0% found this document useful (0 votes)
72 views

Dokumentasi Pekerjaan Service Fire Alarm System Di Pt. Bumi Tangerang Mesindotama (BT Cocoa)

This document documents the service work performed on the fire alarm system at PT. Bumi Tangerang Mesindotama (BT Cocoa). It contains before and after photos of the fire alarm systems in various areas of the facility, including the boiler area, warehouses, offices, powder plants, and more. Over 50 pairs of photos show the fire alarm equipment and components before and after the service work was completed.

Uploaded by

warnet ilham
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Dokumentasi Pekerjaan Service Fire Alarm System Di Pt. Bumi Tangerang Mesindotama (BT Cocoa)

This document documents the service work performed on the fire alarm system at PT. Bumi Tangerang Mesindotama (BT Cocoa). It contains before and after photos of the fire alarm systems in various areas of the facility, including the boiler area, warehouses, offices, powder plants, and more. Over 50 pairs of photos show the fire alarm equipment and components before and after the service work was completed.

Uploaded by

warnet ilham
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM

DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Area boiler bifore Area boiler after Beacon sounder bifore area deo

Bifore area deo After area deo After area deo beacon sounder

Bifore TBFA Area gudang sperpart Bifore TBFA Area gudang sperpart After area gudang sperpart TBFA
DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Mcp area gudang sperpart bifore After area gudang sperpart Bifore area traning

After area traning Beacon sounder bifore Area mikro bifore

After area mikro Bifore area Gh 1 Bifore area Gh 1


DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

After Gh 1 Bifore area panel lantai 3 Bt 3 Bifore area panel lantai 3 Bt 3

Bifore area silo Bifore area silo After area silo

After area silo Bifore area Sulawesi room After office lantai 1
DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Bifore office lantai 2 Bifore office lantai 2 After office lantai 2

Bifore area sempling Bifore area sempling After area sempling

After area sempling Bifore area tanki After area tanki


DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Bifore area powder plant lantai 2 Bifore area powder plant lantai 2 After area plant room lantai 2

Bifore area powder plant room lantai 2 After area powder plant room lantai 2 Bifore area powder resmil qq

After area powder resmil qq Bifore area room press Bifore area room press
DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

After area room press After area room press Bifore area room press

After area room press Bifore area panel BT 3 Bifore area panel BT 3

After area room panel BT 3 After area room panel BT 3 Bifore area binowing
DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

After area binowing cleaning After area binowing cleaning Bifore area winowing Bt 3

Bifore area winowing Bt 3 Bifore area winowing Bt 3 Bifore area winowing Bt 3

After area winowing Bt 3 After area winowing Bt 3 Bifore Bt 3 ruangan opex


DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

After Bt 3 ruangan opex Bifore area low peras Bifore area low peras

After area low peras After area low peras Bifore area row peras

After area row peras Bifore area plant at rm office After area plant at rm office
DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Bifore area plant at rm office Bifore area plant at rm office After area plant at rm office

After area plant at rm office Bifore area office timbangan Bifore area office timbangan

After area office timbangan Bt 3 Bifore area office timbangan Bt 3 After area timbangan Bt 3
DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Bifore area office warehouse Bt 3 Bifore area office warehouse Bt 3 After area office warehouse

Bifore area office warehouse Bt 3 After area office warehouse Bt 3 Bifore area locker Bt 3

Bifore area locker Bt 3 After area locker Bt 3 After area locker Bt 3


DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Bifore area locker Bt 3 After area locker Bt 3 Bifore area laboratory chimical Bt 1

After area laboratory chimical Bt 1 Bifore area BT 3 gedung putih Bifore area BT 3 gedung putih

After area Bt 3 gedung putih lt 1 After area Bt 3 gedung putih lt 1 Bifore Bt 3 gedung putih lt 2
DOKUMENTASI PEKERJAAN SERVICE FIRE ALARM SYSTEM
DI PT. BUMI TANGERANG MESINDOTAMA (BT COCOA)

Bifore Bt 3 gedung putih lt 2 After Bt 3 gedung putih lt 2 After Bt 3 gedung putih lt 2

After Bt 3 gedung putih lt 2 Bifore gedung putih lt 1 After gedung putih lt 1

Bifore gedung putih lt 2 Bifore gedung putih lt 2 After gedung putih lt 2