Method Statement Wall Opening 2 TBT

The document is a method statement diagram for wall openings that includes: 1. Labels for scaffolding components like uprights, braces, ladders, and handrails. 2. Labels for joining pins that connect pipes and a caster that the scaffolding sits on. 3. Details on the project being for the MRT in Jakarta, the contractor PT. Trasfello Bangun Teknika, and approval signatures from engineering and project management.

Uploaded by

fakihudin 24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
203 views1 page

Method Statement Wall Opening 2 TBT

The document is a method statement diagram for wall openings that includes: 1. Labels for scaffolding components like uprights, braces, ladders, and handrails. 2. Labels for joining pins that connect pipes and a caster that the scaffolding sits on. 3. Details on the project being for the MRT in Jakarta, the contractor PT. Trasfello Bangun Teknika, and approval signatures from engineering and project management.

Uploaded by

fakihudin 24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10 11 12

KETERANGAN :

a: TIANG VERTIKAL (SCAFFOLDING UPRIGHT)


b: PALANG PENGUAT (BRACE/DIAGONAL BRACE)
c: SAMBUNGAN PIPE (JOIN PIN)
d: RODA (CASTER)
e: TANGGA (LADDER) g
f: LANTAI KERJA (PLATFORM)
g: PAGAR PENGAMAN (HANDRAIL)
h: PIPA PENGUAT (SGP 32A)

g g

c c
e

b
a h a

c f
c
e
b
a a PROYEK :

MRT

OWNER :

PT. MRT JAKARTA

d d CONTRACTOR :

TRASFELLO
PT. TRASFELLO BANGUN TEKNIKA
CONTRACTORS, DESIGN & ENGINEERS

PT. TRASFELLO BANGUN TEKNIKA PT. MRT JAKARTA


DRAWN BY CHECKED BY APPROVED BY CHECKED BY APPROVED BY
METHOD STATEMENT WALL OPENING
SCALE NTS
NAME IQBAL WAHYU JOKO
DEST. DFR/ENG SM PM
DATE 21-07-2021 21-07-2021 21-07-2021

METHOD STATEMENT WALL OPENING

DRAWING NUMBER PAGE REV. SCALE


NTS
- - SIZE
A3

1 2 3 4 5 6 7 8 9 10 11 12

You might also like