Suphaa Adaadii Rate Haaraa
Suphaa Adaadii Rate Haaraa
m3
111 Spot Repair Gravel Road-Crushed Aooreqate 279.77
m3
121 Culvert Cleaning 603.97
m3
123 Repair Erosion Damaqe (Selected fill) 432.27
m3
124 Repair Erosion Damaqe (Rock fill) 1,148.95
412 DWs/KM
Variable
Betterment
M14 m3 1,046.18
Crushed Aaareqate (for Concret€:- ·
m3
M15 Crushed Aaareqate (Road Base) 727.29
m3 147.51
M16 Selected Material (Gravel Road Surfacinq)
m3 240.08
417B Borrow Placing
Rock Excavation m3 153.11
414
464 Class "B" Masonary m3 3,667.72
m2
471 Paved Waterway 875.58
Demolishing Existing Masonry m3 449.57
TOTAL SERIES
VAT 15%
GRAND TOTAL
Contract
Amount
71,163.12
209,502.00
-
-
397,022.98
5,142,810.60
-
-
-
-
-
-
-
-
-
-
-
-
5,820,498.70
873,074.80
6,693,573.50