The constructed public toilet built on the property of School Institution specified in particular
location Kechane area (Kechane debera selem Primary School) to be used by the staffs, Students
and guests of the school has handed over to the client (AAWSA) on _____/_____/2022 with all
associated facilities as specified in the contract document. Refer the attached check list which is
part and parcel of this hand over note.
Representatives
Witness
1. --------------------------------------- ---------------------------
2. ---------------------------------------- --------------------------
3. ---------------------------------------- ---------------------------
Employer: - ____________________________________________
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Contractor: - _________________________________________________
Purpose:
Purpose of this site session is meant to attend and witness the hand over process of full
completed part of the project (Construction of toilet block, septic tank, and ancillary
items i.e., supply and installations of electric and sanitary items.)
1. Contractual Information
S. No Contracts Contract Amount (ETB) Remark
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Main Contract
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
4. Handover Team
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
The Constructed Public Toilet built on the property of School Institution specified in particular
Location in Koye Feche area (Koye face Primary School) to be used by the staffs, Students and
guests of the school has handed over to the client (AAWSA) on ______/_____/2022 with all
associated facilities as specified in the contract document. Refer the attached check list which is
part and parcel of this hand over note.
Representatives
Witness
1. --------------------------------------- ---------------------------
2. ---------------------------------------- --------------------------
3. ---------------------------------------- ---------------------------
Employer: - ____________________________________________
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Contractor: - _________________________________________________
Purpose:
Purpose of this site session is meant to attend and witness the hand over process of full
completed part of the project (Construction of toilet block, septic tank, and ancillary
items i.e., supply and installations of electric and sanitary items.)
3. Contractual Information
S. No Contracts Contract Amount (ETB) Remark
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Main Contract
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
drainage ditch
5. Handover Team
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
______________________________________________________________________________
______________________________________________________________________________
The constructed public toilet built on the property of School Institution specified in particular
Location Saris area (Sebsite Primary School) to be used by the staffs, Students and guests of the
school has handed over to the client (AAWSA) on ______/______/2022 with all associated
facilities as specified in the contract document. Refer the attached check list which is part and
parcel of this hand over note.
Representatives
Witness
1. --------------------------------------- ---------------------------
2. ---------------------------------------- --------------------------
3. ---------------------------------------- ---------------------------
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Employer: - ____________________________________________
Contractor: - _________________________________________________
Purpose:
Purpose of this site session is meant to attend and witness the hand over process of full
completed part of the project (Construction of toilet block, septic tank, and ancillary
items i.e., supply and installations of electric and sanitary items.)
5. Contractual Information
S. No Contracts Contract Amount (ETB) Remark
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Main Contract
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
6. Handover Team
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
The constructed public toilet built on the property of School Institution specified in particular
Location Adisu Gabaya area (Belay zeleke no.2 Primary School) to be used by the staffs,
Students and guests of the school has handed over to the client (AAWSA) on
______/_______/2022 with all associated facilities as specified in the contract document. Refer
the attached check list which is part and parcel of this hand over note.
Representatives
Witness
1. --------------------------------------- ---------------------------
2. ---------------------------------------- --------------------------
3. ---------------------------------------- ---------------------------
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Employer: - ____________________________________________
Contractor: - _________________________________________________
Purpose:
Purpose of this site session is meant to attend and witness the hand over process of full
completed part of the project (Construction of toilet block, septic tank, and ancillary
items i.e., supply and installations of electric and sanitary items.)
7. Contractual Information
S. No Contracts Contract Amount (ETB) Remark
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
Main Contract
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)
COMPLETED PROJECT HAND-OVER NOTE OF SCHOOL TOILET (CLAUSE 53)
drainage ditch
10
7. Handover Team
Construction of 11 Units of Public/Communal/School/Health Toilets in Sub Cities and Water Catchment Areas of
Addis Ababa Institution Latrines in different Areas of Addis Ababa Contract No. (ET-AAWSA-150353-CW/RFB
(Lot-9.)