Note 1: If agreed customer's requirements (change communication, validation etc.) are more severe than this 4M Matrix, then those
-La troisième sceance à permis de valider l' item"1,3,2 Change of process parameter (sans incidences produits ) "
- Redaction du referentiel "Processus d'annonce et d'acceptation des Dossiers d'Assurances Qualité" prevue pour fin S15
requirements agreed with the customer must be respected and not this 4M Matrix
Note 2: For OES parts out of original OEM production or specific OES developments, the OES customer procedure must be applied (Ex:
OEM 4M matrix rules respected if the aftermarket change must be managed as OEM). If no customer procedure/rules the IAM 4M matrix
rules are applied.
1. MACHINE
1.1.3.1 WITH impact on "Made In" of finished good A 1 3. R.Arumugam (R.A) - Sr.Engineer QA
1.1.3.2 WITHOUT any impact on "Made In" of finished good C 2 4. P.Kumaran ( P.K) - Engineer Production
2. METHOD
3. MATERIAL
12/27/2022 1 of 2 635381663.xlsx
objet de la reunion :
Note 1: If agreed customer's requirements (change communication, validation etc.) are more severe than this 4M Matrix, then those
-La troisième sceance à permis de valider l' item"1,3,2 Change of process parameter (sans incidences produits ) "
- Redaction du referentiel "Processus d'annonce et d'acceptation des Dossiers d'Assurances Qualité" prevue pour fin S15
requirements agreed with the customer must be respected and not this 4M Matrix
Note 2: For OES parts out of original OEM production or specific OES developments, the OES customer procedure must be applied (Ex:
OEM 4M matrix rules respected if the aftermarket change must be managed as OEM). If no customer procedure/rules the IAM 4M matrix
rules are applied.
3.10 Supplier
4. MAN