This document provides specifications for a fire and gas system for a natural gas distribution project in Riau Province, Indonesia. It outlines the project background, definitions, references, environmental and site conditions, materials requirements, design standards, and specifications for fire and gas detection, extinguishing systems, alarms, testing, documentation and warranty. The project involves developing pipeline infrastructure to transport 111 MMSCFD of natural gas from an offtake station to distribution networks in Lubuk Gaung and Pelintung to increase gas utilization in Dumai City.

Uploaded by

kepuren loro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views5 pages

SPEC. FGS Rev.2 - 1-5

This document provides specifications for a fire and gas system for a natural gas distribution project in Riau Province, Indonesia. It outlines the project background, definitions, references, environmental and site conditions, materials requirements, design standards, and specifications for fire and gas detection, extinguishing systems, alarms, testing, documentation and warranty. The project involves developing pipeline infrastructure to transport 111 MMSCFD of natural gas from an offtake station to distribution networks in Lubuk Gaung and Pelintung to increase gas utilization in Dumai City.

Uploaded by

kepuren loro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

 

PT Persero Tbk

SPECIFICATION FOR FIRE AND GAS SYSTEM

Document No. Rev. CONTRACTOR Job No.


Page 1 of 23
EIC-PS-005 1 -

EMPLOYER : PT EMPLOYER

CONTRACTOR : PT CONTRACTOR

PROJECT TITLE : PROYEK PELAKSANAAN PEKERJAAN PENGEMBANGAN


JARINGAN DAERAH

2 Re-Issued For Information 13-06-2017


1 Re-Issued For Information 25-04-2017
0 Issued For Information 17-01-2017
PRPD CHKD APVD
REV DESCRIPTION DATE
CONTRACTOR
 
PT Persero Tbk

SPECIFICATION FOR FIRE AND GAS SYSTEM

Document No. Rev. CONTRACTOR Job No.


Page 2 of 23
EIC-PS-005 2 -
 
REVISION HISTORICAL SHEET

REV. DATE DESCRIPTION

0 17-Jan-2017 Issued For Information


1 25-Apr-2017 Re-Issued For Information
Revised as per comment rev.0

2 13-Jun-2017 Re-Issued For Information


Revised as per comment rev.1

 
 
 
PT Persero Tbk

SPECIFICATION FOR FIRE AND GAS SYSTEM

Document No. Rev. CONTRACTOR Job No.


Page 3 of 23
EIC-PS-005 2 -
 
Table of Contents

1.  INTRODUCTION ............................................................................................................................... 4 


2.  DEFINITION ...................................................................................................................................... 5 
3.  REFERENCES .................................................................................................................................. 5 
4.  ENVIRONMENTAL CONDITIONS .................................................................................................... 6 
5.  SITE AND SERVICE CONDITIONS.................................................................................................. 6 
6.  MATERIALS ...................................................................................................................................... 7 
7.  DESIGN ............................................................................................................................................ 7 
8.  FIRE AND GAS DETECTION ........................................................................................................... 8 
9.  FIRE EXTINGUISHING SYSTEMS ................................................................................................. 14 
10.  LOCAL ALARM AND LOCAL CONTROL PANEL ........................................................................... 17 
11.  EQUIPMENT COATING AND PAINTING ....................................................................................... 19 
12.  INSPECTION .................................................................................................................................. 19 
13.  TESTING ......................................................................................................................................... 20 
14.  DOCUMENTATION......................................................................................................................... 21 
15.  WARRANTY .................................................................................................................................... 22 
16.  MARKING AND TAGGING ............................................................................................................. 22 
17.  PREPARATION FOR SHIPMENT................................................................................................... 22 

   

 
 
PT Persero Tbk

SPECIFICATION FOR FIRE AND GAS SYSTEM

Document No. Rev. CONTRACTOR Job No.


Page 4 of 23
EIC-PS-005 2 -
 
1. INTRODUCTION

PT. Persero Tbk, hereinafter referred to PERSERO is a State-Owned Enterprises (SOEs)


which is engaged in the transmission and distribution of natural gas. In line with this,
PERSERO will invest to develop an integrated pipeline infrastructure in order to increase the
utilization of natural gas in the province of Riau, particularly the region Dumai. The area is
becoming one of the company’s priorities as it has a huge potential in terms of energy needs
and supported by an adequate infrastructure. On the supply side, the area is quite strategic
because it is located in the area of oil and gas resources.

The development of Natural Gas Distribution Line Facilities in Riau Province and Dumai City
is expected to have positive impact.

The overall project scheme, as showed in figure below, will comprise: The Works for this
project will normally transport 111 MMSCFD of natural gas from Dumai Offtake Station (OTS)
to Dumai Distribution Network which consist of Lubuk Gaung and Pelintung Distribution
Pipeline.

Formatted: Font: (Default) Arial, 11 pt

Figure 1.1 Process Block Description

The natural gas flow shall be measured by Ultrasonic meter, analyzed by gas chromatograph,
controlled by Pressure Regulating Valve, odorized and transported to Lubuk Gaung and
Pelintung Distribution Pipeline to serve the customer demand in Dumai City using MR/S
Costumer Attachment Package. The natural gas will be send to costumer plant and
 
PT Persero Tbk

SPECIFICATION FOR FIRE AND GAS SYSTEM

Document No. Rev. CONTRACTOR Job No.


Page 5 of 23
EIC-PS-005 2 -
 
equipment.
2. DEFINITION
EMPLOYER PT. EMPLOYER
PROJECT Proyek Pelaksanaan Pekerjaan Pengembangan
Jaringan Daerah
CONTRACTOR PT. CONTRACTOR
SUBCONTRACTOR The party(s) that carry(s) out all or part of the
procurement, installation and testing of the system
specified by Contractor
SUPPLIER/VENDOR The party which supply materials, equipments and
services to perform the duties specified by Contractor
3. REFERENCES
The following standard and specification are used as reference in development of this
procedure.
API RP 520 Recommended Practice for Sizing, Selection and
Installation of Pressure Relieving Systems in Refineries
API RP 505 Recommended Practice for Classification of Location for
Electrical Installation at Petroleum Facilities Classified as
Class I, Zone 0, Zone 1, and Zone 2
API 2031 Combustible Gas Detector Systems and Environmental
Operational Factors influencing their Performance
ASME B31.8 Gas Transmission and Distribution Piping Systems FM
Factory Mutual
ISA S12.13 Part I, Performance Requirements , Combustible Gas
Detectors
ISA S12.13 Part II, Installation, Operation, and Maintenance of
Combustible Gas Detectors
ISA TR 84.00.07 Guidance Of Fire Combustible Gas And Toxic Gas