Suphaa Adaadii Rate Haaraa

This document contains a bill of quantities for road maintenance work on the Adadi Mariam - Tume Wato road in the Oromia Region of Ethiopia. It lists various construction and maintenance activities along with the unit rates in Birr per measurement unit (e.g. cubic meter, linear meter, etc.). The total contract amount for the work is over 6.6 million Birr including a 15% VAT.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
504 views6 pages

Suphaa Adaadii Rate Haaraa

This document contains a bill of quantities for road maintenance work on the Adadi Mariam - Tume Wato road in the Oromia Region of Ethiopia. It lists various construction and maintenance activities along with the unit rates in Birr per measurement unit (e.g. cubic meter, linear meter, etc.). The total contract amount for the work is over 6.6 million Birr including a 15% VAT.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

BILL OF QUANTITIES(URRAP)

PROJECT NAME :- ADADI MARIAM - TUME WATO URRAP


CLIENT :- KERSA MALIMA ROADS AND LOGISTICS OFFICE
PROJECT LENGTH :- 10.30km
Road Maintance Cost In OROMIA Region
Summarv of current Um·t Rates 2015 E C

Code Name of Activity Contract


Unit
Unit Rate
Quantity
(Birr/unit)
m3
110 Spot Repair Gravel Road-Selected Material 279.77

m3
111 Spot Repair Gravel Road-Crushed Aooreqate 279.77

m3
121 Culvert Cleaning 603.97

122 Ditch Cleaning (Manual) m 48.02

m3
123 Repair Erosion Damaqe (Selected fill) 432.27
m3
124 Repair Erosion Damaqe (Rock fill) 1,148.95

125 Mortared Masonry Repair m3


3,388.72 21

126 Dry Masonarv Repair m3


1,443.75
127 Gabion Structure m3
4,468.47
131 Bush Clearinq 61800
3.39
m2
220 Bladinq Gravel Road (Liqht)
Km 4,280.93

222 Gravel Provision- Selected Material (Extra- Over) m3


170.31
Gravel Provision- Crushed Aggregate (Extra- Over)
223 m3 170.31

230 Ditch Cleaning (Machine) km


19,272.96 20.6

240 Shoulder Blading Km


3,109.39
241 Shoulder Rehabilitation m3
1,158.56
251 Concrete Construction (Class 1) m3
10,447.72

252 Concrete Construction (Class 2) m3


9,131.04
253 Steel Reinforcement kg
121.99
316 Pavement Reconstruction (Aggregate Road Base) m3
520.84
317 Gravel Resurfacinq (Selected Material) m3
554.78
9270
318 Gravel Resurfacing (Crushed Aooreqate) m3
554.78
410 Emerqencv Repair DWs/KM
Variable
411 DWs/KM Variable
Other Routine Maintenance

412 DWs/KM
Variable
Betterment

413 Environmnetal Protection DWs Variable

510 Overhaul m3km 31.89

M14 m3 1,046.18
Crushed Aaareqate (for Concret€:- ·

m3
M15 Crushed Aaareqate (Road Base) 727.29

m3 147.51
M16 Selected Material (Gravel Road Surfacinq)

M17 Crushed Aqaregate (Gravel Road Surfacing) m3 636.16


m3
M18 Masonary Stone Production 567.28

412B Common Excavation to Embankment m3 234.88

m3 240.08
417B Borrow Placing
Rock Excavation m3 153.11
414
464 Class "B" Masonary m3 3,667.72

453 Pipe Installation Lm 1,288.55

418 Road Bed Preparation (Gravel Road) Lm 752.40

472 Detour Construction Lm 122.15

461 Structural Excavation in Common Material m3 199.07

417A Granular Backfill m3 1,300.81

Clearinq & Grubbinq


411 Ha 30,150.39

m2
471 Paved Waterway 875.58
Demolishing Existing Masonry m3 449.57

421B Borrow Production m3


48.80
434A m3
Base Course Placing 459.85
452A 30 Inch R.C Pipe Production 4,104.64
Lm
452B
36 Inch R.C Pipe Production Lm 5,245.28
452C 42 Inch R.C Pipe Production
Lm 6,725.45
452D 48 Inch R.C Pipe Production Lm 7,865.93

TOTAL SERIES
VAT 15%
GRAND TOTAL
Contract

Amount

71,163.12

209,502.00

-
-

397,022.98

5,142,810.60
-

-
-

-
-

-
-

-
-

-
-
-

5,820,498.70
873,074.80
6,693,573.50