Daily Report: Date

The daily report summarizes work done on June 19th, 2011 at the Doha North Sewerage Treatment site. It describes work carried out in four areas: MCC1, MCC2, and the HV and Generator Building where cable installation was done; LPS, SC, FPS and OCU where cable tray and support installation occurred; AB, GH and WS where conduit and wire installation took place; and manpower codes for different job roles. Weather was normal with a temperature of 21°C and wind conditions.

Uploaded by

Ramesh Kaphale
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views

Daily Report: Date

The daily report summarizes work done on June 19th, 2011 at the Doha North Sewerage Treatment site. It describes work carried out in four areas: MCC1, MCC2, and the HV and Generator Building where cable installation was done; LPS, SC, FPS and OCU where cable tray and support installation occurred; AB, GH and WS where conduit and wire installation took place; and manpower codes for different job roles. Weather was normal with a temperature of 21°C and wind conditions.

Uploaded by

Ramesh Kaphale
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

DAILY REPORT

DOHA NORTH SEWERAGE TREATMENT & ASSOCIATED WORKS PS70 & PUMPING MAINS 682/2 Section
ELECTRICAL WORKS

Date :
Work. Hours Start : Finish : Weather Time : TC: Wind : Condition :
o

19.06.2011 Shift 1 6:00 17:00 Shift 1 10:00AM 21C Normal Normal Shift 2 Shift 2

Location
MCC1, MCC2, HV & GEN

SUBCONTRACTO R Name: Subir Chatterjee Visa:

CONTRACTOR Name: Manuelito David Visa:

SUBCONTRACTOR

Original to Daily Report Officer, Copy to Section Manager


QUANTITIES Details (Unit) Shift 1 Shift 2 Total Worker Site Agent Skilled Worker MANPOWER Specialist Operator Foreman Technician Supervisor Engineer Pick up Bus Fork lift Generator Welding generator Tower crane Mobile crane EQUIPMENT Boom Truck Excavator Truck Loader Roller Dozer Crusher Pumps Driller Crusher HV & GEN(11kv GF) HV & GEN(11kv Basement) HV & GEN(415 V GF)2 HV & GEN(415 V Basement) HV & GEN(Generator) HV & GEN(3.3kv GF) MCC2(GF rooms) MCC2(Basement) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MCC1(GF rooms) MCC1(Basement) HV&G: MCC2: MCC1 0 MCC2 0 HV & GEN 0 MCC1: cable DETAILS OF PROGRESS

REMARKS Safety/Environment : Quality : Technical Matters : Engineer's Remarks/Instructions :

Material/Equipment delivered :

Others :

DAILY REPORT
DOHA NORTH SEWERAGE TREATMENT & ASSOCIATED WORKS PS70 & PUMPING MAINS 682/2 Section
ELECTRICAL WORKS

Date :
Work. Hours Start : Finish : Weather Time : TC: Wind : Condition :
o

19.06.2011 Shift 1 6:00 17:00 Shift 1 10:00AM 21C Normal Normal Shift 2 Shift 2

Location
LPS, SC, FPS, OCU

SUBCONTRACTO R Name: Subir Chatterjee Visa:

CONTRACTOR Name: Manuelito David Visa:

SUBCONTRACTOR

Original to Daily Report Officer, Copy to Section Manager


QUANTITIES Details (Unit) Shift 1 Shift 2 Total Worker Site Agent Skilled Worker MANPOWER Specialist Operator Foreman Technician Supervisor Engineer Pick up Bus Fork lift Generator Welding generator Tower crane Mobile crane EQUIPMENT Boom Truck Excavator Truck Loader Roller Dozer Crusher Pumps Driller Crusher OCU: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LPS: Pipe Gallery: 2 Riser Culverts: Motor/Pump room: SC: cable tray installation FPS: support riser instlation for ladder tray Cable Gallery Pump Rooms Motor Rooms 6 LPS 0 SC 0 FPS 0 OCU 0 LPS: support instalition for cable ladder DETAILS OF PROGRESS

REMARKS Safety/Environment : Quality : Technical Matters : Engineer's Remarks/Instructions :

Material/Equipment delivered :

Others :

DAILY REPORT
DOHA NORTH SEWERAGE TREATMENT & ASSOCIATED WORKS PS70 & PUMPING MAINS 682/2 Section
ELECTRICAL WORKS

Date :
Work. Hours Start : Finish : Weather Time : TC: Wind : Condition :
o

19.06.11 Shift 1 6:00 17:00 Shift 1 10:00AM 21C Normal Normal Shift 2 Shift 2

Location
AB, GH, WS, OUTSIDE

SUBCONTRACTO R Name: Subir Chatterjee Visa:

CONTRACTOR Name: Manuelito David Visa:

SUBCONTRACTOR

Original to Daily Report Officer, Copy to Section Manager


QUANTITIES Details (Unit) Shift 1 Shift 2 Total Worker Site Agent Skilled Worker MANPOWER Specialist Operator Foreman Technician Supervisor Engineer Pick up Bus / van Light Service Vehicle Generator Welding generator Fork lift Mobile crane EQUIPMENT Boom Truck Excavator Truck Loader Roller Dozer Crusher Pumps Driller Crusher 1 2 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 WS: AB: conduit instalation & wire AB 0 GH 0 WS 0 TSF AREA 0 TSF Area: site office worker DETAILS OF PROGRESS

REMARKS Safety/Environment : Quality : Technical Matters : Engineer's Remarks/Instructions :

Material/Equipment delivered :

Others :

MCC1, MCC2, HV & GENERATOR BLDG. MANPOWER CODES


1 WO WORKER Helper Tea Boy / Bearer / Cleaner Flagman 2 3 SA EXPAT SK SKILLED WORKER Steel fixer Compactor operator Pick-up driver Assistant surveyor (QS Electrician) Assistant QA/QC inspector (QC Electrician) Secretary 4 SP SPECIALIST Plumber Welder Electrician Mechanic Fabricator Instrument Fitter Carpenter Cable jointer Mason Site Administrator cum Material Controller Store keeper Rigger Painter Nurse 5 OP OPERATOR Truck driver Earthwork machine driver Pump operator Crane operator 6 FO FOREMAN Foreman Chargehand Actg. chargehand 7 TE TECHNICIAN Surveyor HSE officer QA/QC Inspector Instrument technician 8 SU SUPERVISOR Superintendent Supervisor 9 EN ENGINEER Project/Site Manager 0 0 0 9 EN 0 0 0 8 SU 0 0 0 7 TE 0 0 0 6 FO 0 0 0 5 OP 0 0 0 4 SP 0 0 0 0 0 0 2 3 SA SK

MCC1 MCC2 HV&G


0 0 0 1 WO

MANPOWER CODES

QA/QC Engineer Planning Engineer 0 0 \ 0

LPS, SC, FPS, OCU MANPOWER CODES


WORKER Helper Tea Boy / Bearer / Cleaner Flagman EXPAT SKILLED WORKER Steel fixer Compactor operator Pick-up driver Assistant surveyor (QS Electrician) Assistant QA/QC inspector (QC Electrician) Secretary SPECIALIST Plumber Welder Electrician Mechanic Fabricator Instrument Fitter Carpenter Cable jointer Mason Site Administrator cum Material Controller Store keeper Rigger Painter Nurse OPERATOR Truck driver Earthwork machine driver Pump operator Crane operator FOREMAN Foreman Chargehand Actg. chargehand TECHNICIAN Surveyor HSE officer QA/QC Inspector Instrument technician SUPERVISOR Superintendent Supervisor ENGINEER Project/Site Manager 0 0 0 0 9 EN 0 0 0 0 8 SU 0 0 0 0 7 TE 0 0 0 0 6 FO 0 0 0 0 5 OP 0 0 0 0 4 SP 0 0 0 0 0 0 0 0 2 3 SA SK

LPS
0

SC
0

FPS OCU
0 0 1 WO

MANPOWER CODES

QA/QC Engineer Planning Engineer 0 0 0 0

ADMIN. BLDG., NON-PROCESS, OUTSIDE AREA MANPOWER CODES


WORKER Helper Tea Boy / Bearer / Cleaner Flagman EXPAT SKILLED WORKER Steel fixer Compactor operator Pick-up/Bus driver Assistant surveyor (QS Electrician) Assistant QA/QC inspector (QC Electrician) Secretary SPECIALIST Plumber Welder Electrician Mechanic Fabricator Instrument Fitter Carpenter Cable jointer Mason Site Administrator cum Material Controller Store keeper Rigger Painter Nurse OPERATOR Truck driver Earthwork machine driver Pump operator Crane operator FOREMAN Foreman Chargehand Actg. chargehand TECHNICIAN Surveyor HSE officer QA/QC Inspector Instrument technician SUPERVISOR Superintendent Supervisor ENGINEER Project/Site Manager 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

AB
0

GH
0

WS
0

TSF
0

QA/QC Engineer Planning Engineer 0 0 0 0 0