This document summarizes the results of a dry density/moisture content test conducted on a fill and capping material sample. Six trials were performed to determine the maximum dry density and optimum moisture content. The maximum dry density was found to be 1.61 g/cc at an optimum moisture content of 4.34%. The test was conducted on a sample from the Giner-IMI-Gode Road project to determine the appropriate compaction levels for the material.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views

MDD Format

This document summarizes the results of a dry density/moisture content test conducted on a fill and capping material sample. Six trials were performed to determine the maximum dry density and optimum moisture content. The maximum dry density was found to be 1.61 g/cc at an optimum moisture content of 4.34%. The test was conducted on a sample from the Giner-IMI-Gode Road project to determine the appropriate compaction levels for the material.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

SATCON CONSTRUCTION PLC

GINER-IMI-GODE ROAD PROJECT


CONTRACT (3) IMI-LAB
DRY DENSITY/MOISTURE CONTENT RELATION SHIP
Date of test
Type of material
Source of sample
Material used for
Location of sample

Density Determination Maximum Dry density/OMC


Trial No. 1 2 3 4 5 6
Assumed water content (%)
Wt.of mould+soil (gm) 9870 9970 10070 10070 1.80

Wt.of mould (gm) 6500 6500 6500 6500


1.75
Wt.of soil in mould (gm) 3370.00 3470.00 3570.00 3570.00
Volume of mould(c.c) 2124 2124 2124 2124

Dry density gm/cc


1.70
Wet density(gm/cc) 1.59 1.63 1.68 1.68
1.65
Moisture content determination
Moistture can No. 1.60
Wt.of can+Wt.of wet soil (gm) 1000 1000 1000 1000
Wt.of can+Wt.dry of soil (gm) 980 970 960 950 1.55
Wt.of water (gm) 20.00 30.00 40.00 50.00
Wt.of can (gm) 39 39 39 39 1.50
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Wt.of dry soil (gm) 941.00 931.00 921.00 911.00
Moisture content (%) 2.13 3.22 4.34 5.49
Dry density(gm/cc) 1.55 1.58 1.61 1.59 M.C(%)

Contractor____________________ MDD=___1.61______________

Consultant____________________ OMC=___4.34______________
Client : ERA Section - : ANNEX - I : STANDARD FORMS
Consultant : BEZA Consulting Engineers Doc. : PQA &PQC -001
Contractor : SATCON Plc Revi. : ooo

EMPLOYER CONSULTANT CONTRACTOR


Ethiopian Road Authority Beza Consulting Engineers SATCON PLC

DRY DENSITY/MOISTURE CONTENT RELATION SHIP

Location of sample : ___________________________ Date of sample : _________________________


Material used for : ___________________________ Date of test : _________________________
Type of material : __________________________
Density Determination Maximum Dry density/OMC
Trial No. 1 2 3 4 5 6
Assumed water content (%)
1.10
Wt.of mould+ wet soil (gm)
Wt.of mould (gm) 1.09
Wt.of soil in mould (gm)

Dry density gm/cc


1.08
Volume of mould(c.c)
Wet density(gm/cc) 1.07

1.06
Moisture content determination
1.05
Moistture can No.
Wt.of can+Wt.of wet soil (gm) 1.04
Wt.of can+Wt.dry of soil (gm) 1.03
Wt.of water (gm)
Wt.of can (gm) 1.02
Wt.of dry soil (gm) 1.01
Moisture content (%)
1.00
Dry density(gm/cc) M.C(%)
30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00

MDD=___________________
OMC=___________________

Analyst Contractor’s Lab Engineer Engineer’s Representative


42.00 44.00
ETHIOPIAN ROADS AURHORITY
PROJECT : GONDER DENSAH ROAD PROJECT SAMPLING DATE: 23/10/2007
CONSULTANT : LEA.LASA/UNICONE JV TESTING DATE: 24/10/2007
CONTROCTOR : SUR CONSTRUCTION P. L. C LOCATION: 60+740
TYPE OF MATERIAL:FILL & CAPPING

MOISTURE DENSITY RELATIONSHIP


AASHTO - T -180

Density Determination Maximum Dry density/OMC


Trial No. 1 2 3 4 5 6
Assumed water content (%) 2.50
Wt.of mould+soil (gm) 2.40
Wt.of mould (gm) 2.30
Wt.of soil in mould (gm) 0.00 0.00 0.00 0.00 2.20
Volume of mould(c.c) 2.10
Wet density(gm/cc) #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Dry density gm/cc


2.00
1.90
Moisture content determination 1.80
Moistture can No. 1.70
Wt.of can+Wt.of wet soil (gm) 1.60
Wt.of can+Wt.dry of soil (gm) 1.50
Wt.of water (gm) 0.00 0.00 0.00 0.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Wt.of can (gm)
Wt.of dry soil (gm) 0.00 0.00 0.00 0.00
Moisture content (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Dry density(gm/cc) #DIV/0! #DIV/0! #DIV/0! #DIV/0! M.C(%)

MDD=___________________

OMC=___________________

Contractor____________________

Consultant____________________
OMC