An administrator receives reports about a Nutanix environment. The investigation finds the following;
VMs are experiencing very high latency
Each node is equipped with a single SSD, utilized at 95%
Each node is equipped with three HDDs, utilized at 40% Why
are the guest VMs experiencing high latency?
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
Reference: https://next.nutanix.com/how-it-works-22/disk-i-o-latency-on-a-nutanix-cluster-
38349
QUESTION 2
In a Nutanix cluster, a Protection Domain contains 50 entities that are replicated to a remote Single Node Replication Target. The current schedule configuration is as follows:
Repeat every 6 hours
Local Retention Policy 1
Remote Retention Policy 8
Starting time 12 am
At 8 am on Monday, the administrator discovers that a protected VM is corrupted. The latest good state was Sunday 2 pm. The administrator needs to maintain current protection.
A. From the Remote site, activate the Protection Domain, then re-protect the entity.
B. From the Remote site, restore the VM from the local snapshot by selecting the correct snapshot.
C. From the local site, retrieve the correct remote snapshot, then restore the VM locally.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
D. From the local site, restore the VM from the local snapshot by selecting the correct snapshot.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 3
An administrator has a custom backup application that requires a 2TB disk and runs in Windows. Throughput is considerably lower than expected. The application was installed on a VM with the following configuration: •
Four vCPUs with one core/vCPU
• 4GB of Memory
• One 50GB vDisk for the Windows installation
• One 2TB vDisk for the application
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 4
An administrator is responsible for the following Nutanix Enterprise Cloud environment:
A central datacenter with a 20-node cluster with 1.5PB of storage
Five remote sites each with a 4-node cluster with 200TB storage
The remote sites are connected to the datacenter via 1GB links with an average latency of 6 ms RTT.
What is the minimum RPO the administrator can achieve for this environment?
A. 0 minutes
B. 15 minutes
C. 1 hour
D. 6 hours
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 5
An administrator of a Nutanix Enterprise Cloud has microsegmentation enabled and a firewall VM installed. The security team notifies the administrator that one of the VMs hosted in the environment has been exhibiting suspect network
activity. The administrator wants to isolate the VM from the production network, but must still be able to access it to perform diagnostics.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
D. Create a security policy with a service chain directing that VMs traffic to the firewall
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 6
A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B. The customer then runs the following command on Site A: ncli pd
deactivate_and__destroy_vms name=<protection_domain_name>.
A. VMs get deleted from Site B and the protection domain is now Active.
B. VMs are powered off on Site A and must be manually powered on at Site B.
C. VMs get deleted from Site A and the protection domain is no longer active.
D. Customer must then manually power off VMs at Site A and power them on at Site B.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
QUESTION 7
An administrator needs to create and start five new VMs for a Data Analytics Project (OLAP). The VM Profile is as follows:
vCPU:4 vRAM: 64 GB vDisk: 1.5 TB
Each of the four nodes of the Nutanix cluster has the following:
24 vCPU. 20% overall usage
192 GB RAM, 60% overall usage
2 x l920 GB SSD
4 x 2 TB HDD
At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB.
A. Physical RAM, because it is not enough to power on all of the new VMs.
B. Physical Cores, because they are not enough to power on all of the new VMs.
C. Storage, because the capacity is not enough to create VMs.
D. Flash Tier because it is not enough to accommodate the workloads.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 8
An administrator manages the following two Nutanix AOS 5.15 cluster environment: Corp-cluster-
01
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Corp-cluster-02
The VM images must be available only on Corp-cluster-01, but cannot be checked out to cluster Corp-cluster-02. The images also cannot be checked out to any other clusters that are registered with Prism Central in the future.
Which two configuration settings must the administrator choose when creating the image placement policy that satisfies the stated requirements? (Choose two.)
A. Create an image placement policy that identifies cluster Corp-cluster-01 as the target cluster
B. Set the policy enforcement to Soft.
C. Set the policy enforcement to Hard.
D. Create an image placement policy that identifies cluster Corp-cluster-02 as the target cluster.
Correct Answer: AC
Section: (none)
Explanation
Explanation/Reference:
QUESTION 9
An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are connected by a 1GbE connection. A new workload is going to be deployed to this
cluster. This workload requires a sustained 150MB/s of write throughput and 20MB/s of read throughput.
Which change must be made to deploy the workload successfully on this cluster?
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 10
Refer to the exhibit.
What are two descriptions of how Files perform quota management? (Choose two.)
A. User 2 can continue to add another 3GB file but will receive a daily notification email.
B. User 1 can continue to add another 5GB file but will receive a daily notification email.
C. User 1 can add an 8GB file to the share without receiving notification.
D. User 2 can add an 8GB file without receiving a notification email.
Correct Answer: BD
Section: (none)
Explanation
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Explanation/Reference:
QUESTION 11
An organization is planning an upgrade to AOS 5.15 and wants to understand which cluster products and/or services are supported for physical traffic isolation. Which Nutanix component supports its network traffic being isolated onto its own
virtual network?
A. Volumes
B. Objects
C. Containers
D. Files
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 12
An administrator is planning to deploy a Nutanix cluster to support a few high-performance VMs. This deployment will have the following considerations:
Individual VMs will likely generate network throughputs in the range of 90-100Mbps
Due to the configuration of the VMs, it is unlikely that a node will host more than one or two of them at a time
Individual VMs will communicate with only a few (one or two) remote hosts at a time
Multicast will not be used in the environment
The hosts are connected via two 1GbE network connections
How should the administrator configure the network bonds to meet this requirement while maintaining the simplest switch configuration?
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 13
An administrator configures authentication in Prism Central (PC) for the NTNX-Admins group. Users report that they are unable to log in. The administrator confirms that the Active Directory (AD) settings in PC are correct. Which condition
could result in this behavior?
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 14
An administrator has an existing Nutanix seven-node cluster running at RF2 that must be changed to have the following capabilities:
RF3 set for the cluster
Performance tier deduplication
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
What is the minimum memory needed on the CVMs to allow for these capabilities?
A. 24GB
B. 28GB
C. 32GB
D. 20GB
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
Controller VMs must be configured with a minimum of 28 GB (20 GB default + 8 GB for the feature) of memory.
Reference: https://next.nutanix.com/how-it-works-22/rf2-rf3-requirements-
37206
QUESTION 15 An administrator needs to deploy an application with a large amount of data connected via
Nutanix Volumes.
Which two actions should the administrator take when designing the Volume Group? (Choose two.)
Correct Answer: BD
Section: (none)
Explanation
Explanation/Reference:
QUESTION 16
An administrator deploys Exchange on a Nutanix cluster. The administrator creates two containers with RF2 configuration:
One container for Exchange
One container for the other VMs
Which changes to Storage Optimization should be used on the Exchange container to enhance I/O performance?
A. No data reduction
B. Post process Deduplication only
C. Inline compression and EC-X
D. Inline compression and Deduplication
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 17
An administrator learns that some security settings in a cluster have been changed. The environment is out of compliance with required policies.
Which function should be used to revert any settings that have changed from the defaults and prevent further violations?
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
A. Cluster Lockdown with strong password enforcement
B. Advanced Intrusion Detection Environment (AIDE)
C. Security Configuration Management Automation (SCMA)
D. Defense Information Systems Agency STIG enforcement
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Reference: https://portal.nutanix.com/page/documents/details?targetId=Nutanix-Security-Guide-v5_17:secsecurity-scma-implementation-wc-c.html
QUESTION 18
A customer with a four-node RF2 cluster is adding application VMs to their system. After adding these Vms, the Prism dashboard shows 81% storage utilization.
A. The customer has the ability to add more VMs up to the 100% storage utilization.
B. There is available capacity in the storage fabric and the cluster is resilient.
C. Node failure is imminent due to storage utilization.
D. The cluster is not resilient in the storage fabric
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
The customer wants to perform a planned failover between the sites. How should the administrator accomplish this?
A. Click Activate on the Secondary site within the Data Protection Dashboard
B. Click Activate on the Secondary site and run deactive NCLI command on Primary site
C. Choose Migrate on the Secondary site within the Data Protection Dashboard
D. Choose Migrate on the Primary site within the Data Protection Dashboard
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Reference:
https://portal.nutanix.com/page/doc
uments/details?targetId=Web-
Console-Guide-Prism-
v510:wcprotection-domain-failover-
wc-t.html
QUESTION 20 A systems administrator needs to add more VMs to their Nutanix cluster. Which two actions should the administrator perform to determine if the current cluster could accommodate the new VMs?
(Choose two.)
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
A. Perform an Inventory with Life Cycle Management.
B. Determine utilization with Cluster Runway.
C. Enable Deduplication and Erasure Coding.
D. Utilize Optimize Resources for VM efficiency.
Correct Answer: BD
Section: (none)
Explanation
Explanation/Reference:
QUESTION 21
An administrator responsible for a VDI environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of
the host CPU on the cluster. The administrator increases the vCPU count on all of the VDI VMs. What are two impacts on the cluster? (Choose two.)
Correct Answer: AB
Section: (none)
Explanation
Explanation/Reference:
QUESTION 22
An administrator is deploying an application using Nutanix Volumes. After configuring the volume group and connecting the guest's iSCSI initiator to the volume group, they begin performance testing. The administrator learns that performance
on the virtual disk attached to the iSCSI initiator is far less than that of a virtual disk connected directly to the VM.
A. The VM's iSCSI traffic is being routed to the data services IP subnet
B. The performance test is generating small block random 10
C. The duster data services IP address is a bottleneck, shared with other iSCSI traffic
D. Data Locality ensures that VM attached disks are always faster than iSCSI volumes
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 23
A guest VM is reported to have poor storage performance. It has an I/O profile of 80% read. 20% write, and the HDDs form more than 50% of the read source.
Correct Answer: A
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Section: (none)
Explanation
Explanation/Reference:
QUESTION 24
An administrator is deploying a three-tier application on a Nutanix Enterprise Cloud consisting of web, application, and database VMs. Traffic between the servers must be limited to specific services/ports.
A. Create a network for each type of VM, and use policy-based routing to control the traffic flow
B. Configure a security policy and service chain redirecting the server traffic through the firewall
C. Separate the web application and database VMs on to dedicated VLANs
D. Categorize the VMs in Prism Central and utilize Flow to set a security policy
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
QUESTION 25
An administrator needs to make sure an RF2 cluster can survive a complete rack failure without negatively effecting workload performance. The current cluster configuration consists of the following:
30 nodes: distributed 10 nodes per rack across three 42U rack
Each nodes is configured with 40TB usable storage all flash (Cluster Total 1.2 PB Usable)
Current cluster utilization is 900TB storage
Which configuration changes should be made to make sure that the cluster meets the requirements?
A. Expanse the cluster by adding 3 additional nodes per rack, 9 nodes total.
B. Expanse the cluster by adding 2 additional nodes per rack, 6 nodes total.
C. Expanse the cluster by adding 9 nodes to a new 42U rack
D. Expanse the cluster by adding 8 nodes to a new 42U rack
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 26 A company needs to replicate their VMs to a remote site and must have an RPO of
less than 1 hour.
When creating a protection domain, what should an administrator do to meet this requirement?
Explanation/Reference:
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
QUESTION 27
An administrator is monitoring the Nutanix v5.15-based AOS cluster performance logs and notices that a SQL server VM is greatly exceeding its intended maximum IOPS. The administrator has confirmed that a QoS policy was previously
created for the group of VMs this server is a member of.
What are two reasons that this VM would exceed its maximum configured IOPS from the QoS Policy? (Choose two.)
A. The VM is missing the required snapshot needed to implement the QoS Policy.
B. The VM was not created as an AFS virtual machine.
C. The SQL Server VM has volume groups attached.
D. It was cloned from another SQL Server VM that was a member of the QoS Policy.
Correct Answer: BC
Section: (none)
Explanation
Explanation/Reference:
QUESTION 28
A customer has a Nutanix cluster with 10Gb connectivity via switch fabric extenders. The administrator receives NCC health check errors of latency greater than 200ms.
Which action should the administrator take to resolve the NCC errors?
A. Replace the switch fabric extenders with 10G line rate switches
B. Upgrade NCC and increase the CVM memory by 4Gb
C. Add 2 additional 10G uplinks from the switch fabric extenders per node
D. Upgrade NCC and increase the vCPU of the CVM
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 29
An administrator knows that the disks in a cluster are out of date and a new firmware is available. For security reasons, these clusters do not have access to the Internet. Which
Correct Answer: AB
Section: (none)
Explanation
Explanation/Reference:
QUESTION 30
A customer needs a DR solution designed around the following requirements:
There are 8 ms of latency between Sites A and B
The administrator needs the shortest RPO/RTO possible
Application consistent snapshots are required
Use of Nutanix VSS
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
A. Async
B. Metro Availability
C. Near Sync
D. Cloud Connect
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 31
A VM is exhibiting one or more of the following baseline values based on the past 30 days:
CPU usage < 20%
CPU ready time < 5%
Memory usage < 50% (moderately) or < 20% (severely)
Memory swap rate = 0 Kbps
A. Constrained VM
B. Inactive VM
C. Bully VM
D. Over-Provisioned VM
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
QUESTION 32 An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be
decommissioned.
A. Check the Disregard Existing Workloads radio button in the Runway scenario.
B. Check the Disregard Existing Nodes radio button in the Runway scenario.
C. Add up the recovered workloads and manually remove from the Runway configuration.
D. Power down the workloads during a maintenance window and run the Capacity Runway.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 33
An administrator is deploying several new application VMs to a Nutanix cluster. The application is very transactional with a 28/72 random, read/write ratio.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
What should the administrator do?
A. Add a minimum of four SSDs to each node to ensure all writes go to the SSDs.
B. Add a minimum of four virtual disks to each VM, and aggregate them on guest OS level.
C. Add one large SSD to each node and enable Flash Mode for the VMs.
D. Add one large virtual disk to each VM and use it for all application data.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation:
>Multiple vdisks should be attached (they can be unified with LVM for example) to get more performance from VM’s, as Nutanix OS limiting oplog size per vdisk (to avoid “noisy neighbor” problem).
Reference:
https://next.nutanix.com/server-virtualization-27/iops-latency-issue-1168
QUESTION 34
An alert about RX errors on eth2 on a node is reported in the cluster. The administrator logs in to the CVM in question, checks the ping_* files in the data/logs/syststats folder, and notices intermittent ping loss. The node in question has the
following network configuration:
Which action should be used to troubleshoot without disrupting the VMs running on this node?
A. Replace the cable from eth2 to the switch
B. Remove eth3 from br0-up and monitor for new alerts
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
C. Check the port on the switch side for any errors
D. Enable balance-s1b on br0-up and monitor if a problem persists
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Reference:
https://portal.nutanix.com/page/documents/details?targetId=Files-v3_6:fil-files-high-availability-c.html
QUESTION 36 Refer
to the exhibits.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
After analyzing the information presented in the exhibits, which option shows the best conclusion regarding this workload?
A. VM is CPU constrained since the hypervisor cannot provide the required resources.
B. VM is CPU constrained because more CPU needs to be added to the VM.
C. VM is Storage constrained, because the workload is waiting for storage access.
D. VM is not CPU constrained, because the VM is not running, a multithreaded application.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 37
An administrator is performing a set of routine checks and notes that Prism Central is running with 4 vCPUs and 21 GB RAM. The organizations environment is based on two Nutanix clusters with 170 VMs plus a Legacy vSphere
infrastructure. No manual changes have been done on Prism Central VM.
A. Nutanix Move is running on Prism Central to import VMs from the Legacy Cluster.
B. Prism Central was installed for Large Deployment environments.
C. Prism Central is running on the legacy cluster and requires more RAM.
D. Nutanix Leap and Nutanix Flow have been enabled on Prism Central
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
QUESTION 38
A customer wants to run SAP HANA on a Nutanix cluster with the following characteristics:
AHV nodes
SAP HANA version 2
Production database files
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
Do not configure storage-saving functionalities such as compression, deduplication, or erasure coding (EC-X) on a storage container that holds production database files. Because of the way the SAP HANA Persistence Engine stores data,
these features deliver no benefits. Nutanix SAP Engineering has tested compression with SAP HANA workloads; the tests indicate no noticeable performance impact but also show no reduction in the space the SAP HANA workload
consumes.
Reference: https://www.nutanix.com/go/sap-hana-on-nutanix-
bpg
QUESTION 39
An administrator receives reports that VDI desktop performance in an 8-node Nutanix VDI environment is poor. Opening applications takes between 1 and 2 minutes. When investigating the issue, the following conditions are found:
Cluster memory utilization: 80%
Cluster SSD utilization: 70%
Average VM CPU Wait Time: 11%
CVM CPU utilization: 75%
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
B. Add memory to the nodes in the cluster.
C. Add CPU resources to the cluster.
D. Increase the number of vCPU cores allocated to the CVM.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 40
An administrator receives an alert in Prism indicating that interface eth2, on an AHV host is receiving many CRC errors. After togging into the problematic host, the following command is run to show the indicated output:
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Explanation: rx_crc_errors are caused either by faults is layer 1 (in the past, we have seen failed twinax cables and incorrect types of fibre being used), or issues with jumbo frames on the network. In an environment with 10 Gig switches
that use cutthrough forwarding (Cisco Nexus, Arista, Cisco devices using IOS default to Store and Forward switching), any packets that come into the switch will get forwarded out the destination interface once the switch has read the
destination MAC address. If that packet has an MTU over what is configured on the interface, it will cut off the packet at the designated MTU, causing the server to receive a malformed packet, which will throw a CRC error. If you have a
layer 1 issue, you will see rx_crc_errors, not on all but one or two nodes.
QUESTION 41
An administrator needs to migrate workloads from a Nutanix cluster running VMware ESXi to Nutanix AHV. The migration process needs to be completed in multiple VM groups and support roll back in case any problems are found during user
acceptance testing.
Correct Answer: C
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Section: (none)
Explanation
Explanation/Reference:
QUESTION 42
Refer to the exhibit.
After performing ESXi to AHV conversion on a cluster, the alerts shown in the exhibit display on Prism. What should the administrator do to resolve this issue efficiently?
A. Remove the VMs. create a new Protection Domain, and add VMs to it.
B. Remove VMs from the Protection Domain and add them back in.
C. Delete the Protection Domain, create a new Protection Domain, and add the VMs to it.
D. Create a new Protection Domain and add the VMs to rt.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 43
For several days, an administrator notices the following alerts:
CVM NIC Speed Low Warning Alerts
Warning Alerts of CVM NIC not performing at optimal speed
CVM is disconnected from the network Critical Alert
Network Visualization page shows excessive dropped packets on CVM/Host.
Which steps should be taken to determine which problem should be addressed first?
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Access the Alerts/Events page for the CVM network connection failures
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 44
An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance window. The cluster will use the same IPs in the new datacenter.
Which two steps should be taken to prepare for this task? (Choose two.)
Correct Answer: AC
Section: (none)
Explanation
Explanation/Reference:
Reference:
https://next.nutanix.com/installation-configuration-23/physical-relocation-of-nutanix-clusters-38403
QUESTION 45
An administrator needs to evaluate if the existing configuration of Protection Domains meets the specified corporate recovery policy for SQL Data. The corporate policy requires that all SQL Servers be recoverable at the DR site within 30
minutes, and must result in a maximum of 60 minutes of data loss. SQL data must be required.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 46
An administrator needs to make sure an RF3 cluster can survive a failure of two complete racks without negatively affecting performance. The current cluster configuration consists of the following:
30 All Flash Nodes: distributed 10 nodes per rack across three 42U racks
Each node is configured with 20TB usable storage all flash (Cluster Total 600TB Usable)
Current cluster utilization is 500TB storage
Storage containers have Erasure Coding enabled
Which configuration changes should be made to make sure the cluster meets the requirements?
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
A. Expand the cluster to 50 nodes distributed evenly across 5 racks
B. Expand the cluster to 48 nodes distributed evenly across 6 racks
C. Expand the cluster to 60 nodes distributed evenly across 6 racks
D. Expand the cluster to 40 nodes distributed evenly across 5 racks
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 47
An administrator receives an error indicating that the CVMs in the cluster are not syncing to any NTP servers. An investigation of the issue finds:
The NTP servers are configured in Prism
The time on all CVMs is the same
Both the CVMs and AHV hosts are configured for the UTC time zone
Which two steps can be taken to troubleshoot this issue? (Choose two.)
A. Confirm that the NTP servers are reachable from the CVMs.
B. Restart genesis on all CVMs.
C. On a CVM. run the command a Hash ntpq -pn.
D. Restart the chronos service on all CVMs.
Correct Answer: AC
Section: (none)
Explanation
Explanation/Reference:
QUESTION 48
HOTSPOT
Which correct configuration options should the administrator use to meet the item requirements? For each procedure, indicate whether it is a correct or incorrect procedure that must be configured to meet the item requirements using the drop-
down option.
Hot Area:
Correct Answer:
Section: (none)
Explanation
Explanation/Reference:
QUESTION 49
A Nutanix cluster is deployed with the following configuration:
Three four-node blocks (A, B, and C)
All Flash Redundancy Factor 2
What is the effect of simultaneous disk failures on two nodes located in block A?
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
B. Each node with a failed disk is marked as degraded.
C. VM read and write operations continue normally.
D. VMs on the nodes with failed disks are unable to write data
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
Dual Disks Failures:
With Replication Factor = 2, we have two copies of each data block. Also, with a 4TB Disk which is only 1TB utilized, we will have 1TB worth of blocks/data across the cluster (shorter rebuild times as we factor in the capacity
utilized) – plus with AOS proactive disk alerting, so, unless two disks are pulled at the same time, this can be a very rare occurrence of two drives failing at the same time.
Reference:
https://next.nutanix.com/prism-infrastructure-management-26/nutanix-fault-tolerance-question-33903
QUESTION 50
An administrator is concerned that Prism will be inaccessible if Active Directory is unable to process logins. Which method should the administrator use to access the cluster in the event of this type of outage?
A. Manage the cluster by using the "nutanix" user on the Prism leader CVM
B. Create and use an emergency local account on the cluster
C. Deploy an Active Directory server locally on the cluster
D. Manage the cluster remotely by downloading ncli to a remote workstation
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 51
An organizations Nutanix Cluster is based on VMware vSphere. The cluster is configured to download software updates automatically. The administration needs to verify and eventually upgrade VMware hypervisor via Prism Ul. After logging
in to Prism, the administrator receives the message shown: No available versions for upgrade.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 52
An administrator recently added VLAN 205 CRM in Prism Element. The workloads attached to the associated NICs are unable to establish network connectivity.
Which Layer 2 protocol allows the administrator to troubleshoot this issue from Prism Element?
A. HDLC
B. SUP
C. LACP
D. LLDP
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Explanation:
Switch information on Nutanix AHV
Managing and troubleshooting virtual guests’ network connectivity issues is quite difficult, if you do not have right information about upstream switches. It is crucial to understand how Nutanix hosts are connected, hosting switch name,
location, switch port number. Nutanix AHV leverages OVS (Open VSwitch) to manage AHV hosts and Guest OS network connectivity. OVS can use LLDP (Link Layer Discovery Protocol) to pull information from physical switches. LLDP is
automatically enabled on Nutanix AHV. To have LLDP discovery working you have to enable it on the network port switches as well. Nutanix AHV will automatically pull switch information and present it in the Prism. In Prism Element, on
main dashboard click on Home -> Network
QUESTION 53
An administrator is deploying an application that requires maximum I/O throughput for scratch data. The administrator is concerned that the throughput requirement is greater than what can be provided by a single cluster node. What should
the administrator do to meet this requirement?
A. Create a volume group with several virtual disks and attach to the VM
B. Create a volume group with one virtual disk attached to the VM
C. Create a virtual disk attached to the VM's PCI interface
D. Create several virtual disks attached to the VM's virtual SCSI controller
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Reference:
https://next.nutanix.com/archive-44/scaling-up-vm-storage-performance-on-ahv-volume-group-load-balancer-28063
QUESTION 54
An administrator protected a DB VM running on a Nutanix cluster with NearSync Replication, which schedules to repeat every 15 minutes to a second site. The daily change rate is low. During nightly backups, the replication window is missed
due to write volume. Which two options describe the expected behavior? (Choose two.)
Correct Answer: AD
Section: (none)
Explanation
Explanation/Reference:
QUESTION 55
HOTSPOT
A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.
Hot Area:
Correct Answer:
Section: (none)
Explanation
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Explanation/Reference:
QUESTION 56
An administrator is migrating 5MB shares from a third-party platform to Nutanix Files with the following characteristics:
Shares contain user profile directories DFS-
N will be used
How should the administrator create target shares for this migration?
A. Create multiple general purpose shares and distribute migrated data as evenly as possible.
B. Create multiple distributed shares and distribute migrated data as evenly as possible.
C. Create standard shares with multiple top-level directories and distribute migrated data.
D. Create distributed shares with multiple top-level directories and distribute migrated data.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
QUESTION 57
Refer to the exhibit.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
QUESTION 58
Refer to the exhibit.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
An administrator configures Active Directory authentication as shown in the exhibit. Upon finishing setup, users are not able to log in.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 59
An administrator inherits a new Nutanix environment and logs in to a CVM to check the network configuration. The configuration is as follows:
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Which action should the administrator take to improve network performance?
A. Configure VLAN tagging both on br0 and br1 and their physical interfaces.
B. Add eth0 and eth1 to the br0-up bond
C. Configure balance-sib or balance-tcp mode for br0-up if switch configuration allows
D. Remove one 10 Gbs interface from br0-up to make sure all 10 Gbs can be used.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 60
An administrator is implementing a VDI solution. The workload will be a series of persistent desktops in a dedicated storage container within a four-node cluster. Storage optimizations should be set on the dedicated storage container to give
optimal performance including during a node failure event.
Which storage optimizations should the administrator set to meet the requirements?
Correct Answer: B
Section: (none)
Explanation
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Explanation/Reference:
QUESTION 61 Microsegmentation was recently enabled in a Nutanix environment. The administrator wants to leverage Prism Central to create a policy that will block all traffic, regardless of direction, between two groups of Vms identified by
their category.
A. A Quarantine Policy
B. An Isolation Environment Policy
C. An Application Security Policy
D. A Whitelist-Based Policy
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 62 An administrator is configuring software only. Data-at-Rest Encryption on their Nutanix cluster. They are planning to deploy a third-party key management server (KMS). Where should this
server be hosted?
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 63
An administrator has a VM that consumes large amounts of storage and has the following characteristics:
Create large / sequential writes
Data must be kept for years
Data is normally only accessed at the end of the year to run report
Which feature should the administrator utilize to save space for this VM?
A. Inline Compression
B. Flash Mode
C. Cache Dedup
D. Post-Process Compression
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
QUESTION 64
While creating an image placement policy on the organizations AOS 5.15-based Nutanix cluster, the administrator wants to ensure there are no restrictions on using the selected images on clusters outside of the identified set. What type of
Policy Enforcement must the administrator choose?
A. Soft
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
B. Internal
C. Hard
D. External
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
QUESTION 65
A VM does not have enough resources for the demand, which leads to performance bottlenecks. The VM is exhibiting one or more of following baseline values, based on the past 30 days:
CPU usage > 90% (moderate), 95% (high)
CPU ready time > 5%, 10%
Memory usage > 90%, 95%
Memory swap rate > 0 Kbps (no moderate value)
A. Constrained VM
B. Bully VM
C. Inactive VM
D. Over-provisioned VM
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
Constrained VM is one that does not have enough resources for the demand and can lead to performance bottlenecks. A VM is considered constrained when it exhibits one or more of the following baseline values, based on the past 30 days:
CPU usage > 90% (moderate), 95% (high)
CPU ready time > 5%, 10%
Memory usage > 90%, 95%
Memory swap rate > 0 Kbps (no moderate value)
QUESTION 66 A customer has Metro Availability configured in Automatic Resume Mode between
Site A and Site B.
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Explanation:
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Reference:
http://www.joshodgers.com/2016/06/15/whats-next-2016-metro-availability-witness/
QUESTION 67
A new Nutanix cluster is ready for production on a remote site with no IT staff. Changes to the infrastructure will cost money and probably cause a cluster stop.
The administrator needs to perform a health check on the environment that should include:
Network connectivity checks
Network performance status
Storage performance status
A. X-Ray
B. curator_cli
C. NCC
D. diagnostic, py
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 68
An administrator needs to expand a cluster based on AHV and running on Nutanix G5 hardware with a new Nutanix G7 system. The cluster is running AOS 5.10 but the operation fails when expanding the cluster. AOS is running on the new
system. There are no issues discovering the node.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
A. AOS version running on G7 is older than the version on the cluster.
B. Foundation software has not been updated on the cluster.
C. G7 hardware cannot be added to a G5 cluster.
D. EVC needs to be configured before cluster expansion
Correct Answer: A
Section: (none)
Explanation
Explanation/Reference:
Reference: https://next.nutanix.com/installation-configuration-23/product-mixing-
restrictions-37231
QUESTION 69
An administrator needs to replace the self-signed certificate on a cluster. Which two requirements must be met as part of the process? (Choose two.)
Correct Answer: BD
Section: (none)
Explanation
Explanation/Reference:
QUESTION 70 An administrator is using Nutanix Move to migrate a Windows VM from ESXi to AHV. Automated guest preparation is
failing with an error:
The administrator is using the local built-in administrator account for the Windows VM Admin approval mode must remain enabled.
What should the administrator do to continue with the migration with Nutanix Move?
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Reference:
https://portal.nutanix.com/page/documents/kbs/details?targetId=kA00e0000009DpgCAE
QUESTION 71
Refer to the exhibit.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
An administrator has an existing cluster and needs to improve performance using AHV Turbo. Which two items are required to achieve even greater performance? (Choose two.)
Correct Answer: AD
Section: (none)
Explanation
Explanation/Reference:
QUESTION 72 An administrator finds that home shares cannot be configured in a new Files
3.5 deployment.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
Reference: https://portal.nutanix.com/page/documents/details?targetId=Files-v35:fil-file-share-create-wc-t.html
QUESTION 73
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
An administrator receives a notification that storage in a Nutanix cluster is unavailable. The cluster consists of five nodes and is configured with a Fault-Tolerance level of 1 (FT-1). Upon
investigation, the administrator finds the following:
All AHV hosts are powered on and the CVMs are running
Nodes A, B, and C are connected to one top of rack switch
Nodes D and E are connected to a second top of rack switch
The cluster status command run on Node A shows that CVM services on nodes D and E are down.
A. The default gateway for the CVMs and AHV hosts is down.
B. The switch connecting Nodes D and E is down.
C. The genesis process is down on both Nodes D and E.
D. Nodes D and E are in maintenance mode.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
Reference: https://hyperhci.com/2020/07/29/nutanix-cluster-services-down-
troubleshooting/
QUESTION 74
An administrator needs to replace an aging SAN and move to a hyper-converged infrastructure. The existing environment consists of the following hosts that are connected to the SAN:
5xAIX hosts
3x Hyper-V hosts
9xESXi hosts
2x physical SQL Clusters (Windows Server 2012R2 hosts)
After deploying a Nutanix AHV cluster, which two actions should the administrator take to meet the requirements? (Choose two.)
Correct Answer: AD
Section: (none)
Explanation
Explanation/Reference:
Reference:
https://portal.nutanix.com/page/documents/kbs/details?targetId=kA00e000000Cr7GCAS
QUESTION 75
An administrator deletes a large amount of data from a Volume Group presented to a Linux VM. The administrator notices that the deleted data has not been reclaimed as usable storage. What
action should be taken to reclaim the storage capacity?
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
QUESTION 76
A customer has NearSync configured. When the administrator tries to restore a snapshot from 3 minutes ago, it is not available. The snapshots are happening at 15-minute intervals instead of at the 5-minute configured interval. When the
protection domain was initially set up, the snapshots were happening at the expected 5-minute interval.
What should the customer do to enable the snapshots to happen at the expected interval?
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 77 An administrator is managing multiple Windows and Linux VMs connected to Nutanix Volumes. The Linux VMs are experiencing intermittent connectivity issues. The Windows VMs do not experience
the same issue.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
QUESTION 78
An administrator migrates a VM onto a new Nutanix cluster. After the migration, the administrator observes the following conditions:
Cluster memory utilization: 64%
Cluster CPU utilization: 19%
Cluster storage utilization: 32%
Average VM CPU utilization: 25%
Average VM CPU ready%: 24%
Average VM memory utilization: 60%
Which two changes should the administrator make to improve VM performance? (Choose two.)
Correct Answer: BD
Section: (none)
Explanation
Explanation/Reference:
Reference: http://www.joshodgers.com/tag/cpu-
ready/
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
QUESTION 79
An administrator is notified that a bare metal database server is down. This database server is being served storage using a Nutanix Volume Group. Upon investigating, the administrator finds that the disks in the database server that map to
the vDisks in the volume group have gone offline.
Correct Answer: D
Section: (none)
Explanation
Explanation/Reference:
QUESTION 80 An administrator is updating disk firmware using LCM and receives the
following message: “There have been 10 or more cluster services restarts within 15 minutes in
the Controller VM.”
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Reference:
https://portal.nutanix.com/page/documents/kbs/details?targetId=kA032000000TT8DCAW
QUESTION 81 An administrator wants to utilize Network Visualization to monitor the physical and logical network on the Nutanix cluster. The first-hop switch has LLDP enabled. The network switch information is still not
being displayed.
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 82
A customer has two mission-critical applications and needs to have them backed up to a remote location. The remote location is connected using a leased line and has an average latency of 7 ms.
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com
Which Nutanix technology will provide the shortest RPO possible?
A. NearSync
B. Leap
C. Metro Availability
D. Asyn&DR
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
QUESTION 83
An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.
The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.
Using Prism Central, which steps are required to identify the correct VMs to be deleted?
Correct Answer: B
Section: (none)
Explanation
Explanation/Reference:
www.vceplus.com - Free Questions & Answers - Online Courses - Convert VCE to PDF - VCEplus.com