PREPARATION
(OIL HANDLING CONTRACTORS,
AGENTS & END CUSTOMERS)
ASSET MANAGEMENT (INSPECTION OF OLTC)
PT Reinhausen Indonesia
Crane or lifting device including operator for lifting the diverter switch insert
New mineral insulating oil in accordance with IEC 60296 minimum 600 L
including for cleaning of OLTC
Oil pump with hoses and connections for oil change (draining and refilling)
* Common tools for pipes and oil handling work must be included
Voltage supply
WARNING: The user of the plant should perform the following safety measure.
The transformer must be switched off, isolated and secured against reclosing. All
terminals must be grounded visibly (by means of ground cables or ground switches).
The working area should be marked clearly.
MR personnel will only start the inspection after all these safety precautions have been
carried out.