1. The document provides general notes for a septic tank including dimensions that need to be checked on site and foundation depth determined by an architect or engineer. 2. Reinforced concrete work must conform to engineer's instructions and specifications. 3. Hoop iron reinforcement is required at alternate courses of the septic tank.

Uploaded by

max
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Plan Layout

1. The document provides general notes for a septic tank including dimensions that need to be checked on site and foundation depth determined by an architect or engineer. 2. Reinforced concrete work must conform to engineer's instructions and specifications. 3. Hoop iron reinforcement is required at alternate courses of the septic tank.

Uploaded by

max
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SEPTIC TANK GENERAL NOTES

1. All dimensions including setting out to be checked


1050 by contractor and confirmed with archtects/ engineers
G.L as necessary.
2. Foundation depth to be determined on site by the archtect/
outlet

200 50
inlet soakway engineer.
comp acte d mor um

cast iron DP M
3. Reinforced concrete works to conform with engineers
MH
cover MH

comp acte d crus he d ston e


instructions
perf ol at ed 1 0 0 and specifications.

600
mm pip e

4. Hoop iron reinforcement at alternate courses to be


soakway
600 General notes provided
B TOP VIEW 1. Concrete to be 1:2:4 1/4 graded and to all walls.
to be according to general specification 5. Damp proof course shall be 3 ply bituminous felt all equal
2. Reinforcement to be mild steel bars to BS785
3. Cover of concrete on steel to be 20mm aprooved.
4. 1:2 Cement rendering on walls and scum 6.3 ply bituminous felt slip joint to be provided between
A A
masonary
SOUTH ELEVATION NORTH ELEVATION and r.c.
7. Permanent air vents to be provied above doors and
B windows.
PLAN WITH COVER AND REINFORCEMENT
8. Plumbing and drainage works to comply with MOH
B 10 m m Ba rs 2 0 0m m C. C 10 mm Bars @ 200 mm C. C
450*6 00mm ma nh ol e
requirements
450 *6 00m m m an h ol e 2m m B ars @ 2 00 mm C. C
cov er cov er
and S & VP' S to be cast iron deep seal ant -vac traps to all
INLET
OUTLET
fittings
MANHOLE
MANHOLE to S and VP all waste pipes all bends and waste pipes and
junctions to have inspection plates.Drains Passing beneath
builidings
and driveways shall be of caste iron and surrounded with 6
inch
concrete.
9. Fire extinquishers tbe instaled to the entire satification of
li ghtl y c om pa cte d s p ot
fill in g
12 m m w at er pr o ofe d c em e nt 12 mm wat er pro of ed
the
cem e ntre n der i ng
ren d eri n g
C.F.O.
WEST ELEVATION 10. water reserve to be provided on roof tanks with booster
pump.
12.ABBREVIATIONS:
EAST ELEVATION 1GT denotes gulley trap
IC denotes inspection chamber
PV denotes permanent vents
Well packed SVP denotes soil vent pipe.
and
compacted
RC denotes reinforced concrete.
North Elevation hardcore WINDOW AND DOOR
12,300 SCHEDULE
200 4,250 900 335 2,900 675 2,715 325
2,100 1,500 1,500
200 1,200 200 2,600 200 4,500 200 3,000 200 CODE TYPE LENGTH HEIGHT NO. REMARKS
IC
steel
casement
200

200

200

R OOF DETAILS:
325

steel 1500
IC D1 2100 1
600

1,450

1,450
700

WASH AREA IC
G.L RIDGE CAP casement
W/C REAR PORCH G.C.L G 28 SHEETS OR EQUIVALENT
75*50 RAFTERS AT 900 C/C
1,505

flash doors
200

200

100*50 TIES AND STRUTS D2 2100


50*50 PURLINS 900 8
100*50 WALLPLATES AND TIE BEAMS
3,000
3,000
1,500
1,000

BDR 01
West Elevation

KITCHEN ROOF PICHT 28 DEGREES.FOR PITCHED W1 steel sill to 1000


DINING
East Elevation

S-01 S-01 ROOF AND 5 DEGREES FOR LEAN TO ROOF casement 2000 1200 1
200
200
1,304

steel

625
sill to 1000
200 300

cabinet W2 casement 1500 1200 7


1,500
600
700

cabinet

IC
1,000
12,541

12,541

W/C W3 steel sill to 1500


500 500 3
casement
200
200

W4 1000 1000 1 sill to 1000

Lounge
IC
PROJECT
5,110

4,000
4,000

MASTER BDR ROOF PLAN THE RESIDENTIAL BUILDING TO


BE BUILT IN DIANI NDEGE
200

HOUSE
200

1,391
1,054
2,100

SECTION S01-S01 DRAWING TITTLE


143

SITE LOCATION FLOOR DETAILS:


FLOOR PLAN,
200

200

25MM CERAM IC TILES FLOOR FINISH ON .


200
150MM THICK CONCRETE 1:3:6 FLOOR SLAB ON
200 4,000 200 4,500 200 1,500 1,300 200
1000 GAUGE BLACK POLYTHINE SHEET DBC ON ELEVATION AND SECTION
1,295 1,500 1,760 1,500 900 1,500 3,846
1,000 2,100 1,000 50MM THICK WELL COMPACTED MURRAM BLINDING ON
12,300 FOUNDATION DEPTH TO BE DETERM INED ON SITE

CLIENT: ONESMUS KINYUA


South Elevation SEPTIC
WATER DEPT
BOBARACHO
DESIGNED AND DRAWN BY:
FLOOR PLAN LAYOUT KISII TO KEGATI
JOHNLEE MURIMI KINYUA
(SOUTH COAST CONTRUCTORS)
OFFFICE CONTACT:074177947

DATE: 12/02/2022
SCALE USED
1:100

SITE LOCATION CHECKED AND APPROVED BY:

You might also like