This document provides cost and specification information for several pieces of equipment used in a process. The total capital cost is $1,263,500 and the total annual operating cost is $914,350. Key equipment includes a heat exchanger (B2-tower) with a cost of $190,700 and a multi-diameter distillation tower. Utilities such as electricity and cooling water are also specified along with their annual costs. The desired annual rate of return on investment is 20%.

Uploaded by

Grace Kuje
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views17 pages

CHE502 Economic Analysis

This document provides cost and specification information for several pieces of equipment used in a process. The total capital cost is $1,263,500 and the total annual operating cost is $914,350. Key equipment includes a heat exchanger (B2-tower) with a cost of $190,700 and a multi-diameter distillation tower. Utilities such as electricity and cooling water are also specified along with their annual costs. The desired annual rate of return on investment is 20%.

Uploaded by

Grace Kuje
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Summary

Name Summary
Total Capital Cost [USD] 1263500
Total Operating Cost [USD/Year] 914350
Total Raw Materials Cost [USD/Year] 0
Total Product Sales [USD/Year] 0
Total Utilities Cost [USD/Year] 0
Desired Rate of Return [Percent/'Year] 20
P.O. Period [Year] 0
Equipment Cost [USD] 190700
Total Installed Cost [USD] 357500

Name Fluid
Electricity
Cooling Water Water
Refrigerant - Freon 12 Refrigerant

Name Equipment Cost [USD]


B4 0
B2 190700
B10 0
B3 0
B11 0
B1 0
B8 0
B12 0

Name Equipment Cost [USD]

B4 0
B2-tower 190700
B10 0
B3 0
B11 0

B1 0
B8 0
B12 0

TEMA HEX
Name DHE TEMA EXCH B4
User tag number B4
Remarks 1 Equipment mapped from 'B4'.
Quoted cost per item [USD]
Currency unit for matl cost
Number of identical items 1
Installation option
Heat transfer area [sqm] 0.124593214257
Number of shells
Front end TEMA symbol B
Shell TEMA symbol E
Rear end TEMA symbol M
Heat exchanger design option
Tube material
Tube design gauge pressure [barg] 2.4342108
Tube design temperature [C] 121.111111111111
Tube operating temperature [C] -29.8
Tube outside diameter [meter] 0.0254
Shell material
Shell design gauge pressure [barg] 1.28504411035
Shell design temperature [C] 121.111111111111
Shell operating temperature [C] 29.92847
Tube side pipe material
Shell side pipe material
Number of tubes per shell
Tube length extended [meter] 6.096
Tube gauge
Tube pitch [meter] 0.03175
Shell diameter [meter]
Shell wall thickness [meter]
Shell corrosion allowance [meter]
Expansion joint
Tube sheet material
Number of tube passes 1
Number of shell passes 1
Allow resize

Multi-diameter tower
Name DTW TOWER B2-tower
User tag number B2-tower
Remarks 1 Equipment mapped from 'B2'.
Quoted cost per item [USD]
Currency unit for matl cost
Number of identical items
Installation option
Application
Base material Bottom
Diameter Bottom section [meter] 0.6096
Bottom tangent to tangent height [meter]29.8704
Design gauge pressure Bottom [barg] 1.03425
Design temperature Bottom [C] 121.111111111111
Operating temperature Bottom [C] 30.667436111111
Number of trays Bottom section 43
Bottom Tray type SIEVE
Bottom Tray material
Bottom Tray spacing [meter] 0.6096
Bottom Packing material Section1
Packing height Bottom Section1 [meter]
Bottom Packing material Section2
Packing height Bottom Section2 [meter]
Cladding material Bottom
Cladding thickness Bottom [meter]
Thickness Bottom section [meter]
Corrosion allowance Bottom [meter]
Base material Middle
Diameter Middle section [meter]
Middle tangent to tangent height [meter]
Design gauge pressure Middle [barg]
Design temperature Middle [C]
Operating temperature Middle [C]
Number of trays Middle section
Middle Tray type
Middle Tray material
Middle Tray spacing [meter]
Middle Packing material Section1
Packing height Middle Section1 [meter]
Middle Packing material Section2
Packing height Middle Section2 [meter]
Cladding material Middle
Cladding thickness Middle [meter]
Thickness Middle section [meter]
Corrosion allowance Middle [meter]
Base material Top
Diameter Top section [meter]
Top tangent to tangent height [meter]
Design gauge pressure Top [barg]
Design temperature Top [C]
Operating temperature Top [C]
Number of trays Top section
Top Tray type
Top Tray material
Top Tray spacing [meter]
Top Packing material Section1
Packing height Top Section1 [meter]
Top Packing material Section2
Packing height Top Section2 [meter]
Cladding material Top
Cladding thickness Top [meter]
Thickness Top section [meter]
Corrosion allowance Top [meter]
Skirt height [meter]
Wind or seismic design
Fluid volume [fraction]
Vacuum design gauge pressure [barg]
Transition height 1 [meter]
Transition height 2 [meter]
Molecular Wt Overhead Prod. 19.246791
ASME design basis
Allow Resize

Quoted equ
Name C B10
User tag number B10
Remarks 1 Equipment mapped from 'B10'.
Code of account 100
Total cost per unit
Icarus/User COA option
Material cost per unit 0
Currency unit for matl cost
Labor hours per unit [hr]
Number of identical items
Installation option
Unit of measure
Quantity
Quantity adjustment option
Item classification
Item type
Material
Component weight [kg]
ID in bulk report

Agitated reactor
Name DAT REACTOR B1
User tag number B1
Remarks 1 Equipment mapped from 'B1'.
Quoted cost per item [USD]
Currency unit for matl cost
Number of identical items
Installation option
Application
Shell material
Liquid volume [cum] 0.133440718900414
Vessel diameter [meter] 0.3048
Vessel tangent to tangent height [meter] 1.8288
Design gauge pressure [barg] 1.03425
Vacuum design gauge pressure [barg]
Design temperature [C] 2027.77777777778
Operating temperature [C]
Jacket design gauge pressure [barg]
Jacket type
Jacket material
Agitator power [kW]
Driver type
Cladding material
Skirt or leg height [meter]
Base material thickness [meter]
Corrosion allowance [meter]
Cladding thickness [meter]
Fluid depth [meter]
Fluid density [kg/cum]
Fluid viscosity [cP]
Impeller type
Impeller diameter [meter]
Number of impellers
Impeller speed [rpm]
Reynolds number
Power function
Allow resize
Utilities
Rate Rate Units Cost per Hour
52.32 KW 4.0548
0.038991 MMGAL/H 4.67892
0.158228 KLB/H 0.013449

Unit operation
Installed Cost [USD] Equipment Weight [LBS] Installed Weight [LBS]
0 0 0
357500 64200 80504
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

Equipment
Installed Cost [USD] Equipment Weight [LBS] Installed Weight [LBS]

0 0 0
357500 64200 80504
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

DHE TEMA EXCH B3


B3
Equipment mapped from 'B3'.

66.8348668686888

B
E
M

4.1579608
2027.77777777778
35
0.0254

2.4342108
2027.77777777778
2000

6.096

0.03175

1
1
Quoted equipment
C B11 C B8 C B12
B11 B8 B12
Equipment mapped from 'B11'. Equipment mapped from 'B8'. Equipment mapped from 'B12'.
100 100 100

0 0 0
Cost Units
USD/H
USD/H
USD/H

Utility Cost [USD/HR]


0.013449
0
0
4.67892
0
0
0
0

Sizing Errors Evaluation Errors


ERROR> 'HE - 1' SPECIFIED AREA DIFFERS FROM
CALCULATED AREA BY >10 PERCENT.
Heat transfer area INPUT: 1.341 CALC: 5.236 SF

ERROR> 'HE - 4' STRESS FOR SHELL MATERIAL IS ZERO.


ERROR> 'AT - 6' MAXIMUM TEMPERATURE EXCEEDED
FOR MATERIAL 'SS304'
ERROR> 'AT - 6' MAXIMUM TEMPERATURE EXCEEDED
FOR MATERIAL 'SS304'
IS ZERO.