1. Description of Works
Supply, installation & Testing of the chilled water piping and its accessories for all
applications in line with project requirements.
3. Access/Egress
6. Work Methodology
Number Activity Description and sequencing
1. Material Storage & Handling
2. Pipes preparation
Before primer, all dirt, dust, grease, oil or other foreign matters
shall be removed by scrapers, wire brushes and solvents or grit
blasting if required.
All finished surfaces shall be free from runs, drops, ridges, waves,
laps, brush marks and variations in color, texture and finish.
Coverage shall be complete, and each coat shall be so applied
as to produce a film of uniform thickness. Special attention shall
be given to ensure that all surfaces including edges, corners,
crevices, welds and rivets receive a film thickness equivalent to that
of adjacent painted surfaces.
Adjacent areas and installations shall be protected by the use of
masking tape, drop cloths or other approved precautionary
measures. Metal surface adjacent to surfaces to receive water
3. Pipe painting @ ground level and touch up above (RC specification shall be
followed)
a) Primer coat (Anticorrosive primer paint)
After pipe surface cleaned primer paint shall be applied immediately
i. red oxide paint as approved from RC engineer
2
ii. Spreading rate: 0.182kg/m /coat
iii. Paint brush or roller coating
b) Second coat (Finishing primer paint)
After pipe installation and prior insulation
i. red oxide paint as approved from RC engineer
2
ii. Spreading rate: 0.059kg/m /coat
iii. Paint brush or roller coating
The proposed chilled water pipes above grade is black steel SCH 40 in
accordance to ASTM A-53 Grade-B SCH-40 as per manufacturer
recommendation and approval.
Fix the sleeves as per approved shop drawings and specification, during
the construction of structural elements.
Pipe sizes 65mm and larger shall have welding joint. Pipe sizes 50mm
and smaller shall have threaded ends as per manufacturer
recommendation. Also refer to point #. 7.4.1 for threaded connection
procedure and 7.4.2
for welding connection procedure.
Page 4 of CONTRACT NO. 021-
RAKAN TRADING
Royal Commission for
& CONTRACTING
Jubail and Yanbu
COMPANY
All the open ends of the pipes shall be protected properly at the end
of each day’s work.
Drains shall be installed at low points in mains and branch lines (Vertical
/ Horizontal) consisting of gate valve and short threaded nipple and cap
so that the system shall be drained completely.
Unions shall be provided adjacent to each screwed type valve and shall
be on the outlet side of the valve.
Plug all open ends of pipes at the end of each day’s work using end caps.
Plug all connections / branches / drains and fill with clean water for
hydro testing.
A. Welder:
I. The welders to be trained and certified
II. The welder must be healthy
III. The welder must be trained for safe work
i.e. toolbox talk etc.
B Equipment:
On site, arc welding is usually carried out with direct current (DC), supplied from
diesel driven generator or Power source. Welding leads and welding return cables
are frequently dragged over rough surface, their insulation should therefore be
suitable for resisting fear and wear.
D Working requirements:
Ensure All Valves are in open condition before starting pressure test,
NO pressure shall be applied against closed valves.
Ensure all system is free from air lock, if so all the vent all entrapped
air from the system.
Repair the leaks and defects if any until satisfactory results are obtained
External chilled water pipes (on roofs and in chiller yard) shall be
insulated as per scope of by not less than 50mm thick rigid insulation
for pipe sizes up to 40 mm dia and 75 mm for for 50mm dia and above.
For both internal and external pipes, the insulation shall be finished as
per scope of work or finished with a water proof Aluglass Cloth
backing (18u / FR Glue / 8x8 Mesh Aluglass Cloth), combined with a
high- performance flame retardant solvent acrylic adhesive, protected
by an easy-release silicone release paper.
Where insulated pipework is run on roof, in plant room, chillers yard and
tunnels it shall be clad using an outer covering of plain aluminum sheet
of 0.7mm or thicker.
Ensure all insulation materials are in dry condition during the application.
Apply insulation with longitudinal seams at top and horizontal pipe runs
For flanges, elbows, fittings and valves mitered section of pipe insulation
of same material shall be used.
Use Thermo foil recommended Tape to seal the joints in a way no air
Page 11 of CONTRACT NO. 021-
RAKAN TRADING
Royal Commission for
& CONTRACTING
Jubail and Yanbu
COMPANY
Identification for Chilled Water Supply and return line and valves and
specialties shall be done as per specification with approved
identification materials. RC specification for identification requirements
must be followed.
7. Resources
c.
Materials and Tools
Item Reason for use
Drill machine / Portable drill For Drilling
Measuring tape For measuring
Steel Hammer For hammering
Spirit Level For leveling
Hole saw Cutter For cutting hole
Marking Pen / Chalk Line For marking
d. Chemicals Required
Item MSDS Number Specific Requirements
01 95370 Wear protective gloves/protective
clothing/eye protection/face protection. Eye
wash station.
02 29208 Wear protective gloves/protective
clothing/eye protection/face protection. Eye
wash station.
03 OK 63.30 (Electrode) Use respirator or air supplied respirator. Wear
hand, head, eyes, ear and body protection like
welders gloves, helmet or face shield with
filter lens, safety boots, apron, arm and
shoulder protection. Eye wash station.
04 ZL-60D Wear protective gloves/eye protection. Eye
wash station.
05 NPD-4 Wear protective gloves/eye protection. Eye
wash station.
Note that all works require mandatory PPE as follows Hardhat, gloves, safety glasses, safety
boots, hi-vis vest.
9. Permits
Permit Type Issued By Additional Information (Reference No. etc)
Hot work permit Foreman Inspected by the safety officer
Product description
Chain Block Safe Working Load - 1 Ton (1000KG) Lift - 6 Meters Minimum Distance Between Hooks -
340MM Chain Falls - 1 Load Chain Diameter - 6MM Hand Chain Length - 5.8 Meters Factor Of Safety
- 4:1 Conforms To: BS EN 13157: 2004+A1: 2009 These Are Manufactured With A Chain Guide To
Provide Smooth Chain Operation And Lightweight Steel Construction For Ease Of Use And Transport.
The Safety Hooks Are Drop Forged And Heat Treated To Ensure Safety And Durability.
H
ENGl¥iEE8. SIGMGE FOg
NOYAIJ.DWEDTO ENTE¥L
i
W0€XING AT MSIBMT. ABM
IS BAORIEADED,
, MAINYAM 100% TIE OFF,
NDT ALLOWED TD EMTEA suPzRyjsofl
ONLY ALLOWED Y0 LISG Or PtlLMY AND BALgET
FOg DE5CENDeifi Of
DISMAN¥L5D TNE MATE9IAI5.
SCAFFOLD. SIGNAGE FOB
FAkMNG l'tAdARD iNPLAEE
AafD UN IN MONfTORIMG
US 1ZM0Ofg TO 2PM6
HMT sTRE5S REtAT¥0,
BAININC
4 3 ' AZ NOT H ' SUNMGMT. NEAT
iurrzuzmze ir zxccso , L
STMSS
$PggD. WORKING oN RAINy '
SEA9ON6 N0TALLOW¥tx
MTfi AND HOLgES5 ARg
REMJNDED TO ALWAYS DNMK
NO NEARBY WORxER
sn5n uust8AxascADzo wrni unLcss iuvotvE iH '
DYk PENETRANT EXPO5UI¥E TO CHcMICAL MSDS AVAlLABcE. pBoP5B PPc Mu5T BgEF PROPERLYyO 1 3 3 L COMPETENT PS905N, SIYE
TESTING ' PROBI.£M
M RE€DMMEMD50 Hi THE tMVO£VE SOCKEk. PROPEg ENGINEER, FOREMAN
! INJURY, PAOPEBTy
wxscins siGzznsz inprocs. uNLcss iuvotvz in
M PASSDRE TESTlf4G FMLURE OF PlPfi H COMPETEMY MMON MUST BE
DAMAGE
AvAjMB E INYWk AREA. INVOLV¥ ¥g0RXER, PROPEn
zguix«sruT use wrr«vcuo nouszXcczi s zoxvaio
YPC TñtPPlNO HAZARD.
Narra
Brief description of
the work and Supply, installation & Testing of the chilled water piping and its
iocaMon accessories for all applications in line with project requirements.
Sequence of Work 1. She preparation-
and how operations Area is fenced, clear from any obstruction, signage
are controlled shall be in place and available.
Inspection of equipment, Daily checMist of equipment.
Area is compacted and level.
All unnecessary materials are removed.
All workers involve safety induction was given, red man
/ green man trained.
2. Material transportation
Driver shall be equipped with a valid Saudi license,
trained with Redman/Green man training, safety
induction and life critical requirements.
Pipe properly secured.
Pipe unload and stored at designated area.
3. Equipment set up,
Area shall be levelled and compacted.
Area barricaded with signage in place.
Equipment and operator with valid TPC.
Loading and unloading forklift
STARRT card is properly filled up and disseminate
towards the workers, site engineer is available at site.
All involve worker are red man/green man trained
• Activity area is secured and barricaded
• All involve worker with manual handling training.
• Equipment and operator with valid TPC.
i
• LOTO must be implemented by the competent person.
• Unauthorized person is not allowed.
• Valid calibration ceñificate
• Training
• Supervision
• Blinding
• Equipment with valid TPC
13. Housekeeping
• Impose housekeeping after the work activities are done.
• Engineer and foreman must follow up if the
housekeeping are properly implemented.
• A circular memo was issued by the project manager
that all worker must allocate 15 minutes for
housekeeping before the end of the shift.
On site supervision arrangements
Task carried out by the Site Eneineer assisted by Foreman and Safety Officer.
021-C09
SAFE SEQUENCE OF WORK
Operator training TPC. Safety induction, site rule regulation, life critical requirement,
requirements Redman/Green man training. Rulea for Driving and Operating Heavy
Equipment.
sefety control Mandatory PPE (Helmet with chin strap, High visibility vest, cotton
measures for gloves, Safety Class, Safety shoes, Full body harness, Dust mask
3* parties etc.), HSE induction, Redman/Grean man training, S*e rute and
regulation, life cñtical training. Equipment / vehicle insurance. Rules
for Driving and Operating Heavy Equipment. Exclusion zone.
Contract f4o..
021-C09 ORGANIZATION CHART
Eng'r. Mohammed AI-Destawi Mr. Muhammad Ishaq Safety Manager 056 2008 281
Contraction Manager
057 8850 957
Emergency Procedure:
1. At the first instance of incident worker should report directly to the foreman, safety officers, nurse or
to the engineer in charge.
2. Stay calm and do not panic.
3. While waiting if situation requires and does not affect the integrity of the patient, bring him in
the clear and fresh area.
4. Do not attempt to help or rescue if not trained or not ask to do so.
5. Do not block at anytime, make the path accessible for the rescue.
6. Upon the arrival of the rescue team, do not interrupt or attempt to help if you are not ask to do it.
The following contact person will be posted and displayed in a prominent areas and notify them in case
of emergency.
All incident must be investigated and reported to the RC Construction Department in timely mannered
as per accident notification and investigation
P&C OF LABOR CAMP
PHASE-1
MR. JAIME R.
GOMEZ SITE NURSE
054-6231-264
USR SOR / MANAGER MR. XHALID MEHMOOO
SITE AMBULANCE
059-2130-905
REGULATORY
ENGR. MAHMOUD J. ABUKABEER ENGR. MOHAMMEO AL-DESTAWI Mfl. MUHAMMAD ISHAQ AGENCIES /
PROJECT MANAGER CONSTRUCTION MANAGER SAFETY MANAGER
THIRD PARTIES
050-5903-785 057-8859-957 056-200g-281
OPERATOR
S/N NAME TPC EXPIRY DATE REMARKS
1 Geronimo Jr. Ostaga (Scissor lift operator) 19 August 2020 Active
2 Muhammad Arif (Forklift operator) 19 August 2020 Active
Royal Comm.lea.ion for eaxanrsao/nsa
Jubail and Yanbu y
C Y
oocument Type:
Methodstatement FOR CuihhED WATER PIPES
PIPING SYSTEM
PRESSURE GAUGE
BALL VALVE
4" PIPE.
SCHEMATIC DIAGRAM OF
PRESSURE TESTING.
1" PIPE
AWS D1.4/01.4M:2011
ELECTRICAL CHARACTERISTICS
Current: Q AC DCEP DCEN
Transfer Mode (CMAW): Short•circuiting @ Globular @ Spray
FILLER METAL
AWS Specification AWS Classification
Describe filler metal (if not covered by AWS specification)
SHIELDING
Gas: | ] Single I | Mixture Composition Flow rate
PREHEAT/IMTERPASS
Preheat/lnterpass Temperature (Min)
Intarpass Temperature (Max)
WELDING PARAIIdETERS
Current Travel
Pass Electrode WFS Electrical Speed Joint
Number Diameter Type Amperage ipm [mm/min.] Volts Stickout (ipm) Detail
'i4
Date:
WELDING PROCEDURE SPECIFICATION Page; lof 2
ASME SEC IX Ed. 2004
JOINTS (QW-402)
TESTIN.G EQUIPMENT
S/N NAME TPC EXPIRY DATE REMARKS
1 Safety Relief Valve (Calibration Certificate) To be followed BEFORE TESTING EXECUTION
2 Pressure Gauge (Calibration CertiRcate) To be followed BEFORE TESTING EXECUTION
3 Manifold (Inspection Certificate) To be followed BEFORE TESTING EXECUTION