ERP RFP Tender Document
ERP RFP Tender Document
Page 1
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Interested eligible bidders may download Bidding Documents from the website of U-
EAS, Swat www.ueas.edu.pk containing detailed specifications of items and other
terms and conditions.
A pre-bid meeting shall take place on June 28, 2022, 10:30 a.m. at the below
mentioned address. The bidder may participate in the said meeting.
Sealed Technical and Financial proposals should be submitted in two separate
envelopes placed and sealed in one big envelope up to July 11, 2022 till 12:00 PM.
(Single Stage-Two Envelope). Technical proposal will be opened on the same day i.e.
July 11,2022 at 12:30 PM. in the Committee Room of U-EAS office, Swat, in the
presence of bidders/ their representatives, who would may care to be present at the
time of opening of bids. Financial proposals will be opened later on, after the
completion of technical evaluation procedures. The proposals received after due date
and time will not be considered.
Procurement Unit
University of Engineering & Applied Sciences (U-EAS), Swat
Address: House # 53, Sector –A, Main Double Road, Kanju Town Ship Khyber Pakhtunkhwa.
Phone #: 0946-613289
Page 2
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Data Sheet
Bid Selection Method The method of selection is: Quality and Cost Based Selection
(QCBS).
____________________________.
Bid Security 2% bid security of the total quoted price
Joint Venture The firm can Participate in Capacity of Joint Venture
(Maximum two firms)
Deliverables Project Charter, Project Schedule (WBS)
Inception Report
Gap Analysis Report, Data Migration Plan
Installation of ERP and CMS software at U-EAS ,Swat
Training material
Training and at U-EAS
Data migration and customization & development of
software.
Source code & related training and technical
documentation
Contact Person For queries/ clarifications, if any please contact:
To,
[email protected]
CC:- [email protected]
Language Proposals should be submitted in English language
Currency All prices should be quoted in Pak Rupees
Estimated Time The estimated number of professional staff-months
required for the Assignment is: 6 months from the award of
the contract
Taxes & Payment terms The price should include all applicable taxes. Invoice receipt
plus 30 days.
Proposal Validity Proposals must remain valid for 90 days after the submission
date
Bidder must submit 0ne Original and one copy of technical and only original of
financial proposal.
A printable and searchable PDF copy in a USB flash drive of
technical proposal.
Technical and financial proposals should be submitted in
separate envelops and USB must be part of technical
proposal and should be clearly marked “Acquisition &
Implementation of ERP and CMS Software”.
Page 3
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Submission Date & Time Both Technical proposal & Financial bid must be submitted
in two different sealed envelopes on or before July 11, 2022
at 12:00 pm.
Page 4
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Table of Contents
Page 5
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 6
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 7
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
1 Project Overview
The University of Engineering & Applied Sciences, Swat (U-EAS) is the department of
Government of Khyber Pakhtunkhwa in Pakistan, committed to provide quality educational
services to the people of Pakistan without discrimination as to, race, religious beliefs, class or
political opinions.
The University of Engineering & Applied Sciences, Swat (U-EAS) — within the framework of its
operation in Pakistan, would like to request your best bid/proposals for the procurement of
ERP&CMS Software (Odoo or at least Equivalent ERP) as per general terms and conditions
mentioned in the bidding document.
Challenges of Pakistan. University’s strong research base and academic programs are the
focus of researchers and students from across the country, and we welcome diverse thoughts
and new perspectives in engineering and technology fields.
Page 8
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 9
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Package A
1. Workflow & Data Archiving System High
2. Campus Management System (CMS) High
3. Budget &Financial Management System High
4. Procurement Management System High
5. Human Resource Management System High
6. Payroll System High
7. User Management System High
8. Inventory System High
9. Hostel Management System High
10. Transport Management System High
Package B
1. Business Intelligence (Bi) System Medium
2. Library Management System Medium
3. Document Management System Medium
4. Sales Management System Medium
5. E-Tender Medium
Package C
1. Project Management System Low
2. Complaint Management System Low
The functional and other requirements are an integral part of this TOR and discussed in detail
in Sections 4.
Page 10
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 11
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 12
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
After clearance of dues, the student is allowed to select entry test venue, date, time etc.
to generate exam admit card/ ticket based on availability of seats in different venue and
time slots.
Facility to conduct online exams at the designed test centers. Alternately, the university
can take answer on a manual sheet (Scanner readable format) that can be scanned to
compute marks through the system.
Auto calculation of results upon completion of the test using the workstation and alert
generation to communicate result of test to the students.
Facility to integrate Entry Test Module with the external testing bodies such as ETEA.
Page 13
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 14
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Each challan will have multiple head of accounts i.e. security fee, admission fee, course
fee etc.
Facility to handle the following scenarios:
o Part payments and instalments
o Adjustment of advances
o Scholarship
o Waivers
o Penalties on late payment
o Refund of fee
Facility to upload bank scroll in machine readable format based on challan ID of a
student or electronic data interchange service giving challan wise collection of fees
deposited by the students in the bank.
Facility to record bank/ cash receipt
Provision to enter adjustments to rectify errors
Provision to create bank reconciliations
Facility to handle final settlement of students through the system
Facility to generate projected fee estimates of any program enrolled with reference to
any particular student.
Facility to generate challan based on different category such as batch, individual
student, semester wise, program wise, etc.
Facility to maintain history of semester wise fee charged to the student.
Integration with General Ledger (a module of ERP software) to post financial effects of
different receipts in the form of journal voucher.
Page 15
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 16
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 17
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Integration with central repository/ achieving system for storing project related material
Facility to record payments of both local & external examiners Payable system
Facility to generate alerts and reports for enrolled students and users
Facility to attach images/ MS Office files along with submission of proposal and other
requirements
Page 18
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 19
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
modules, will be periodically posted into the control accounts in the GL. The GL system will
have the following salient features:
The General Ledger should support cash basis/ double entry system.
Provision to maintain financial accounts of multiple campuses/ entities/ employee funds
within a same database thereby helping the user to consolidate the financial information
at Group level.
Facility of maintaining multiple years of data jointly allowing previous and current year’s
data to be accessed simultaneously.
Handling of multi-level chart of accounts with a flexibility of defining user specific
structure of the chart of accounts in line with the requirements set-out by PIFRA by
devising new accounting model.
Providing multi-level cost center structure to record transactions with reference to
different segments like department, campuses, etc. to produce segment wise analysis.
Calendar with user-defined financial periods according to reporting requirement of the
U-EAS.
Facility to define standard vouchers with customized printing options.
Facility of standard transaction narration on single keystroke for each voucher type.
Full screen-editing facility while entering data.
Provision to define month end vouchers as ‘reversible’ at the opening of subsequent
financial period.
Providing options whether to maintain automatic numbering of all documents or user
entered document number.
Powerful password protection for all activities.
Facility to lock entered data to protect against any changes.
Provision for standard/ recurring vouchers.
Flexible user defined on-screen inquiries to analyze the entered vouchers with different
logical operator and filters.
Automatic calculation of excess/ shortage of funds at year-end (temporary or
permanent) and update of user defined profit account with corresponding printing of
Journal Voucher.
Period-end and year-end processing and generation of year-end voucher for closing
balances of accounts.
General Reporting
Option to print the voucher as soon as its entry has been completed.
Printing of transactions list, voucher type wise.
Printing of trial balance at any level of the chart of accounts with data range selection.
Printing of general journal, ledger activity and ledger balances.
Financial Reports
Month wise income and expense report, with budget comparatives.
Comparison of data of different periods
Facility to design user-defined report formats through the report writer including
balance sheet, profit/ loss statement, income / expense statement.
Facility to set up cash flow statement through the report writer
Cost center definition enabling cost-center wise reporting.
Page 20
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
The Budget module is designed to allocate the financial budgets at group or detail account
code level, in accordance with the U-EAS’s requirements. The system will also maintain track
of budget revisions during a financial year. The proposed module will have the following
salient features:
Facility to enter annual budgets for different heads of account and campuses with a
breakup of financial periods defined by the user.
Facility to define multiple budgets such as HEC budgets as well as recurring budgets.
Facility to allocate budget figures with reference to business segment i.e. cost center,
department, campuses, etc.
Facility to copy previous year’s budgeting values or get new allocation using a factor of
previous data to minimize the data input efforts.
Facility to revise the budget before completion of the year.
Facility to print report for each head of account comparing the actual amount therein
with the budgeted figure and the last year’s figure.
Facility to view consolidated budget covering all the departments and campuses.
Facility to import budget data from the spreadsheets.
Facility to compare budgets from periods of different years for a head of account and
their actual for different reports including profit and loss statement, balance sheets, cost
center-reports and other user defined user defined reports.
Page 21
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
resulting from the entry of supplier invoice, debit/credit notes etc. The system should provide
a facility to make payments against the payable liabilities and make necessary deductions. The
main features of the system are as follows:
Facility to enter bill/ invoice containing demand reference, supplier reference, payment
and tax deductions.
Facility to enter supplier invoice along with other costs breakups to account for
purchases and accounts payable.
Facility for the Purchase department to validate and approve invoices on the computer.
Maintaining track of local and foreign purchases.
Maintain history of foreign currency rates used for the purchase of imported items.
Facility to define approval cycles to authorize payments initiating from different
authorities such as VC, Chairman, Pre-audit, etc.
General Reporting
Details of outstanding bills/ list of payments to be made during each week
List of payments due in the next xx number of days and the related cash outflow
requirements
Aging analysis for a given set of days
Printing of supplier ledger and balances
Sales tax report
Page 22
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 23
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 24
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 25
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 26
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 27
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 28
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 29
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 30
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 31
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 32
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 33
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 34
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 35
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 36
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 37
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Page 38
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
System Security
Systems should have secure communication with SSL (https) or any other equivalent
security mechanism.
All the sensitive information such as student grades, exam data, should be stored in
encrypted form in the database.
Page 39
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
Service Levels
The vendor should specify the service levels for:
o Fixation of critical and non-critical bugs and errors
o Response to any queries
o Time required for maintenance and upgrades
The vendor should provide 1 year free technical support services after the successful
deployment of the software
Availability
Software solution should be available for internal users 24 x 7 x 365 with minimal
downtime.
Training Manuals
Vendor should provide online help and user manuals covering each and every option for
all the systems and modules discussed above.
Vendor should provide installation manual.
Vendor should provide technical documents such as data dictionary, schema, system
architecture, DFDs, class diagrams and other necessary documentation for the
customization of software.
All the manuals discussed above should be updated time to time by the vendor.
Trainings
The vendor should impart training to the U-EAS’s project team and the end-users by
taking the following initiatives:
o Creation of test environment of the deployed software i.e. Conference Room Pilot
(CRP) for software acceptance testing and on-going training.
o Provision of hands-on training to the end-users to allow them to test key processes.
o Train the trainer of the U-EASfor their capacity building.
o Train and empower the technical team so that they can add new modules, enhance
and customize the existing software according to their needs.
Page 40
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – Final – V1.1| June 22, 2022
For a PROPOSER to be considered, U-EAS must receive four (4) copies (one original and three
photocopies) of the technical proposal& one copy of financial proposal by 12:00 pm July 11,
2022 at the following address:
House # 53, Sector –A, Main Double Road, Kanju Town Ship Khyber Pakhtunkhwa
Please also send one printable and searchable PDF copy of technical proposal in a flash drive.
All proposals must be clearly marked separately for both technical and financial proposals:
Sealed Technical and Financial proposals should be submitted in two separate envelops placed
and sealed in one big envelope (as per single stage – two envelops bidding procedure).
There is no expressed or implied obligation for the U-EAS to reimburse responding PROPOSER
for any expenses incurred in preparing proposals in response to this request.
U-EAS reserves the right to retain all proposals submitted, and to use any ideas in a proposal
regardless of whether that proposal is selected. Submission of a proposal indicates acceptance
by the PROPOSER of the conditions contained in this request for proposal, unless clearly and
specifically noted in the proposal submitted and confirmed in the contract between U-EAS
and the PROPOSER selected.
The U-EAS shall not bear any cost related to the preparation of proposal as well as any
subsequent cost such as pre bid meeting visit cost, etc. incurred by the PROPOSER.
Page 41
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
To,
[email protected]
CC:- [email protected]
The PROPOSER is responsible for ensuring that the email was successfully received. Questions
and requests for clarification and/or additional information should be directed via email to
the contact above. Any change in response to questions/clarifications will be re-advertised as
an addendum to this RFP.
Page 42
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Date Activity
June 22, 2022 RFP release
July 11, 2022 Proposals Due(by12:30 pm)
Within 10 days after due date Presentations by shortlisted firms
(tentative)
August 05, 2022, tentative (provided Contract awarded, work begins
that the final evaluation has been
approved by the competent
authority by this date)
September 06,2022 (tentative) Submits Inception Report, Project Charter, Project
Schedule (WBS)
Fortnightly (before close of business Fortnightly Progress Reports giving target
of each fortnight) achieved against planned, targets slipped,
causes joand recommendations and next
targets.
October 18, 2022 (tentative),GAP Submits Gap Analysis Report, Data Migration Plan
analysis as per module.
Aer per Modules (February 15,2023- Installation of ERP and CMS software (Package A, B
Tentative) & C) at U-EAS and handing over of training
material.
Immediate required after completion Handing over of source code & related technical
of work. documentations as discussed above
Job closeout Closeout and handing over and taking over of
project
Page 43
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
a) The PROPOSER should describe the company’s profile giving details of legal status,
services and products offer, number of offices, overall staff strength and other
details highlighting the company’s profile along with Annex – IV.
c) A statement identifying the names of key personnel that will be assigned to this
project, including their titles, length of relevant experience (name of projects
executed in govt institutions and task performed), qualifications and proof of
certifications for the products and services being offered (attach resumes). Please
Page 44
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
include the PROPOSER’s ability to adequately and consistently staff the project with
the same team.
The PROPOSER will depute at least 07 qualified staff in this project, mainly
comprising of Project Manager, Functional Consultants, Developers, Business
Analyst, QA Analyst, Database Administrators, Technical Writer, etc.
d) The firm’s ability to complete the work specified in this RFP and produces the required
products in a timely fashion and the ability to present any necessary reports and
recommendations to University staff. This section should contain the description of
two successfully completed projects in government organizations including the name
of institution for which work was been performed, general description of the scope of
work, name and contact information of agency representative responsible for the
project.
Page 45
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
In second stage of technical marking will be done as per section of the RFP i-e
“selection criteria-Section 4.23”
The Technical marking will be conducted on a pass or fail basis. Only bids which have
been rated "pass" in the technical marking of bids shall be considered for further
evaluation.
Page 46
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
c) The PROPOSER shall present a specific “not to exceed” fixed fee, including
associated and Implementation Cost.
Page 47
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
The payment schedule commensurate with the deliverables and the work schedule
are as follows:
Page 48
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Page 49
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
The selection process shall be based on the received bids. The process may include
discussion and clarification thorough any mean as notified. Criteria for evaluation shall
include:
Page 50
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
The final evaluation will be based on the respective weightage assigned to Technical Criteria
and Financial Criteria and the marks attained.
TM x 0.5 = TTM
FM x 0.5 = TFM
GTM = TTM + TFM, where:
TM=Technical Marks
FM = Financial Marks
TTM= Total Technical Marks
TFM= Total Financial Marks
GTM= Grand Total Marks
Page 51
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
5.2 Delivery
Delivery of the Goods/Services shall be made by the Supplier according to project deliverable
and set deadline made by U-EAS after award of the contract.
5.3 Warranty
The Supplier warrants that the Goods/services supplied under the Contract are new, unused,
of the most recent or current models. The Supplier further warrants that all Goods supplied
under this Contract shall have no defect, arising from design, materials, or workmanship or
from any act or omission of the Supplier that may develop under normal use of the supplied
Goods/services in the conditions prevailing in the place of final destination of the Purchaser.
This warranty shall remain valid for twelve (12) months, as desired against it, in its
specification, after the Goods/services, or any portion thereof as the case may be, have been
delivered, installed and commissioned at the final destination.
The Purchaser shall promptly notify the Supplier in writing of any claims arising under this
warranty.
Upon receipt of such notice, the Supplier shall, within one month and with all reasonable
speed, repair or replace the defective Goods or parts thereof, without costs to the Purchaser.
If the Supplier, having been notified, fails to remedy the defect(s) within the specified period,
the Purchaser may proceed to take such remedial action as may be necessary, at the Supplier’s
risk and expense and without prejudice to any other rights which the Purchaser may have
against the Supplier under the Contract.
5.4 Payment
The Supplier’s request(s) for payment shall be made to the Purchaser in writing, accompanied
by an invoice describing, as appropriate, the Goods delivered and Services performed, and by
documents submitted.
Page 52
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
with or without liquidated damages, in which case the extension shall be ratified by the parties
by amendment of Contract.
A delay by the Supplier in the performance of its delivery obligations shall render the Supplier
liable to the imposition of liquidated damages, unless an extension of time is agreed upon
without the application of liquidated damages.
Page 53
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
If a Force Majeure situation arises, the Supplier shall promptly notify the Purchaser in writing
of such condition and the cause thereof. Unless otherwise directed by the Purchaser in
writing, the Supplier shall continue to perform its obligations under the Contract as far as is
reasonably practical, and shall seek all reasonable alternative means for performance not
prevented by the Force Majeure event.
Page 54
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Page 55
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Date:_____________________
Procurement Ref. No: U-EAS/2021/ERP-001-A
To:
The Project Director,
University of Engineering & Applied Sciences, Swat
Dear Sir,
Having examined the bidding documents, the receipt of which is hereby duly
acknowledged, we, the undersigned, offer to supply, install, train and commission the
ERP Software in conformity with the said bidding documents.
We undertake, if our Bid is accepted, to deliver the goods/services within
_________ days from date of award of contract.
We agree to abide by this Bid for the Bid Validity Period specified in the bidding
documents and it shall remain binding upon us and may be accepted at any time
before the expiration of that period.
Until a formal Contract is prepared and executed, this Bid, together with your
written acceptance thereof and your notification of award, shall constitute a binding
Contract between us.
We understand that you are not bound to accept the lowest or any bid you may
receive. We certify/confirm that we comply with the eligibility requirements as per
bidding documents.
Page 56
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure – II
LETTER OF BID (LETTER OF INTENTION)
(To be furnished with financial proposal)
Date:
Procurement Ref. No: U-EAS/2021/ERP-001-A
To:
Dear Sir,
Having examined the bidding documents, the receipt of which is hereby duly
acknowledged, we, the undersigned, offer to supply, install, train and commission the
ERP Software in conformity with the said bidding documents for the sum of ________
[total bid amount in words and figures] or such other sums as may be ascertained in
accordance with the Price Break-down schedule attached herewith and made part of
this Bid.
We undertake, if our Bid is accepted, to deliver the goods within _________
days from date of award of contract.
We agree to abide by this Bid for the Bid Validity Period specified in the bidding
documents and it shall remain binding upon us and may be accepted at any time
before the expiration of that period.
Until a formal Contract is prepared and executed, this Bid, together with your
written acceptance thereof and your notification of award, shall constitute a binding
Contract between us. We understand that you are not bound to accept the lowest or
any bid you may receive.
We certify/confirm that we comply with the eligibility requirements as per
bidding documents.
Dated this ________________ day of ________________ 2022
___
[Signature] [in the capacity of]
Page 57
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure – III
PRICE BREAKDOWN SCHEDULE
1 2 3 4 5 6
Module Cost Module Cost
including including
Country No. of
Package No. Module Description User license User license
of origin Licenses
cost Unit cost Total
price (PKR) price (PKR)
1 Workflow & Data Archiving 01
System
2 Financial Management system
including data migration from 01
OODO Community version to
Enterprises version.
3 Procurement Module including
data migration from OODO 01
Community version to
Enterprises version.
4 Campus Management System
Package A (CMS) 01
5 Human Resource Management
System 01
6 Payroll System 01
7 User Management System 01
8 Inventory System 01
9 Hostel Management System 01
10 Transport Management System 01
1 Business Intelligence (Bi) System 01
2 Library Management System 01
3
Package B Document Management System 01
4 Sales Management System 01
5 E-Tender 01
1 Project Management System 01
Package C
2 Complaint Management System 01
01 Total Implementation Cost
Page 58
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Grand Total =
We offer to supply, install and commission the abovementioned goods(s), in accordance with the
terms and conditions stated in your Request for Quotations referenced above.
The validity period of our quotation is: ____90____ days from the time and date of the submission
deadline.
We confirm that the prices quoted above are fixed and firm for the duration of the validity period and
will not be subject to revision or variation.
Page 59
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Company: _____________________________________________________________________
Address: _____________________________________________________________________
_____________________________________________________________________
OFFICE SEAL
Page 60
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure - IV
(LETTERHEAD OF SUPPLIER/TENDERER/MANUFACTURER)
BIDDER QUALIFICATION STATEMENT
A. Name of Supplier/Tenderer_________________________________________
C. No. of Employees/Engineers_______________________________________
F. Section/Department/Division _______________________________________
We hereby certify to the best of our knowledge that the foregoing statement are true and
correct and all available information and data have been supplied and that we agree to
show documentary proof thereon upon your request.
Page 61
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Date _________________________________
_________________________________
_________________________________
(Signature)
_________________________________
(In the Capacity of)
Page 62
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure - V
REFERENCE LIST OF SIMILAR NATURE COMPLETED PROJECTS
Note: Please attached the supporting documents such as PO/Agreements along with Completion Certificates
must be provided, etc.
Page 63
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure - VI
CONTRACT FORM
THIS AGREEMENT made the ___________ day of __________ 2022 between University of
Engineering & Applied Sciences, Swat (hereinafter called “the Purchaser”) of the one part and
[name of Supplier] (hereinafter called “the Supplier”) of the other part:
WHEREAS the Purchaser invited bids for certain goods and ancillary services, viz.,
procurement of ERP Software’sand has accepted a bid by the Supplier for the supply,
installation, commissioning and training of those goods and services in the sum of [contract
price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
1. In this Agreement words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part
of this Agreement, viz.:
(a) the Price Schedule submitted by the Bidder;
(b) the Technical Specifications;
(c) the General Conditions of Contract;
(d) the Purchaser’s Notification of Award.
(e) Bidding Documents.
3. In consideration of the payments to be made by the Purchaser to the Supplier as
hereinafter mentioned, the Supplier hereby covenants with the Purchaser to provide the
goods and services and to remedy defects therein in conformity in all respects with the
provisions of the Contract
4. The Purchaser hereby covenants to pay the Supplier in consideration of the provision
of the goods and services and the remedying of defects therein, the Contract Price or such
other sum as may become payable under the provisions of the contract at the times and in
the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in
accordance with their respective laws the day and year first above written.
Page 64
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure - VII
PERFORMANCE BOND (FORM)
To
The Project Director,
University of Engineering & Applied Sciences, Swat.
____________________________
____________________________
____________________________
____________________________
Page 65
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure - VIII
FORM OF BID SECURITY
(a) has withdrawn its Bid during the period of bid validity specified by the Bidder in the
Form of Bid; or
(b) does not accept the correction of errors in accordance with the Instructions to
Bidders (ITB) or
(c) having been notified of the acceptance of its Bid by the Purchaser during the period
of bid validity, (i) fails or refuses to execute the Contract Form, if required, or (ii) fails
or refuses to furnish the performance security, in accordance with the ITB.
This guarantee will expire: (a) if the Bidder is the successful bidder, upon our receipt of copies
of the contract signed by the Bidder and the performance security issued to you upon the
instruction of the Bidder; or (b) if the Bidder is not the successful bidder, upon the earlier of
(i) our receipt of a copy of your notification to the Bidder of the name of the successful bidder;
or (ii) twenty-eight days after the expiration of the Bidder’s Bid.
Consequently, any demand for payment under this guarantee must be received by us at the
office on or before that date.
_____________________________
[Signature and Stamp]
Page 66
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure - IX
INSTALLATION/COMMISSIONING/TRAINING UNDERTAKING BY ORIGINAL
EQUIPMENT/SOFTWARE MANUFACTURER
If for any reason, such as travel restrictions imposed by our government etc., we are
unable to send our engineers/supervisors to perform the installation, commissioning, and
training for our equipment/software at the Purchaser’s designated premises, then we are
exclusively responsible for all the costs inclusive of all associated expenses for seven (7)
days detailed training of at least two (2) technical personnel of the Purchaser at our
premises at (Original Software Manufacturer or Authorized Dealer premises Address)
for each lot secured as per the Purchaser bidding documents.
Any and all costs associated with successful installation, commissioning, and training
has been included in our aforementioned quotation.
Date _________________________________
_________________________________
_________________________________
(Signature)
Note: This letter should be on the letterhead of the Original Software Manufacturer or Authorized
Dealer and should be signed by a duly person.
Page 67
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
Annexure - X
ORIGINAL SOFTWARE MANUFACTURER’S AUTHORIZATION FORM
To:
Project Director,
University of Engineering & Applied Sciences, Swat
We hereby extend our full guarantee and warranty as per General Conditions of
Contract (1 year warranty) for the goods offered for supply by the above firm against
this Invitation for Bids.
Note: This letter of authority should be on the letterhead of the Original Software Manufacturer or
Authorized Dealer and should be signed by a person competent and having the power of
attorney to bind the Original Software Manufacturer or Authorized Dealer.
Page 68
Acquisition & Implementation of ERP & CMS Software
University of Engineering & Applied Sciences, Swat Request for Proposal (RFP) – | June 22, 2022
End of Document
Page 69