0% found this document useful (0 votes)
23 views1 page

Inspection

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Inspection

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Electrical

Inspection

This section generally describes the necessary inspection before ATV6000 UL is powered on. Besides,
review the following steps:

Step Description ✔
1 Verify that the site power supply meets the requirement of the medium voltage drive system. The rated
input voltage of the medium voltage drive system must be compatible with grid voltage.
2 The rated output voltage of the medium voltage drive system must be compatible with rated voltage of
the motor which is marked on the motor nameplate.
3 The control power supply (low voltage) must be compatible with rated voltage of control system.
4 The rated power of the ATV6000 UL must be compatible with the power of motor.
5 Verify that the ATV6000 UL is connected to ground securely, and its grounding resistance must be lower
than 4 Ω. The control system with a separate ground bus-bar and its resistance must be lower than 1 Ω.
6 Verify the insulation of all cables and terminals is not damaged.
7 Verify all terminals, components mounting, and other parts are marked or labeled, or contact your local
manufacturer representative.
8 Verify that control power supply and main power supply are correctly connected and follow all local and
national electrical code requirements as well as all other applicable regulations.
9 Verify that all wiring is tightly and correctly connected.
10 Verify whether the isolating switches in bypass cabinet (optional) are installed tightly and that the
mechanical interlock of the isolation switches operate normally. Verify that isolation switches is well
contacted.
11 Verify that the input and output medium voltage cables are connected correctly.
12 Verify that all electrical connections of the transformer are tight including input, output, and auxiliary
windings (option).
13 Verify that the temperature sensors are installed appropriately.
14 Verify that cooling fans on the top of cabinet are connected correctly and tightly, and can rotate freely in
the correct direction.
15 Verify that all bolts used for connecting transformer input, output and auxiliary cables (option) are tightly
connected.
16 Verify that the optical fibre connections are correct (Colour and wire number), optical fiber and the fiber
terminal connections are correct, fiber terminal and fiber connection must be clean with good
connections. The fiber length must be correct so that there is no pulling or bending
17 All cables must be fastened. PCBAs in the control box must be plugged into the right place. The boards
and control boxes must be fastened tightly by screws.
18 Verify that frequency setting signal is a 0(4) - 20 mA or 0-10 V source signal.
19 Verify that the control wiring is separated from power wiring.

NOTE: If any inspection result is abnormal, please contact your local manufacturer representative.

70 GDE99019 09/2020