U014 Add VOP R5
U014 Add VOP R5
Appendix A3
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF MATERIALS TOGETHER WITH QUANTITIES AND BASIC UNIT PRICES TO PRICE VARIATION IN ACCORDANCE WITH THE "SPECIAL PROVISIONS
TO THE CONDITIONS OF CONTRACT (VARIATION OF PRICE) FOR CIVIL ENGINEERING WORKS"
3 Ordinary Portland BS12 50kg bag 45,697 19.33 22.56 3.23 147,602.25
5 Automotive Gas Oil (Diesel) Note (1) Litre 638,402 1.79 4.45 2.66 1,698,149.32
6 Aggregates
- Crushed Aggregates (Crusher Run) Metric Ton 8,016 26.50 27.75 1.25 10,020.00
7 Fabric Reinforcement
- A4, MS145 kg N/A N/A N/A N/A N/A
- A5, MS145 kg N/A N/A N/A N/A N/A
- A6, MS145 kg N/A N/A N/A N/A N/A
- A7, MS145 kg 15,937 4.20 6.45 2.25 35,858.25
- A8, MS145 kg 121,641 4.20 7.93 3.73 453,720.93
- A9, MS145 kg N/A N/A N/A N/A N/A
- A10, MS145 kg N/A N/A N/A N/A N/A
- B5, MS145 kg N/A N/A N/A N/A N/A
- B6, MS145 kg N/A N/A N/A N/A N/A
- B7, MS145 kg N/A N/A N/A N/A N/A
- B8, MS145 kg N/A N/A N/A N/A N/A
- B9, MS145 kg N/A N/A N/A N/A N/A
- B10, MS145 kg N/A N/A N/A N/A N/A
- B12, MS145 kg N/A N/A N/A N/A N/A
- C5, MS145 kg N/A N/A N/A N/A N/A
- C6, MS145 kg N/A N/A N/A N/A N/A
- C7, MS145 kg N/A N/A N/A N/A N/A
- C8, MS145 kg N/A N/A N/A N/A N/A
- C9, MS145 kg N/A N/A N/A N/A N/A
- C10, MS145 kg N/A N/A N/A N/A N/A
- DA4, MS145 kg N/A N/A N/A N/A N/A
- DA5, MS145 kg N/A N/A N/A N/A N/A
- DA6, MS145 kg N/A N/A N/A N/A N/A
- DA7, MS145 kg N/A N/A N/A N/A N/A
- DA8, MS145 kg N/A N/A N/A N/A N/A
- DA9, MS145 kg N/A N/A N/A N/A N/A
- DA10, MS145 kg N/A N/A N/A N/A N/A
Page - 1 of 29
LAMPIRAN B1/CW/K-L(2021)
Appendix A3
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF MATERIALS TOGETHER WITH QUANTITIES AND BASIC UNIT PRICES TO PRICE VARIATION IN ACCORDANCE WITH THE "SPECIAL PROVISIONS
TO THE CONDITIONS OF CONTRACT (VARIATION OF PRICE) FOR CIVIL ENGINEERING WORKS"
8 Guardrail
(i) Single Mounted
Materials
- 1.95m Post Spacing Metre 628 300.00 329.63 29.63 18,607.64
- 3.80m Post Spacing Metre N/A N/A N/A N/A N/A
11 Mild Steel Pipe Pile / Mild Steel Permanent Casing Metre N/A N/A N/A N/A N/A
12 Steel Pipe Pile / Steel Permanent Casing Metre N/A N/A N/A N/A N/A
13 Steel Sheet Pile Metric Ton N/A N/A N/A N/A N/A
Notes:
(1) For estimation purpose, the Unit Rate of the Month for diesel is based on the average rate at 1st of Calendar Month and at 15th of Calendar Month, the
quotation from Sri Minyak (Sarawak) Sdn. Bhd. dated 30 September 2022. This is only an estimated amount, and subject to the Contractor's provision of
delivery orders and invoices paid for the diesel supply, and the work done for each month.
(2) For estimation purpose, the Unit Rate of the Month is based on the rates published in Jabatan Perangkaan Malaysia's Special Release 1 (Sabah & Sarawak)
(for Civile Engineering Works) September 2022.
Page - 2 of 29
LAMPIRAN B1/CW/K-L(2021)
Appendix A3
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF MATERIALS TOGETHER WITH QUANTITIES AND BASIC UNIT PRICES TO PRICE VARIATION
IN ACCORDANCE WITH THE "SPECIAL PROVISIONS TO THE CONDITIONS OF CONTRACT
(VARIATION OF PRICE) FOR CIVIL ENGINEERING WORKS"
6 Aggregates
- Crushed Aggregates (Crusher Run) Metric Ton 8,016 26.50
** The quantities stated shall be the same as the quantities shown in earlier VOP Supplementary
Contract, if any. The VOP assessment of these materials shall be continuous from the earlier VOP
assessment without double assessment.
Page - 3 of 29
LAMPIRAN B1/CW/K-L(2021)
Appendix A3
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF MATERIALS TOGETHER WITH QUANTITIES AND BASIC UNIT PRICES TO PRICE VARIATION
IN ACCORDANCE WITH THE "SPECIAL PROVISIONS TO THE CONDITIONS OF CONTRACT
(VARIATION OF PRICE) FOR CIVIL ENGINEERING WORKS"
7 Fabric Reinforcement
- A4, MS145 kg N/A N/A
- A5, MS145 kg N/A N/A
- A6, MS145 kg N/A N/A
- A7, MS145 kg 15,937 4.20
- A8, MS145 kg 121,641 4.20
- A9, MS145 kg N/A N/A
- A10, MS145 kg N/A N/A
- B5, MS145 kg N/A N/A
- B6, MS145 kg N/A N/A
- B7, MS145 kg N/A N/A
- B8, MS145 kg N/A N/A
- B9, MS145 kg N/A N/A
- B10, MS145 kg N/A N/A
- B12, MS145 kg N/A N/A
- C5, MS145 kg N/A N/A
- C6, MS145 kg N/A N/A
- C7, MS145 kg N/A N/A
- C8, MS145 kg N/A N/A
- C9, MS145 kg N/A N/A
- C10, MS145 kg N/A N/A
- DA4, MS145 kg N/A N/A
- DA5, MS145 kg N/A N/A
- DA6, MS145 kg N/A N/A
- DA7, MS145 kg N/A N/A
- DA8, MS145 kg N/A N/A
- DA9, MS145 kg N/A N/A
- DA10, MS145 kg N/A N/A
8 Guardrail
(i) Single Mounted
- 1.95m Post Spacing Metre 628 300.00
- 3.80m Post Spacing Metre N/A N/A
Page - 4 of 29
LAMPIRAN B1/CW/K-L(2021)
Appendix A3
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF MATERIALS TOGETHER WITH QUANTITIES AND BASIC UNIT PRICES TO PRICE VARIATION
IN ACCORDANCE WITH THE "SPECIAL PROVISIONS TO THE CONDITIONS OF CONTRACT
(VARIATION OF PRICE) FOR CIVIL ENGINEERING WORKS"
11 Mild Steel Pipe Pile / Mild Steel Permanent Casing Metre N/A N/A
Page - 5 of 29
LAMPIRAN B1/CW/K-L(2021)
Appendix A3
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF MATERIALS TOGETHER WITH QUANTITIES AND BASIC UNIT PRICES TO PRICE VARIATION
IN ACCORDANCE WITH THE "SPECIAL PROVISIONS TO THE CONDITIONS OF CONTRACT
(VARIATION OF PRICE) FOR CIVIL ENGINEERING WORKS"
Notes:
1. The above quantities are intended for the purpose of price variation only and do not necessarily reflect
the actual quantities required for the Contract. The Contractor shall ascertain himself the actual
quantities required upon which his tender is deemed to have been based.
2. Price Variation shall be applied to the above quantities fixed or actual quantities used, whichever is
the lesser.
3. The "Basic Unit Prices" shall be the appropriate Unit Price as stated in the Special Release1
published by the Department of Statistics. The Basic Unit Price shall be determined as follows based
on:
a. st
The month during which tender closes (for tenders closed on and after 1 January 2021); or
b. The month December 2020 (for tender closed before 1st January 2021).
4. For Mild Steel Pipe Pile / Mild Steel Permanent Casing, Steel Pipe Pile / Steel Permanent Casing and
Ductile Iron (D.I) pipe, where the unit price and indices for materials are not provided by DOSM, the
Department should write in to DOSM to apply for the unit price to be included in the Special Release.
In the case after the written application, the unit price are still not provided by DOSM, the unit price
and indices for variation of price must be derived based on the criteria as at Lampiran E (2021) of this
circular.
5. However, in case of the unit price for the Mild Steel Pipe Pile / Mild Steel Permanent Casing, Steel
Pipe Pile / Steel Permanent Casing and Ductile Iron (D.I) pipe have been included in Special Release
by DOSM, the unit price in the Special Release shall be used.
6. For Steel Sheet Pile, where the unit price and indices for material are currently not available under
Special Release by DOSM, the Department/Agency has to propose and determine the reasonable
and appropriate assessment method to calculate the VOP and to seek JKR Sarawak’s comment prior
to submission to State Financial Secretary’s Office for consideration and decision.
7 For P.C. Strand of 15.7mm Diameter, the "Basic Unit Price" shall be the appropriate Unit Price for
16mm Daimeter High Tensile Deformed bar as stated in in the Special Release1 (Sarawak & Sabah)
published by the Department of Statistic Malaysia.
Page - 6 of 29
LAMPIRAN B1/CW/K-L(2021)
Appendix B1
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF CATEGORY AND SIZE OF MILD STEEL PIPE TOGETHER WITH QUANTITY AND
BASIC UNIT PRICE SUBJECT TO PRICE VARIATION IN ACCORDANCE WITH THE "SPECIAL
PROVISIONS TO THE CONDITIONS OF CONTRACT (VARIATION OF PRICE) FOR CIVIL
ENGINEERING WORKS"
Category and Size of Mild Steel Pipe Quantity Unit Price for Adjustment Basic Unit Price
(m) Basic Material Factor
WATER PIPE
1. 100mm Ø N/A N/A N/A N/A
2. 150mm Ø N/A N/A N/A N/A
3. 200mm Ø N/A N/A N/A N/A
4. 250mm Ø N/A N/A N/A N/A
5. 300mm Ø N/A N/A N/A N/A
6. 350mm Ø N/A N/A N/A N/A
7. 400mm Ø N/A N/A N/A N/A
8. 450mm Ø N/A N/A N/A N/A
9. 500mm Ø N/A N/A N/A N/A
10. 600mm Ø N/A N/A N/A N/A
11. 700mm Ø N/A N/A N/A N/A
12. 750mm Ø N/A N/A N/A N/A
13. 800mm Ø N/A N/A N/A N/A
14. 900mm Ø N/A N/A N/A N/A
15. 1000mm Ø N/A N/A N/A N/A
16. 1100mm Ø N/A N/A N/A N/A
17. 1150mm Ø N/A N/A N/A N/A
18. 1200mm Ø N/A N/A N/A N/A
19. 1300mm Ø N/A N/A N/A N/A
20. 1400mm Ø N/A N/A N/A N/A
21. 1500mm Ø N/A N/A N/A N/A
22. 1600mm Ø N/A N/A N/A N/A
23. 1700mm Ø N/A N/A N/A N/A
24. 1800mm Ø N/A N/A N/A N/A
25. 1900mm Ø N/A N/A N/A N/A
26. 2000mm Ø N/A N/A N/A N/A
27. 2100mm Ø N/A N/A N/A N/A
28. 2200mm Ø N/A N/A N/A N/A
Appendix B1
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF CATEGORY AND SIZE OF MILD STEEL PIPE TOGETHER WITH QUANTITY AND
BASIC UNIT PRICE SUBJECT TO PRICE VARIATION IN ACCORDANCE WITH THE "SPECIAL
PROVISIONS TO THE CONDITIONS OF CONTRACT (VARIATION OF PRICE) FOR CIVIL
ENGINEERING WORKS"
Category and Size of Mild Steel Pipe Quantity Unit Price for Adjustment Basic Unit Price
(m) Basic Material Factor
SEWERAGE PIPE
1. 100mm Ø N/A N/A N/A N/A
2. 125mm Ø N/A N/A N/A N/A
3. 150mm Ø N/A N/A N/A N/A
4. 200mm Ø N/A N/A N/A N/A
5. 250mm Ø N/A N/A N/A N/A
6. 300mm Ø N/A N/A N/A N/A
7. 350mm Ø N/A N/A N/A N/A
8. 400mm Ø N/A N/A N/A N/A
9. 450mm Ø N/A N/A N/A N/A
10. 500mm Ø N/A N/A N/A N/A
11. 550mm Ø N/A N/A N/A N/A
12. 600mm Ø N/A N/A N/A N/A
13. 650mm Ø N/A N/A N/A N/A
14. 700mm Ø N/A N/A N/A N/A
15. 750mm Ø N/A N/A N/A N/A
16. 800mm Ø N/A N/A N/A N/A
17. 850mm Ø N/A N/A N/A N/A
18. 900mm Ø N/A N/A N/A N/A
19. 950mm Ø N/A N/A N/A N/A
20. 1000mm Ø N/A N/A N/A N/A
21. 1200mm Ø N/A N/A N/A N/A
22. 1400mm Ø N/A N/A N/A N/A
23. 1600mm Ø N/A N/A N/A N/A
24. 1800mm Ø N/A N/A N/A N/A
25. 2000mm Ø N/A N/A N/A N/A
26. 2100mm Ø N/A N/A N/A N/A
27. 2200mm Ø N/A N/A N/A N/A
Page - 8 of 29
LAMPIRAN B1/CW/K-L(2021)
Appendix B1
Contract No.: RECODA/2019/U014
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke Long Tangau, Penempatan Semula Metalun, Belaga (Fasa I)
LIST OF CATEGORY AND SIZE OF MILD STEEL PIPE TOGETHER WITH QUANTITY AND
BASIC UNIT PRICE SUBJECT TO PRICE VARIATION IN ACCORDANCE WITH THE "SPECIAL
PROVISIONS TO THE CONDITIONS OF CONTRACT (VARIATION OF PRICE) FOR CIVIL
ENGINEERING WORKS"
Notes:
1. The above quantities are intended for the purpose of price variation only and do not
necessarily reflect the actual quantities required for the Contract.
2. Price Variation shall be applied to the above quantities fixed or actual quantities used,
whichever is the lesser.
3. The "Basic Unit Prices" shall be the appropriate Unit Price as stated in the Special Release1
published by the Department of Statistics. The Basic Unit Price shall be determined as follows
based on:
a. The month during which tender closes (for tenders closed on and after 1st January 2021); or
b. The month December 2020 (for tender closed before 1st January 2021).
4. Price Adjustment Factor shall be as stated in the Special Release 1 published by the
Department of Statistics.
5. The Basic Material is the most commonly used material for the relevant category of pipes in
most projects.
6. TBA = To be ascertained by the Superintending Officer (S.O.) and in accordance with the
Notes for Item 4 and 5 of the Appendix A3.
Page - 9 of 29
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM - CADANGAN NAIKTARAF JALAN KE
LONG TANGAU, PENEMPATAN SEMULA METALUN, BELAGA (FASA 1)
cement 10 dia. (t) 12 dia. (t) 16-25 dia.(t) 32 dia. (t) A7 fabric (kg) A8 fabric (kg) PC Strand (kg)
drains 16,522 - - - - 15,937 35,491 -
pavement 24,864 5.00 - - - - 86,150 -
bridge 4,311 0.50 18.02 26.80 1.90 - - 4.86
45,697 5.50 18.02 26.80 1.90 15,937 121,641 4.86
cement (50kg/bag)
G15 G20 G25 G30 G40 G50 10 dia. (t) 12 dia. (t) 16-25 dia.(t) 32 dia. (t) Total (t)
bored piling - - - - 2,866 - - 2.00 6.00 - 8.00
bridge 12 - - 121 - - 0.50 6.10 11.70 1.00 19.30
bridge girder - - - - - 1,312 - 9.92 9.10 0.90 19.92
BQ Item Contract Amount Initial Cost (RM) (b) Recurring Cost based % of Recurring Cost
(RM) (a) on Workdone (RM) based on Work Done
Date: 6
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
2/I Works programme using Critical Path Method Analysis 20.77 14.58 70.20%
Programme.
No revision of Works Programme from 26.10.2020 to 25.12.2020.
2/J Progress report in eight (8) sets per month. Rate to 20.77 14.58 70.20%
include progress photographs.
Kemudi Harta Sdn. Bhd.'s letter ref. KH CT 62/1.1 (160) dated 02.12.2020 and Monthly Progress
Report No. 14 (Ending 25th November 2020)
Kemudi Harta Sdn. Bhd.'s letter ref. KH CT 62/1.1 (169) dated 09.01.2021 and Monthly Progress
Report No. 15 (Ending 25th December 2020)
3/E Compliance with Occupational Safety and Health Requirements, 100% #REF!
including provision of personnel protective equipment.
Health, Safety and Environment (HSE) Monthly Report for the Month of November 2020 enclosed
in Monthly Progress Report No. 14.
Health, Safety and Environment (HSE) Monthly Report for the Month of December 2020 enclosed
in Monthly Progress Report No. 15.
3/F Provision, maintenance and removal upon completion of Contractor's 100% #REF! 0%
facilities.
3/G Provide, maintain and remove upon completion supervision and #REF!
administration service.
Date: 7
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Date: 8
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Carrying out vertical boring in soil Carry out vertical diamond core drilling
BH ref.
5/F, ne 10m 5/G, 10 - 20m 5/H, 20 - 30m 6/A, ne 10m 6/B, 10 - 20m 6/C, 20 - 30m
BH1 3.000 - - 5.000 - -
Tests
Classification Test
7/E,
BH ref. 7/F, Consolidated Core Rock Sample
Unconsolidated 7/I, Uniaxial 7/J, Pointed load
undrained triaxial
undrained triaxial compression test. test.
compression test
compression
BH1 - - C1 1 -
BH1 - - C2 - -
BH1 - - C3 1 -
BH1 - - C4 - -
- - 2 -
Date: 9
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
9/B Topsoil of average depth 150mm and disposal to Contractor's dumpsite as approved by the S.O. 100.00%
9/C Topsoil of average depth 150mm and stockpile for re-use as top soil. 100.00%
9/D All materials except rock from original ground level to form embankment, Work Done (m3) Estimated Total % completed
Quantity (m3)
maximum depth of 6.5m.
Total fill volume from Table B: 3,361.540 #REF! #REF!
9/E All materials except rock for disposal, maximum depth of 6.5m.
Total Cut Volume from Table A: 13,941.560
LESS: cut volume used in forming embankment: 3,361.540
10,580.020 #REF! #REF!
Table A - Earthworks (Cut) Computation for Tegulang (based on KTA's Bulk Earthworks Calculation)
Chainage (CH) Cumulative Cut cut volume % completed (%), Volume of Work Contractor's Total Contractor's
Volume at CH between CH based (b) = { (B) / (A) } x Done (m3), Estimated Quantity Progress Quantity
based on KTA's on KTA's Bulk 100% (c) = (a) x (b) extracted from extracted from
Bulk Earthwork Earthwork Earthwork Volume Earthwork Volume
Calculation (m3) Calculation (m3), SK Tegulang (m3), SK Tegulang (m3),
(a) (A) (B)
Main Road
-
395.680 99.51% 393.740 11.200 11.145
25.000 395.68
0.310 99.51% 0.310 - -
50.000 395.99
162.680 99.91% 162.530 5.430 5.425
75.000 558.67
163.690 99.91% 163.540 5.430 5.425
100.000 722.36
21.570 0.00% - - -
125.000 743.93
8.490 0.00% - - -
150.000 752.42
273.470 99.98% 273.420 23.020 23.015
Date: 10
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Table A - Earthworks (Cut) Computation for Tegulang (based on KTA's Bulk Earthworks Calculation)
Chainage (CH) Cumulative Cut cut volume % completed (%), Volume of Work Contractor's Total Contractor's
Volume at CH between CH based (b) = { (B) / (A) } x Done (m3), Estimated Quantity Progress Quantity
based on KTA's on KTA's Bulk 100% (c) = (a) x (b) extracted from extracted from
Bulk Earthwork Earthwork Earthwork Volume Earthwork Volume
Calculation (m3) Calculation (m3), SK Tegulang (m3), SK Tegulang (m3),
(a) (A) (B)
Date: 11
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Table A - Earthworks (Cut) Computation for Tegulang (based on KTA's Bulk Earthworks Calculation)
Chainage (CH) Cumulative Cut cut volume % completed (%), Volume of Work Contractor's Total Contractor's
Volume at CH between CH based (b) = { (B) / (A) } x Done (m3), Estimated Quantity Progress Quantity
based on KTA's on KTA's Bulk 100% (c) = (a) x (b) extracted from extracted from
Bulk Earthwork Earthwork Earthwork Volume Earthwork Volume
Calculation (m3) Calculation (m3), SK Tegulang (m3), SK Tegulang (m3),
(a) (A) (B)
650.000
BRIDGE OVER SUMGAI SEPABO
675.000
700.000 12,844.21
- 0% - - -
725.000 12,844.21
- 0% - - -
750.000 12,844.21
- 0% - - -
775.000 12,844.21
- 0% - - -
800.000 12,844.21
- 0% - - -
825.000 12,844.21
- 0% - - -
850.000 12,844.21
64.480 0% - - -
875.000 12,908.69
12.270 0% - - -
900.000 12,920.96
- 0% - - -
925.000 12,920.96
6.930 0% - - -
950.000 12,927.89
13.210 0% - - -
975.000 12,941.10
0.040 0% - - -
1,000.000 12,941.14
16.280 0% - - -
1,025.000 12,957.42
392.600 90.71% 356.130 11.300 10.250
1,050.000 13,350.02
350.260 87.05% 304.900 16.060 13.980
1,075.000 13,700.28
240.200 84.08% 201.960 13.660 11.485
1,100.000 13,940.48
Date: 12
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Table A - Earthworks (Cut) Computation for Tegulang (based on KTA's Bulk Earthworks Calculation)
Chainage (CH) Cumulative Cut cut volume % completed (%), Volume of Work Contractor's Total Contractor's
Volume at CH between CH based (b) = { (B) / (A) } x Done (m3), Estimated Quantity Progress Quantity
based on KTA's on KTA's Bulk 100% (c) = (a) x (b) extracted from extracted from
Bulk Earthwork Earthwork Earthwork Volume Earthwork Volume
Calculation (m3) Calculation (m3), SK Tegulang (m3), SK Tegulang (m3),
(a) (A) (B)
Date: 13
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Table B - Earthworks (Fill) Computation for Tegulang (based on KTA's Bulk Earthworks Calculation)
Chainage (CH) Cumulative Fill fill volume between % completed (%), Volume of Work Contractor's Total Contractor's
Volume at CH CH based on (b) = { (B) / (A) } x Done (m3), Estimated Quantity Progress Quantity
based on KTA's KTA's Bulk 100% (c) = (a) x (b) extracted from extracted from
Bulk Earthwork Earthwork Earthwork Volume Earthwork Volume
Calculation (m3) Calculation (m3), SK Tegulang (m3), SK Tegulang (m3),
(a) (A) (B)
Main Road
- -
28.250 100.00% 28.250 4.010 4.010
25.000 28.25
285.500 100.00% 285.500 12.400 12.400
50.000 313.75
159.310 100.00% 159.310 16.530 16.530
75.000 473.06
76.600 100.00% 76.600 10.230 10.230
100.000 549.66
35.610 100.00% 35.610 5.720 5.720
125.000 585.27
81.400 100.00% 81.400 10.270 10.270
150.000 666.67
136.560 100.00% 136.560 10.150 10.150
175.000 803.23
192.580 100.00% 192.580 11.750 11.750
200.000 995.81
76.300 100.00% 76.300 8.240 8.240
225.000 1,072.11
- 0.00% - - -
250.000 1,072.11
36.790 100.00% 36.790 0.900 0.900
275.000 1,108.90
6.670 100.00% 6.670 3.070 3.070
300.000 1,115.57
3.740 100.00% 3.740 2.170 2.170
325.000 1,119.31
0.050 0.00% - - -
350.000 1,119.36
44.840 100.00% 44.840 4.160 4.160
375.000 1,164.20
26.040 100.00% 26.040 5.790 5.790
400.000 1,190.24
15.940 100.00% 15.940 1.630 1.630
425.000 1,206.18
37.700 0.00% - - -
450.000 1,243.88
2.160 0.00% - - -
Date: 14
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Table B - Earthworks (Fill) Computation for Tegulang (based on KTA's Bulk Earthworks Calculation)
Chainage (CH) Cumulative Fill fill volume between % completed (%), Volume of Work Contractor's Total Contractor's
Volume at CH CH based on (b) = { (B) / (A) } x Done (m3), Estimated Quantity Progress Quantity
based on KTA's KTA's Bulk 100% (c) = (a) x (b) extracted from extracted from
Bulk Earthwork Earthwork Earthwork Volume Earthwork Volume
Calculation (m3) Calculation (m3), SK Tegulang (m3), SK Tegulang (m3),
(a) (A) (B)
650.000
BRIDGE OVER SUMGAI SEPABO
675.000
700.000 2,225.20
- 0.00% - - -
725.000 2,225.20
- 0.00% - - -
750.000 2,225.20
- 0.00% - - -
775.000 2,225.20
- 0.00% - - -
800.000 2,225.20
- 0.00% - - -
825.000 2,225.20
- 0.00% - - -
850.000 2,225.20
13.860 0.00% - - -
875.000 2,239.06
133.590 100.00% 133.590 6.380 6.380
900.000 2,372.65
210.480 100.00% 210.480 10.440 10.440
925.000 2,583.13
97.620 100.00% 97.620 6.510 6.510
Date: 15
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Table B - Earthworks (Fill) Computation for Tegulang (based on KTA's Bulk Earthworks Calculation)
Chainage (CH) Cumulative Fill fill volume between % completed (%), Volume of Work Contractor's Total Contractor's
Volume at CH CH based on (b) = { (B) / (A) } x Done (m3), Estimated Quantity Progress Quantity
based on KTA's KTA's Bulk 100% (c) = (a) x (b) extracted from extracted from
Bulk Earthwork Earthwork Earthwork Volume Earthwork Volume
Calculation (m3) Calculation (m3), SK Tegulang (m3), SK Tegulang (m3),
(a) (A) (B)
Date: 16
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Area Turved (m2), Total Estimated Payment Schedule acceptable %, (d) % completed, (e) =
(a) Area (m2), (b) in Add. S-1 (Rev. { (a) / (b) } x (c) x
1) to SSRW, (c) (d)
9/G Spot turfing to flat areas. 553.80 #REF! 50.00% 20.00% #REF!
9/H Close turfing to slopes including pegging - #REF! 50.00% 0.00% #REF!
down with stakes.
Item "3.5 - Unlined and lined surface drains, culverts, and other drainage structure." of Summary of Tender:
10/J Diversion channel with depth not exceeding 1.50m. 30.00 #REF! #REF!
number completed Estimated Total % completed
(nr) Quantity (nr)
10/K Removal and disposal of existing timber crossings, including clearing of 3 3 100.00%
existing timber logs and debris within 20m upstream and downstream of
the existing waterways.
Pipe Culvert 11/D, 600mm dia. (m) 11/E, 1200mm dia. 11/F, 1500mm dia. 11/G, 1800mm dia. 11/A, excavation < 11/B, excavation
(m) (m) (m) 1.5m deep (m3) 1.5m < deep < 3.0m
(m3)
Date: 17
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Pipe Culvert Gabion Mattress Protection Works at Culvert Inlet and Outlet
Completed 11/C, well-compacted 11/H, non-woven 11/I, 300mm Thick 11/J, non-woven 11/K, 300mm Thick
sand fill as bedding geotextile Type NW9 gabion mattress as geotextile Type gabion mattress as
(m3) as separator (m2) inlet/outlet base (m2) NW15 as separator inlet/outlet wall, laid
(m2) in slope (m2)
TS-1 68.40 - - - -
TS-2 85.20 - - - -
TS-3 63.00 - - - -
MJ-1 30.75 - - - -
Total Completed: 247.35 - - - -
Estimated Total Quantity: #REF! #REF! #REF! #REF! #REF!
% completed: 100.00% #REF! #REF! #REF! #REF!
Item "3.6 - Reinforced concrete road pavement, earth shoulder and road furniture." of Summary of Tender:
12/A Earth material to receive 300mm thick reinforced concrete road pavement. 5,700.00 #REF! #REF!
500mm diameter bored piles as working piles, include temporary casing, stabilising agent, and enlarged
bases. Piling records and disposal of excavated and surplus materials (in 44 no.)
(based on Bored Pile Driving Record for Bridge over Sg, Sepabo)
15/A Provision of all necessary piling plant and equipment, transportation to the Site, handling, assembling,
and removal off the Site after completion of operation.
weightage % completed
provision: 60.00% 100.00% 60.00%
removal: 40.00% 100.00% 40.00%
100.00%
15/B Moving and handling of all piling plant and equipment within the Site and from location to location as
often as is, and whenever necessary for the execution of the whole piling operation.
Total Pile Point Completed Pile % Completed
Point
44 44 100.00%
15/C Provision of temporary staging/platform and move rig to each pile group location for installation of
bored cast-in-situ piles, including removal upon completion of works.
weightage % completed
provision: 60.00% 100.00% 60.00%
moving: 30.00% 100.00% 30.00%
removal: 10.00% 100.00% 10.00%
100.00%
Date: 18
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Date: 19
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
MEASUREMENT FOR CONCRETE, STEEL REINFORCEMENT BARS AND OTHERS TO BORED PILING WORKS
Pile Cut-Off Level 15/H - Concreted 16/A - Reinforcement 16/B - High tensile 16/C - Cut-Off Pile 16/D - Preparing Pile
length with grade 40. straight bars high reinforcement helical Head Head
tensile, ND ne 20mm. bars, ND ne 20mm.
AP1 385.948 9.000 223.383 41.867 1 1
laps for steel reinforcement - 3.136
AP10 385.948 8.300 207.847 38.614 - -
laps for steel reinforcement - 3.136
AP8 385.948 8.400 210.066 39.079 - -
laps for steel reinforcement - 3.136
AP9 385.948 8.500 212.286 39.544 - -
laps for steel reinforcement - 3.136
AP5 385.948 8.022 201.677 37.323 - -
laps for steel reinforcement - 3.136
AP4 385.948 7.760 195.862 36.105 - -
laps for steel reinforcement - 3.136
AP3 385.948 7.726 195.107 35.947 - -
laps for steel reinforcement - 2.091
AP2 385.948 7.910 199.191 36.802 - -
laps for steel reinforcement - 3.136
AP6 385.948 7.180 182.990 33.410 - -
laps for steel reinforcement - 2.091
AP7 385.948 7.110 181.436 33.085 - -
laps for steel reinforcement - 2.091
BP9 385.948 8.800 218.944 40.938 1 1
laps for steel reinforcement - 3.136
BP7 386.148 9.000 223.383 41.867 1 1
laps for steel reinforcement - 3.136
BP6 386.148 9.100 225.602 42.332 1 1
laps for steel reinforcement - 3.136
BP8 386.148 9.400 232.260 43.725 1 1
laps for steel reinforcement - 3.136
BP10 386.148 9.700 238.918 45.119 1 1
laps for steel reinforcement - 3.136
BP1 386.148 8.160 204.740 37.964 1 1
laps for steel reinforcement - 3.136
BP3 386.148 7.610 192.533 35.408 1 1
laps for steel reinforcement - 2.091
BP4 386.148 8.250 206.737 38.382 1 1
laps for steel reinforcement - 3.136
BP5 386.148 7.900 198.969 36.756 1 1
laps for steel reinforcement - 3.136
BP2 386.148 8.210 205.849 38.196 1 1
laps for steel reinforcement - 3.136
1P7 378.100 6.430 166.344 29.926 - -
laps for steel reinforcement - 2.091
1P11 378.100 6.460 167.010 30.065 - -
laps for steel reinforcement - 2.091
1P12 378.100 6.390 165.456 29.740 - -
Date: 20
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
MEASUREMENT FOR CONCRETE, STEEL REINFORCEMENT BARS AND OTHERS TO BORED PILING WORKS
Pile Cut-Off Level 15/H - Concreted 16/A - Reinforcement 16/B - High tensile 16/C - Cut-Off Pile 16/D - Preparing Pile
length with grade 40. straight bars high reinforcement helical Head Head
tensile, ND ne 20mm. bars, ND ne 20mm.
laps for steel reinforcement - 2.091
1P1 378.100 6.450 166.788 30.019 - -
laps for steel reinforcement - 2.091
1P2 378.100 6.230 161.905 28.996 - -
laps for steel reinforcement - 2.091
1P3 378.100 6.100 159.020 28.392 - -
laps for steel reinforcement - 2.091
1P4 378.100 6.040 157.688 28.114 - -
laps for steel reinforcement - 2.091
1P5 378.100 6.130 159.686 28.532 - -
laps for steel reinforcement - 2.091
1P6 378.100 5.840 153.250 27.184 - -
laps for steel reinforcement - 2.091
1P8 378.100 8.020 201.632 37.313 - -
laps for steel reinforcement - 3.136
1P9 378.100 6.100 159.020 28.392 - -
laps for steel reinforcement - 2.091
1P10 378.100 6.270 162.793 29.182 - -
laps for steel reinforcement - 2.091
2P8 378.100 6.240 162.127 29.043 - -
laps for steel reinforcement - 2.091
2P12 378.100 5.500 145.704 25.604 - -
laps for steel reinforcement - 2.091
2P11 378.100 5.560 147.035 25.883 - -
laps for steel reinforcement - 2.091
2P10 378.100 5.870 153.915 27.324 - -
laps for steel reinforcement - 2.091
2P9 378.100 5.610 148.145 26.116 - -
laps for steel reinforcement - 2.091
2P7 378.100 6.900 176.775 32.109 - -
laps for steel reinforcement - 2.091
2P6 378.100 5.890 154.359 27.417 - -
laps for steel reinforcement - 2.091
2P5 378.100 5.750 151.252 26.766 - -
laps for steel reinforcement - 2.091
2P4 378.100 6.230 161.905 28.996 - -
laps for steel reinforcement - 2.091
2P3 378.100 6.100 159.020 28.392 - -
laps for steel reinforcement - 2.091
2P2 378.100 6.080 158.576 28.299 - -
laps for steel reinforcement - 2.091
2P1 378.100 6.130 159.686 28.532 - -
laps for steel reinforcement - 2.091
314.358 8,016.871 1,572.568 11 11
8.02 1.57
Date: 21
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA) - PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM -
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
work done
16/E Static Load Test on working vertical pile on land to two (2) times the 1
working load at 2200 kN including preparation of pile head, provision of
all necessary equipment, kentledge, personnel, record as described.
Allpile Solutions Sdn. Bhd.'s Borepile Static Pile Loading Test Report - Load Test report for Pile Ref. AP1.
Concrete Work
work done Total Estimated % completed
50mm thick lean concrete (Grade 20) as working slab laid under: Quantity
22/C Type 25 girder, overall sizes 24.4m long x 0.51m wide x 1.475m high.
weightage % completed
22/D Type 20 girder, overall sizes 19.4m long x 0.51m wide x 1.275m high.
weightage % completed
Preparation of Casting yard 20.00% 25.00% 5.00%
Reinforced concrete Grade 50 10.00% 0.00% 0.00%
Steel reinforcement bars 8.00% 90.00% 7.20%
Prestressing tendon & grouting 15.00% 0.00% 0.00%
Formwork 12.00% 90.00% 10.80%
Launching and placing in position 35.00% 0.00% 0.00%
100.00% 23.00%
Date: 22
CONTRACT NO.: RECODA/2019/U015
UPPER RAJANG DEVELOPMENT AGENCY (URDA)
PACKAGE 3: ROAD INFRASTRUCTURE PROJECTS IN BELAGA / MURUM
Cadangan Naiktaraf Jalan Ke SK Tegulang, Penempatan Semula Tegulang, Belaga (Fasa I)
Category Plant No. on Site Brake Horse Power Plant Working Day Working Hour per Average Diesel Comsumption Total Diesel Remark
(b.h.p.) Day Consumption (litre per hour Consumption (litre)
per 100 b.h.p. hour)
(a) (b) (c) (d) (e) (e) = { (b) x (e) } / (f) = (a) x (c) x (d) x
100 (e)
A Earth Moving Plants & Other
Equipment (Diesel Engine Type)
1 Track-type Excavator 3 162 312 8 15.00 24.30 181,958 based on CAT 320 Hydraulic
Excavator
2 Compact Roller 1 112 364 8 15.00 16.80 48,922 based on SAKAI SV521 Vibratory
Single Drum Roller
3 Bulldozer 1 215 338 8 15.00 32.25 87,204 based on CAT D6 track-type
Tractor.
4 Motorgrader 1 130 104 8 15.00 19.50 16,224 based on CAT C7.1 motorgrader.
Category Plant No. on Site Average Distance Plant Working Day Working Hour per Average Diesel Comsumption Total Diesel Remark
Travel per Day (km) Day Consumption per day Consumption (litre)
(km/litre)
(a) (b) (c) (d) (e) (e) = { (b) / (e) } (f) = (a) x (c) x (e)
B Vehicles (Diesel Engine Type)
1 Tipper Truck, 6m3 - 20 312 8 3.50 5.71 - 3.5 km/litre (10 Miles/I. Gall.)
d Multiple 15.7 diameter, 7 wire super grade low relaxation stress relieved type strands prestressing tendon
density = 1.180 kg/m, based on "Freyssinet C Range Post-tensioning System".
tendon A 1 29.400 1.000 1.000 8.260 242.84
tendon B 1 29.400 1.000 1.000 8.260 242.84
485.68 kg
(27.11.2022) Page - 24