CLJOC-FAC-WPK-40-0158 WP For Vessel Inspection of Glycol Coalescer (MAD-2445) On CPP - Rev.0
CLJOC-FAC-WPK-40-0158 WP For Vessel Inspection of Glycol Coalescer (MAD-2445) On CPP - Rev.0
WORKPACK FOR
VESSEL INSPECTION OF GLYCOL COALESCER
(MAD-2445) ON CPP
Page 2 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 3 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
TABLE OF CONTENTS
1 WORK DESCRIPTION.....................................................................................................4
1.1 Introduction................................................................................................................4
1.2 Abbreviations.............................................................................................................4
1.3 Vessel description......................................................................................................5
1.4 General Inspection Work Scope................................................................................8
1.5 Work package plan..................................................................................................10
2 PREPARATION..............................................................................................................10
2.1 General Safety/HSE Screening...............................................................................10
2.2 Reference Document...............................................................................................11
2.3 Bill of materials.........................................................................................................12
2.4 Scaffolding / rigging / tools.......................................................................................13
2.5 Manpower / Role & Responsibilities........................................................................13
3 IMPLEMENTATION........................................................................................................14
3.1 Onshore work...........................................................................................................14
3.2 Offshore work...........................................................................................................14
3.3 Breaking Containment.............................................................................................16
3.4 Internal Inspection....................................................................................................17
3.5 Re-Installation..........................................................................................................17
4 JOB CARDS...................................................................................................................18
4.1 Job cards.................................................................................................................18
4.2 Mechanical Completion...........................................................................................22
5 ATTACHMENTS.............................................................................................................22
Page 4 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
1 WORK DESCRIPTION
1.1 Introduction
Vessel inspection for the high pressure containments are a mandatory requirement of A&OI
management programme applied in CLJOC, and compliance with Vietnamese legislation.
Pressure Vessels activities including external and internal inspection follows requirement set
by either Class Body (ABS for FPSO Thai Binh VN) or Risk Based Inspection (RBI) Scheme
for all fixed platforms. The RBI scheme is prepared/ revalidated periodically by Independent
Verification Body, endorsed by CuuLong JOC and approved by Vietnam Register for
implementation. Even though for non-class vessel ones, we need to carry out internal
inspection for safe purpose.
To guarantee safe for all entrants, a vessel must be positively isolated all inlet and outlet
nozzles, vessel free/ or acceptable limit of H-C, toxic gases like H2S, CO, Hg, benzene,
NORM when allocable…as well as sufficient oxygen for breathing. All control measures
need to take place like using proper PPE / tools, available rescue team, contingency plan
set up…
People who involves to the task must be well trained, JSA shall be done in advance and
conducted to whole team members for full awareness of the related risks and control
measure as well as contingency plan. Work control system like permit to work, isolation,
confined space entry certificate…, and numbers of related procedures like LO/TO, confined
space entry, etc… available in CLJOC to assist in safety control for the task.
This Workpack is generated to describe what need to be done for inspection of Glycol
Coalescer (MAD-2445) on STV CPP.
1.2 Abbreviations
A&OI Asset & Operating Integrity
ABS American Bureau of Shipping
BOSIET Basic Offshore Safety Induction & Emergency Training
CLJOC Cuu Long Joint Operating Company
CCR Central Control Room
CRO Control Room Operator
CUI Corrosion Under Insulation
FCS Facility Control System
FE Flow Element
FGS Fire and Gas System
FPSO Thai Binh VN Float Production Storage and Offloading
GFA General Fire Alarm
H-C Hydrocarbon
Page 5 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 6 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 7 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 8 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 9 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 10 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
2 PREPARATION
Page 11 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Pressure testing must be strictly complied with CLJOC specific procedure CLJOC-HSE-
STD-HS-006 Rev.C - Pressure Testing
Vessel entry must be strictly complied with CLJOC specific procedure CLJOC-HSE-
PRO-HS-0012 Rev.1 – Confined Space Entry
Fall protection &working at height procedure CLJOC-HSE-PRO-HS-0002
The following procedures on the HSE Screening sheet shall be strictly complied with when
carrying out the work
Page 12 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 13 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 14 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Leak test personnel – P&P: responsibility for purging and leak test the vessel breaking
points where the joints are de-bolted and re-bolted (positive isolation points). Their
scope included is to safety for their equipment during operating period
Vessel cleaner: responsibility for internal cleaning the vessel until satisfaction for
inspection.
P&P / CRO: responsibility for shutdown and restart-up process, carrying-out isolation,
de-isolation, flushing, purging, ventilation
Scaffolder: Responsibility for erecting and removal the scaffolding outside the vessel.
H-C tester: Responsibility for checking H-C, toxic gas, Hg, Benzene, and NORM inside
the vessel.
3 IMPLEMENTATION
Page 15 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
NDT inspection: NDT method will be applied for detect the associated with suspecting
damage mechanism.
Perform boroscope inspection for lower part of vessel by offshore M&R engineer.
Complete the inspection job
Inspect Filter Elements and replace by new one if found damaged
3.2.3 AFTER INSPECTION
Reinstall internal parts & using new gaskets in the same orientation as when they were
removed and note the position of the nozzles.
Re-install the removed instruments, piping connections if any
Re-swing spectacles if needed
De-isolation job
Leak test if necessary
Check service in line with Operation Manual
Housekeeping job
Inspection job completed
Page 16 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 17 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 18 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Remove internal parts (filters & accessories) through quick opening closure & ensure
not damage to them.
Check internal parts for any sign of build-up of surfaces and clean surfaces if found
build-up.
Check internal/ external coating of vessel
Visual check welding joints of vessel
Boroscope for lower part of the vessel
Check enclosure gasket, seal of hand-hole, quick opening closure, nozzles and replace
if damaged
Reinstall internal parts using a new gasket and taking care not to damage the parts.
Internal parts must be reinstalled in the same orientation, location as when it was
removed
Check for loose connections and all wiring for signs of insulation breakdown or
brittleness (If required)
3.5 Re-Installation
3.5.1 Removal positive isolations
When completion of internal inspection, to ensure all tools, auxiliary devices, torch etc… are
cleared out of the vessel before reinstallation of internal parts, then removal of the positive
isolation.
Replacing all gaskets, with correct torque and bolt tighten sequence are requirement for
each flange.
3.5.2 4.5.2 Oxygen Elimination
After reinstatement, N2 purging will be conducted to eliminate oxygen from the vessel and
pipeline. This shall be done to get rid of O2 by sweeping N2 before leak test. Sweeping can
be done by pressurizing vessel up to 3 barg with N2 then depressurizing during 2-3 cycles to
check O2 less than 5%.
3.5.3 Leak test
Leak test can be carried out at 7 barg as existing nitrogen system then increase pressure to
141 barg of MAD-2445 by N2 bundles.
Visual check and snoop liquid detector are used for detection leak on the breaking joints.
Holding time will keep in 30 minutes for monitoring any drops pressure.
CAUTION: Leak Test must be STRICTLY complied with the Pressure Testing Procedure
No. CLJOC-HSE-STD-HS-0006 Rev.C
4 JOB CARDS
Page 19 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 20 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Page 22 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
Reference Documents:
2004-4024-01-0140_P&ID; ICC; PTW; Positive isolation plan
Special requirements:
Shutdown oil: No Scaffolding: Yes
Shutdown gas: No Rigging: No
Hot work permit: Yes (taken photos) Painting: No
Cold work permit: Yes Insulation: No
Hazards: Yes (Fire, trip, slip, drop objects) Welding: No
Preheat: No Heat treatment: No
Other: Manual handling, hand tools
Page 23 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
5 ATTACHMENTS
APPENDIX REGISTER
Project Title Vessel Inspection of Glycol Coalescer MAD-2445 on CPP
Project Number CLJOC-FAC-WPK-40-0158 Workplace Inter. Deck
Sheet No. 1/1 System Gas Dehydration
Item
Description Attachment
No.
4 Equipment Layout of CD
Page 24 of 25
WORKPACK FOR VESSEL INSPECTION OF GLYCOL
CLJOC-FAC-WPK-40-0158 Rev. 0
COALESCER (MAD-2445) ON CPP
7 Flushing Plan
Page 25 of 25