0% found this document useful (0 votes)
13 views1 page

PLUMBING FIXTURES FORMS Rev. 2

This document summarizes the results of a plumbing fixtures functionality test conducted at a project location. It tests the draining time and for leaks, defects, or clogs in various plumbing fixtures including water closets, urinals, lavatories, bath tubs, floor drains, sinks, lavatory faucets, bath tub faucets, and shower faucets. The test results are recorded and categorized as passing or failing. Representatives from the supplier, contractor, client, and quality assurance teams were present and signed off to approve the test results.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

PLUMBING FIXTURES FORMS Rev. 2

This document summarizes the results of a plumbing fixtures functionality test conducted at a project location. It tests the draining time and for leaks, defects, or clogs in various plumbing fixtures including water closets, urinals, lavatories, bath tubs, floor drains, sinks, lavatory faucets, bath tub faucets, and shower faucets. The test results are recorded and categorized as passing or failing. Representatives from the supplier, contractor, client, and quality assurance teams were present and signed off to approve the test results.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Date Conducted :

Control No. :

PLUMBING FIXTURES FUNCTIONALITY TEST


PROJECT
LOCATION
Trade:

Plumbing / Sanitary
Attachment:
Plan Diagram Product Data Methodology Mill Certificate

Bldg. # / Floor : Brand / Contractor :


Unit :

Design Actual Visual Inspection Checklist TEST RESULT


ITEM
ITEM DESCRIPTION Draining Draining REMARKS
NO.
Time (sec) Time (sec) leak deffective clogged PASS FAIL
1 WATER CLOSET
Trial 1 see product
data
Trial 2
2 URINAL
Trial 1 see product
data
Trial 2
3 LAVATORY
Trial 1 see product
data
Trial 2
4 BATH TUB
Trial 1 see product
data
Trial 2
5 FLOOR DRAIN (t&b) see product
data
Trial 1
Trial 2
6 FLOOR DRAIN (balcony)
Trial 1 see product
data
Trial 2
7 SINK
Trial 1 see product
data
Trial 2

Design Actual Visual Inspection Checklist TEST RESULT


ITEM
ITEM DESCRIPTION Draining Draining REMARKS
NO.
Time (Lps) Time (Lps) leak deffective clogged PASS FAIL
1 WATER CLOSET
Trial 1 see product
data
Trial 2
2 URINAL
Trial 1 see product
data
Trial 2
3 LAVATORY FAUCET
Trial 1 see product
data
Trial 2
4 BATH TUB
Trial 1 see product
data
Trial 2
5 SHOWER
Trial 1 see product
data
Trial 2
6 SINK FAUCET
Trial 1 see product
data
Trial 2

CONDUCTED BY: WITNESSED BY: APPROVED BY: NOTED BY:

(Supplier & Contractor Representative) ( MEPF / Client) ( QA / QC) ( PIC / PM / MEPF HEAD)

DISTRIBUTION : Subcon DPI Document Control Client