Boq - Gypsum Works

This document is a bill of quantities (BOQ) for gypsum wall partition works for a proposed residential and commercial building project in Dubai, UAE. It includes 11 items for installing different types of drywall partitions totaling over 33,000 AED. The payment terms specify paying within 15 days for bills under 30,000 AED or within 30 days for larger bills, with 20,000 AED paid upfront for mobilization. There is no retention amount held since this is a labor subcontract, and the contractor agrees to rectify any workmanship issues found during inspection.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
297 views

Boq - Gypsum Works

This document is a bill of quantities (BOQ) for gypsum wall partition works for a proposed residential and commercial building project in Dubai, UAE. It includes 11 items for installing different types of drywall partitions totaling over 33,000 AED. The payment terms specify paying within 15 days for bills under 30,000 AED or within 30 days for larger bills, with 20,000 AED paid upfront for mobilization. There is no retention amount held since this is a labor subcontract, and the contractor agrees to rectify any workmanship issues found during inspection.
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BOQ FOR GYPSUM WALL PARTITION WORKS

PROJECT : DOWN TOWN VIEWS II - Proposed Residential & Commercial Builidng - (3-Towers) on
Plot No. 3370587, @ Zabeel Second Dubai-UAE

ITEM
DESCRIPTION QTY UNIT UNIT RATE AMOUNT (AED)
NO.
Installation of dry wall partition works type 1. all works as
1 per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping

Installation of dry wall partition works type 2-6. All works as


2 per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping

Installation of dry wall partition works type 2-6B. All works


3 as per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping

Installation of dry wall partition works type 9. All works as


4 per approved naterials and drawings including jointing & 100 M2 27 2,700.00
Taping

Installation of dry wall partition works type 7. All works as


5 per approved naterials and drawings including jointing & 100 M2 27 2,700.00
Taping

Installation of dry wall partition works type 8. All works as


6 per approved naterials and drawings including jointing & 100 M2 30 3,000.00
Taping

Installation of dry wall partition works type 9. All works as


7 per approved naterials and drawings including jointing & 100 M2 25 2,500.00
Taping

Installation of dry wall partition works type 1 wet. All works


8 as per approved naterials and drawings including jointing & 100 M2 34 3,400.00
Taping

Installation of dry wall partition works type 1E. All works as


9 per approved naterials and drawings including jointing & 100 M2 32 3,200.00
Taping

Installation of partition shaft wall Type 8A1,2,B1,C,B2, A3D.


10 Allworks as per approved materials and drawings including 100 M2 34 3,400.00
jointing & taping.

Installation of dry wall partition above pod. All works as per


11 100 M2 34 3,400.00
approved naterials and drawings including jointing & Taping

Total 33,300.00
THIRTY THREE THOUSAND THREE HUNDRED DIRHAM ONLY.
NOTE 5% VAT IS EXCLUDED

PAYMENT TERMS
Payment shall be submitted within 15 days once the bill reaches 30,000AED. Otherwise, if in excess of 30,000AED
1
the payment shall be paid within 30 days.
Mobilization of 20,000 Dhs shall be paid after 15 days from site mobilization. To cope-up our intermittent
2
expenses and complete the works as per schedule.

No Retention. As this is only Labor Sub-Contract. Any concerns on workmanship durind inspection, we are ready
3
to rectify the works.