This Hazard Identification, Risk Assessment and Risk Control (HIRARC) form identifies hazards during scaffold erection work. Hazards identified include falling from heights, manual handling injuries, and heat stress. Existing controls include fall protection equipment, training, and safe work procedures. Recommended additional controls are close supervision for working at heights, securing scaffold materials, using lifting equipment, implementing buddy systems, and job rotation to prevent overexertion. The overall risks were assessed as medium requiring further controls.

Uploaded by

ArinaAhmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
721 views

Hirarc Scaffold

This Hazard Identification, Risk Assessment and Risk Control (HIRARC) form identifies hazards during scaffold erection work. Hazards identified include falling from heights, manual handling injuries, and heat stress. Existing controls include fall protection equipment, training, and safe work procedures. Recommended additional controls are close supervision for working at heights, securing scaffold materials, using lifting equipment, implementing buddy systems, and job rotation to prevent overexertion. The overall risks were assessed as medium requiring further controls.

Uploaded by

ArinaAhmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC) FORM

Company:
Process / Location: Conduct by:
Approved by:
Date: 1 2 Review Date:
1. Hazard Identification 2. Risk Analysis 3. Risk Control

Which Can Cause/


No Work Activity Hazard Existing Risk Control (if any) L S R Recommended Control Measures P.I.C
Effect

1.To cordon unloading area


Unsecure scaffold 2. Toolbox briefing
Unloading scaffold 4
tool and Body injury 3. Training forklift driver 2 2
material using fork lift (Low)
component 4. Check & secure scaffold material before lift
5. PPE (safety helmet,shoe,vest)
1.Follow SWP
2. Toolbox briefing
3. Training workers
Workers working Fall from high and 12
4. Working at Height Training 4 3 1. Close supervision
at height sustain body injury (Medium)
5. Make sure workers hook lanyard at anchorage
point at all times.
6. PPE (safety helmet,shoe,vest & safety hardness)

1. Scaffold tool and component must be secured or


lashed
2. To cordon off the work area
Unsecure scaffold 3. Erection by competent scaffold
4.Follow SWP 6
tool and Body injury 2 3
5. Toolbox briefing (Medium)
component
6. Make sure workers hook lanyard at anchorage point
at all times.
8 7. PPE (safety helmet,shoe,vest & safety hardness)

Erection of scaffolding

1. Buddy system
Back 2. To cordon off the work area
Excessive manual 9
pain/Musculoskeletal 3. Erection by competent scaffold 3 3
handling (Medium)
Disorder Syndrome 4.Follow SWP
5. Toolbox briefing
6. Job rotation.
7. PPE (safety helmet,shoe,vest & safety hardnes)
8

Erection of scaffolding HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL (HIRARC) FORM
Company:
Process / Location: Conduct by:
Approved by:
Date: 1 2 Review Date:
1. Hazard Identification 2. Risk Analysis 3. Risk Control

Which Can Cause/


No Work Activity Hazard Existing Risk Control (if any) L S R Recommended Control Measures P.I.C
Effect

1.Follow SWP
Installation 2. Toolbox briefing
Dehydrate / Heat 10
scaffold under hot 3. Training workers 5 2
stress (Medium)
weather 4. Job rotation
5. PPE (safety helmet,shoe,vest & safety hardness)