END OF CYCLE REPORT
With a view to obtaining the Higher Technician Diploma in Production and
Maintenance of Industrial Systems (DUT-PMSI)
THEME:
SUMMARY
INTRODUCTION ................................................................................................................................... 3
CONCLUSION ..................................................................................................................................... 15
IMPLEMENTATION OF SAFETY MEASURES ON PFI CONSTRUCTION SITES (INDUSTRIAL PLATFORM)
INTRODUCTION
It is in this sense that the company PLATEFORME INDUSTRIELLE (PFI) in order to ensure
the safety of its workers submitted us to the theme entitled << IMPLEMENTATION OF
SECURITY MEASURES ON PFI CONSTRUCTION SITES ˃˃
For a better presentation of our work, we will focus in the first part on the presentation of the
structure that hosted us and the context of the given project. This first part will also give us
the opportunity to talk about the certain activities and projects carried out by the companies
thereafter in a second part we will speak about the role and the importance of an HSE service
in a company in order to set up in a third part security measures related to the types of
business activities. And at the level of the fourth part, it was a question of applying its
measures on one of the projects of the OLAM site.
IMPLEMENTATION OF SAFETY MEASURES ON PFI CONSTRUCTION SITES (INDUSTRIAL PLATFORM)
I. COMPANY PRESENTATION
PFI (industrial platform) is a company specializing in the fields of industry, created in 2017
by Mr. Zamblé Bi Zamblé Michel on the initiative of former workers of mechanical
construction structures and the national industrial chessboard.
Company with limited resources (SARL), with a capital of 1,000,000 FCFA, PFI has assigned
itself since its creation the mission of stimulating a new dynamic in this sector, by
implementing innovative ideas.
It is based in Ivory Coast more precisely in Marcory. It is one of the companies offering its
services to different sectors of activity in the national market. The company specializes in
various fields such as piping, boilermaking, metal construction, maintenance, mechanical
installation, etc.
The end-of-cycle project aims to meet a particular need of a company in a technical field. As
a senior technician student in Production and
Maintenance of Industrial Systems (PMSI) of the ESI, our mission, during this
three-month internship, to meet the objectives set.
IMPLEMENTATION OF SAFETY MEASURES ON PFI CONSTRUCTION SITES (INDUSTRIAL PLATFORM)
II.2. Interest
The interest of this theme is to ensure the safety of workers, improve working conditions in
order to increase the productivity of the company while giving it a good reputation.
II.3. Work to do
- Identification, analysis and assessment of the risks related to the various activities,
To impose itself on the market of industrial services in Ivory Coast, PFI strives to offer a wide
range of activities to its customers; thus meeting all the possible needs of companies using its
services. Among all its services offered there are some that observe a strong demand from
customers, which is why our study will focus more on its 4 activities or the implementation of
security procedures will cover all the other activities.
For the identification of risks, it will be a question in a table of presenting all the risks relating
to the activities in question.
TASKS RISK FAMILY DESCRIPTION OF THE RISK
Risk assessment is used to plan control actions in the company, taking into account
priorities. When risks cannot be eliminated or reduced immediately, they must be
classified as objectively as possible according to their importance, in order to prioritize
preventive actions.
▪ The assessment will be made on the basis of 3 parameters which together will
make it possible to assess all the risks and know who to prioritize in order to be
reduced or eliminated urgently
The results of the criticalities will then allow us to define intervals in which the results of the
products (G x P) will be the levels of criticality.
12-16: very high/6-9: High/4-3: Medium/1-2: Low
Thanks to its results, a level of priority will thus be given to each risk in order to proceed with
the reduction or elimination of its risks.
IMPLEMENTATION OF SAFETY MEASURES ON PFI CONSTRUCTION SITES (INDUSTRIAL PLATFORM)
Following the assessment, the analysis will consist in a table of exposing all the risks and
consequences of each activity in order to affect the criticality indices and therefore to know
the levels of criticality linked to each facet of the activity.
As an example below, the analysis table relating to the boilermaking activity is presented.
Number
Source of Description of Probabilit
Risk families Consequences of people Gravity
danger the risk y
exposed
Hearing impairment,
deafness,
Noise pollution, musculoskeletal 4
thermal risks, 2
Physical disorders, contusions, (Very
Hearing risks, (Mean)
crushing, cuts, probable)
Eye
osteoarticular disorders
angioneurotic disorders
Maintenanc
Crushing,
e
/ slipping, falling 4
Injuries, bruises, broken 1
Manufactur Handling objects, tripping, (Very
bones, excessive fatigue (Weak)
ing collision, Everyone probable)
/ overexertion involved
Work at Electrification, 4
4
Height Electric electrocution, Injury, death, fire (Very
(Likely)
short circuit serious)
Stress, internal Trouble concentrating,
4
violence, sleeping, irritation, 1
Psychosocial (Very
external nervousness, severe (Weak)
probable)
violence fatigue
Respiratory pathologies
4
Toxic smoke (cough, expectoration, 3
Chemical (Very
emission shortness of breath), (Severe)
probable)
cancer
A table similar to this one will also be drawn up for all the other activities in our study.
IMPLEMENTATION OF SAFETY MEASURES ON PFI CONSTRUCTION SITES (INDUSTRIAL PLATFORM)
After carrying out the analysis and risk assessment, well before drawing up our table which
will affect the preventive measures to be adopted for each activity, it will first be necessary to
present some means of prevention that exist.
In the industrial world and outside, there are several means of safety and prevention against
risks and accidents and we can list among the different existing families:
➢ PPE which includes several categories (protective equipment for the body, head,
hands, etc.) ranging from head protection (helmet, goggles, etc.) to feet (safety
shoes, etc.) Depending on activity to be performed
- TRAINING
- The risks against which the PPE protects them, the instructions or instructions
concerning the PPE and many others.
- VERIFICATION OR CONTROL
After all this theory phase, it is important to test the veracity and functioning of this process in
the field in order to ensure that the prevention measures found are adapted to the realities on
the ground.
It is with this in mind that we will proceed for this project to the complete process of
identification, evaluation, analysis and assignment of the measures to be undertaken during
the execution of each stage of the project.
For this project, the task was to repair a leaf of the gate of one of the entrances to the OLAM
factory. The different stages were:
I. IDENTIFICATION OF RISKS
➢ Support rebuild
Number of
Source of Risk Description of the Probabili
Consequences people Gravity
danger families risk ty
exposed
4 2
electrification,
Electric Injury, death, fire (Very (Unlikely
electrocution
serious) )
Beyond the implementation of its preventive measures, the most difficult step is to have them
applied and respected by the agents who are most concerned.
Therefore, in the project execution phase, a pre-project instruction meeting was held with the
agents in order to present to them the measures that they will have to adopt in each phase of
the project.
- 0 accidents
- 0 complaints
The objectives have been achieved, but it is important to continue to work together in
order to always ensure the safety of the staff, the well-being of our agents and therefore
the sustainability of the company.
IMPLEMENTATION OF SAFETY MEASURES ON PFI CONSTRUCTION SITES (INDUSTRIAL PLATFORM)
CONCLUSION
Through these three (03) months of internship within the company PLATEFORME
INDUSTRIELLE, we were able to acquire a better knowledge of the industrial field, the risks
incurred by the agents and industrial personnel on a daily basis and the search for appropriate
measures in order to ensure safety. In order to carry out our mission, we have followed the
following approach:
- visit all PFI company sites to understand the risks to which employees are exposed on
a daily basis;
- identify risks;
- analyze the risks;
- assess the risks;
- propose prevention and recovery measures;
- apply the measures on one of the projects at OLAM;
- assess the performance of its measures and the impact on the execution of the work.
Indeed the effectiveness of these recommendations could not be verified on all the company's
sites because of the limited duration of the internship, but we received a favorable response
from the supervisor.
We think that this experience offered us a good preparation for our professional integration
because it was for us an enriching and complete experience which reinforces our desire to
practice in the field of industry.
IMPLEMENTATION OF SAFETY MEASURES ON PFI CONSTRUCTION SITES (INDUSTRIAL PLATFORM)
Contents
SUMMARY ............................................................................................................................................... 2
INTRODUCTION ....................................................................................................................................... 3
CHAPTER 1: PRESENTATION OF THE RECEPTION STRUCTURE ................................................................ 4
I. COMPANY PRESENTATION .......................................................................................................... 4
II. PRESENTATION OF THE TOPIC..................................................................................................... 4
II.1. Theme title ............................................................................................................................... 5
II.2. Interest ..................................................................................................................................... 5
II.3. Work to do ................................................................................................................................ 5
III. PFI ACTIVITIES .......................................................................................................................... 5
CHAPTER 2: IDENTIFICATION AND ASSESSMENT OF RISKS ..................................................................... 6
I. IDENTIFICATION OF RISKS FOLLOWING EACH ACTIVITY ............................................................. 6
II. BASICS OF RISK ASSESSMENT ...................................................................................................... 7
III. RISK ANALYSIS ......................................................................................................................... 8
IV. DISCOVERY OF EXISTING PREVENTION MEASURES .................................................................... 9
v. APPLICATION OF PREVENTIVE MEASURES AND RECOVERY MEASURES TO PFI ACTIVITIES ........... 9
CHAPTER 3: APPLICATION ON A PROJECT (OF THE OLAM CUSTOMER) ............................................... 11
I. IDENTIFICATION OF RISKS ......................................................................................................... 12
II. ANALYSIS AND EVALUATION OF ONE OF THE STAGES .............................................................. 12
III. IMPLEMENTATION OF PREVENTIVE MEASURES AND RECOVERY MEASURES ...................... 13
IV. DURING THE WORKS ............................................................................................................. 14
CONCLUSION ......................................................................................................................................... 15
Contents ................................................................................................................................................ 16