1. The document outlines the proposal and tendering flow and project flow execution for a construction project. It lists the key activities from receiving an RFQ through contract signing and project execution.
2. The proposal and tendering process includes attending meetings, conducting site inspections, preparing technical documents and specifications, reviewing vendor offers, finalizing bills of quantities, and submitting proposals.
3. The project flow execution begins with contract signing, issuing a notice to proceed, manpower hiring, material approval and purchasing, project execution through punch listings and testing and commissioning, documentation and acceptance, and progress billings. Regular reviews and approvals are required at various stages.
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
109 views
RFQ and Project Flow Execution
1. The document outlines the proposal and tendering flow and project flow execution for a construction project. It lists the key activities from receiving an RFQ through contract signing and project execution.
2. The proposal and tendering process includes attending meetings, conducting site inspections, preparing technical documents and specifications, reviewing vendor offers, finalizing bills of quantities, and submitting proposals.
3. The project flow execution begins with contract signing, issuing a notice to proceed, manpower hiring, material approval and purchasing, project execution through punch listings and testing and commissioning, documentation and acceptance, and progress billings. Regular reviews and approvals are required at various stages.
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2
Proposal and Tendering Flow
Item no. Activities/Work Description Scope by Remarks/Comments
Received and acknowledged of RFQ - DC 1 Request for bid/quotation Marketing DC Attend online meeting schedule by 2 Marketing client (if any) Engineering Support Review, request site inspection, DC Engineering support 3 prepare and submit TCL (technical Marketing (ME, EE, CVL, clarification lists) to client. Engineering Support Automation) HR 4 Arrange schedule of site inspection Logistics Finance Marketing 5 Bring the TCL during site inspection. Engineering Support Consolidate data gathered during DC site walk through. Prepare updated 6 Marketing TCL and resubmit to client for Engineering Support closeout. Marketing Prepare MTO with complete 7 Engineering Support specification and send to canvasser. Canvasser Technical documents comprises of below if required: i. Prepare BOQ. Check prices Technical drawings on the DATABASE (past, previous, Marketing Brochures 8 updated prices of goods). Canvasser Catalogue ii. Prepare Technical Engineering Support NFCC Documents needed (if any). Insurances CV/Resume Table of organization others Review vendor’s offer as per project Marketing 9 specs. Engineering Support Marketing Review and finalize BOQ and send to DC 10 client GM OM 11 Follow up of proposal Marketing Project Flow Execution Item no. Activities/Work Description Scope by Remarks/Comments DC 1 NOA and Contract Signing GM Planning & Engineering DC Kick-off Meeting and Issuance of NTP 2 GM of Client Planning & Engineering Billing 3 DP Processing Accounting Marketing OP’s Mgr 4 Manpower Hiring and Evaluation HR/Admin 5 Review Planning & Engineering Planning & Engineering Client 6 Material Approval As per client specs Engineering PTS 7 Material Canvass Purchaser 8 Material PO Release GM or OP’s Mgr 9 Material Purchase Purchaser 10 Material Inspection and Acceptance QA/QC Engineering As per client specs Op’s Mgr Supervisor Skill sets and QA_QC expertise for each Project Execution, Punch listings, Foreman 11 role. (experience T&C and Acceptance DC requirements for Coordinator direct labors) Planning & Engineering Support Workforce (Laborers/workers) Supervisor Coordinator shall be Project Reports and Documentation DC 12 minimum of Eng’g & Acceptance and Close out Coordinator Level QA_QC Billing 13 Progress billings Accounting Marketing