1. The document describes a supervision note for the grounding system installation at the Purification Plant V waste area in KY. 2. The grounding system was installed nicely with no issues noted, and pictures will suffice to show the installation of the remaining transverse copper conductor. 3. The supervision note was later updated and approved with no further issues.

Uploaded by

GANESH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

SN830

1. The document describes a supervision note for the grounding system installation at the Purification Plant V waste area in KY. 2. The grounding system was installed nicely with no issues noted, and pictures will suffice to show the installation of the remaining transverse copper conductor. 3. The supervision note was later updated and approved with no further issues.

Uploaded by

GANESH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SN830 Grounding in waste,KY

SN830 Jording i waste,KY


Supervision Note/Tilsynsnotat

Project Purification Plant V Work package Facility_WP-203E_Structure of Tank Farm

Inspection plan 203E_EL Workflow Tilsynsnotat Supervisory note


Group heading Beskyttelse Protection Date created Sep 22 2022, 3:31 PM
Beskyttende
67.2 Udførelseskontrol Deadline Sep 26 2022
potentialudligniing
Building Purification Plant V Created by jon madsen, NNE A/S

Drawing KA KU 6 DD 29 91000 02 (Version 2) Substitute for Diego stougaard, NNE A/S

67.2 Execution control Responsible (Approved, closed)

Building Building KY Critical for HO A - Affects operations and/or safety

Sub Area Group N/A Participants

Sep 22 2022, 3:31 PM Created by: jon madsen, NNE A/S


Assigned to NCC Substitute for: Diego stougaard, NNE A/S

Assignee: Kasper Colmorn, NCC


Title: Jording i waste,KY Grounding in waste,KY
Deadline: Sep 26 2022

Description: Pæn udførelse af jordingsanlægget.

Ingen kommentar til monteringen af kobberlederen.

Tværgående kobberleder var ikke monteret ved tilsyn. Det er aftalt at billeder af dette er
tilstrækkeligt når disse er monteret.

Nice execution of the earthing system.


No comment on the installation of the copper conductor.
Transverse copper conductor was not installed during
inspection. It is agreed that pictures of this are sufficient when
these are mounted.

Dalux Field Printed Nov 7 2022, 5:40 AM


  Anjali Dahiya

Page 1 of 4
SN830 Grounding in waste,KY
SN830 Jording i waste,KY
Supervision Note/Tilsynsnotat

1.1, 2022-09-22, 15.08 1.2, 2022-09-22, 15.08

1.3, 2022-09-22, 15.08 1.6, 2022-09-22, 15.09

1.4, 2022-09-22, 15.09 1.7, 2022-09-22, 15.10

Dalux Field Printed Nov 7 2022, 5:40 AM


  Anjali Dahiya

Page 2 of 4
SN830 Grounding in waste,KY
SN830 Jording i waste,KY
Supervision Note/Tilsynsnotat

1.5, 2022-09-22, 15.09

Sep 27 2022, 11:04 AM Updated by: Fatih Yildiz, NCC


Reported ready by NCC
Substitute for: Kasper Colmorn, NCC

New assignee: Diego stougaard, NNE A/S

2.3, 2022-09-23, 07.08 2.2, 2022-09-23, 07.08

2.1, 2022-09-23, 07.20

Oct 4 2022, 4:54 PM Updated by: jon madsen, NNE A/S

Dalux Field Printed Nov 7 2022, 5:40 AM


  Anjali Dahiya

Page 3 of 4
SN830 Grounding in waste,KY
SN830 Jording i waste,KY
Supervision Note/Tilsynsnotat

Approved by NNE A/S Substitute for: Diego stougaard, NNE A/S

Description: OK herfra.

  OK from here.

Dalux Field Printed Nov 7 2022, 5:40 AM


Anjali Dahiya

Page 4 of 4