The document is a certificate of completion for maintenance performed on equipment. It certifies that hydrotesting was completed on a subplate mounted ball valve for an accumulator bladder drain valve according to drawings, procedures, specifications, and standards.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
36 views1 page
CPM Coc 22 003
The document is a certificate of completion for maintenance performed on equipment. It certifies that hydrotesting was completed on a subplate mounted ball valve for an accumulator bladder drain valve according to drawings, procedures, specifications, and standards.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
REPORT NO.
: CPM-COC-22-003
CERTIFICATE OF COMPLETION
Maintenance of the equipment mentioned below has been inspected, tested
and found to be conforming with the requirement in accordance with drawing, procedure, specification and standard, and certify to be completely accepted.
PROJECT : EMS - ITMS
DESCRIPTION : Hydrotest of Subplate mounted ball valve for Z-2803 HPU Accumulator Bladder Drain Valve
SHELL IMPORT FACILITIES TABANGAO CPM CONSTRUTION & GENERAL SERVICES, INC.