Scaffolding Checklist (For HSE Team)

Uploaded by

Sreejith Suresh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Scaffolding checklist

NAME Date
AREA/LOCATION Scaffolding Tag number
No WOK PERMIT,SCAFFOLD DESIGN /PLAN/CALCULATION YES No
1 Is the scaffold categorized as special scaffold?
2 If the scaffold is special scaffold ,was it provided w/ approved Design plan and calculation
3 Work permit has attached scaffold request form, J S A, M S( if applicable)
4 Scaffold to be erected near un-insulated/insulated power lines.
5 Scaffold to be erected near excavation (distance set in yanbu 3 is complied )
6 Permit issuer & certified scaffold supervisor is present during erection ,dismantling & modification
NO SCAFFOLD TAG
1 Scaffold have scaffold tag near the point of access properly fitted and secured with coupler
2 Is the scaffold tag properly filled up by supervisor / inspector (No. of total planked & working platform?
3 The inspector date of the scaffold tag is updated (every 14 days)?
No SCAFFOLD MEMBER /COMPONENTS
1 Sill bored are used to support scaffold on soft surfaces with base plate ?
2 Screw jack is not adjusted more than 2/3 of its threaded length?
3 Post standards are plumb and level and the lift height is not more than 2 meters?
4 If tube and coupler scaffold is used is the post standards connection is not on the same bay and lift?
5 Are the tubes and couplers used having no defects?
6 Post standard for light duty is not more than 1.2 meter ×2.7 meter apart ?
7 Post standard for medium duty is not 1.2 meter ×1.8 meter apart ?
8 All working level is fully planked and no gaps can be found more than 1 inch
9 Wood planks are free from damage ,decay ,defects ,crack, bent and twist
10 Planks are firmly secured against movement at both sides ?
11 Planks extending their end support not more than 6 inches to maximum of 12 inches
12 End of planks are properly supported end to end
13 Top rails ,mid rail, toe board on all open sides are installed ?
14 Guardrails and toe boards are fixed inside of support post?
15 Ties guys or raker is provided if the scaffold is 4 times the minimum base dimension
16 Scaffold is vertically braced and in the full length of scaffold
17 Braces are attached as close as possible to post , runner , bearer interconnection ?
18 Working platform has access by ladder ,stair ,ramp or walkway ?
19 Ladder is placed 75 degrees (4:1) or if ladder is vertical is it properly attached in the top ,middle,bottom?
20 Ladder extend at least 1 meter or at least 3 rungs above the landing platform
*for the complete checklist pleas use the scaffold user’s safety checklist found at
the back of scaffold tag
HSE DEPARTMENT