earth conductors and water mains earth terminals.
Insulation 200 Litres Mixer taps Sink with brickforce every course
Pressure Control
panel MUNICIPAL STAMP:
To absorber Bearer Wash Hand Basin
Bath tub

0.250
25MPa Conc. footing
230x230mm beam to eng's
2 x 50 x 100mm Beams to pecs
Decorative cornice to Accormodate Geyser Power supply
client's choice Hot Water supply Water From Main supply Footings to engineer's details and specs.
20 x 220mm Fascia Window frame as per Window
board R.C Gutter to Engineer's details and specifications Typical Hot Water Detail/Solar Geyser Gate ValveGate Valve schedule

Geyser Platform Detail


Scale 1:50 Ground Level
Foundation Detail 02
Scale 1:50 1:25

Roof Detail 01
1:25

21.948 CLIENT NAME:


5.866 10.370 4.572 1.139
5.866 0.700 3.530 0.700 5.440 0.700 3.172 0.700 0.439 0.700
House Yongama Malangabi
6.225 4.230 6.141 3.872 1.139 0.340
PROJECT:
0.700
0.340

0.340
1.757

Proposed 3 Bedroom House


2.115
2.345

14.473 Conc. roof slab to


1.415

0.358

Engineer's details and


2.115

2.115

9.670 0.700 3.172 0.700 1.139


Conc. roof slab to water proofing to DRAWING TITLE:

0.769
Engineer's details and 1.000 1.000 1.000 1.000 +2400 ROOF SLAB specialist.
0.700

0.700

0.700

3.115
1.633

water proofing to Foundation Layout, Roof Plan, Electrical Plan, Saction A-A, Hot & Cold Water Systim, Roof
0.230

2.660 +2400
1.275

specialist.
3.530 0.700 5.440 0.700 3.172 0.700 0.439 Line of wall Line of wall Detail 01, Detail 03
ROOF SLAB
1.275

1.000 1.000
DRAWING REVISIONS:
2.530

parapet wall
Line of wall REV 1
3.818

3.818
4.758

REV 2
4.058

+2400
REV 3

4.288
ROOF SLAB
0.700

Conc. roof slab to REV 4


13.880 8.563

4.530 0.700 2.930 1.510 0.700 3.172 0.700 0.439 0.700 Engineer's details and INDEMNITY
water proofing to The Contractor or client indemnifies the Architect from any claim that may
6.230
5.530
13.880

specialist.
0.700

14.220

arise from any obscurities and/or any bona fide oversights not pointed out to,

parapet wall
0.230

parapet wall

discussed with or resolved by the parties concerned before construction


6.645

1.384
0.700 6.230 4.530 0.700 2.930 0.700 2.700 0.700 1.283 0.700 1.139 Fall of roof Fall of roof Fall of roof Fall of roof commenced - refer to GENERAL NOTES above.
Cognizence is taken of the fact that construction may not commence prior to

parapet wall
5.805

3.349

3.349

the approval of the plans by the relevant Local Authority declining to issue
4.279

4.279
4.049
7.035

an occupation certificate compelling the contractor and/or client to submit as

4.275
0.700

built plans for approval prior to the issuing of such occupancy certificate.
The Architect will not accept any responsibility for any construction that
parapet wall
0.700

0.700
2.230
1.530

commence prior to the building plans being approved or any deviations from
2.230

6.232 the approved building plans during construction.


parapet wall

parapet wall
Denotes fall of roof
1.930

SIGNATURES
3.560

5.383
0.700

1.698

NOTE: ROOF TO BE BUILT AS PER


2.858

parapet wall
PLAN,MAY NOT BE CHANGED OR
2.858

2.858

2.858

3.275
R.V. Mamba
1.690

0.990

ALTERED IN ANYWAY BEFORE


1.330

2.862
1.501
1.690

CONSULTING AUTHOR OF THE


1.160

PLAN, AND OBTAINING


1.690

APPROVAL OF OWNER'S Architectural Professional Client


ASSOCIATION SACAP PAD24751141
0.360

parapet wall
0.360 6.230 1.255 3.975 3.630 3.400 1.983 0.340 7.587 DESIGNER DRAWN BY SHEET NO. SHEET SIZE: [email protected]
0.700 5.530 0.700 4.530 0.700 2.930 0.700 2.700 0.700 1.283 0.700 Roof Plan CAD 50105929 2/2 A1 www.vhouseplans.com
Bronkhorstpruit 1020
6.230 5.230 4.330 5.383
1:100 44kruger street
21.173 DATE: SCALE:
April. 2022 AS SHOWN
Farmbell Building Shop no 4
Foundation Layout SACAP Gauteng, ZA
REGISTRATION
1:25 PAD24751141 Cell: 0832311508
GSPublisherVersion 0.9.100.100