0% found this document useful (0 votes)
110 views

General Plan Jetty & Trestle-Layout

This document appears to be a key plan drawing that shows coordinates for 8 points that define an area. The drawing includes a title block with project (PN) and title (TN) information. It lists latitude and longitude coordinates for 8 points that define the boundary of the area. There are also general notes, but no other text or labels on the drawing.

Uploaded by

Dito Narendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

General Plan Jetty & Trestle-Layout

This document appears to be a key plan drawing that shows coordinates for 8 points that define an area. The drawing includes a title block with project (PN) and title (TN) information. It lists latitude and longitude coordinates for 8 points that define the boundary of the area. There are also general notes, but no other text or labels on the drawing.

Uploaded by

Dito Narendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PN TN KEY PLAN

DRAWING LIMIT PN TN

POSISI KORDINAT : W E

0
S
W E -7.67
0 1 3.20 POINT 1 : 6°46'49.96" LS ; 111°52'57.99" BT
-8.0 EL.- T1 POINT 2 : 6°46'50.28" LS ; 111°52'57.08" BT

-9.0
S
ARE
A
P OIN POINT 3 : 6°46'57.96" LS ; 111°52'59.75" BT
G
GIN

0
POINT 4 : 6°46'57.64" LS ; 111°53'00.68" BT
D .00
DRE
POINT 5 : 6°46'57.77" LS ; 111°53'00.31" BT
-10
N T2 00
POINT 6 : 6°46'57.91" LS ; 111°52'59.91" BT
POI -1
0. POINT 7 : 6°47'05.90" LS ; 111°53'02.70" BT
POINT 8 : 6°47'05.76" LS ; 111°53'03.10" BT

0
GENERAL NOTES

-8.0
-7.80

-7.19

-9.00
-9.00
0

J ET
0
0.
-1

TY A
REA
-7.87

.00
-10
-7.20

4
NT
POI REFERENCE DRAWINGS
DRAWING LIMIT

-9.0

DRAWING LIMIT
0
I 00T 3
.N -7.16
P-O10
-6.85 -10.00
N T6
POI
5
NT
POI -9.00
-8.00

TRE
-6.85

S TLE
A
REA

00
-7.
.00 REV DATE DESCRIPTION PREPARE CHECK APPROVAL
-7 EMPLOYER :
T8
00
N SOLUSI BANGUN
-6.54 POI INDONESIA
-8.

ENGINEER :
7
NT
POI
CONTRACTOR :
TPJC-TQ1-DW-C8-641-3C02-001

PROJECT :
EPC TUBAN JETTY UPGRADE AND
-6.43 ITS ANCILLARY PRODUCTION &
TRANSPORTATION FACILITIES
TITLE :
DRAWING LIMIT JETTY & TRESTLE PLAN
GENERAL PLAN & SHIP POSITION

GENERAL PLAN DRAWING NO. SHEET OF SIZE

A3
A

You might also like