Old Formula MBBR
Old Formula MBBR
If BOD, COD is too high, Ex: BOD Primary clarifier - Anaerobic reactor - MBBR
- 8,000ppm, COD - 15,000ppm, - Secondary clarifier - Extended aeration -
3 TSS - 2000ppm Tertiary clarifier - Filter
If Oil content is very high with Flash mixer - Flocculator - DAF - MBBR -
4 High BOD & COD Extended aeration - filter
98% 98%
HEMES
Retention
considered - 6 - 8 hrs
Retention considered - 6 - 8 hrs max 1500 ppm - 3000ppm 0.3 0.4 max
MLSS - 8000-
12000PPM(As per
CPHEEO) & Flux - (400 -
600LMD)
Sr.
Sewage Stream
No
Design Basis
Raw sewage Quantity
Total Flow Q 15.00 m3/d
Design flow Q(avg) = Q / 20 0.63 m3/hour
Peak Factor PF = 3.00 assumed
Peak Flow Q(peak) = Q(avg) x PF 2.25 m3/hour
SCREEN CHAMBER
1 Design of Coarse Screen Channel
No of Units (Manual ) N = 1.00 Nos.
Working at a time N(working) = 1.00 No.
Peak Design Flow Q(peak) = 0.00063 m3/sec
Avg Flow Q(avg) = 0.00017 m3/sec
= Ref.: 4 - 7 Kg/BOD/m3.day
MetCafe & Eddy; Pg. No.-
BOD loading on media 1012 6.00 Kg of BOD / m3 /Day
Media Volume 2.00 m3
=
Back Wash Water Rate Wat(rate) 24.00 m/hour
Back Wash Water Flow Required BW(flow) = Wat(rate) x A 1.25 m3 /hour
Wash Water Duration = 10.00 min
Wash Water Quantity BW(Q) = BW(flow) x Bw (dur) 0.21 m3 /filter/backwash
Total washwater 0.21 m3
SS output from Tubesettler = 45.00 ppm
SS output from PSF = 8.00 ppm
SS Load in Backwash 0.162 kg/Backwash
Estimated No of Backwash Per day 1.00 per day
Total SS Load Per day for Backwash 0.16 Kg/backwash
Total Back wash water per day = 0.21 m3
Filter Inlet size
Flow through unit service flow Q(unit) = 1.25 m3/hour
Velocity Vel = 2.20 m/sec
Area of opening A = Q(unit)- Vel 0.000158 m2
Diameter D = √ (A/(п/4)) 0.0142 m
= 14.00 mm size
Nearest Commercial Size Considering B/W flow 50.00 mm size
Backwash Pump Capacity 0.50 m3/hr
Quantity = 2W Nos
Pump Head 15.00 m
Dimensions of PSF Provide 1 No Pressure Sand Filters = 1 Nos
Diameter = 0.26 m
Depth = 1.800 m
Multi port valve and Frontal piping 50.00 mm
Size Provided 30" dia X 72" HOS Change as per design each time
ACF
15 Design of Activated Carbon Filter =
Type = Downflow Vertical
Working Time 21.00 Hours
Peak Design Flow Q(peak) = 0.63 m3/hour
No of Working units N = 1.00 Nos
Flow through each unit Q(unit) = 0.63 m3/hour
Ref.: 6-15 M3/m2/hr; water
= supply engineering, By SK
Velocity thru column FR(max) Garg 12.00 m/hour
Area of each unit Required A = 0.05 m2
Dia of column 0.26 m
Dia of column provided 0.75 m
Provide HOS 1.800 m
Say 0.75 m
Backwash Design for ACF
Back Wash Water Rate Wat(rate) = 9.00 m/hour
Back Wash Water Flow Required BW(flow) = Wat(rate) x A 3.97 m3 /hour
Wash Water Duration = 10.00 min
Wash Water Quantity BW(Q) = BW(flow) x Bw (dur) 0.66 m3 /filter/backwash
No. of back wash per day = 1.00 No.
Total washwater 0.66 m3/day
Filter Inlet size
Flow through unit service flow Q(unit) = 0.63 m3/hour
Velocity Vel = 2.20 m/sec
Area of opening A = Q(unit)- Vel 0.000079 m2
Diameter D = √ (A/(п/4)) 0.0100 m
Nearest Commercial Size = 32.00 mm size
Dimensions of ACF Provide 1 No ACF =
Diameter = 0.75 m
HOS = 1.800 m
Multi port valve and Frontal piping 32 mm
Provided size 30" dia X 72" HOS
Sludge system =
Sludge tank = 1.00 No.
Volume = 600.00 Litres
Filter press size = 460.00 mm X mm
No. of chambers = 6.00 No.
Filter press feed pumps = 1w+1s
Capacity = 0.50 cum/hr
head = 3.00 kg/cm2
DWPE DOSING SYSTEM
18 De watering Polyelectrolyte Dosing Tank
Sludge quantity = 6.00 kg/day
S:No Layer from top Description Media thickness in mm Length Breadth Media depth Volume/compartment
Clean coarse sand 0.5-0.75
mm with uniformity
1 1 st layer coefficient < 4 150 1.0 1.0 0.2 360
Clean coarse sand 0.5-0.75
mm with uniformity
2 2nd layer coefficient < 4 100 1.0 1.0 0.1 180
3 3rd layer 10 mm aggregate 75 1.0 1.0 0.075 135
4 4th layer 20 mm aggregate 75 1.0 1.0 0.075 135
5 5th layer 40 mm aggregate 133 1.0 1.0 0.15 270
Total
98
79
168
151.2
615.5
2
1.5
1.3333333
1.1547005
1.1547005
1
12
0.0833333
0.3258176
13.032704
s per design each time
Total volume(8
compartments)
2880
1440
1080
1080
2160
8640
Sr.
Sewage Stream
No
Design Basis
Raw effluent Quantity
Total Flow Q As per Tender 100.00 m3/d
Average Flow Q(avg) = Q / 22 5.00 m3/hour
Design Flow Q = 5.37 m3/hour
Peak Factor PF = 3.00
Peak Flow Q(peak) = 15.00 m3/hour
Peak Factor PF = 3.00 Derived
SCREEN CHAMBER
1 Design of coarse screen
No of Units (Manual ) N = 1.00 Nos.
Working at a time N(working) = 1.00 No.
Peak Design Flow Q(peak) = 0.00417 m3/sec
Avg Flow = Peak as inflow is by pumping Q(avg) = 0.00417 m3/sec
Minium Self cleansing velocity V min = 0.60 m/sec
C/s area required at average flow A ave = 0.00694 m2
C/s area required at Peak flow A Max = 0.00694 m2
Width of screen chamber provided W = 0.30 m
Depth of Flow at Peak Flow d peak = 0.02 m
Bar Spacing space = 0.01 m
Thickness of bars Thk. = 5.00 mm
No of Bars n = W/Space 20.00 No
Say 20.00 No.
Flowing Section 0.00463 m2
Velocity through Screen 0.90 m/sec
Angle of Inclination degree = 60.00 ˚
Liquid Depth d1 = 0.02 m
Area of bars in contact with water A2 = 0.0023 m2
CS Area of Channel A(total) = A1+ A2 0.0093 m2
Channel width W = A(total) / d1 0.4000 m
Channel width provided 0.5000 m
Dimensions of Unit No. of units 1 =
Length L = 0.50 m
Width W = 0.50 m
Liquid Depth d1 = 0.02 m
Free Board FB = 0.50 m
Total Depth d2 = 0.52 m
V = (2gr^2)(d1-d2)/( 9 µ)
2.18245 m/hr
Rising velocity V 4.00 m/hr
Q(peak)/(rising
Area velocity/3600) 3.75 m2
width 2.00 m
Width provided 2.00 m
Caluculated Length 1.88 m
Length provided 2.50 m
HRT provided 15.00
Ref.: 5-20 minutes ; STP
Guide; publication by
Karnataka pollution control
board. min
Volume (Q(peak)*60)*HRT 3.75 m3
Hopper depth 0.63 m
Hopper volume 1.56 cum
calculated SWD volume /(Length*width) 0.44 m
Provided SWD 1.20 m
FB 0.60 m
Dimensions of Oil & Grease Trap =
Length L = 2.50 m
Width W = 2.00 m
Liquid Depth d1 = 1.20 m
Free Board FB = 0.60 m
Total Depth d2 = d1 + FB 1.80 m
Hopper Depth = PROVIDED 0.50 m
EQUALIZATION TANK
5 Design of Equalization tank
Avg Design Flow Q(avg) = 5.00 m3/hr
Recyle backwash flow from filters & Filter =
press filtrate Q(recycle) Refer water balance 4.9 m3/d
HRT at Average flow HRT = Practical consideration 8.00 hours
=
Storage capacity required V (Q(avg)) x HRT +(Q(recycle)) 44.92 m3
Storage capacity provided V = 45.00 m3
Liquid Depth Considered d1 = 4.00 m
Area = V/d1 11.25 m2
Length L = 3.4 m
Breath B = 3.4 m
Dimensions of Tank
Liquid Depth d1 = 4.00 m
Length L = 3.4 m
Breadth B = 3.4 m
Free Board FB = 0.50 m
Total Depth d2 = d1 + FB 4.50 m
6 Calculation for Air Requirement for Equalization tank
m3/m3/hr
Ref.: 0.60-1.0 m3/m3/hr;
= MetCafe & Eddy; Pg. No.-
Air Supply Rate ASR 344 0.60
Air required = ASR x V 0.45 m3/min
Air required for EQ Tank = 27.00 m3/hour
COAGULANT DOSING
8 Details of Coagulant dosing system
Design flow rate 5.000 cum/hr
Dosage as FeCL3 50.000 mg/l
Quantity of FeCL3required 0.250 kg/hr
6.000 kg/day
Strength of commercial grade FeCL3 10.000 %
Quantity of FeCL3 required 2.500 kg/hr
Pump capacity required 2.500 lph
Tank capacity required 60.000 litres
POLY DOSING
9 Details of Poly dosing system
Design flow rate 5.000 cum/hr
Dosage as Poly Electrolyte 1.000 mg/l
Quantity of Poly Electrolyte required 0.005 kg/hr
0.120 kg/day
Strength of commercial grade Poly Electrolyte 0.100 %
Quantity of Poly Electrolyte required 5.000 kg/hr
Pump capacity required 5.000 lph
Tank capacity required 120.000 litres
FLOCCULATION TANK
12 Flocculation tank
Pumping flow rate = 5.37 m3/hour
Detention time = 20.000 minutes
volume 1.790 cum
Provide depth = 1.500 m
Edge = 1.093 m
Dimensions of unit No. of units No. = 1.000
Length L = 1.100 m
Width W 1.100 m
Liquid Depth d1 = 1.500 m
Free Board FB = 0.300 m
Total Depth d2 = 1.800 m
TUBE SETTLER - 1
13 Tube Settler
Design Flow = 5.37 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck technology 11.00 m2/m3
Area Available in TubePac = provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck technology
Rise Rate Considered = provider 0.5 m3/m2/hr
Volume of TubePac Required = 1.302 m3
Plan Area required for TubePac = 1.74 m2
Length = 1.3 m
Correction for angle = 0.45 m
plan area = 2.33 m2
Each edge = 1.53 m
Volume of TubePac Required = 1.23 m3
Total side water depth = 2.1 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.10 m
Length L = 1.60 m
Breadth B = 1.60 m
Free Board FB = 0.30 m
Total Depth d2 = 2.40 m
Hopper depth required hd = 0.80 m
Hopper depth provided = 1.00 m
Media required = 1.23 m3
MBBR TANK
15 Design of MBBR
Avg BOD concentration 117.11 mg/l
Total BOD load = Flow X BOD /1000 117.11 kg/d
CPHEEO - Page No:
= 293/Ref.: MetCafe & Eddy
BOD loading on media Pg. No. 953 20.00 grams/m2/day
Area of media required 5855.51 m2
= As per supplier
Considering area of media / cum recommendation 400.00
Volume of media required = 14.64 m3
Volume to provided 15.00 m3
Consider media filling 45.00 %
Therefore volume of aeration tank = 33.33 m3
No. of compartments to be provided = 1.00 No.
Volume of each tank 33.33 m3
Providing SWD as = 4.00 m
Area 8.33 m2
Providing square tank - edge = 2.9 m
Breadth provided = 2.9 m
Diffuser
Air Quantity = 242.8 m3/hour
Diffuser range for Tubular Diffuser 8.00
Diffuser for each MMBR Tank Air Quantity/Diffuser range = 30.35 Nos.
Diffuser Provided for each MMBR Tank = 76.00 Nos.
Dimensions of unit
No. of units No. = 1.00 Nos.
No. of compartment No. = 1.00 Nos.
Breadth D = 2.9 m
Length D = 2.9 m
Liquid Depth d1 = 4.00 m
Free Board FB = 0.70 m
Total Depth d2 = 4.70 m
TUBE SETTLER - 2
16 Tube Settler ( secondary sludge )
Design Flow = 5.20 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck technology 11.00 m2/m3
Area Available in TubePac = provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck technology
Rise Rate Considered = provider 0.4 m3/m2/hr
Volume of TubePac Required = 1.577 m3
Plan Area required for TubePac = 2.10 m2
Length = 1.5 m
Correction for angle = 0.45 m
plan area = 2.76 m2
Each edge = 1.66 m
Volume of TubePac Required = 1.51 m3
Total side water depth = 2.2 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.20 m
Length L = 1.70 m
Breadth B = 1.70 m
Free Board FB = 0.30 m
Total Depth d2 = 2.50 m
Hopper depth required hd = 0.85 m
Hopper depth provided = 1.00 m
Media required = 1.51 m3
Handbook of environmental
=
engg, Advanced biological
treatment processes: Page
organic loading rate No: 343 0.28 kg BOD/cum/day
Volume of aeration tank required = 82.73 m3
Considering depth of tank as = 4.00 m
Plan area of tank = 20.68 m2
Diffuser
Air Quantity = 91.0 m3/hour
Diffuser range for Tubular Diffuser 8.00
Diffuser for Aeration Tank = 11.38 Nos.
Diffuser Provided for Aeration Tank = 12.00 Nos.
AIR BLOWER
20 Air Requirement for MBBR
Ref.: CPHEEO Manual
Table.13.1, Pg. No. 235 and
MetCafe & Eddy Pg. No.
Oxygen required per kg of BOD removed = 683 1.50 kg
Total BOD removed per day = 117.11 kg/day
Total oxygen req. = 175.67 kg/day
Standard oxygen transfer
Ref.: 15-19 %, MetCafe &
efficiency (SOTE) for 4 m depth Eddy Pg. No. 437 23.56 %
Air density = 1.20 kg/cum
% of oxygen in air = 0.23
Ref.: 8-9 mg/l, MetCafe &
Conc. at saturation Cast = Eddy pg. No. 67-68 8.24
Blowers required
No. Required = 1W+1S Nos.
Capacity provided = 414.92 m3/hour
Head = 0.50 kg/cm2
TUBE SETTLER - 3
22 Tube Settler ( secondary sludge )
Design Flow = 5.15 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck technology 11.00 m2/m3
Area Available in TubePac = provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck technology
Rise Rate Considered = provider 0.4 m3/m2/hr
Volume of TubePac Required = 1.560 m3
Plan Area required for TubePac = 2.08 m2
Length = 1.4 m
Correction for angle = 0.45 m
plan area = 2.73 m2
Each edge = 1.65 m
Volume of TubePac Required = 1.49 m3
Total side water depth = 2.2 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.20 m
Length L = 2.00 m
Breadth B = 2.00 m
Free Board FB = 0.30 m
Total Depth d2 = 2.50 m
Hopper depth required hd = 1.00 m
Hopper depth provided = 1.00 m
Media required = 1.49 m3
HYPO DOSING
24 Details of Hypo dosing system
Design flow rate 5.000 cum/hr
Dosage as Hypo 5.000 mg/l
Quantity of Hypo required 0.025 kg/hr
0.600 kg/day
Strength of commercial grade Hypo 6.000 %
Quantity of Hypo required 0.417 kg/hr
Pump capacity required 0.417 lph
Tank capacity required 10.000 litres
Filter press
Solids content in dewatered sludge 30 %
Total dewatered sludge volume 170.84 litres
Number of batches 3.00
Volume for each batch 56.95
Size of filter press 610 X 610 mm x mm
Volume of each chamber 9.0 litres/ per chamber
Details will be finalized after filter press order placement.
No of chambers required 6.33 No.
Provided 12 No.
=
Filter press feed pumps 1w+1s
Capacity = 1.00 cum/hr
head = 3 kg/cm2
assumed
assumed
0.6-1.0
37.5
Air Quantity/Diffuser range
Change based on height
of tanks
kg/kg of BOD removed
Total volume(8
compartments)
11520
5760
4320
4320
8640
34560
ETP Capacity 15 KLD
Working hours - ETP 12 Hrs
BOD 1500
COD 800
TSS 300
Fecl3
Poly
15 Screen & Oil grease 107.426
1.25 trap 5.37 Equalization tank FM & Floculator
5.396 5.396
0.27 Sludge sump 0.337248 Filter press
Sludge 0.47
60
1
Primary 104.0979
FM & Floculator clarifier 5.20 MBBR tank Secondary clarifier
3.3281 m3/d
0.17 m3/hr 1.15
0.04
4.924
0.337
100
ACF 5.0
0.74
0.06
102.95
ondary clarifier 5.15
m3/day
m3/day
Sr.
Sewage Stream
No
Design Basis
Raw effluent Quantity
Total Flow Q As per Tender 100.00 m3/d
Average Flow Q(avg) = Q / 22 5.00 m3/hour
Design Flow Q = 5.37 m3/hour
Peak Factor PF = 3.00
Peak Flow Q(peak) = 15.00 m3/hour
Peak Factor PF = 3.00 Derived
SCREEN CHAMBER
1 Design of coarse screen
No of Units (Manual ) N = 1.00 Nos.
Working at a time N(working) = 1.00 No.
Peak Design Flow Q(peak) = 0.00417 m3/sec
Avg Flow = Peak as inflow is by pumping Q(avg) = 0.00417 m3/sec
Minium Self cleansing velocity V min = 0.60 m/sec
C/s area required at average flow A ave = 0.00694 m2
C/s area required at Peak flow A Max = 0.00694 m2
Width of screen chamber provided W = 0.30 m
Depth of Flow at Peak Flow d peak = 0.02 m
Bar Spacing space = 0.01 m
Thickness of bars Thk. = 5.00 mm
No of Bars n = W/Space 20.00 No
Say 20.00 No.
Flowing Section 0.00463 m2
Velocity through Screen 0.90 m/sec
Angle of Inclination degree = 60.00 ˚
Liquid Depth d1 = 0.02 m
Area of bars in contact with water A2 = 0.0023 m2
CS Area of Channel A(total) = A1+ A2 0.0093 m2
Channel width W = A(total) / d1 0.4000 m
Channel width provided 0.5000 m
Dimensions of Unit No. of units 1 =
Length L = 0.50 m
Width W = 0.50 m
Liquid Depth d1 = 0.02 m
Free Board FB = 0.50 m
Total Depth d2 = 0.52 m
V = (2gr^2)(d1-d2)/( 9 µ)
2.18245 m/hr
Rising velocity V 4.00 m/hr
Q(peak)/(rising
Area velocity/3600) 3.75 m2
width 2.00 m
Width provided 2.00 m
Caluculated Length 1.88 m
Length provided 2.50 m
HRT provided 15.00
Ref.: 5-20 minutes ; STP
Guide; publication by
Karnataka pollution control
board. min
Volume (Q(peak)*60)*HRT 3.75 m3
Hopper depth 0.63 m
Hopper volume 1.56 cum
calculated SWD volume /(Length*width) 0.44 m
Provided SWD 1.20 m
FB 0.60 m
Dimensions of Oil & Grease Trap =
Length L = 2.50 m
Width W = 2.00 m
Liquid Depth d1 = 1.20 m
Free Board FB = 0.60 m
Total Depth d2 = d1 + FB 1.80 m
Hopper Depth = PROVIDED 0.50 m
EQUALIZATION TANK
5 Design of Equalization tank
Avg Design Flow Q(avg) = 5.00 m3/hr
Recyle backwash flow from filters & Filter =
press filtrate Q(recycle) Refer water balance 4.9 m3/d
HRT at Average flow HRT = Practical consideration 8.00 hours
=
Storage capacity required V (Q(avg)) x HRT +(Q(recycle)) 44.92 m3
Storage capacity provided V = 45.00 m3
Liquid Depth Considered d1 = 4.00 m
Area = V/d1 11.25 m2
Length L = 3.4 m
Breath B = 3.4 m
Dimensions of Tank
Liquid Depth d1 = 4.00 m
Length L = 3.4 m
Breadth B = 3.4 m
Free Board FB = 0.50 m
Total Depth d2 = d1 + FB 4.50 m
6 Calculation for Air Requirement for Equalization tank
Air Supply Rate ASR = 0.60 m3/m3/hr
Air required = ASR x V 0.45 m3/min
Air required for EQ Tank = 27.00 m3/hour
COAGULANT DOSING
8 Details of Coagulant dosing system
Design flow rate 5.000 cum/hr
Dosage as FeCL3 50.000 mg/l
Quantity of FeCL3required 0.250 kg/hr
6.000 kg/day
Strength of commercial grade FeCL3 10.000 %
Quantity of FeCL3 required 2.500 kg/hr
Pump capacity required 2.500 lph
Tank capacity required 60.000 litres
POLY DOSING
9 Details of Poly dosing system
Design flow rate 5.000 cum/hr
Dosage as Poly Electrolyte 1.000 mg/l
Quantity of Poly Electrolyte required 0.005 kg/hr
0.120 kg/day
Strength of commercial grade Poly Electrolyte 0.100 %
Quantity of Poly Electrolyte required 5.000 kg/hr
Pump capacity required 5.000 lph
Tank capacity required 120.000 litres
FLOCCULATION TANK
12 Flocculation tank
Pumping flow rate = 5.37 m3/hour
Detention time = 20.000 minutes
volume 1.790 cum
Provide depth = 1.500 m
Edge = 1.093 m
Dimensions of unit No. of units No. = 1.000
Length L = 1.100 m
Width W 1.100 m
Liquid Depth d1 = 1.500 m
Free Board FB = 0.300 m
Total Depth d2 = 1.800 m
TUBE SETTLER - 1
13 Tube Settler
Design Flow = 5.37 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck technology 11.00 m2/m3
Area Available in TubePac = provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck technology
Rise Rate Considered = provider 0.5 m3/m2/hr
Volume of TubePac Required = 1.302 m3
Plan Area required for TubePac = 1.74 m2
Length = 1.3 m
Correction for angle = 0.45 m
plan area = 2.33 m2
Each edge = 1.53 m
Volume of TubePac Required = 1.23 m3
Total side water depth = 2.1 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.10 m
Length L = 1.60 m
Breadth B = 1.60 m
Free Board FB = 0.30 m
Total Depth d2 = 2.40 m
Hopper depth required hd = 0.80 m
Hopper depth provided = 1.00 m
Media required = 1.23 m3
16 Anaerobic filter
BOD removal at primary stage ETP considered =
BOD load remaining = 675 kg/day
MBBR TANK
15 Design of MBBR
Avg BOD concentration 258.05 mg/l
Total BOD load = Flow X BOD /1000 258.05 kg/d
CPHEEO - Page No:
= 293/Ref.: MetCafe & Eddy
BOD loading on media Pg. No. 953 20.00 grams/m2/day
Area of media required 12902.60 m2
Considering area of media / cum = 400.00
Volume of media required = 32.26 m3
Volume to provided 33.00 m3
Consider media filling Practical 45.00 %
Therefore volume of aeration tank = 73.33 m3
No. of compartments to be provided = 1.00 No.
Volume of each tank 73.33 m3
Providing SWD as = 4.00 m
Providing square tank - edge = 3.5 m
Breadth provided = 5.2 m
Diffuser
Air Quantity = 535.0 m3/hour
Diffuser range for Tubular Diffuser 8.00
Diffuser for each MMBR Tank Air Quantity/Diffuser range = 66.87 Nos.
Diffuser Provided for each MMBR Tank = 68.00 Nos.
Dimensions of unit
No. of units No. = 1.00 Nos.
No. of compartment No. = 1.00 Nos.
Breadth D = 3.5 m
Length D = 5.2 m
Liquid Depth d1 = 4.00 m
Free Board FB = 0.50 m
Total Depth d2 = 4.50 m
TUBE SETTLER - 2
16 Tube Settler ( secondary sludge )
Design Flow = 5.20 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck technology 11.00 m2/m3
Area Available in TubePac = provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck technology
Rise Rate Considered = provider 0.4 m3/m2/hr
Volume of TubePac Required = 1.577 m3
Plan Area required for TubePac = 2.10 m2
Length = 1.5 m
Correction for angle = 0.45 m
plan area = 2.76 m2
Each edge = 1.66 m
Volume of TubePac Required = 1.51 m3
Total side water depth = 2.2 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.20 m
Length L = 1.70 m
Breadth B = 1.70 m
Free Board FB = 0.30 m
Total Depth d2 = 2.50 m
Hopper depth required hd = 0.85 m
Hopper depth provided = 1.00 m
Media required = 1.51 m3
EXTENDED AERATION TANK
19 Design of Extended aeration system
Handbook of environmental
=
engg, Advanced biological
treatment processes: Page
organic loading rate No: 343 0.28 kg BOD/cum/day
Volume of aeration tank required = 176.52 m3
Considering depth of tank as = 4.00 m
Plan area of tank = 44.13 m2
Diffuser
Air Quantity = 194.2 m3/hour
Diffuser range for Tubular Diffuser 8.00
Diffuser for Aeration Tank = 24.27 Nos.
Diffuser Provided for Aeration Tank = 12.00 Nos.
AIR BLOWER
20 Air Requirement for MBBR
Blowers required
No. Required = 1W+1S Nos.
Capacity provided = 869.63 m3/hour
Head = 0.50 kg/cm2
TUBE SETTLER - 3
22 Tube Settler ( secondary sludge )
Design Flow = 5.15 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck technology 11.00 m2/m3
Area Available in TubePac = provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck technology
Rise Rate Considered = provider 0.4 m3/m2/hr
Volume of TubePac Required = 1.560 m3
Plan Area required for TubePac = 2.08 m2
Length = 1.4 m
Correction for angle = 0.45 m
plan area = 2.73 m2
Each edge = 1.65 m
Volume of TubePac Required = 1.49 m3
Total side water depth = 2.2 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.20 m
Length L = 2.00 m
Breadth B = 2.00 m
Free Board FB = 0.30 m
Total Depth d2 = 2.50 m
Hopper depth required hd = 1.00 m
Hopper depth provided = 1.00 m
Media required = 1.49 m3
HYPO DOSING
24 Details of Hypo dosing system
Design flow rate 5.000 cum/hr
Dosage as Hypo 5.000 mg/l
Quantity of Hypo required 0.025 kg/hr
0.600 kg/day
Strength of commercial grade Hypo 6.000 %
Quantity of Hypo required 0.417 kg/hr
Pump capacity required 0.417 lph
Tank capacity required 10.000 litres
assumed
assumed
0.6-1.0
37.5
Air Quantity/Diffuser range
Change based on height
of tanks
kg/kg of BOD removed
Total volume(8
compartments)
60941
30470
22853
22853
45706
182822
ETP Capacity 15 KLD
Working hours - ETP 20 Hrs
BOD 800
COD 600
TSS 500
Fecl3
Poly
15 Screen & Oil grease 118.112
0.75 trap 5.91 Equalization tank FM & Floculator
17.107 17.107
0.86 Sludge sump 1.069158 Filter press
Sludge 1.50
60
1
Primary 112.4842 107.52
FM & Floculator clarifier 5.62 Anaerobic filter 5.376084 MBBR tank
5.627684 m3/d 4.96 m3/day
0.28 m3/hr
15.610
1.069
99
ACF 4.9
0.74
0.04
BOD 48 80%
COD 33.6 80%
TSS 4.6875 75%
102.97
MBBR tank 5.15 Secondary clarifier
4.55 m3/day
0.08 m3/day
Sr.
Sewage Stream
No
Design Basis
Raw effluent Quantity
Total Flow Q As per Tender 1008.00 m3/d
Average Flow Q(avg) = Q / 22 42.00 m3/hour
Design Flow Q = 5.37 m3/hour
Peak Factor PF = 3.00
Peak Flow Q(peak) = 126.00 m3/hour
Peak Factor PF = 3.00 Derived
SCREEN CHAMBER
1 Design of coarse screen
No of Units (Manual ) N = 1.00 Nos.
Working at a time N(working) = 1.00 No.
Peak Design Flow Q(peak) = 0.03500 m3/sec
Avg Flow = Peak as inflow is by pumping Q(avg) = 0.03500 m3/sec
Minium Self cleansing velocity V min = 0.60 m/sec
C/s area required at average flow A ave = 0.05833 m2
C/s area required at Peak flow A Max = 0.05833 m2
Width of screen chamber provided W = 0.30 m assumed
Depth of Flow at Peak Flow d peak = 0.19 m
Bar Spacing space = 0.01 m
Thickness of bars Thk. = 5.00 mm
No of Bars n = W/Space 20.00 No
Say 20.00 No.
Flowing Section 0.03889 m2
Velocity through Screen 0.90 m/sec
Angle of Inclination degree = 60.00 ˚
Liquid Depth d1 = 0.19 m
Area of bars in contact with water A2 = 0.0194 m2
CS Area of Channel A(total) = A1+ A2 0.0778 m2
Channel width W = A(total) / d1 0.4000 m
Channel width provided 0.5000 m
Dimensions of Unit No. of units 1 =
Length L = 0.50 m
Width W = 0.50 m
Liquid Depth d1 = 0.19 m
Free Board FB = 0.50 m
Total Depth d2 = 0.69 m
V = (2gr^2)(d1-d2)/( 9 µ)
2.18245 m/hr
Rising velocity V 4.00 m/hr
Q(peak)/(rising
Area velocity/3600) 31.50 m2
width 2.00 m assumed
Width provided 2.00 m
Caluculated Length 15.75 m
Length provided 2.50 m
HRT provided 15.00
Ref.: 5-20 minutes ;
STP Guide;
publication by
Karnataka pollution
control board. min
Volume (Q(peak)*60)*HRT 31.50 m3
Hopper depth 0.63 m
Hopper volume 1.56 cum
calculated SWD volume 5.99 m
/(Length*width)
Provided SWD 1.20 m
FB 0.60 m
Dimensions of Oil & Grease Trap =
Length L = 2.50 m
Width W = 2.00 m
Liquid Depth d1 = 1.20 m
Free Board FB = 0.60 m
Total Depth d2 = d1 + FB 1.80 m
Hopper Depth = PROVIDED 0.50 m
EQUALIZATION TANK
5 Design of Equalization tank
Avg Design Flow Q(avg) = 42.00 m3/hr
Recyle backwash flow from filters & Filter =
press filtrate Q(recycle) Refer water balance 4.9 m3/d
HRT at Average flow HRT = 8.00 hours
= (Q(avg)) x HRT +
Storage capacity required V (Q(recycle)) 340.92 m3
Storage capacity provided V = 45.00 m3
Liquid Depth Considered d1 = 4.00 m
Area = V/d1 11.25 m2
Length L = 3.4 m
Breath B = 3.4 m
Dimensions of Tank
Liquid Depth d1 = 4.00 m
Length L = 3.4 m
Breadth B = 3.4 m
Free Board FB = 0.50 m
Total Depth d2 = d1 + FB 4.50 m
= Ref.: 0.60-1.0
m3/m3/hr; MetCafe
Air Supply Rate ASR & Eddy; Pg. No.-344 0.60 0.6-1.0
Air required = ASR x V 0.45 m3/min
Air required for EQ Tank = 27.00 m3/hour
COAGULANT DOSING
8 Details of Coagulant dosing system
Design flow rate 42.000 cum/hr
Dosage as FeCL3 50.000 mg/l
Quantity of FeCL3required 2.100 kg/hr
50.400 kg/day
Strength of commercial grade FeCL3 10.000 %
Quantity of FeCL3 required 21.000 kg/hr
Pump capacity required 21.000 lph
Tank capacity required 504.000 litres
POLY DOSING
9 Details of Poly dosing system
Design flow rate 42.000 cum/hr
Dosage as Poly Electrolyte 1.000 mg/l
Quantity of Poly Electrolyte required 0.042 kg/hr
1.008 kg/day
Strength of commercial grade Poly Electrolyte 0.100 %
Quantity of Poly Electrolyte required 42.000 kg/hr
Pump capacity required 42.000 lph
Tank capacity required 1008.000 litres
FLOCCULATION TANK
12 Flocculation tank
Pumping flow rate = 5.37 m3/hour
Detention time = 20.000 minutes
volume 1.790 cum
Provide depth = 1.500 m
Edge = 1.093 m
Dimensions of unit No. of units No. = 1.000
Length L = 1.100 m
Width W 1.100 m
Liquid Depth d1 = 1.500 m
Free Board FB = 0.300 m
Total Depth d2 = 1.800 m
DAF SYSTEM
15 Dissolved Air floation system
Inlet Flow at DAF 42.00 M3/hr
Recycle Ratio 25 % of inlet flow 25 % %
Recycling flow 25 % of inlet flow 10.50 M3/hr
Total Flow In Q 52.50 M3/hr
Area Required Q/6 x SS(Raw)/1500 0.58 m2
Diameter Calculated A=л/4 X D^2 0.37 m
Minimum Dia meter Available 1.20 m
Air to Solid ratio A/S = ρ * s * (f*P – 1) * R / (S * Q)
Density of Air ρ 1.20 kg/L @ 30 Celcius
Solubility of Air s 15.70 mg/L at 30 Celcius
Saturation factor f 0.80
Operating pressure P 6.00 kg/cm2g( 7 atm)
Recycle ratio R 0.25 x Q 0.94
Intet TSS S 100.00 mg/l
Inlet Flow + recyle flow at DAF Q 52.50 m3/hr
A/S 0.01
Air Required A/S X Inlet TSS (S) 1.28 ml/l
67.12 L/hr
0.07 m3/hr
Air Compressor Provided 0.37 NM3/hr Min
Compressor Pressure Provided 6.50 kg/cm2
Overall Size ø 1.230 m
Height 0.66 m
Assuming inlet
Phosphorous required as P phosphorus as 0 ppm 55.440 kg/day
Dosage of DAP required 120.521 kg/day
Quantity of DAP solution of 10 % required 1205.211 lit/day
Quantity of DAP solution per hour 54.782 lit/hr
Total nutrient quantity 83.0138 lit/hr
Pump capacity required 99.617 lit/hr
Tank capacity required 2191.566 litres
MBBR TANK
15 Design of MBBR
Avg BOD concentration 445.17 mg/l
Total BOD load = Flow X BOD /1000 445.17 kg/d
Diffuser
Air Quantity = 746.4 m3/hour
Diffuser range for Tubular Diffuser 8.00
Diffuser for each MMBR Tank Air Quantity/Diffuser range = 93.29 Nos.
Diffuser Provided for each MMBR Tank = 102.00 Nos.
Dimensions of unit
No. of units No. = 1.00 Nos.
No. of compartment No. = 1.00 Nos.
Breadth D = 3.5 m
Length D = 5.2 m
Liquid Depth d1 = 4.00 m
Free Board FB = 0.50 m
Total Depth d2 = 4.50 m
TUBE SETTLER
16 Tube Settler ( secondary sludge )
Design Flow = 5.20 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck 11.00 m2/m3
Area Available in TubePac = technology provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck
Rise Rate Considered = technology provider 0.4 m3/m2/hr
Volume of TubePac Required = 1.577 m3
Plan Area required for TubePac = 2.10 m2
Length = 1.5 m
Correction for angle = 0.45 m
plan area = 2.76 m2
Each edge = 1.66 m
Volume of TubePac Required = 1.51 m3
Total side water depth = 2.2 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.20 m
Length L = 1.70 m
Breadth B = 1.70 m
Free Board FB = 0.30 m
Total Depth d2 = 2.50 m
Hopper depth required hd = 0.85 m
Hopper depth provided = 1.00 m
Media required = 1.51 m3
Handbook of
environmental engg,
=
Advanced biological
treatment processes:
organic loading rate Page No: 343 0.28 kg BOD/cum/day
Volume of aeration tank required = Err:509 m3
Considering depth of tank as = 4.00 m
Plan area of tank = Err:509 m2
Diffuser
Air Quantity = Err:509 m3/hour
Diffuser range for Tubular Diffuser 8.00
Diffuser for Aeration Tank = Err:509 Nos. Air Quantity/Diffuser range
Diffuser Provided for Aeration Tank = 36.00 Nos.
AIR BLOWER
20 Air Requirement for MBBR
Ref.: CPHEEO
Manual Table.13.1,
Pg. No. 235 and
MetCafe & Eddy Pg.
Oxygen required per kg of BOD removed = No. 683 1.50 kg
Total BOD removed per day = 360.00 kg/day
Total oxygen req. = 540.00 kg/day
Standard oxygen transfer
Ref.: 15-19 %,
MetCafe & Eddy Pg.
efficiency (SOTE) for 4 m depth No. 437 23.56 %
Air density = 1.20 kg/cum
% of oxygen in air = 0.23
Ref.: 8-9 mg/l,
MetCafe & Eddy pg.
Conc. at saturation Cast = No. 67-68 8.24
Ref.: Oxygen
solubility in water
Appendix D, MetCafe
D.O in fresh water Ca = & Eddy Pg. No.-1745 7.58
Ref.: CPHEEO
Manual Table.13.1,
Pg. No. 235 and
MetCafe & Eddy Pg.
Oxygen required per kg of BOD removed = No. 683 2.00 kg
Total BOD removed per day = Err:509 kg/day
Total oxygen req. = Err:509 kg/day
Standard oxygen transfer
Ref.: 15-19 %,
MetCafe & Eddy Pg.
efficiency (SOTE) for 4 m depth = No. 437 24.80 %
Air density = 1.20 kg/m3
% of oxygen in air = 0.23
Ref.: 8-9 mg/l,
MetCafe & Eddy pg.
Conc. at saturation Cast = No. 67-68 8.24
Ref.: Oxygen
solubility in water
Appendix D, MetCafe
D.O in fresh water Ca = & Eddy Pg. No.-1745 7.58
Blowers required
No. Required = 1W+1S Nos.
Capacity provided = Err:509 m3/hour
Head = 0.50 kg/cm2
TUBE SETTLER - 2
22 Tube Settler ( secondary sludge )
Design Flow = 5.15 m3/hour
Height of tube settler considered = 0.75 m
Ref.: Cool deck 11.00 m2/m3
Area Available in TubePac = technology provider
Plan Area Available per Cu.m of Tube Pac @ 0.75m depth = 8.25 m2
Ref.: Cool deck
Rise Rate Considered = technology provider 0.4 m3/m2/hr
Volume of TubePac Required = 1.560 m3
Plan Area required for TubePac = 2.08 m2
Length = 1.4 m
Correction for angle = 0.45 m
plan area = 2.73 m2
Each edge = 1.65 m
Volume of TubePac Required = 1.49 m3
Total side water depth = 2.2 m
Free board = 0.3 m
Dimensions of Tube Settler
Liquid Depth d1 = 2.20 m
Length L = 2.00 m
Breadth B = 2.00 m
Free Board FB = 0.30 m
Total Depth d2 = 2.50 m
Hopper depth required hd = 1.00 m
Hopper depth provided = 1.00 m
Media required = 1.49 m3
HYPO DOSING
24 Details of Hypo dosing system
Design flow rate 42.000 cum/hr
Dosage as Hypo 5.000 mg/l
Quantity of Hypo required 0.210 kg/hr
5.040 kg/day
Strength of commercial grade Hypo 6.000 %
Quantity of Hypo required 3.500 kg/hr
Pump capacity required 3.500 lph
Tank capacity required 84.000 litres
Industrial 768M3/D
Fine Screen
wastewater 32.00M3/H
BOD 750ppm
COD 1,500ppm
TSS 1,000ppm
O&G - Free 20ppm
O&G - Dissolved 20ppm
7M3/D
Acidic wastewater
0.29M3/H storage tank
From Wash
shops
15M3/D
Caustic wastewater
0.63M3/H storage tank
BOD 375ppm
COD 1,500ppm
TSS 250ppm
O&G - Free 2,000ppm
O&G -
Dissolved 0ppm
1.83823529411765
11.0294117647059
25.887812012
77.663436036
139.79418487
22M3/D 22M3/D
Neutralization tank Pipe flocculaor
0.92M3/H 0.92M3/H
#NAME?
25% BOD 375ppm BOD
25% COD 1,500ppm COD
75% TSS 250ppm TSS
O&G - Free 2,000ppm O&G - Free
1,187M3/D
Buffer Mixing tank
59.36M3/H DAF
19.68711140247 1,186M3/D
1.363892868728
5.455571474914
1,666M3/D 1,666M3/D
PSF
69.41M3/H 69.41M3/H
81M3/D
3.38M3/H
1,666M3/D MBR
69.41M3/H
22M3/D 21M3/D
Pipe flocculaor Lamella separator
0.92M3/H 0.89M3/H
0.6M3/D
281ppm 25%
1,125ppm 25%
63ppm 75%
5ppm
5ppm
To calamity tank
49.41M3/H
480M3/D
Treated sewage
20.00M3/H
BOD 30ppm
COD 150ppm
TSS 10ppm
5.12897457834807
1.07172603129661
1,654M3/D 1,241M3/D
MBR RO Remineralisation
68.93M3/H 51.70M3/H
414M3/D
Reject handling - By client
dge to Indusrial waste
water tank
17M3/D
Sludge dewatering unit Filtrate to buffer tank
2M3/D
Remineralisation
Sr.
Sewage Stream
No
Design Basis
Raw effluent Quantity
Total Flow Q As per Tender 100.00 m3/d
Average Flow Q(avg) = Q / 22 5.00 m3/hour
Design Flow Q = 5.37 m3/hour
Peak Factor PF = 3.00
Peak Flow Q(peak) = 15.00 m3/hour
Peak Factor PF = 3.00 Derived
SCREEN CHAMBER
1 Design of coarse screen
No of Units (Manual ) N = 1.00 Nos.
Working at a time N(working) = 1.00 No.
Peak Design Flow Q(peak) = 0.00417 m3/sec
Avg Flow = Peak as inflow is by pumping Q(avg) = 0.00417 m3/sec
Minium Self cleansing velocity V min = 0.60 m/sec
C/s area required at average flow A ave = 0.00694 m2
C/s area required at Peak flow A Max = 0.00694 m2
Width of screen chamber provided W = 0.30 m
Depth of Flow at Peak Flow d peak = 0.02 m
Bar Spacing space = 0.01 m
Thickness of bars Thk. = 5.00 mm
No of Bars n = W/Space 20.00 No
Say 20.00 No.
Flowing Section 0.00463 m2
Velocity through Screen 0.90 m/sec
Angle of Inclination degree = 60.00 ˚
Liquid Depth d1 = 0.02 m
Area of bars in contact with water A2 = 0.0023 m2
CS Area of Channel A(total) = A1+ A2 0.0093 m2
Channel width W = A(total) / d1 0.4000 m
Channel width provided 0.5000 m
Dimensions of Unit No. of units 1 =
Length L = 0.50 m
Width W = 0.50 m
Liquid Depth d1 = 0.02 m
Free Board FB = 0.50 m
Total Depth d2 = 0.52 m
V = (2gr^2)(d1-d2)/( 9 µ)
2.18245 m/hr
Rising velocity V 4.00 m/hr
Q(peak)/(rising
Area velocity/3600) 3.75 m2
width 2.00 m
Width provided 2.00 m
Caluculated Length 1.88 m
Length provided 2.50 m
HRT provided 15.00
Ref.: 5-20 minutes ; STP
Guide; publication by
Karnataka pollution
control board. min
Volume (Q(peak)*60)*HRT 3.75 m3
Hopper depth 0.63 m
Hopper volume 1.56 cum
calculated SWD 0.44 m
volume /(Length*width)
Provided SWD 1.20 m
FB 0.60 m
Dimensions of Oil & Grease Trap =
Length L = 2.50 m
Width W = 2.00 m
Liquid Depth d1 = 1.20 m
Free Board FB = 0.60 m
Total Depth d2 = d1 + FB 1.80 m
Hopper Depth = PROVIDED 0.50 m
EQUALIZATION TANK
5 Design of Equalization tank
Avg Design Flow Q(avg) = 5.00 m3/hr
Recyle backwash flow from filters & Filter =
press filtrate Q(recycle) Refer water balance 4.9 m3/d
HRT at Average flow HRT = 8.00 hours
= (Q(avg)) x HRT +
Storage capacity required V (Q(recycle)) 44.92 m3
Storage capacity provided V = 45.00 m3
Liquid Depth Considered d1 = 4.00 m
Area = V/d1 11.25 m2
Length L = 3.4 m
Breath B = 3.4 m
Dimensions of Tank
Liquid Depth d1 = 4.00 m
Length L = 3.4 m
Breadth B = 3.4 m
Free Board FB = 0.50 m
Total Depth d2 = d1 + FB 4.50 m
6 Calculation for Air Requirement for Equalization tank
m3/m3/hr
Ref.: 0.60-1.0 m3/m3/hr;
= MetCafe & Eddy; Pg.
Air Supply Rate ASR No.-344 0.60
Air required = ASR x V 0.45 m3/min
Air required for EQ Tank = 27.00 m3/hour
Handbook of
environmental engg,
=
Advanced biological
treatment processes:
organic loading rate Page No: 343 0.25 kg BOD/cum/day
Volume of aeration tank required = 200.00 m3
Considering depth of tank as = 4.00 m
Plan area of tank = 50.00 m2
Diffuser
Air Quantity = 131.3 m3/hour
Diffuser range for Tubular Diffuser 8.00
Diffuser for Aeration Tank = 16.41 Nos.
Diffuser Provided for Aeration Tank = 18.00 Nos.
HYPO DOSING
24 Details of Hypo dosing system
Design flow rate 5.000 cum/hr
Dosage as Hypo 5.000 mg/l
Quantity of Hypo required 0.025 kg/hr
0.600 kg/day
Strength of commercial grade Hypo 6.000 %
Quantity of Hypo required 0.417 kg/hr
Pump capacity required 0.417 lph
Tank capacity required 10.000 litres
assumed
assumed
0.6-1.0
Depend on PH
100
Total volume(8
compartments)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Sr.
Sewage Stream
No
Design Basis
Raw effluent Quantity
Total Flow Q As per Tender 100.00 m3/d
Average Flow Q(avg) = Q / 22 5.00 m3/hour
Design Flow Q = 5.37 m3/hour
Peak Factor PF = 3.00
Peak Flow Q(peak) = 15.00 m3/hour
Peak Factor PF = 3.00 Derived
SCREEN CHAMBER
1 Design of coarse screen
No of Units (Manual ) N = 1.00 Nos.
Working at a time N(working) = 1.00 No.
Peak Design Flow Q(peak) = 0.00417 m3/sec
Avg Flow = Peak as inflow is by pumping Q(avg) = 0.00417 m3/sec
Minium Self cleansing velocity V min = 0.60 m/sec
C/s area required at average flow A ave = 0.00694 m2
C/s area required at Peak flow A Max = 0.00694 m2
Width of screen chamber provided W = 0.30 m
Depth of Flow at Peak Flow d peak = 0.02 m
Bar Spacing space = 0.01 m
Thickness of bars Thk. = 5.00 mm
No of Bars n = W/Space 20.00 No
Say 20.00 No.
Flowing Section 0.00463 m2
Velocity through Screen 0.90 m/sec
Angle of Inclination degree = 60.00 ˚
Liquid Depth d1 = 0.02 m
Area of bars in contact with water A2 = 0.0023 m2
CS Area of Channel A(total) = A1+ A2 0.0093 m2
Channel width W = A(total) / d1 0.4000 m
Channel width provided 0.5000 m
Dimensions of Unit No. of units 1 =
Length L = 0.50 m
Width W = 0.50 m
Liquid Depth d1 = 0.02 m
Free Board FB = 0.50 m
Total Depth d2 = 0.52 m
V = (2gr^2)(d1-d2)/( 9 µ)
2.18245 m/hr
Rising velocity V 4.00 m/hr
Q(peak)/(rising
Area velocity/3600) 3.75 m2
width 2.00 m
Width provided 2.00 m
Caluculated Length 1.88 m
Length provided 2.50 m
HRT provided 15.00
Ref.: 5-20 minutes ;
STP Guide;
publication by
Karnataka pollution
control board. min
Volume (Q(peak)*60)*HRT 3.75 m3
Hopper depth 0.63 m
Hopper volume 1.56 cum
calculated SWD volume 0.44 m
/(Length*width)
Provided SWD 1.20 m
FB 0.60 m
Dimensions of Oil & Grease Trap =
Length L = 2.50 m
Width W = 2.00 m
Liquid Depth d1 = 1.20 m
Free Board FB = 0.60 m
Total Depth d2 = d1 + FB 1.80 m
Hopper Depth = PROVIDED 0.50 m
EQUALIZATION TANK
5 Design of Equalization tank
Avg Design Flow Q(avg) = 5.00 m3/hr
Recyle backwash flow from filters & Filter =
press filtrate Q(recycle) Refer water balance 4.9 m3/d
HRT at Average flow HRT = 8.00 hours
= (Q(avg)) x HRT +
Storage capacity required V (Q(recycle)) 44.92 m3
Storage capacity provided V = 45.00 m3
Liquid Depth Considered d1 = 4.00 m
Area = V/d1 11.25 m2
Length L = 3.4 m
Breath B = 3.4 m
Dimensions of Tank
Liquid Depth d1 = 4.00 m
Length L = 3.4 m
Breadth B = 3.4 m
Free Board FB = 0.50 m
Total Depth d2 = d1 + FB 4.50 m
= Ref.: 0.60-1.0
m3/m3/hr; MetCafe
Air Supply Rate ASR & Eddy; Pg. No.-344 0.60
Air required = ASR x V 0.45 m3/min
Air required for EQ Tank = 27.00 m3/hour
ASP TANK
13 Design of ASP
CPHEEO Page No
MLSS considered 276 3500 mg/l
= CPHEEO Page No
F/M ratio 276 0.40
BOD load = 50.00 kg/d
Tank volume 35.71 m3
Depth considered = 4.00 m
Area = 8.93 m2
Length 2.99 m
Breadth 2.99 m
Air Quantity = 131.3 m3/hour
Diffuser range for Disc type Diffuser 5 m3/hr 5.00
Diffuser for ASP Tank Air Quantity/Diffuser range = 26.26 Nos.
Diffuser Provided for ASP Tank = 28.00 Nos.
Dimensions of unit
No. of units No. = 1.00 Nos.
No. of compartment No. = 1.00 Nos.
Breadth D = 10.0 m
Length D = 26.0 m
Liquid Depth d1 = 6.00 m
Free Board FB = 0.50 m
Total Depth d2 = 6.50 m
21 Air Requirement forASP
Ref.: CPHEEO
Manual Table.13.1,
Pg. No. 235 and
MetCafe & Eddy Pg.
Oxygen required per kg of BOD removed = No. 683 2.00 kg
Total BOD removed per day = 50.00 kg/day
Total oxygen req. = 100.00 kg/day
Standard oxygen transfer
Ref.: 15-19 %,
MetCafe & Eddy Pg.
efficiency (SOTE) for 4 m depth = No. 437 24.80 %
Air density = 1.20 kg/m3
% of oxygen in air = 0.23
Ref.: 8-9 mg/l,
MetCafe & Eddy pg.
Conc. at saturation Cast = No. 67-68 8.24
Ref.: Oxygen
solubility in water
Appendix D, MetCafe
D.O in fresh water Ca = & Eddy Pg. No.-1745 7.58
HYPO DOSING
24 Details of Hypo dosing system
Design flow rate 5.000 cum/hr
Dosage as Hypo 5.000 mg/l
Quantity of Hypo required 0.025 kg/hr
0.600 kg/day
Strength of commercial grade Hypo 6.000 %
Quantity of Hypo required 0.417 kg/hr
Pump capacity required 0.417 lph
Tank capacity required 10.000 litres
assumed
assumed
0.6-1.0
Depend on PH
kg/kg of BOD removed
100
Total volume(8
compartments)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
STP - MBR 400 KLD
DESCRIPTION CAPACITY UOM
PLANT CAPACITY 150 KLD
OPERATING HOURS 24 HRS
SERVICE FLOW RATE 6 M3/HR
BOD 500 PPM
COD 750 PPM
TSS 300 PPM
BARSCREEN
PEAK FACTOR CONSIDERED 2.5
PEAK FLOW 16 M3/HR
VELOCITY 0.7 - 0.9 M/S
VELOCITY CONSIDERED 0.7 M/S
AREA 0.006 M2
DEPTH TAKEN 0.1 M
CLEAR WIDTH 0.06 M
SPACING B/W BARS 20 MM
NO OF CLEAR OPENINGS 4.00 NOS
WIDTH OF FLATS 10.00 MM
ACTUAL WIDTH 120 MM
WIDTH OF SCREEN CONSIDERED 144 MM
WIDTH OF SCREEN PROVIDED 300 MM
HEIGHT OF SCREEN 500 MM
BARSCREEN CHAMBER
WIDTH OF CHAMBER 350 MM
LENGTH OF CHAMBER 1250 MM
HEIGHT OF CHAMBER 425 MM
CHAMBER DIMENSIONS 1.25M X 0.35M X 0.425M
OIL SKIMMER 10 LPH
OIL SKIMMING CHAMBER
RETENTION TIME CONSIDERED 30 MIN
VOLUME OF TANK REQUIRED 3.1 M3
DEPTH TAKEN 1.5 M
AREA 2.1 M2
LENGTH 1.4 M
BREADTH 1.4 M
TANK DIMENSIONS 1.5 m L x 1.5 m W x 1.5 m D + 0.5 m FB
SEWAGE TRANSFER PUMP
PUMP CAPACITY 6 M3/HR
HEAD 12 MWC
DUPLEX STRAINER
CAPACITY 6.3 M3/HR
LINE SIZE REQUIRED 32 NB
LINE SIZE 65 NB
EQUALISATION TANK
RETENTION TIME 4-8 HRS
RETENTION TIME CONSIDERED 8 HRS
VOLUME OF TANK REQUIRED 50 M3
DEPTH TAKEN 3.5 M
AREA 14.3 M2
LENGTH 3.8 M
BREADTH 3.8 M
VOLUME PROVIDED 50.0 M3
TANK DIMENSIONS 6.2 M X 6.2 M X 3.5 M +(0.5M)
AIR VOLUME
AIR REQUIREMENT 0.5 M3/HR/M3 OF TANK VOLUME
AIR REQUIRED 25.0 M3/HR
BIO REACTOR TANK(AERATION TANK+ ANOXIC TANK+ MBR TANK)
MLSS TAKEN 8000 PPM
MLVSS 80%
F/M RATIO 0.12
BOD LOAD 75 KG/DAY
BIO REACTOR VOLUME 98 M3
BOD AT THE OUTLET 10 PPM
COD AT THE OUTLET 75 PPM
ANOXIC TANK
TANK VOLUME 10% BRV
VOLUME REQUIRED 10 M3
LIQUID DEPTH 3.6 M
LENGTH 2.3 M
BREADTH 1.2 M
VOLUME PROVIDED 9.8 M3
TANK DIMENSIONS 4.2 M X 1.5 M X 3.6 M(+ 0.5 M FB)
REACTIVATED SLUDGE PUMP
PUMP CAPACITY REQUIRED 4Q-5Q
FACTOR CONSIDERED 4
PUMP CAPACITY 25 M3/HR
HEAD 12 MWC
MBR MODULE
OPERATING HOURS CONSIDERED 24 HOURS
AVERAGE FLOW 6.3 M3/HR
FLUX CONSIDERED 25 LM2H
MEMBRANE AREA 250 M2
MEMBRANE AREA CONSIDERED 250 M2
MODULE SELECTED HSM 250
AREA PER MODULE 125 M2
NO OF MODULES 2.0 NOS
MBR TANK
LIQUID DEPTH 3.6 M
LENGTH 4.2 M
BREADTH 2.3 M
VOLUME PROVIDED 34.8 M3
TANK DIMENSIONS 4.1 M X 2.3 M X 3.6 M(+0.5M FB)
AERATION TANK
AERA TION TANK VOLUME 53 M3
LIQUID DEPTH 3.6 M
BREADTH 5 M
LENGTH 2.7 M
VOLUME PROVIDED 53 M3
TANK DIMENSIONS 8.4 M X 5 M X 3.6 M(+0.5M FB)
AIR VOLUME FOR AERATION TANK
O2 REQUIREMENT 2 KG OF O2/KG OF BOD
O2 REQUIRED 150.0 KG OF O2/DAY
O2 REQUIRED 6.3 KG/HR
DENSITY OF AIR 1.2 KG/M3
O2 IN AIR
OTE 12%
ALPHA FACTOR 0.65
BETA FACTOR 0.95
AIR VOLUME #DIV/0! M3/HR
FINE DIFFUSERS REQUIRED AIR 9 M3/HR PER DIFFUSER
NO OF DIFFUSERS #DIV/0! NOS
NO OF DIFFUSERS PROVIDED #DIV/0! NOS
AIR VOLUME FOR MBR TANK
AIR REQUIREMENT 0.50 M3/HR/M2
AIR REQUIRED 125 M3/HR
NO OF DIFFUSERS 14
HEAD 5000 MMWC
CIP TANK - LDPE
FLUX TAKEN 2 LM2H
LITER OF SOLUTION REQUIRED 500 LITERS
TANK CAPCITY CONSIDERED 600 LITERS
TANK CAPCITY PROVIDED 2000 LITERS
CHEMICAL CONSUMPTION
FOR MAINTENANCE CLEANING WEEKLY ONCE
DOSAGE 500.0 PPM
QUANTITY OF CHEMICAL REQUIRED AS
100% 0.25 KGS
QUANTITY OF CHEMICAL REQUIRED AS
6% 4.17 KGS
FOR RECOVERY CLEANING THREE MONTHS ONCE
DOSAGE 5000.0 PPM
QUANTITY OF CHEMICAL REQUIRED AS
100% 2.5 KGS
QUANTITY OF CHEMICAL REQUIRED AS
6% 41.7 KGS
PERMEATE TRANSFER PUMP
PUMP CAPACITY 7.1 M3/HR
HEAD 12 MWC
CLEAR WATER TANK
RETENTION TIME CONSIDERED 4 HRS
VOLUME OF TANK REQUIRED 28.6 M3
LIQUID DEPTH 3 M
AREA 9.5 M2
LENGTH 3.1 M
BREADTH 3.1 M
VOLUME OF TANK PROVIDED 28.6 M3
TANK DIMENSIONS 5.0 M X 5.0 M X 3.0 M +(0.5M)
HYPO DOSING SYSTEM
DOSAGE 6 PPM
HYPO REQUIRED AS 100% 0.9 KGS / DAY
HYPO CONCENTRATION 6%
HYPO REQUIRED AS 6% 15 LITER/DAY
PUMP CAPACITY REQUIRED 0.63 LPH
PUMP CAPACITY PROVIDED 0.75 LPH
DOSING TANK CAPACITY REQUIRED 15 LITERS
DOSING TANK CAPACITY PROVIDED 50 LITERS
SLUDGE VOLUME
BOD CONTRIBUTION 50%
TSS CONTRIBUTION 100%
BOD LOAD 37.5 KGS/DAY
TSS LOAD 45 KGS/DAY
TOTAL SOLIDS 82.5 KGS/DAY
SLUDGE CONSISTENCY 1%
SLUDGE GENERATED 8.3 M3/DAY
SDB
SLUDGE GENERATED 1.0 DAYS
SLUDGE GENERATED FOR 7 DAYS 8.3 M3
NO OF BEDS CONSIDERED 3.0 NOS
ONE BED VOLUME 2.8 M3
BED DEPTH 1.2 M
AREA 2.3 M2
LENGTH 3.0 M
BREADTH 0.8 M
SCREW PUMP
NO OF BATACHES CONSIDERED 4 NOS
SCREW PUMP CAPACITY 2 M3/HR
HEAD 60 MWC
FILTERPRESS
OUTLET SLUDGE CONSISTENCY 40%
CAKE GENERATED PER DAY 21 KG/DAY
BULK DENSITY OF CAKE 1.2 KG/M3
CAKE GENERATED PER DAY 17 LITERS
NO OF BATCHES 1 NOS
CAKE HOLDING CAPACITY REQUIRED 17.2 LITERS/BATCH
CAKE HOLDING CAPACITY PROVIDED 42 LITERS/BATCH
TOTAL AIR VOLUME
AIR VOLUME REQUIRED #DIV/0! M3/HR
AIR VOLUME PROVIDED #DIV/0! M3/HR
HEAD 5000 MMWC
SKID DRAWING
2.7 2.3
AT MBR
4.2
5.4
ANOXIC
1.2
2.7 2.3
KUBOTA DESIGN
NITROGEN synthesis
BOD:N:P is 100 : 5: 1
TKN used up = (BOD in raw sewage *5)/100
TKN used up
Max TKN in Raw Sewage
Assuming that 10% is non biodegradable removed in the grit chamber
Remaining TKN = TKN present in raw sewage - 10 (TKN present in raw sewage)/100
Remaining TKN
TKN to be nitrified in the aeration tank= Remaining TKN - TKN present
TKN to be nitrified in the aeration tank (Nox)
Oxygen reqd= (Nox * 4.57 * flow in cum/d)/1000
Oxygen required for Nitrification kg oxygen per Kg N
Oxygen required for Nitrification
oxygen requirement
a) For BOD removal
b) For endogenous respiration
c) Air required for nitrification
Total
Volume of anoxic tank
Volume of DNT tank
X (MLVSS in Aeration tank)
Sludge Volume Index (SVI)
Xs
Recirculation Ratio = (X/(Xs- X))*100
Sludge Recirculation Ratio
Return Activated sludge ratio ( R )
Return Activated Sludge
Sludge Recycling Pumps
Nitrate produced in aeration tank NOx
Nitrate in Effluent (Ne)
Internal Recycle Ratio (Ir)
Quantity to be recycled
Check for Denitrification Tank Volume
Specific Denitrification rate (Assumed) SDNR
Nitrogen Removed Nor
Formula used for MLVSS is MLVSS= Flow in MLD * Suspended solids content in Raw
Sewage * 0.8 (Fraction of volatile solids) * Internal recycle quantity * MLVSS in Aeration
tank + RAS Quantity * Assumed MLVSS in RAS/Total Flow
MLVSS in RAS (Assumed) Xs
MLVSS
Formula used is Nor= Vnox * SDNR * MLVSS
Volume of the tank (Vnox)
Considering No. of tanks
Liquid Depth (considered )
Area
Size of one side of the tank
Calculated size of tank with edge
Each Edge provided
HRT obtained
SIGN
input
150.00 cum/d
500 mg/l
400 mg/l
mg/l
75 kg/d
8000 mg/l CPHEOO Page No 383
0.15
62.5 cum
4 m
4
1.5 Kg
75 Kg/day
112.5 Kg/day
18.6 %
1.2 Kg/m3
0.23
8.24
7.58
0.63
0.95
1.13
2
4876.9899556879 m3/day
243.849497784395 m3/hr
268.234447562834 m3/hr
189 m3/hr
268 m3/hr
3.5 m
4 m
2.5 m
0.5 m Based on vendor suggestion
31.25 mg/L
0 mg/L
%
10
0 mg/L
-31.25 mg/L
4.57 kg Oxygen / kg N
-21.421875 kg/d
6400 mg/L
100 CPHEEO - Page no. 283
8000 mg/L
400 %
0.96
0.144 MLD
30 cum/hr
-31.25 mg/L
10 mg/L
-5.085
-0.76275 MLD
0.06 MLD
-6187.5
6400 mg/L
5388.49449204406 mg/l
-19.137998591677 m3
1 No
3 m
-6.3793328638924 m2
Err:502 m
Err:502 m
1.4 m
-3.0620797746684 Hrs
chart Wrt to area
2.5
2.4
2.5
482.2222
103.2
0
0
0
Project : 500KLD
Flow 0.8 MLD
800 KLD
No.of Hours of operation 24 hrs
33.3 m3/h
Average Flow 33 m3/h
Peak Factor 2.25
Flow considered 1250.0 KLD
Flow Considered as per Tender 52.1 m3/h
UASB Reactor
No.of Units 1 Nos
Peak Flow 52.1 m3/h
Avg Flow 33 m3/h
No.of feed chambers considered 2 Nos
26.0 m3/h
Inlet Characteristics COD BOD TSS
in ppm 7843 6527 7480
in Kg/h 408 340 390
of feed
flow per
Recirculation Ratio 30% basin
Feed flow to each basin 0 m3/h
Recirculation pump flow reqd 0 m3/h
Recirculation pump flow provided 1 m3/h
H Selector ( Anoxic Zone)
Flow rate to each basin 1 m3/h
HRT in selector zone 60 mins
Vol reqd 1 m3
No. Of selector compartments per basin 4 nos
SWD of selector compartment 4.5 m
Width of selector compartment 0.3 m
Length of selector Compartment 1.0 m
Width of selector compartment provided 0.5 m
Volume offered in Selector zone 2.3 m3
I Oxygen calculation at peak flow
Volume of sewage treated 10 m3/d
Theoretical Kg of O2 reqd per Kg of BOD 1.2
Inlet BOD5 2000 mg/l
Outlet BOD 5 5 mg/l
BOD5 removed 1995 mg/l
Kg of BOD removed in a day 19.95 kg/d
Kg of O2 reqd for BOD load 23.94 kg/d
TKN @ inlet 45 mg/l
NH3-N @ outlet 2 mg/l
Nitrogen assimilated during BOD removal 19.95 mg/l
outlet Nitrate Nitrogen 2 mg/l
NH3-N removed in a day 23.05 mg/l
Kg O2 required per Kg of NH3-N 4.33
Kg of NH3-N removed in a day 0.2 kg/d
Kg O2 required for NH3-N removal 1.0 kg/d
Kg of O2 released per Kg of Nitrate-Nitrogen during
denitrification 2.86
kg of Nitrate Nitrogen generated 0.2 kg/d
Kg of Nitrate Nitrogen in treated sewage 0.02 kg/d
Kg of Nitrate Nitrogen in treated sewage 0.02 kg/d
Quantity of NH3-N denitrified 0.2 kg/d
Kg of O2 released during denitrification 0.4 kg/d
Total kg of O2 required /day 25 kg/d
J Air Requirement at average flow condition
Total Actual Kg O2 required per day AOR 25 kg/d
Oxygen required under std condition SOR
'=(AOR)/(((βC'sw -C)/Csw)*1.024^(T-20)*α*F)
Csw solubility of O2 at 20 C 9.17 mg/l
C'sw Solubility of O2 in tap water at field Temp 8.4 mg/l
C Design DO conc in C-Tech Basin 2 mg/l
α O2 transfer correction factor 0.65
β Salinity surface tension correction factor 0.98
F fouling factor 1.0
SOR 50 kg/d
SOR Considered 50 kg/d
No.of Basins 2 nos
standard O2 reqd at field condition per basin 25 kg/d/basin
TWL in Basin 4.5 m
BWL in Basin 2.6 m
Liquid level in C-Tech basin during avg flow 3.5 m
Height at which diffusers are kept 0.3 m
Effective aeration depth 3.25 m
SOTE for above effective aeration depth 25.33 %
Fraction of O2 in air 23.18 %
Sp.gr of air at Std. Condition 1.293
Air required at field cond per basin 340 Nm3/d/basin
Hours of aeration per basin per day 6 hr/day/basin
Air reqd per hour per basin 56.7
447 Nm3/h/basin
No.of operating air blower per basin 1 nos
Capacity of air blower reqd 447 Nm3/h
Safety factor in blower capacity 2%
Capacity of air blower with safety factor 455.9 Nm3/h
Capacity of air blower provided 500 Nm3/h
No.of basins per set of air blower 2 nos
Number of basins 2 nos
No.of operating air blower 1 nos
No.of standby air blower 1 nos
Sludge Wasting
Kg/Kg of
BOD
Excess sludge generated per Kg of BOD 0.767 removed
Kg of BOD removed in a day 19.95 kg/d
Excess sludge generated per day 15.3 kg/d 2
No.of Basins 2 nos
Sludge wasted per basin 7.7 kg/d/basin
cycle/
no. of cycles per day per basin 4.00 day/basin
Sludge wasted per cycle per basin 2 kg/d 0.239088
Sludge solids consistency 0.8% 1.43453
vol of sludge wasted per cycle per basin 0.2 m3/cycle
pump running time / cycle 20.0 min
pump capacity reqd 1 m3/h
pump capacity provided 7 m3/h
34100
https://www.youtube.com/watch?v=LEIF2eLn6co
9,800,000,000.00