The document lists 105 transactions of construction materials from January 2021 to June 2021. It includes items like aluminum, ceramic tiles, rebar, paint, wood, nails and other building supplies. For each transaction it provides the date, item, quantity and unit of measurement.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
84 views123 pages
BPB List
The document lists 105 transactions of construction materials from January 2021 to June 2021. It includes items like aluminum, ceramic tiles, rebar, paint, wood, nails and other building supplies. For each transaction it provides the date, item, quantity and unit of measurement.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 123
No.
Date Item Name Qnty UOM
1 1/2/2021 SENG ALUMUNIUM (KULIT JERUK) 40 LBR 2 2/1/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 3 3/1/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 4 4/1/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 5 5/2/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 2 TIN 6 6/2/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 7 6/2/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 8 7/1/2021 PAPAN CAMPUR 3/4X8X5MTR 10 KPG 9 7/1/2021 BROTI CAMPUR 2" X 3" X 5MTR 20 BTG 10 7/1/2021 IRON NAILS 2 1/2" 5 KG 11 7/1/2021 TRIPLEK 4MMX4X8 20 LBR 12 8/2/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 10 TIN 13 1/2/2021 SENG ALUMUNIUM (KULIT JERUK) 15 LBR 14 2/1/2021 CINCIN KERAMIK WARNA PUTIH 1 KTK 15 3/1/2021 BROTI PUNAK 2X3X5MTR 10 BTG 16 3/1/2021 BROTI PUNAK 3"X5"X5 MTR 2 BTG 17 3/1/2021 TRIPLEK 4MMX4X8 20 LBR 18 4/1/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 20 BTG 19 5/2/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 10 TIN 20 6/2/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 21 7/1/2021 SENG ALUMUNIUM (KULIT JERUK) 25 LBR 22 8/2/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 15 TIN 23 1/3/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 2 BTG 24 2/1/2021 SEMEN PUTIH MERK BITAGROUP 4 KGS 25 3/1/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 26 3/1/2021 BROTI PUNAK 2X4X5MTR 2 BTG 27 4/1/2021 IRON NAILS 2" 5 KG 28 5/2/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 10 TIN 29 6/2/2021 IRON NAILS 3" 4 KG 30 7/1/2021 PAPAN MERANTI 1X8X5MTR 7 KPG 31 7/1/2021 BROTI PUNAK 2X3X5MTR 15 BTG 32 7/1/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 33 8/2/2021 CAT AVITEX S WHITE (25 KG) 1 TIN 34 1/3/2021 Pipa Galvanis 1 1/4" X 6M Welded, Brand: BOS Bakrie Pip 10 BTG 35 2/1/2021 BROTI PUNAK 2X3X5MTR 1 BTG 36 2/1/2021 TRIPLEK 4MMX4X8 7 LBR 37 2/1/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 38 3/1/2021 MELAMIC Kawat Las @ 1 LTR RB26 Welding 4.0 mm @ 5Kg, Brand: Kobe 1 TIN 39 4/1/2021 6 BKS Steel 40 4/1/2021 Kawat Las RB26 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 8 BKS 41 5/2/2021 MINYAK BENSIN 20 LTR 42 6/2/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 1 BTG 43 7/1/2021 IRON NAILS 2" 1 KG 44 7/1/2021 IRON NAILS 2 1/2" 1 KG 45 8/2/2021 BESI BETON ULIR 16MMX12M 2 BTG 46 1/3/2021 CAT PLATONE GOLDEN YELLOW @ 3,785 LTR NIPPON 1 TIN 47 2/1/2021 IRON NAILS 2" 1 KG 48 3/1/2021 PAPAN MERANTI 1X8X5MTR 17 KPG 49 4/1/2021 KAWAT DURI UK.26MMX30 MTR 1 ROLL 50 5/2/2021 MINYAK BENSIN 10 LTR 51 6/2/2021 Kawat Las RB26 Welding 3.2 mm, Brand: Kobe Steel 5 KG 52 7/1/2021 BROTI PUNAK 3"X5"X5 MTR 2 BTG 53 8/2/2021 SEMEN PUTIH MERK BITAGROUP 6 KGS 54 1/3/2021 ROOFING NAILS 2" 1 KG 55 2/1/2021 PAPAN MERANTI 1X8X5MTR 4 KPG 56 2/1/2021 BROTI PUNAK 2X3X5MTR 7 BTG 57 3/1/2021 GRANITE (BATU KORAL) 4 M3 58 3/1/2021 PASIR 11.2 TON 59 4/1/2021 Kawat Las SS 3.2 mm NSN 308, Brand: Nikko Steel 20 KG 60 5/2/2021 MINYAK BENSIN 15 LTR 61 6/2/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 62 6/2/2021 MATA JIGSAW NO.3 MERK MAKITA 2 PCS 63 7/1/2021 ROOFING NAILS 2" 3 KG 64 8/2/2021 SEMEN PUTIH MERK BITAGROUP 7 KGS 65 1/3/2021 ROOFING NAILS 2 1/2" 5 KG 66 2/1/2021 KERAMIK UK.40CMX40CM (PUTIH) 10 KTK 67 3/1/2021 PAPAN MERANTI 3/4X8X5 17 KPG 68 4/1/2021 ROOFING NAILS 2 1/2" 5 KG 69 5/2/2021 MINYAK BENSIN 5 LTR 70 6/3/2021 ROOFING NAILS 2 1/2" 10 KG 71 7/1/2021 IRON NAILS 2" 3 KG 72 7/1/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 10 PCS 73 7/1/2021 BESI BETON POLOS 8MMX12M SNI KS 15 BTG 74 7/1/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 15 BTG 75 8/2/2021 Electrode 220842 Plasma Cut Powermax 85 1 PCS 76 8/2/2021 Nozzle 220816 Plasma Cut Powermax85 1 PCS 77 1/3/2021 KAYU BAKAU 3" X 5 MTR 200 BTG 78 2/1/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 79 3/1/2021 PASIR 5.6 TON 80 4/1/2021 KAYU BAKAU 3" X 5 MTR 120 BTG 81 5/2/2021 MINYAK BENSIN 5 LTR 82 6/3/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 15 PCS 83 7/2/2021 IRON NAILS 1 1/2" 1 KG 84 7/2/2021 IRON NAILS 2 1/2" 1 KG 85 7/2/2021 PAKU GRC BOARD @ 6 Ons 1 KTK 86 8/2/2021 PAPAN CAMPUR 3/4X8X5MTR 2 KPG 87 1/4/2021 IRON NAILS 1 1/2" 1 KG 88 2/2/2021 ROOF ROOF DECK DECK ZINCALUM ZINCALUM AZ-150 AZ-150 SD-680/ SD-680/ 0.4MM 0.4MM XX 0.68 8 LBR 89 2/2/2021 2 LBR 0.680MM X 6MTR 90 3/1/2021 GRANITE (BATU KORAL) 8 M3 91 4/1/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 92 5/2/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 6 BTG 93 6/3/2021 BESI BETON POLOS 8MMX12M SNI KS 10 BTG 94 6/3/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 95 7/2/2021 IRON NAILS 2" 1 KG 96 7/2/2021 IRON NAILS 3" 1 KG 97 8/2/2021 GRANITE (BATU KORAL) 20 M3 98 8/2/2021 PASIR CAT PLATONE MATT BLACK 666 @ 3,785 LTR 168 TON 99 1/4/2021 2 TIN NIPPON PAINT 100 2/2/2021 IRON NAILS 4" 5 KG 101 3/2/2021 IRON NAILS 2 1/2" 2 KG 102 4/3/2021 PAPAN MERANTI 1X8X5MTR 5 KPG 103 5/3/2021 CNP CANAL C 100MM X 6M 11 BTG 104 6/3/2021 SCREW TRUSS 12-14 X 20 MM 400 PCS 105 7/2/2021 CINCIN KERAMIK WARNA PUTIH 1 KTK 106 8/2/2021 GRANITE (BATU KORAL) 4 M3 107 8/2/2021 PASIR 5.6 TON 108 1/4/2021 KAYU BAKAU 3" X 5 MTR 300 BTG 109 2/2/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 110 3/2/2021 BESI BETON ULIR 13MMX12M SNI KS 24 BTG 111 3/2/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 20 BTG 112 4/3/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 113 4/3/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 114 5/3/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 3 TIN 115 6/3/2021 Kawat Las LB52 Welding 3.2 mm, Brand: Kobe Steel 2 KG 116 7/2/2021 IRON NAILS 4" 5 KG 117 8/2/2021 PASIR 5.6 TON 118 1/4/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 119 1/4/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 120 2/2/2021 PAPAN MERANTI 3/4X8X5 40 KPG 121 3/2/2021 KAWAT BETON @ 1 KG 10 ROLL 122 4/3/2021 Kawat Kawat Las Las RB26 Welding 3.2 LB52 Welding 3.2 mm mm @@ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 8 BKS 123 4/3/2021 4 BKS Steel 124 4/3/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 8 BKS 125 5/3/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 2 TIN 126 6/3/2021 Kawat Las LB52 Welding 3.2 mm, Brand: Kobe Steel 2 KG 127 7/2/2021 BROTI CAMPUR 2" X 3" X 5MTR 25 BTG 128 8/2/2021 GRANITE (BATU KORAL) 20 M3 129 8/2/2021 PASIR 16.8 TON 130 1/5/2021 ROOFING NAILS 2 1/2" 1 KG 131 1/5/2021 ROOFING NAILS 2 1/2" 2 KG 132 1/5/2021 ROOFING NAILS 2 1/2" 1 KG 133 1/5/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 3 TIN 134 2/2/2021 PAPAN MERANTI 3/4X8X5 6 KPG 135 2/2/2021 BROTI MERANTI 2" X 4" X 5MTR 2 BTG 136 3/2/2021 IRON NAILS 3/4" 1 KG 137 3/2/2021 IRON NAILS 2" 1 KG 138 3/2/2021 IRON NAILS 2 1/2" 1 KG 139 4/3/2021 IRON NAILS 2" 4 KG 140 4/3/2021 IRON NAILS 2" 1 KG 141 4/3/2021 IRON NAILS 2 1/2" 5 KG 142 4/3/2021 BESI BETON POLOS 8MMX12M SNI KS 12 BTG 143 4/3/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 3 BTG 144 5/3/2021 TRIPLEK 4MMX4X8 15 LBR 145 6/3/2021 Kawat Las RB26 Welding 3.2 mm, Brand: Kobe Steel 20 KG 146 7/2/2021 BROTI MERANTI 3" X 4" X 5MTR 2 BTG 147 7/2/2021 Seng Perabung 2 LBR 148 1/5/2021 BROTI PUNAK 2X4X5MTR 1 BTG 149 2/2/2021 IRON NAILS 1 1/2" 1 KG 150 2/2/2021 IRON NAILS 2" 1 KG 151 3/2/2021 PAPAN MERANTI 3/4X8X5 25 KPG 152 3/2/2021 BROTI PUNAK 2X3X5MTR 10 BTG 153 4/3/2021 IRON NAILS 2" 2 KG 154 5/3/2021 GEROBAK ANGKONG Kawat Las RB26 BAN Welding 3.2HIDUP, BRAND: mm @ 5Kg, ARTCO Brand: Kobe 1 PCS 155 6/3/2021 3 BKS Steel 156 6/3/2021 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 1 BKS 157 6/3/2021 MS PLATE 5MM X 4FT X 8FT 10 LBR 158 7/2/2021 CAT PLATONE EVER GREEN 239 @ 3,785 LTR NIPPON 2 TIN 159 1/5/2021 IRON NAILS 4" 1 KG 160 2/2/2021 IRON NAILS 2" 1 KG 161 3/2/2021 PAPAN MERANTI 3/4X8X5 35 KPG 162 3/2/2021 BROTI PUNAK 2X3X5MTR 11 BTG 163 3/2/2021 KAYU BAKAU 3" X 5 MTR 10 BTG 164 3/2/2021 TRIPLEK 4MMX4X8 6 LBR 165 4/3/2021 PAPAN MERANTI 3/4X8X5 20 KPG 166 5/3/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 167 5/3/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 168 6/3/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 169 6/3/2021 KERAMIK UK.30CMX30CM (PUTIH) 2 KTK 170 6/3/2021 CINCIN KERAMIK WARNA PUTIH 1 KTK 171 7/2/2021 IRON NAILS 3" 1 KG 172 7/2/2021 ROOFING Kawat Las NAILS 2" RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe 1 KG 173 1/6/2021 4 BKS Steel 174 2/2/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 12 BTG 175 3/2/2021 IRON NAILS 3/4" 1 KG 176 3/2/2021 IRON NAILS 2 1/2" 4 KG 177 3/2/2021 IRON NAILS 3" 1 KG 178 4/3/2021 CAT PLATONE AZZURE BLUE 067 @ 3,785 LTR NIPPO 10 TIN 179 4/3/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 4 TIN 180 5/3/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 181 6/3/2021 Kawat Las LB52 Welding 3.2 mm, Brand: Kobe Steel 2 KG 182 7/2/2021 IRON NAILS 2 1/2" 2 KG 183 7/2/2021 BESI BETON POLOS 8MMX12M SNI KS 10 BTG 184 7/2/2021 BESI KawatBETON Las RB26POLOS 6 MM Welding 3.2Xmm 12 M @SNI 5Kg,KS Brand: Kobe 2 BTG 185 1/6/2021 3 BKS Steel 186 2/2/2021 ROOF DECK ZINCALUME AZ-150 0,45 BMT BY BLUESCOP 20 LBR 187 3/2/2021 GRANITE (BATU KORAL) 0.8 M3 188 3/2/2021 PASIR 1.4 TON 189 4/3/2021 PAPAN MERANTI 3/4X8X5 30 KPG 190 4/3/2021 PAPAN MERANTI 1X8X5MTR 6 KPG 191 5/3/2021 MATEX WALL FILLER @ 4 KG 1 TIN 192 6/4/2021 DIAMOND CUTTER 4" NIPPON RESIBON 1 PCS 193 7/2/2021 GRANITE (BATU KORAL) 1 M3 194 7/2/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 195 7/2/2021 PAPAN MERANTI 1X8X5MTR 5 KPG 196 7/2/2021 BROTI PUNAK 2X3X5MTR 3 BTG 197 7/2/2021 KAYU BAKAU 3" X 5 MTR 50 BTG 198 7/2/2021 PASIR Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe 14 TON 199 1/6/2021 3 BKS Steel 200 2/2/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 3 TIN 201 3/3/2021 IRON NAILS 2 1/2" 3 KG 202 3/3/2021 IRON NAILS 3" 3 KG 203 3/3/2021 BESI BETON POLOS 8MMX12M SNI KS 20 BTG 204 4/3/2021 IRON NAILS 4" 5 KG 205 5/3/2021 AQUAPROOF @ 1 kg 1 TIN 206 6/4/2021 MS WIREMESH M6X2.1MX54 MTR ULIR 1 PCS 207 7/2/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 208 1/6/2021 BESI BETON ULIR 25MMX12 M 2 BTG 209 2/3/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 3 TIN 210 2/3/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 10 TIN 211 3/3/2021 IRON NAILS 2 1/2" 4 KG 212 4/3/2021 CUTTING WHEEL 4" MERK PROHEX 10 PCS 213 5/3/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 6 BTG 214 6/4/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 215 6/4/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 216 6/4/2021 CAT PLATONE LIGHT GREEN 989M @ 3,785 LTR 1 TIN 217 7/2/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 218 1/6/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 4 BKS 219 2/3/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 220 2/3/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 10 TIN 221 3/3/2021 IRON NAILS 2 1/2" 3 KG 222 4/3/2021 CUTTING WHEEL 4" MERK PROHEX 20 PCS 223 5/3/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 5 TIN 224 6/4/2021 BESI BETON ULIR 13MMX12M SNI KS 1 BTG 225 6/4/2021 BESI BETON ULIR 10MMX12M 5 BTG 226 7/2/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 3 BTG 227 1/6/2021 MS SIKU 75 X 75 X 6 MM X 6 M 10 BTG 228 1/6/2021 SHIP PLATE 10 MM x 6 FT x 20 FT (Plate Marine) 12 LBR 229 2/3/2021 SEMEN PUTIH MERK BITAGROUP 6 KGS 230 3/3/2021 BESI BETON POLOS 8MMX12M SNI KS 6 BTG 231 4/3/2021 CUTTING WHEEL 4" MERK PROHEX 5 PCS 232 5/3/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 5 TIN 233 6/5/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 234 6/5/2021 BROTI CAMPUR 2" X 3" X 5MTR 4 BTG 235 6/5/2021 BROTI MERANTI 3" X 4" X 5MTR 2 BTG 236 6/5/2021 KAWAT BETON @ 1 KG 1 ROLL 237 7/3/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 3 BTG 238 7/3/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 239 1/6/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 240 2/3/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 241 3/3/2021 MINYAK BENSIN 5 LTR 242 3/3/2021 MINYAK BENSIN 6 LTR 243 4/3/2021 IRON NAILS 1 1/2" 5 KG 244 4/3/2021 IRON NAILS 2" 5 KG 245 5/4/2021 BESI BETON ULIR 13MMX12M SNI KS 7 BTG 246 6/5/2021 KAYU BAKAU 3" X 5 MTR 30 BTG 247 7/3/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 248 1/6/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 249 2/3/2021 TRIPLEK 4MMX4X8 5 LBR 250 3/3/2021 CAT PLATONE Kawat Las RB26BLUE 0663.2 Welding @ mm 3.785 @LTR 5Kg,NIPPON PAINT Brand: Kobe 4 TIN 251 4/3/2021 1 BKS Steel 252 4/3/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 1 BKS 253 5/4/2021 TRIPLEK 4MMX4X8 2 LBR 254 5/4/2021 Kain Pelapis ( No Drop ) 1 ROLL 255 5/4/2021 AQUAPROOF @ 1 kg 4 TIN 256 6/5/2021 MINYAK BENSIN 15 LTR 257 7/3/2021 TRIPLEK 4MMX4X8 10 LBR 258 7/3/2021 SENG ALUMUNIUM (KULIT JERUK) 5 LBR 259 7/3/2021 PASIR 1 TON 260 1/6/2021 IRON NAILS 2" 5 KG 261 2/3/2021 MS WIREMESH M6X2.1MX54 MTR ULIR 1 PCS 262 3/4/2021 BROTI CAMPUR 2" X 3" X 5MTR 10 BTG 263 4/3/2021 SENG ALUMUNIUM (KULIT JERUK) 80 LBR 264 5/4/2021 CAT AVITEX RANGKA BAJA M WHITE RINGAN896 (5 KG) CANAL TS 150 - C75, TEBAL 1 TIN 265 6/5/2021 1 BTG 0,75MM, PANJANG 6M, MERK TASO 266 7/3/2021 IRON NAILS 2 1/2" 1 KG 267 7/3/2021 ROOFING NAILS 2" 1 KG 268 1/6/2021 USED CASING PIPE 95/8" X 11-12.6M 2 BTG 269 2/3/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 270 3/4/2021 IRON NAILS 2 1/2" 2 KG 271 4/3/2021 GRANITE (BATU KORAL) 2 M3 272 4/3/2021 PASIR 2 TON 273 5/4/2021 MINYAK BENSIN 2 LTR 274 6/5/2021 BESI BETON ULIR 16MMX12M 2 BTG 275 7/3/2021 KERAMIK UK.40CMX40CM (PUTIH) 40 KTK 276 1/6/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 277 2/3/2021 IRON NAILS 1 1/2" 1 KG 278 3/4/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 279 4/3/2021 IRON NAILS 2 1/2" 5 KG 280 4/3/2021 ROOFING NAILS 2" 2 KG 281 4/3/2021 BESI BETON POLOS 8MMX12M SNI KS 12 BTG 282 5/5/2021 TRIPLEK 4MMX4X8 16 LBR 283 6/5/2021 BROTI PUNAK 2X4X5MTR 2 BTG 284 7/3/2021 BROTI PUNAK 2X4X5MTR 1 BTG 285 1/6/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 286 2/3/2021 CAT PLATONE EVER GREEN 239 @ 3,785 LTR NIPPON 1 TIN 287 3/4/2021 IRON NAILS 3" 2 KG 288 4/3/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 289 5/5/2021 IRON NAILS 3/4" 1 KG 290 6/6/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 20 PCS 291 7/3/2021 PAPAN MERANTI 1X8X5MTR 20 KPG 292 7/3/2021 BROTI PUNAK 2X4X5MTR 5 BTG 293 1/6/2021 ASPAL @ 155 KG 4 DRUM 294 2/4/2021 SEMEN PUTIH Kawat Las LB52MERK BITAGROUP Welding 3.2 mm @ 5Kg, Brand: Kobe 4 KGS 295 3/4/2021 1 BKS Steel 296 4/3/2021 BROTI CAMPUR 2" X 3" X 5MTR 3 BTG 297 4/3/2021 PAPAN MERANTI 3/4X8X5 35 KPG 298 4/3/2021 SENG ALUMUNIUM (KULIT JERUK) 10 LBR 299 4/3/2021 BROTI MERANTI 2" X 4" X 5MTR 3 BTG 300 5/5/2021 SEMEN @ 50KG MERK TIGA RODA 90 ZAK 301 6/6/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 25 PCS 302 7/3/2021 PAPAN CAMPUR 3/4X8X5MTR 10 KPG 303 7/3/2021 KAWAT BETON @ 1 KG 2 ROLL 304 7/3/2021 BESI BETON POLOS 8MMX12M SNI KS 6 BTG 305 7/3/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 6 BTG 306 1/7/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 5 BTG 307 2/4/2021 CINCIN KERAMIK WARNA PUTIH 1 KTK 308 3/5/2021 IRON NAILS 1 1/2" 1 KG 309 4/3/2021 BROTI PUNAK 2X3X5MTR 3 BTG 310 5/5/2021 SEMEN @ 50KG MERK TIGA RODA 20 ZAK 311 6/6/2021 KAYU BAKAU 3" X 5 MTR 25 BTG 312 7/3/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 313 7/3/2021 KAWAT BETON @ 1 KG 1 ROLL 314 7/3/2021 BESI BETON POLOS 8MMX12M SNI KS 3 BTG 315 7/3/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 3 BTG 316 1/7/2021 IRON NAILS 2" 3 KG 317 2/4/2021 TRIPLEK 4MMX4X8 12 LBR 318 2/4/2021 SENG ALUMUNIUM (KULIT JERUK) 50 LBR 319 3/5/2021 PAPAN MERANTI 3/4X8X5 5 KPG 320 4/4/2021 ROOFING NAILS 2" 10 KG 321 5/5/2021 SEMEN @ 50KG MERK TIGA RODA 20 ZAK 322 6/7/2021 CAT PLATONE MATT BLACK 666 @ 3,785 LTR NIPPON 1 TIN 323 7/3/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 324 7/3/2021 KAWAT BETON @ 1 KG 1 ROLL 325 7/3/2021 BESI BETON POLOS 8MMX12M SNI KS 3 BTG 326 7/3/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 3 BTG 327 1/8/2021 PIPA PVC 1 1/2" X 4M WAVIN TIPE AW 4 BTG 328 2/4/2021 ROOFING NAILS 2" 5 KG 329 3/5/2021 PAPAN MERANTI 1X8X5MTR 30 KPG 330 4/4/2021 CUTTING WHEEL 4" MERK PROHEX 40 PCS 331 5/5/2021 SEMEN @ 50KG MERK TIGA RODA 10 ZAK 332 6/7/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 333 7/3/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 334 1/9/2021 ROOF DECK ZINCALUME AZ-150 0,45 BMT BY BLUESCOP 4 LBR 335 2/4/2021 SENG ALUMUNIUM (KULIT JERUK) 20 LBR 336 3/5/2021 IRON NAILS 3" 2 KG 337 4/5/2021 ROOFING NAILS 2" 5 KG 338 5/5/2021 SEMEN @ 50KG MERK TIGA RODA 6 ZAK 339 6/7/2021 IRON NAILS 4" 1 KG 340 6/7/2021 PAPAN MERANTI 1X8X5MTR 30 KPG 341 7/3/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 342 1/9/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 343 2/4/2021 SCREW TRUSS 12-14 X 20 MM 200 PCS 344 3/5/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 345 3/5/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 20 BTG 346 4/6/2021 Kawat Kawat Las Las RB26 Welding 4.0 LB52 Welding 3.2 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 2 BKS 347 4/6/2021 4 BKS Steel 348 5/5/2021 KAWAT BETON @ 1 KG 2 ROLL 349 5/5/2021 BESI BETON ULIR 13MMX12M SNI KS 8 BTG 350 5/5/2021 BESI BETON POLOS 8MMX12M SNI KS 15 BTG 351 6/7/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 10 PCS 352 7/3/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 353 1/9/2021 BROTI MERANTI 3" X 4" X 5MTR 2 BTG 354 2/4/2021 ROOFING NAILS 2" 2 KG 355 3/5/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 356 4/6/2021 Kawat Las SS 3.2 mm NSN 308, Brand: Nikko Steel 20 KG 357 5/5/2021 KAWAT BETON @ 1 KG 4 ROLL 358 6/8/2021 BROTI MERANTI 3" X 4" X 5MTR 4 BTG 359 7/3/2021 MINYAK BENSIN 60 LTR 360 1/9/2021 PAPAN MERANTI 1X8X5MTR 3 KPG 361 1/9/2021 BROTI PUNAK 2X3X5MTR 2 BTG 362 2/4/2021 TRIPLEK 4MMX4X8 2 LBR 363 2/4/2021 SENG ALUMUNIUM (KULIT JERUK) 30 LBR 364 3/5/2021 IRON KawatNAILS 2" Welding 3.2 mm @ 5Kg, Brand: Kobe Las LB52 5 KG 365 4/6/2021 8 BKS Steel 366 4/6/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 8 BKS 367 4/6/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 50 PCS 368 5/5/2021 DIAMOND CUTTER 4" NIPPON RESIBON 1 PCS 369 6/8/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 1 BTG 370 7/3/2021 CINCIN KERAMIK WARNA PUTIH 1 KTK 371 1/9/2021 Zinc Anodes @ 11 Kg Tipe Welded 27 PCS 372 2/4/2021 ROOFING NAILS 2" 2 KG 373 3/5/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 374 4/6/2021 IRON NAILS 2 1/2" 3 KG 375 4/6/2021 IRON NAILS 2 1/2" 2 KG 376 4/6/2021 IRON NAILS 4" 5 KG 377 5/6/2021 PAPAN CAMPUR 3/4X8X5MTR 8 KPG 378 5/6/2021 PAPAN MERANTI 1X8X5MTR 1 KPG 379 6/8/2021 KAYU BAKAU 3" X 5 MTR 20 BTG 380 7/3/2021 ROOFING Kawat Las NAILS 2" RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe 2 KG 381 1/10/2021 4 BKS Steel 382 2/4/2021 BROTI MERANTI 3" X 4" X 5MTR 1 BTG 383 2/4/2021 BROTI PUNAK 2X3X5MTR 1 BTG 384 3/5/2021 TRIPLEK 4MMX4X8 4 LBR 385 4/6/2021 IRON NAILS 3" 2 KG 386 4/6/2021 IRON NAILS 3" 1 KG 387 5/6/2021 IRON NAILS 1 1/2" 1 KG 388 6/5/2021 MS PLATE WASHER 3/4" 20 PCS 389 6/5/2021 M/S SPRING WASHER 3/4" 20 PCS 390 7/3/2021 MINYAK BENSIN 5 LTR 391 1/11/2021 TRIPLEK 4MMX4X8 15 LBR 392 1/11/2021 SENG ALUMUNIUM (KULIT JERUK) 10 LBR 393 2/4/2021 SENG ALUMUNIUM (KULIT JERUK) 25 LBR 394 3/5/2021 BROTI CAMPUR 2" X 3" X 5MTR 4 BTG 395 3/5/2021 PAPAN MERANTI 3/4X8X5 5 KPG 396 3/5/2021 BROTI MERANTI 2" X 4" X 5MTR 2 BTG 397 4/6/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 4 TIN 398 5/6/2021 SEMEN @ 50KG MERK TIGA RODA 50 ZAK 399 6/8/2021 Ban Luar Gerobak Angkong 2 PCS 400 6/8/2021 BAN DALAM GEROBAK SIZE 2.50/2.75 - 17 MERK SW 2 PCS 401 6/8/2021 BAN DALAM GEROBAK ANGKONG 2 PCS 402 7/3/2021 MINYAK BENSIN 5 LTR 403 1/11/2021 TRIPLEK 4MMX4X8 20 LBR 404 2/4/2021 ROOFING NAILSNATURAL SIKA CHAPDUR 2" FLOOR HARDENER @ 25 2 KG 405 3/5/2021 10 ZAK KG 406 4/6/2021 Kawat Kawat Las Las RB26 RB26 Welding Welding 3.2 3.2 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 2 BKS 407 5/6/2021 2 BKS Steel 408 5/6/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 3 BKS 409 5/6/2021 BESI BETON ULIR 13MMX12M SNI KS 1 BTG 410 6/8/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 411 6/8/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 412 6/8/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 413 7/5/2021 KERAMIK UK.30CMX30CM (PUTIH) 3 KTK 414 1/11/2021 BROTI PUNAK 2X3X5MTR 5 BTG 415 2/4/2021 TRIPLEK 4MMX4X8 6 LBR 416 3/6/2021 BROTI MERANTI 3" X 4" X 5MTR 5 BTG 417 4/6/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 418 4/6/2021 CAT PLATONE AZZURE BLUE 067 @ 3,785 LTR NIPPO 2 TIN 419 5/6/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 420 6/8/2021 ROOFING NAILS 2" 5 KG 421 7/5/2021 BESI BETON POLOS 8MMX12M SNI KS 2 BTG 422 1/11/2021 ROOFING NAILS 2" 1 KG 423 2/4/2021 IRON NAILS 4" 4 KG 424 3/6/2021 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 1 BKS 425 4/6/2021 ROOFING NAILS 2 1/2" 5 KG 426 5/6/2021 SEMEN @ 50KG MERK TIGA RODA 30 ZAK 427 6/8/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 1 BTG 428 6/8/2021 BESI BETON ULIR 10MMX12M 4 BTG 429 7/5/2021 ROOFING NAILS 2" 2 KG 430 1/11/2021 TRIPLEK 4MMX4X8 7 LBR 431 2/4/2021 PAPAN MERANTI 1X8X5MTR 8 KPG 432 2/4/2021 BROTI PUNAK 2X3X5MTR 4 BTG 433 3/6/2021 PAPAN MERANTI 3/4X8X5 5 KPG 434 4/1/2021 IRON NAILS 2 1/2" 1 KG 435 5/6/2021 SEMEN @ 50KG MERK TIGA RODA 40 ZAK 436 6/9/2021 BROTI CAMPUR 2" X 3" X 5MTR 20 BTG 437 7/5/2021 IRON NAILS 2 1/2" 5 KG 438 1/11/2021 BAN DALAM GEROBAK ANGKONG 1 PCS 439 2/4/2021 PAPAN CAMPUR 3/4X8X5MTR 50 KPG 440 2/4/2021 PAPAN CAMPUR 3/4X8X5MTR 50 KPG 441 2/4/2021 BROTI CAMPUR 2" X 3" X 5MTR 30 BTG 442 2/4/2021 BROTI 2" X 2" X 16 FIT CAMPUR 20 BTG 443 3/6/2021 BROTI MERANTI 2" X 4" X 5MTR 5 BTG 444 4/6/2021 BESI BETON ULIR 13MMX12M SNI KS 12 BTG 445 5/6/2021 BESI IWF MS 150 X 75 X 5 X 7 MM X 12 M 1 BTG 446 6/9/2021 BROTI CAMPUR 2" X 3" X 5MTR 10 BTG 447 6/9/2021 BROTI MERANTI 3" X 4" X 5MTR 3 BTG 448 6/9/2021 PAPAN MERANTIULIR M/S WIREMESH 1X8X5MTR M10 X 2.1M X 5.4M MESH 150 X 8 KPG 449 7/5/2021 35 LBR 150 450 1/11/2021 BAN DALAM GEROBAK ANGKONG 2 PCS 451 2/4/2021 IRON NAILS 2" 5 KG 452 2/4/2021 IRON NAILS 2 1/2" 3 KG 453 3/6/2021 IRON NAILS 2" 1 KG 454 4/7/2021 MATEX WALL FILLER @ 4 KG 2 TIN 455 4/7/2021 CAT AVITEX M WHITE 896 (25 KG) 2 TIN 456 4/7/2021 Kain Pelapis ( No Drop ) 3 ROLL 457 4/7/2021 AQUAPROOF @ 1 kg 5 TIN 458 5/7/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 459 6/9/2021 IRON NAILS 3" 2 KG 460 7/5/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 461 1/11/2021 PAPAN CAMPUR 3/4X8X5MTR 14 KPG 462 1/11/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 463 2/4/2021 TRIPLEK 4MMX4X8 1 LBR 464 3/6/2021 TRIPLEK 4MMX4X8 4 LBR 465 4/7/2021 PAPAN MERANTI 1X8X5MTR 4 KPG 466 5/7/2021 PAPAN CAMPUR 3/4X8X5MTR 20 KPG 467 6/9/2021 IRON NAILS 3" 3 KG 468 7/5/2021 IRON NAILS 2 1/2" 2 KG 469 7/5/2021 IRON NAILS 3" 3 KG 470 1/11/2021 IRON NAILS 2" 5 KG 471 2/4/2021 BROTI PUNAK 2X3X5MTR 20 BTG 472 3/8/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 473 4/7/2021 BESI IWF MS 200 X 100 X 5.5 X 8 MM X 12 M 3 BTG 474 5/7/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 475 6/9/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 1 PCS 476 7/5/2021 BROTI PUNAK 2X3X5MTR 5 BTG 477 7/5/2021 BROTI PUNAK 2X3X5MTR 6 BTG 478 7/5/2021 BROTI PUNAK 2X3X5MTR 2 BTG 479 7/5/2021 BROTI PUNAK 2X3X5MTR 2 BTG 480 7/5/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 1 LBR 481 7/5/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 5 LBR 482 1/12/2021 CAT NIPPELUX ANTI CORROSIVE 1101 @ 5 LTR NIPP 10 TIN 483 2/4/2021 IRON NAILS 3" 4 KG 484 2/4/2021 ROOFING NAILS 2 1/2" 4 KG 485 3/8/2021 BROTI PUNAK 2X3X5MTR 3 BTG 486 3/8/2021 TRIPLEK 4MMX4X8 4 LBR 487 4/7/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 488 4/7/2021 CAT MENI @ 5 KG NIPPON PAINT 3 TIN 489 5/7/2021 SEMEN @ 50KG MERK TIGA RODA 5 ZAK 490 6/9/2021 PAPAN CAMPUR 3/4X8X5MTR 2 KPG 491 6/9/2021 IRON NAILS 1 1/2" 1 KG 492 7/5/2021 Screw Roofing Drill 2" ( 5.5 - 24 x 50 ) @ 450pcs Brand: Ta 1 KTK 493 1/12/2021 TRIPLEK 4MMX4X8 7 LBR 494 1/12/2021 SENG ROOF ALUMUNIUM DECK ZINCALUM (KULIT JERUK) AZ-150 SD-680/ 0.4MM X 40 LBR 495 2/4/2021 102 LBR 0.680MM X 6MTR 496 2/4/2021 ROOF ROOF DECK DECK ZINCALUM ZINCALUM AZ-150 AZ-150 SD-680/ SD-680/ 0.4MM 0.4MM XX 0.68 23 LBR 497 3/8/2021 16 LBR 0.680MM X 6MTR 498 3/8/2021 AQUA ROOF PROOF @ 20 LTR AZ-150 0,45 BMT BY DECK ZINCALUME 1 TIN 499 3/8/2021 4 LBR BLUESCOPE STELL ( 0,05M X 0,68M X 6M ) 500 4/7/2021 Kawat Kawat Las Las RB26 Welding 3.2 LB52 Welding 3.2 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 2 BKS 501 4/7/2021 2 BKS Steel 502 5/7/2021 SEMEN @ 50KG MERK TIGA RODA 1 ZAK 503 6/9/2021 IRON NAILS 1" 1 KG 504 6/9/2021 PAPAN MERANTI 3/4X8X5 1 KPG 505 6/9/2021 SUPER POLY 122CMX244XM 1 LBR 506 7/5/2021 BESI BETON POLOS 8MMX12M SNI KS 2 BTG 507 1/13/2021 ROOFING NAILS 2" 5 KG 508 2/4/2021 KAWAT BETON @ 1 KG 20 ROLL 509 3/8/2021 BROTI PUNAK 2X3X5MTR 2 BTG 510 4/7/2021 CAT PLATONE AZZURE BLUE 067 @ 3,785 LTR NIPPO 3 TIN 511 5/7/2021 KERAMIK UK.30CMX30CM (PUTIH) 2 KTK 512 6/9/2021 BESI BETON POLOS 8MMX12M SNI KS 50 BTG 513 7/5/2021 Gunting baja ringan 10" merk. Tekiro 1 PCS 514 7/5/2021 Staples Tembak Tekiro Original 6-14mm Staples Gun 1 PCS 515 1/13/2021 IRON NAILS 2" 4 KG 516 2/4/2021 MS SIKU 75 X 75 X 6 MM X 6 M 5 BTG 517 3/8/2021 THINNER @ 1 LTR MERK LABA LABA WARNA HIJAU 3 TIN 518 3/8/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 519 4/8/2021 PAPAN MERANTI 3/4X8X5 5 KPG 520 5/10/2021 PASIR 42 TON 521 6/9/2021 BESI BETON ULIR 10MMX12M 3 BTG 522 7/5/2021 BESI BETON POLOS 8MMX12M SNI KS 3 BTG 523 7/5/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 3 BTG 524 1/13/2021 KAYU CINCINBAKAU KERAMIK3" XSIZE 5 MTR100MM X 25 MM PERMUKAAN 100 BTG 525 2/4/2021 6 KTK GL 526 3/8/2021 BROTI MERANTI 3" X 4" X 5MTR 2 BTG 527 3/8/2021 PAPAN MERANTI 3/4X8X5 5 KPG 528 3/8/2021 BROTI PUNAK 2X3X5MTR 10 BTG 529 3/8/2021 BROTI PUNAK 2X4X5MTR 1 BTG 530 3/8/2021 TRIPLEK 4MMX4X8 20 LBR 531 4/8/2021 IRON NAILS 2" 2 KG 532 4/8/2021 BESI BETON POLOS 8MMX12M SNI KS 8 BTG 533 5/10/2021 PASIR 7 TON 534 6/9/2021 PAPAN RANGKA CAMPUR 3/4X8X5MTR BAJA RINGAN RENG TR 110 - R32.45, 10 KPG 535 7/5/2021 2 BTG TEBAL 0,45MM, MERK TASO 536 1/13/2021 IRON NAILS 2 1/2" 2 KG 537 2/4/2021 Mata Gerinda Poles Stainless 4" 6 PCS 538 3/8/2021 IRON NAILS 2" 2 KG 539 3/8/2021 IRON NAILS 2 1/2" 2 KG 540 3/8/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 3 TIN 541 4/8/2021 KAYU BAKAU 3" X 5 MTR 30 BTG 542 5/10/2021 GRANITE (BATU KORAL) 3 M3 543 5/10/2021 PASIR 4.2 TON 544 6/9/2021 GRC BOARD 4 MM 10 LBR 545 7/6/2021 Kawat Las RB26 Welding 3.2 mm, Brand: Kobe Steel 2 KG 546 1/13/2021 PAPAN MERANTI 1X8X5MTR 8 KPG 547 1/13/2021 BROTI PUNAK 2X3X5MTR 20 BTG 548 2/4/2021 Electrode 220842 Plasma Cut Powermax 85 3 PCS 549 3/8/2021 IRON NAILS 2 1/2" 2 KG 550 4/8/2021 PAPAN MERANTI 1X8X5MTR 4 KPG 551 5/10/2021 MINYAK BENSIN 3 LTR 552 6/9/2021 Semen @ 50Kg, Brand: Merah Putih 25 ZAK 553 7/6/2021 BROTI CAMPUR 2" X 3" X 5MTR 30 BTG 554 1/13/2021 Charger Baterai Baterai Cas KotakCas 9VKotak 2 Slot 280mAh / Battery Rechargeable 1 PCS 555 1/13/2021 2 PCS 9V, Brand: Panasonic 556 2/5/2021 THINNER @ 1 LTR MERK LABA LABA WARNA HIJAU 1 TIN 557 2/5/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 558 3/8/2021 Bronze Bush 2" x 6" x 1 Mtr 1 MTR 559 4/8/2021 MATEX WALL FILLER @ 4 KG 2 TIN 560 4/8/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 561 5/10/2021 MINYAK BENSIN 30 LTR 562 6/10/2021 ROOFING NAILS 2" 2 KG 563 6/10/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 564 7/6/2021 MS WIREMESH ULIR M8X2.1MX5.4M MESH 150X150 3 LBR 565 1/13/2021 BROTI PUNAK 2X3X5MTR 4 BTG 566 2/5/2021 BESI BETON ULIR 25MMX12 M 7 BTG 567 3/8/2021 GEROBAK ANGKONG BAN HIDUP, BRAND: ARTCO 2 PCS 568 4/8/2021 IRON NAILS 2 1/2" 4 KG 569 4/8/2021 BESI BETON POLOS 8MMX12M SNI KS 8 BTG 570 5/10/2021 MINYAK BENSIN 20 LTR 571 6/10/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 9 LBR 572 7/6/2021 MS WIREMESH Kawat Las RB26 ULIR M8X2.1MX5.4M Welding MESH 4.0 mm @ 5Kg, 150X150 Brand: Kobe 3 LBR 573 1/13/2021 2 BKS Steel 574 2/5/2021 SEMEN PUTIH MERK BITAGROUP 4 KGS 575 2/5/2021 KERAMIK UK.40CMX40CM (PUTIH) 40 KTK 576 2/5/2021 CINCIN KERAMIK WARNA PUTIH 2 KTK 577 3/8/2021 MINYAK BENSIN 6 LTR 578 4/8/2021 PAPAN MERANTI 3/4X8X5 19 KPG 579 4/8/2021 PAPAN MERANTI 3/4X8X5 1 KPG 580 4/8/2021 KAYU BAKAU 3" X 5 MTR 12 BTG 581 4/8/2021 KAYU BAKAU 3" X 5 MTR 3 BTG 582 5/10/2021 MINYAK BENSIN 1 LTR 583 5/10/2021 MINYAK BENSIN 1 LTR 584 6/10/2021 IRON NAILS 3" 3 KG 585 6/10/2021 PAPAN MERANTI 3/4X8X5 57 KPG 586 6/10/2021 BROTI PUNAK 2X4X5MTR 15 BTG 587 7/6/2021 IRON NAILS 5" 2 KG 588 1/14/2021 IRON NAILS 5" 1 KG 589 2/5/2021 Screw Roofing Drill 2 1/2" ( 5.5 - 24 x 70 ) @ 300pcs 1 KTK 590 3/8/2021 MINYAK BENSIN Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe 10 LTR 591 4/8/2021 1 BKS Steel 592 5/10/2021 MINYAK BENSIN 2 LTR Flexible Rubber Coupling FCL, Ukuran: Inside 16 mm, 593 6/10/2021 16 PCS Outside 36 mm, Tinggi 40 mm 594 7/6/2021 BESI BETON POLOS 8MMX12M SNI KS 2 BTG 595 7/6/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 596 1/14/2021 Kain Pelapis ( No Drop ) 1 ROLL 597 1/14/2021 AQUAPROOF @ 1 kg 2 TIN 598 2/5/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 599 2/5/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 600 2/5/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 601 3/8/2021 BROTI PUNAK 2X4X5MTR 30 BTG 602 4/9/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 8 BKS 603 5/10/2021 GRANITE (BATU KORAL) 15 M3 604 5/10/2021 PASIR SS Hexagon Socket Cup Screw M8 X 25mm (Jarak 24 TON 605 6/10/2021 8 PCS Benang = 1.25 mm) 606 7/6/2021 KAWAT BETON @ 1 KG 1 ROLL 607 1/14/2021 ROOFING NAILS 2" 4 KG 608 1/14/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 609 2/5/2021 IRON NAILS 2 1/2" 4 KG 610 3/9/2021 PAPAN MERANTI 3/4X8X5 15 KPG 611 4/9/2021 KAWAT BETON @ 1 KG 2 ROLL 612 5/10/2021 IRON NAILS 2 1/2" 3 KG 613 6/10/2021 VERTICAL AXIAL FLOW IRRIGATION PUMP 14ZLB 1 UNIT 614 6/10/2021 Nut Baja M14 x Benang 2.0 4 PCS 615 7/6/2021 BROTI CAMPUR 2" X 3" X 5MTR 21 BTG 616 1/14/2021 ROOFING NAILS 2" 1 KG 617 2/5/2021 MATEX WALL FILLER @ 4 KG 1 TIN 618 2/5/2021 PLYWOOD 6MM 7 LBR 619 2/5/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 620 2/5/2021 Fiber Glass Self - Adhesion Mesh Tape 1 ROLL 621 3/9/2021 IRON NAILS 1 1/2" 1 KG 622 3/9/2021 IRON NAILS 2" 1 KG 623 4/9/2021 GRC BOARD 4 MM 1 LBR 624 4/9/2021 MATEX WALL FILLER @ 4 KG 1 TIN 625 5/10/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 626 5/10/2021 BROTI CAMPUR 2" X 3" X 5MTR 15 BTG 627 5/10/2021 BROTI 2" X 2" X 16 FIT CAMPUR 15 BTG 628 6/10/2021 IRON NAILS 3" 3 KG 629 7/6/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 630 1/14/2021 IRON NAILS 2 1/2" 2 KG 631 1/14/2021 IRON NAILS 3" 1 KG 632 1/14/2021 ROOFING NAILS 2 1/2" 3 KG 633 1/14/2021 BROTI PUNAK 2X3X5MTR 7 BTG 634 1/14/2021 BROTI PUNAK 2X3X5MTR 3 BTG 635 2/6/2021 KERAMIK UK.40CMX40CM (PUTIH) 3 KTK 636 2/6/2021 KERAMIK UK.40CMX40CM (PUTIH) 2 KTK 637 3/9/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 638 3/9/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 639 4/9/2021 PAPAN MERANTI 3/4X8X5 15 KPG 640 4/9/2021 PAPAN MERANTI 1X8X5MTR 100 KPG 641 4/9/2021 BROTI PUNAK 2X3X5MTR 15 BTG 642 5/10/2021 MINYAK PINTU + BENSIN KUSEN ALUMUNIUM SPANDREL MERK 3 LTR 643 6/10/2021 1 UNIT ALEXINDO 644 7/7/2021 Cat TekoAvitex ListrikSpring Lake Maspion B21-004 @ Ukuran BLG-TKBE20 25 Kg 22 cm, Brand: 1 TIN 645 1/14/2021 1 PCS Maspion 646 2/6/2021 PAPAN MERANTI 3/4X8X5 16 KPG 647 3/9/2021 THINNER @ 1 LTR MERK LABA LABA WARNA HIJAU 6 TIN 648 4/9/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 649 4/9/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 650 4/9/2021 CAT AVITEX S WHITE (5 KG) 5 TIN 651 5/10/2021 PASIR 14 TON 652 6/10/2021 BROTI PUNAK 2X3X5MTR 5 BTG 653 7/7/2021 IRON NAILS 2 1/2" 3 KG 654 7/7/2021 IRON NAILS 4" 3 KG 655 1/14/2021 Sendok Semen Ukuran Kecil, Brand: Stamvick 1 PCS 656 1/14/2021 Sendok Semen Ukuran Besar, Brand: Stamvick 1 PCS 657 2/6/2021 KAYU BAKAU 3" X 5 MTR 250 BTG 658 3/9/2021 THINNER @ 1 LTR MERK LABA LABA WARNA HIJAU 3 TIN 659 4/9/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 660 5/10/2021 GRANITE (BATU KORAL) 15 M3 661 5/10/2021 PASIR 21 TON 662 6/11/2021 BROTI PUNAK 2X4X5MTR 3 BTG 663 6/11/2021 TRIPLEK 4MMX4X8 4 LBR 664 7/8/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 665 1/14/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 666 2/6/2021 Kawat Kawat Las Las RB26 RB26 Welding Welding 4.0 4.0 mm mm @@ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 22 BKS 667 2/6/2021 20 BKS Steel 668 2/6/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 60 BKS 669 3/9/2021 THINNER @ 1 LTR MERK LABA LABA WARNA HIJAU 2 TIN 670 4/9/2021 BROTI PUNAK 2X3X5MTR 4 BTG 671 5/10/2021 GRANITE (BATU KORAL) 3 M3 672 5/10/2021 PASIR 9 TON 673 6/11/2021 TRIPLEK 4MMX4X8 6 LBR 674 7/8/2021 HACK ALKAN 3" (RING+KARET+BAUT) 50 SET 675 7/8/2021 Screw Roofing Drill 2 1/2" ( 5.5 - 24 x 70 ) @ 300pcs 1 KTK 676 1/14/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 677 2/6/2021 SEMEN PUTIH MERK BITAGROUP 10 KGS 678 3/9/2021 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 4 BKS 679 4/9/2021 MATEX WALL FILLER @ 4 KG 2 TIN 680 4/9/2021 KERAMIK UK.40CMX40CM (PUTIH) 1 KTK 681 5/10/2021 IRON NAILS 2" 2 KG 682 5/10/2021 BROTI PUNAKDrill Screw Roofing 2X3X5MTR 2" ( 5.5 - 24 x 50 ) @ 450pcs Brand: 5 BTG 683 6/11/2021 1 KTK Tako / Self Drilling Screw 684 7/8/2021 MS SIKU 30MM X 30MM X 3MM X 6M 1 BTG 685 1/14/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 686 2/7/2021 KAWAT BETON Kawat Las RB26 @ 1 KG 3.2 mm @ 5Kg, Brand: Kobe Welding 20 ROLL 687 3/9/2021 4 BKS Steel 688 4/10/2021 PAPAN MERANTI 3/4X8X5 20 KPG 689 4/10/2021 BROTI PUNAK 2X3X5MTR 5 BTG 690 5/17/2021 IRON NAILS 4" 10 KG 691 5/17/2021 ROOFING NAILS 2 1/2" 10 KG 692 6/11/2021 TRIPLEK 4MMX4X8 1 LBR 693 7/8/2021 BESI BETON POLOS 8MMX12M SNI KS 4 BTG 694 1/15/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 18 BTG 695 2/7/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 696 3/9/2021 CAT Pipa MENI @ 51 KG Galvanis 1/4"NIPPON PAINTBrand: BOS Bakrie X 6M Welded, 1 TIN 697 3/9/2021 1 BTG Pipe Indonesia (BPI) 698 3/9/2021 Pipa Galvanis 1" X 6M Welded, Brand: BOS Bakrie Pipe In 2 BTG 699 3/9/2021 Thinner Nippe HR @ 5 Ltr, Brand: Nippon Paint 1 TIN 700 4/10/2021 IRON NAILS 2" 4 KG 701 4/10/2021 ROOFING NAILS 2" 4 KG 702 5/17/2021 BROTI PUNAK 2X3X5MTR 50 BTG 703 5/17/2021 BROTI PUNAK 2X4X5MTR 30 BTG 704 6/11/2021 MATEX WALL FILLER @ 4 KG 1 TIN 705 6/11/2021 TRIPLEK 4MMX4X8 1 LBR 706 7/8/2021 PAPAN MERANTI 3/4X8X5 3 KPG 707 1/15/2021 BROTI PUNAK 2X3X5MTR 6 BTG 708 2/7/2021 IRON NAILS 2" 2 KG 709 3/9/2021 THINNER @ 1 LTR MERK LABA LABA WARNA HIJAU 3 TIN 710 4/10/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 711 5/17/2021 KERAMIK UK.40CMX40CM (PUTIH) 1 KTK 712 6/11/2021 RANGKA RANGKA BAJA BAJA RINGAN RINGAN CANAL TS110 RENG TR 150- -R32.45, C75, TEBAL 0 13 BTG 713 6/11/2021 100 BTG TEBAL 0,45MM, MERK TASO 714 7/8/2021 CAT PLATONE MATT BLACK 666 @ 3,785 LTR NIPPON 1 TIN 715 1/15/2021 BROTI PUNAK 2X4X5MTR 6 BTG 716 2/7/2021 BROTI PUNAK 2X4X5MTR 2 BTG 717 3/9/2021 BROTI PUNAK 2X3X5MTR 20 BTG 718 4/10/2021 SENG ALUMUNIUM (KULIT JERUK) 30 LBR 719 5/17/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 3 PCS 720 5/17/2021 RANGKA BAJA MATT CAT PLATONE RINGAN CANAL BLACK 666TS @150 - C75, 3,785 LTRTEBAL 0 3 BTG 721 6/11/2021 1 TIN NIPPON PAINT 722 7/8/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 723 1/15/2021 SEMEN PUTIH MERK BITAGROUP 1 KGS 724 2/7/2021 PAPAN CAMPUR 3/4X8X5MTR 10 KPG 725 3/9/2021 IRON NAILS 2 1/2" 3 KG 726 4/10/2021 Kawat Las SS 3.2 mm NSN 308, Brand: Nikko Steel 10 KG 727 5/17/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 3 PCS 728 5/17/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 3 BTG 729 6/11/2021 PIPA PVC 8" X 4M WAVIN TIPE AW 3 BTG 730 7/9/2021 TRIPLEK 4MMX4X8 20 LBR 731 7/9/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 732 1/15/2021 AQUAPROOF @ 1 kg 2 TIN 733 2/7/2021 IRON NAILS 1 1/2" 1 KG 734 3/9/2021 BROTI MERANTI 2" X 2" X 5 MTR 6 BTG 735 4/10/2021 PAPAN MERANTI 1X8X5MTR 97 KPG 736 4/10/2021 PAPAN MERANTI 1X8X5MTR 81 KPG 737 5/18/2021 IRON NAILS 2" 3 KG 738 6/12/2021 PAPAN MERANTI 1X8X5MTR 25 KPG 739 7/9/2021 BESI BETON POLOS 8MMX12M SNI KS 15 BTG 740 7/9/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 12 BTG 741 1/15/2021 BROTI MERANTI 3" X 4" X 5MTR 7 BTG 742 1/15/2021 BROTI PUNAK 2X3X5MTR 10 BTG 743 2/8/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 744 2/8/2021 BROTI PUNAK 2X4X5MTR 30 BTG 745 2/8/2021 BROTI PUNAK 2X4X5MTR 10 BTG 746 3/10/2021 PAPAN MERANTI 1X8X5MTR 3 KPG 747 3/10/2021 PAPAN MERANTI 1X8X5MTR 3 KPG 748 3/10/2021 BROTI PUNAK 2X3X5MTR SIKA CHAPDUR NATURAL FLOOR HARDENER @ 25 5 BTG 749 4/10/2021 2 ZAK KG 750 5/18/2021 GALV PIPA 1" X 6M SCH 40 WELDED 1 BTG 751 6/12/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 752 7/9/2021 KAWAT BETON @ 1 KG 5 ROLL 753 1/15/2021 GRANITE (BATU KORAL) 4 M3 754 1/15/2021 PASIR 4.2 TON 755 2/8/2021 ROOFING NAILS 2 1/2" 10 KG 756 3/10/2021 TRIPLEK 4MMX4X8 1 LBR 757 4/10/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 758 4/10/2021 KERAMIK UK.40CMX40CM (PUTIH) 1 KTK 759 4/10/2021 Sikafloor Proseal 22 @ 25 Ltr 1 TIN 760 5/19/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 761 6/12/2021 BROTI PUNAK 2X3X5MTR 15 BTG 762 6/12/2021 TRIPLEK 4MMX4X8 13 LBR 763 7/9/2021 PAPAN MERANTI 1X8X5MTR 6 KPG 764 1/15/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 12 BTG 765 2/8/2021 ROOFING NAILS 2 1/2" 6 KG 766 3/10/2021 IRON NAILS 2" 2 KG 767 3/10/2021 BESI BETON POLOS 8MMX12M SNI KS 4 BTG 768 4/10/2021 SENG ALUMUNIUM (KULIT JERUK) 30 LBR 769 5/19/2021 GRC BOARD 4 MM 2 LBR 770 5/19/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 771 5/19/2021 AQUAPROOF @ 1 kg 1 TIN 772 6/12/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 773 6/12/2021 IRON NAILS 3" 3 KG 774 6/12/2021 BROTI PUNAK 2X4X5MTR 20 BTG 775 6/12/2021 KAYU BAKAU 3" X 5 MTR 30 BTG 776 7/9/2021 PAPAN MERANTI 1X8X5MTR 6 KPG 777 1/15/2021 KAYU BAKAU 3" X 5 MTR 20 BTG 778 2/8/2021 PAPAN CAMPUR 3/4X8X5MTR 21 KPG 779 2/8/2021 PAPAN CAMPUR 3/4X8X5MTR 1 KPG 780 2/8/2021 PAPAN CAMPUR 3/4X8X5MTR 1 KPG 781 2/8/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 782 3/10/2021 IRON NAILS 3" 1 KG 783 4/10/2021 SENG ALUMUNIUM (KULIT JERUK) 8 LBR 784 4/10/2021 SENG ALUMUNIUM (KULIT JERUK) 10 LBR 785 5/19/2021 IRON NAILS 1 1/2" 1 KG 786 5/19/2021 IRON NAILS 2" 1 KG 787 5/19/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 788 5/19/2021 BROTI MERANTI 2" X 4" X 5MTR 1 BTG 789 6/12/2021 Kawat Las LB52 Welding 3.2 mm, Brand: Kobe Steel 2 KG 790 7/9/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 3 LBR 791 1/15/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 792 1/15/2021 KAYU BAKAU 3" X 5 MTR 20 BTG 793 2/8/2021 PAPAN MERANTI 3/4X8X5 10 KPG 794 3/10/2021 IRON NAILS Downlight 2 1/2" Philips Meson 59203, Daya 10 Watt, Warna 7 KG 795 4/10/2021 3 PCS Sinar Putih (6500k) 796 5/19/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 797 5/19/2021 KERAMIK UK.40CMX40CM (PUTIH) 1 KTK 798 6/12/2021 IRON NAILS 1 1/2" 1 KG 799 6/12/2021 IRON NAILS 3" 1 KG 800 7/9/2021 PAPAN CAMPUR 3/4X8X5MTR 30 KPG 801 1/15/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 12 BTG 802 2/8/2021 Triplek Second, Ukuran: 9 mm x 122 cm x 244 cm 10 LBR 803 3/12/2021 IRON NAILS 3/4" 1 KG 804 3/12/2021 TRIPLEK 4MMX4X8 8 LBR 805 4/10/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 806 4/10/2021 CAT PLATONE LIGHT GREEN 989M @ 3,785 LTR 2 TIN 807 5/19/2021 IRON NAILS 2" 4 KG 808 5/19/2021 IRON NAILS 2 1/2" 6 KG 809 6/12/2021 BROTI CAMPUR 2" X 3" X 5MTR 5 BTG 810 6/12/2021 PAPAN MERANTI 3/4X8X5 5 KPG 811 6/12/2021 PAPAN MERANTI 3/4X8X5 2 KPG 812 7/10/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 813 1/15/2021 GRANITE (BATU KORAL) 1 M3 814 1/15/2021 PASIR 2.4 TON 815 2/8/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 25 BTG 816 2/8/2021 MS SIKU 75 X 75 X 6 MM X 6 M 2 BTG 817 2/8/2021 MS SIKU 75 X 75 X 6 MM X 6 M 5 BTG 818 2/8/2021 MS PLATE BORDERS 4MMX4FTX8FT 6 LBR 819 2/8/2021 MS PLATE BORDERS 4MMX4FTX8FT 3 LBR 820 3/12/2021 BROTI CAMPUR 2" X 3" X 5MTR 20 BTG 821 4/10/2021 IWF 300MM X 150MM X 6.5MM X 9MM X 12 M 2 BTG 822 5/19/2021 PAPAN CAMPUR 3/4X8X5MTR 20 KPG 823 5/19/2021 BROTI 2" X 2" X 16 FIT CAMPUR 15 BTG 824 6/12/2021 Kawat Las LB52 Welding 3.2 mm, Brand: Kobe Steel 2 KG 825 7/10/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 826 1/15/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 827 2/8/2021 MATEX WALL FILLER @ 4 KG 1 TIN 828 2/8/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 829 3/12/2021 VELG JARI-JARI TIPE BEHEL + BAN GEROBAK 1 SET 830 4/10/2021 BESI BETON ULIR 13MMX12M SNI KS 12 BTG 831 5/19/2021 SEMEN @ 50KG MERK TIGA RODA 8 ZAK 832 5/19/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 833 6/12/2021 BESI BETON ULIR 16MMX12M 2 BTG 834 6/12/2021 BESI BETON ULIR 13MMX12M SNI KS 3 BTG 835 7/10/2021 BROTI PUNAK 2X4X5MTR 1 BTG 836 1/15/2021 Gear Pion Drum 12T Mesin Molen Tiger 1 PCS 837 1/15/2021 Gear Pion Piring 12T Mesin Molen Tiger 1 PCS 838 2/8/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 3 TIN 839 2/8/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 840 3/13/2021 TRIPLEK 4MMX4X8 10 LBR 841 4/11/2021 ROOFING NAILS 2" 4 KG 842 5/19/2021 PAPAN MERANTI 3/4X8X5 12 KPG 843 5/19/2021 BROTI PUNAK 2X3X5MTR 5 BTG 844 6/12/2021 PAPAN MERANTI 1X8X5MTR 4 KPG 845 7/10/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 846 1/15/2021 Flexible Rubber Coupling FCL, Ukuran: Inside 16 mm, Ou 8 PCS 847 2/8/2021 IRON NAILS 5" 6 KG 848 3/13/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 4 TIN 849 3/13/2021 Dana Paint Top Color S Blue @ 1 Liter 6 TIN 850 3/13/2021 Katalis 2 LTR 851 3/13/2021 Resin Fiberglass @ 5 Kg 14 PAIL 852 3/13/2021 Isolasi Kertas Ukuran 24 mm 3 PCS 853 3/13/2021 Dana Paint Top Color S White @ 1 Liter 4 TIN 854 3/13/2021 Chopped Strand Mat / Serat Fiber 9 KG 855 4/11/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 3 TIN 856 4/11/2021 CAT PLATONE LIGHT GREEN 989M @ 3,785 LTR 7 TIN 857 5/19/2021 AQUAPROOF @ 1 kg 3 TIN 858 5/19/2021 AQUAPROOF @ 1 kg 1 TIN 859 6/12/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 1 BTG 860 7/10/2021 BROTI CAMPUR 2" X 3" X 5MTR 1 BTG 861 1/16/2021 KAYU BAKAU 3" X 5 MTR 255 BTG 862 1/16/2021 KAYU BAKAU 3" X 5 MTR 55 BTG 863 2/8/2021 ROOFING NAILS 2" 3 KG 864 3/12/2021 ELBOW PVC 1" WAVIN TYPE AW 2 PCS 865 4/11/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 866 4/11/2021 CAT PLATONE LIGHT GREEN 989M @ 3,785 LTR 2 TIN 867 5/20/2021 PAPAN MERANTI 1X8X5MTR 10 KPG 868 6/12/2021 IRON NAILS 1 1/2" 2 KG 869 6/12/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 870 7/10/2021 IRON NAILS 2 1/2" 3 KG 871 7/10/2021 IRON NAILS 3" 3 KG 872 1/16/2021 MINYAK BENSIN 8 LTR 873 2/8/2021 MATEX WALL FILLER @ 4 KG 1 TIN 874 2/8/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 875 2/8/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 876 3/15/2021 SIKA CHAPDUR NATURAL FLOOR HARDENER @ 25 K 8 ZAK 877 4/11/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 878 5/20/2021 IRON NAILS 2 1/2" 1 KG 879 5/20/2021 IRON NAILS 2 1/2" 1 KG 880 5/20/2021 IRON NAILS 3" 3 KG 881 6/13/2021 GRC BOARD 6MM 10 LBR 882 7/10/2021 GRANITE (BATU KORAL) 7 M3 883 7/10/2021 PASIR 14 TON 884 1/16/2021 MINYAK BENSIN 4 LTR 885 2/8/2021 BROTI MERANTI 2" X 4" X 5MTR 55 BTG 886 3/15/2021 IRON NAILS 2" 10 KG 887 4/11/2021 KAYU BAKAU 3" X 5 MTR 100 BTG 888 5/20/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 889 6/13/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 6 PCS 890 7/10/2021 GRANITE (BATU KORAL) 15 M3 891 7/10/2021 PASIR 21 TON 892 1/16/2021 IRON NAILS 2" 2 KG 893 2/8/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 894 3/15/2021 BROTI 2" X 2" X 16 FIT CAMPUR 30 BTG 895 4/11/2021 KAYU BAKAU 3" X 5 MTR 25 BTG 896 4/11/2021 KAYU BAKAU 3" X 5 MTR 11 BTG 897 4/11/2021 KAYU BAKAU 3" X 5 MTR 5 BTG 898 4/11/2021 KAYU Kawat BAKAU Las RB263" Welding X 5 MTR3.2 mm @ 5Kg, Brand: Kobe 145 BTG 899 5/20/2021 20 BKS Steel 900 6/13/2021 DIAMOND ROOF DECKCUTTER ZINCALUM 4" NIPPON AZ-150RESIBON SD-680/ 0.4MM X 1 PCS 901 7/10/2021 1 LBR 0.680MM X 6MTR 902 7/10/2021 Screw Roofing Drill 2 1/2" ( 5.5 - 24 x 70 ) @ 300pcs 1 KTK 903 1/16/2021 ROOFING NAILS 2" 2 KG 904 2/8/2021 KAYU BAKAU 3" X 5 MTR 50 BTG 905 3/15/2021 PAPAN MERANTI 1X8X5MTR 3 KPG 906 4/11/2021 KAYU BAKAU 3" X 5 MTR 15 BTG 907 5/20/2021 MS PLATE 5MM X 4FT X 8FT 10 LBR 908 6/14/2021 BROTI PUNAK 2X3X5MTR 15 BTG 909 7/10/2021 BROTI CAMPUR 2" X 3" X 5MTR 20 BTG 910 1/16/2021 Timbangan Duduk Kapasitas 10 Kg 1 PCS 911 2/8/2021 SENG ALUMUNIUM (KULIT JERUK) 60 LBR 912 3/15/2021 MATEX WALL FILLER @ 4 KG 2 TIN 913 3/15/2021 CAT AVITEX M WHITE 896 (25 KG) 3 TIN 914 4/11/2021 KAYU BAKAU 3" X 5 MTR 50 BTG 915 5/20/2021 KAWAT BETON @ 1 KG 2 ROLL 916 5/20/2021 BESI BETON ULIR 13MMX12M SNI KS 1 BTG 917 5/20/2021 BESI BETON POLOS 8MMX12M SNI KS 4 BTG 918 6/14/2021 PAPAN MERANTI 1X8X5MTR 5 KPG 919 7/11/2021 ROOFING NAILS 2 1/2" 1 KG 920 1/16/2021 PLINGKUT DEMPUL Kawat Las RB26 @ 1 4.0 Welding KGmm NIPPON PAINT @ 5Kg, Brand: Kobe 1 TIN 921 2/8/2021 6 BKS Steel 922 2/8/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 6 BKS 923 3/15/2021 IRON NAILS 1" 2 KG 924 4/12/2021 IRON NAILS 2 1/2" 5 KG 925 4/12/2021 ROOFING NAILS 2" 5 KG 926 5/20/2021 BROTI PUNAK 2X3X5MTR 5 BTG 927 5/20/2021 PAPAN RESAK 1" X 8" X 5 MTR 12 KPG 928 6/14/2021 PLINGKUT DEMPUL Screw Roofing Drill 2" @ 1 KG ( 5.5 - 24NIPPON x 50 ) @PAINT 450pcs Brand: 1 TIN 929 6/14/2021 1 KTK Tako / Self Drilling Screw 930 7/11/2021 MINYAK BENSIN 5 LTR 931 1/16/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 932 2/9/2021 IRON NAILS 2 1/2" 5 KG 933 3/15/2021 MATEX WALL FILLER @ 4 KG 2 TIN 934 3/15/2021 CAT AVITEX M WHITE 896 (5 KG) 3 TIN 935 4/12/2021 AQUAPROOF @ 1 kg 3 TIN 936 5/20/2021 Inverter Mig-200B,Brand : Wipro 1 UNIT 937 6/14/2021 BESI :BETON Type MIG-200BULIR 16MMX12M 2 BTG 938 7/11/2021 Voltage PLINGKUT : 220V / 50HZ@ 1 KG NIPPON PAINT DEMPUL 1 TIN 939 1/16/2021 Welding IRON NAILSWire3" : 0.8 - 1.0 mm 5 KG 940 1/16/2021 IRON NAILS 4" 20 KG 941 2/9/2021 SEMEN PUTIH MERK BITAGROUP 5 KGS 942 3/15/2021 IRON NAILS 4" 5 KG 943 4/12/2021 CAT AVITEX S WHITE (5 KG) 4 TIN 944 5/20/2021 PENSIL TUKANG MERK MAKITA 2 PCS 945 6/14/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 946 6/14/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 947 7/11/2021 ROOFING NAILS 2 1/2" 1 KG 948 1/16/2021 BROTI PUNAK 2X3X5MTR 6 BTG 949 2/9/2021 BROTI MERANTI 3" X 4" X 5MTR 4 BTG 950 2/9/2021 PAPAN MERANTI 3/4X8X5 15 KPG 951 3/15/2021 ROOFING NAILS 2 1/2" 4 KG 952 4/12/2021 SIKA CHAPDUR NATURAL FLOOR HARDENER @ 25 K 2 ZAK 953 5/21/2021 IRON NAILS 4" 10 KG 954 6/14/2021 BESI BETON POLOS 8MMX12M SNI KS 10 BTG 955 6/14/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 956 7/11/2021 Amplas Bulat C411 Velcro G240 1 PCS 957 1/16/2021 BESI IWF MS 150 X 75 X 5 X 7 MM X 12 M 1 BTG 958 2/9/2021 IRON NAILS 2 1/2" 4 KG 959 3/15/2021 BROTI MERANTI 2" X 4" X 5MTR 5 BTG 960 4/14/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 961 4/14/2021 PAPAN MERANTI 3/4X8X5 40 KPG 962 4/14/2021 KAYU BAKAU 3" X 5 MTR 8 BTG 963 4/14/2021 BROTI MERANTI 2" X 4" X 5MTR 1 BTG 964 5/21/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 3 BTG 965 6/14/2021 CUTTING WHEEL 4" MERK NIPPON RESIBON 10 PCS 966 7/12/2021 KAWAT BETON @ 1 KG 1 ROLL 967 7/12/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 968 7/12/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 3 BTG 969 1/18/2021 Molen Tanpa Mesin, Brand: Tiger Type GT-425 1 UNIT 970 2/10/2021 PAPAN MERANTI 3/4X8X5 6 KPG 971 2/10/2021 BROTI PUNAK 2X3X5MTR 10 BTG 972 3/15/2021 ROOFING NAILS 2 1/2" 15 KG 973 4/14/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 974 5/21/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 1 BTG 975 6/14/2021 MINYAK BENSIN 4 LTR 976 7/12/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 977 7/12/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 2 BTG 978 1/18/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 979 2/10/2021 IRON NAILS 1 1/2" 1 KG 980 2/10/2021 IRON NAILS 2" 1 KG 981 3/15/2021 ROOFING NAILS 2 1/2" 10 KG 982 4/14/2021 IRON NAILS 2" 5 KG 983 5/21/2021 PAPAN MERANTI 3/4X8X5 2 KPG 984 5/21/2021 BROTI PUNAK 2X3X5MTR 2 BTG 985 5/21/2021 BROTI PUNAK 2X4X5MTR 1 BTG 986 6/14/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 987 7/12/2021 TRIPLEK 4MMX4X8 2 LBR 988 7/12/2021 TRIPLEK 4MMX4X8 5 LBR 989 1/18/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 990 2/10/2021 TRIPLEK 4MMX4X8 2 LBR 991 3/15/2021 BROTI PUNAK 2X4X5MTR 2 BTG 992 4/14/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 993 4/14/2021 KAYU BAKAU 3" X 5 MTR 8 BTG 994 5/21/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 1 BTG 995 6/15/2021 BESI BETON POLOS 8MMX12M SNI KS 2 BTG 996 7/12/2021 GRC BOARD 4 MM 2 LBR 997 7/12/2021 GRC BOARD 4 MM 8 LBR 998 1/18/2021 Orstick Putih 20 MTR 999 2/10/2021 PAPAN MERANTI 3/4X8X5 17 KPG 1000 3/15/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 4 BTG 1001 4/14/2021 IRON NAILS 2 1/2" 1 KG 1002 5/21/2021 PAPAN CAMPUR 3/4X8X5MTR 2 KPG 1003 5/21/2021 BROTI MERANTI 2" X 4" X 5MTR 1 BTG 1004 6/15/2021 BROTI PUNAK 2X3X5MTR 9 BTG 1005 6/15/2021 BROTI PUNAK 2X4X5MTR 3 BTG 1006 6/15/2021 TRIPLEK 4MMX4X8 9 LBR 1007 7/13/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 1008 1/18/2021 IRON NAILS 4" 10 KG 1009 2/10/2021 IRON NAILS 3" 3 KG 1010 3/15/2021 Seng Perabung 5 LBR 1011 4/14/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 1012 5/22/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 1 BTG 1013 6/15/2021 BROTI PUNAK 2X3X5MTR 9 BTG 1014 6/15/2021 BROTI PUNAK 2X4X5MTR 3 BTG 1015 6/15/2021 TRIPLEK 4MMX4X8 24 LBR 1016 7/13/2021 ELBOW PVC 1 1/2" RUCIKA AW 1 PCS 1017 1/18/2021 IRON NAILS 2" 4 KG 1018 2/10/2021 PAPAN MERANTI 3/4X8X5 10 KPG 1019 2/10/2021 BROTI PUNAK 2X3X5MTR 4 BTG 1020 2/10/2021 KAYU BAKAU 3" X 5 MTR 30 BTG 1021 3/15/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 1022 3/15/2021 TRIPLEK 4MMX4X8 30 LBR 1023 4/14/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1024 4/14/2021 CAT AVITEX M WHITE 896 (5 KG) 3 TIN 1025 5/22/2021 PAPAN MERANTI 3/4X8X5 7 KPG 1026 6/15/2021 KAWAT BETON @ 1 KG 5 ROLL 1027 7/13/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 3 PCS 1028 7/13/2021 MS PLATE 3 MM X 4 FT X 8 FT 1 LBR 1029 7/13/2021 Galvanis Hollow 20 mm x 40 mm x 1.2 mm x 6 mtr 15 BTG 1030 7/13/2021 Galvanis Hollow 40 mm x 40 mm x 1.2 mm x 6 mtr 5 BTG 1031 1/18/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 1032 2/10/2021 GRANITE (BATU KORAL) 3 M3 1033 2/10/2021 PASIR 2.8 TON 1034 3/15/2021 SENG ALUMUNIUM (KULIT JERUK) 40 LBR 1035 4/14/2021 Screw Roofing Drill 2 1/2" ( 5.5 - 24 x 70 ) @ 300pcs 3 KTK 1036 5/22/2021 BROTI PUNAK 2X3X5MTR 30 BTG 1037 6/15/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 40 LBR 1038 7/13/2021 Kawat Kawat Las Las LB52 LB52 Welding Welding 3.2 4.0 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 4 BKS 1039 7/13/2021 20 BKS Steel 1040 7/13/2021 Kawat Las RB26 Welding 4.0 mm, Brand: Kobe Steel 8 KG 1041 1/18/2021 BAN DALAM GEROBAK ANGKONG 1 PCS 1042 2/10/2021 IRON NAILS 3" 3 KG 1043 3/15/2021 ROOFING NAILS 2" 3 KG 1044 4/14/2021 CAT AVITEX M WHITE 896 (5 KG) 2 TIN 1045 5/22/2021 BROTI PUNAK 2X4X5MTR 20 BTG 1046 5/22/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 25 LBR 1047 6/15/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 20 LBR 1048 7/13/2021 IRON NAILS 2 1/2" 5 KG 1049 7/13/2021 PAPAN MERANTI 3/4X8X5 50 KPG 1050 7/13/2021 BROTI MERANTI BAN DALAM 2" X 4" SIZE GEROBAK X 5MTR 2.50/2.75 - 17 MERK 15 BTG 1051 1/18/2021 1 PCS SWALLOW 1052 2/10/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 1053 3/16/2021 BROTI PUNAK 2X3X5MTR 1 BTG 1054 4/15/2021 Terpal Plastik Ukuran: 10mtr x 15mtr Warna Biru 1 PCS 1055 4/15/2021 BROTI 2" X 2" X 16 FIT CAMPUR 20 BTG 1056 5/22/2021 IRON NAILS 3" 3 KG 1057 5/22/2021 ROOFING NAILS 2 1/2" 5 KG 1058 6/15/2021 BESI BETON ULIR 13MMX12M SNI KS 3 BTG 1059 7/13/2021 ELBOW PVC 1 1/2" RUCIKA AW 1 PCS 1060 1/18/2021 IRON NAILS 2" 1 KG 1061 2/11/2021 MINYAK BENSIN 6 LTR 1062 3/16/2021 PAPAN MERANTI 3/4X8X5 45 KPG 1063 4/15/2021 IRON NAILS 2 1/2" 3 KG 1064 5/22/2021 Kain ScrewPelapis Roofing( No DrillDrop 2" ( )5.5 - 24 x 50 ) @ 450pcs Brand: 3 ROLL 1065 6/15/2021 1 KTK Tako / Self Drilling Screw 1066 7/13/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 1067 1/18/2021 IRON NAILS 2 1/2" 5 KG 1068 2/11/2021 MINYAK BENSIN 6 LTR 1069 3/16/2021 SENG ALUMUNIUM (KULIT JERUK) 40 LBR 1070 4/15/2021 DIAMOND CUTTER 4" NIPPON RESIBON 1 PCS 1071 5/22/2021 BESI BETON POLOS 8MMX12M SNI KS 4 BTG 1072 6/15/2021 BROTI CAMPUR 2" X 3" X 5MTR 11 BTG 1073 6/15/2021 BROTI CAMPUR 2" X 3" X 5MTR 9 BTG 1074 7/13/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 1075 1/18/2021 IRON NAILS 2 1/2" 4 KG 1076 2/11/2021 ROOFING NAILS 2" 3 KG 1077 3/16/2021 TRIPLEK 4MMX4X8 16 LBR 1078 4/15/2021 IRON NAILS 1" 3 KG 1079 4/15/2021 IRON NAILS 2" 5 KG 1080 5/22/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 1081 6/15/2021 MS SIKU 75 X 75 X 7 MM X 6 M 10 BTG 1082 6/15/2021 SHIP PLATE 10 MM x 6 FT x 20 FT (Plate Marine) 5 LBR 1083 7/13/2021 BESI BETON ULIR 10MMX12M 5 BTG 1084 1/18/2021 KAWAT BETON Kawat Las RB26 @ 1 KG 4.0 mm @ 5Kg, Brand: Kobe Welding 1 ROLL 1085 2/11/2021 8 BKS Steel 1086 3/16/2021 IRON NAILS 3/4" 1 KG 1087 3/16/2021 IRON NAILS 2 1/2" 10 KG 1088 3/16/2021 ROOFING NAILS 2" 5 KG 1089 4/15/2021 GRANITE (BATU KORAL) 20 M3 1090 4/15/2021 PASIR 28 TON 1091 5/22/2021 PAPAN CAMPUR 3/4X8X5MTR 25 KPG 1092 5/22/2021 BROTI 2" X 2" X 16 FIT CAMPUR 15 BTG 1093 6/16/2021 BROTI PUNAK 2X3X5MTR 13 BTG 1094 6/16/2021 BROTI PUNAK 2X4X5MTR 2 BTG 1095 6/16/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 1096 6/16/2021 TRIPLEK 4MMX4X8 13 LBR 1097 7/13/2021 BAN DALAM GEROBAK ANGKONG 2 PCS 1098 1/18/2021 KAWAT BETON @ 1 KG 2 ROLL 1099 2/11/2021 KAYU BAKAU 3" X 5 MTR 100 BTG 1100 3/16/2021 BROTI MERANTI 2" X 4" X 5MTR 6 BTG 1101 4/15/2021 GRANITE (BATU KORAL) 30 M3 1102 4/15/2021 PASIR 168 TON 1103 5/22/2021 BESI BETON POLOS 8MMX12M SNI KS 10 BTG 1104 5/22/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 1105 6/16/2021 BESI BETON ULIR 13MMX12M SNI KS 20 BTG 1106 7/13/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 6 BTG 1107 1/18/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 1108 2/11/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 10 BTG 1109 3/16/2021 BESI BETON POLOS 8MMX12M SNI KS 2 BTG 1110 3/16/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 1 BTG 1111 4/15/2021 GRANITE (BATU KORAL) 5 M3 1112 4/15/2021 PASIR 14 TON 1113 5/22/2021 IRON NAILS 4" 4 KG 1114 6/16/2021 Terpal Plastik Ukuran: 10mtr x 15mtr Warna Biru 1 PCS 1115 7/14/2021 KAWAT BETON @ 1 KG 3 ROLL 1116 7/14/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 1117 7/14/2021 BESI BETON ULIR 10MMX12M 20 BTG 1118 1/18/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 1119 2/13/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 1120 3/16/2021 IRON NAILS 4" 1 KG 1121 3/16/2021 BROTI MERANTI 3" X 4" X 5MTR 1 BTG 1122 3/16/2021 BROTI PUNAK 2X3X5MTR 1 BTG 1123 4/15/2021 IWF 300MM X 150MM X 6.5MM X 9MM X 12 M 1 BTG 1124 5/23/2021 KAYU BAKAU 3" X 5 MTR 400 BTG 1125 5/23/2021 MINYAK BENSIN 2 LTR 1126 6/16/2021 MS SIKU 65MM X 65MM X 6MM X 6MTR 1 BTG 1127 7/14/2021 IRON NAILS 2" 3 KG 1128 1/18/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 1129 2/13/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1130 2/13/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 1131 2/13/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 2 TIN 1132 3/16/2021 KAWAT BETON @ 1 KG 2 ROLL 1133 4/15/2021 GRANITE (BATU KORAL) 30 M3 1134 4/15/2021 PASIR RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 28 TON 1135 5/23/2021 3 BTG 0,75MM, PANJANG 6M, MERK TASO 1136 5/23/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 20 BTG 1137 6/17/2021 KAWAT BETON @ 1 KG 2 ROLL 1138 6/17/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 6 BTG 1139 6/17/2021 BESI BETON ULIR 10MMX12M 10 BTG 1140 7/14/2021 PAKU GRC BOARD @ 6 Ons 1 KTK 1141 1/18/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 12 BTG 1142 2/13/2021 IRON NAILS 3" 20 KG 1143 3/17/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 1144 3/17/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 1145 4/15/2021 PASIR 28 TON 1146 5/23/2021 BESI ScrewBETON RoofingULIR 13MMX12M Drill 2" ( 5.5 - 24 xSNI 50 )KS @ 450pcs Brand: 13 BTG 1147 6/17/2021 1 KTK Tako / Self Drilling Screw 1148 6/17/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 20 LBR 1149 7/14/2021 PAKU GRC BOARD @ 6 Ons 2 KTK 1150 1/19/2021 ELBOW PVC 4" RUCIKA AW 9 PCS 1151 2/13/2021 IRON NAILS 5" 10 KG 1152 3/17/2021 PAPAN MERANTI 3/4X8X5 8 KPG 1153 3/17/2021 PAPAN MERANTI 1X8X5MTR 1 KPG 1154 3/17/2021 BROTI PUNAK 2X4X5MTR 4 BTG 1155 4/15/2021 GRANITE (BATU KORAL) 5 M3 1156 4/15/2021 PASIR 14 TON 1157 5/23/2021 MINYAK BENSIN 60 LTR 1158 5/23/2021 MINYAK BENSIN 6 LTR 1159 5/23/2021 MINYAK BENSIN 40 LTR 1160 6/17/2021 SENG ALUMUNIUM (KULIT JERUK) 20 LBR 1161 7/14/2021 PAKU RIVET 3,2 MM 1 KTK 1162 1/19/2021 Ban Luar + Ban Dalam + Velg Untuk Angkong 1 SET 1163 2/13/2021 KAWAT BETON @ 1 KG 3 ROLL 1164 3/17/2021 IRON NAILS 1" 1 KG 1165 3/17/2021 IRON NAILS 2" 1 KG 1166 3/17/2021 IRON NAILS 2 1/2" 1 KG 1167 4/15/2021 BROTI CAMPUR 2" X 3" X 5MTR 15 BTG 1168 5/23/2021 PASIR 224 TON 1169 6/17/2021 TRIPLEK 4MMX4X8 10 LBR 1170 7/14/2021 KAYU BAKAU 3" X 5 MTR 15 BTG 1171 7/14/2021 KAWAT BETON @ 1 KG 1 ROLL 1172 7/14/2021 BESI BETON ULIR 10MMX12M 3 BTG 1173 1/19/2021 Ban Luar + Ban Dalam + Velg Untuk Angkong 1 SET 1174 2/13/2021 ROOFING Kawat Las NAILS 2" RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe 1 KG 1175 3/17/2021 1 BKS Steel 1176 4/15/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 1177 5/23/2021 PASIR 44.8 TON 1178 6/17/2021 ROOFING NAILS 2" 3 KG 1179 7/14/2021 MINYAK BENSIN 7 LTR 1180 1/19/2021 PLYWOOD 9 MM 1 LBR 1181 2/13/2021 BROTI PUNAK 2X4X5MTR 6 BTG 1182 2/13/2021 BROTI PUNAK 2X4X5MTR 18 BTG 1183 3/17/2021 CUTTING WHEEL 4" MERK PROHEX 50 PCS 1184 4/16/2021 IRON NAILS 2 1/2" 10 KG 1185 4/16/2021 ROOFING NAILS 2" 2 KG 1186 5/23/2021 PAPAN CAMPUR 3/4X8X5MTR 12 KPG 1187 6/17/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 1188 7/14/2021 MINYAK BENSIN 7 LTR 1189 1/19/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 1190 2/13/2021 BROTI MERANTI 3" X 4" X 5MTR 4 BTG 1191 2/13/2021 BROTI MERANTI 2" X 4" X 5MTR 3 BTG 1192 3/18/2021 THINNER @ 5 LTR CAT PLATONE MERKBLUE AZZURE LABA067 LABA WARNA @ 3,785 LTRHIJAU 1 TIN 1193 3/18/2021 1 TIN NIPPON PAINT 1194 3/18/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 1 TIN 1195 4/16/2021 ROOFING NAILS 2" 3 KG 1196 5/23/2021 Kawat Las LB52 Welding 3.2 mm, Brand: Kobe Steel 2 KG 1197 6/17/2021 BESI BETON ULIR 16MMX12M 2 BTG 1198 7/14/2021 MINYAK BENSIN 7 LTR 1199 1/19/2021 PAPAN MERANTI 1X8X5MTR 1 KPG 1200 2/13/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 45 BTG 1201 3/18/2021 MS WIREMESH M6X2.1MX54 MTR ULIR 6 PCS 1202 4/16/2021 Kawat Kawat Las Las LB52 LB52 Welding Welding 3.2 4.0 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 8 BKS 1203 4/16/2021 12 BKS Steel 1204 4/16/2021 Kawat Las RB26 Welding 3.2 mm, Brand: Kobe Steel 8 KG 1205 5/24/2021 MINYAK BENSIN 12 LTR 1206 6/17/2021 BROTI PUNAK 2X3X5MTR 4 BTG 1207 7/14/2021 MINYAK BENSIN 7 LTR 1208 1/19/2021 ROOF ROOF DECK DECK ZINCALUM ZINCALUM AZ-150 AZ-150 SD-680/ SD-680/ 0.4MM 0.4MM X X 0.68 175 LBR 1209 1/19/2021 115 LBR 0.680MM X 6MTR 1210 2/14/2021 KERAMIK UK.40CMX40CM (PUTIH) 40 KTK 1211 3/18/2021 MS Round Bar ID 36mm x 12mtr 10 BTG 1212 4/16/2021 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 4 BKS 1213 5/24/2021 MATEX WALL FILLER @ 4 KG 2 TIN 1214 6/17/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 3 PCS 1215 6/17/2021 BESI BETON ULIR 10MMX12M 3 BTG 1216 6/17/2021 Pipa Galvanis 1 1/4" X 6M Welded, Brand: BOS Bakrie Pip 2 BTG 1217 7/14/2021 MINYAK BENSIN 7 LTR 1218 1/19/2021 IRON NAILS 4" 10 KG 1219 1/19/2021 ROOFING NAILS 2 1/2" 1 KG 1220 1/19/2021 ROOFING NAILS 2 1/2" 12 KG 1221 2/15/2021 PIPA PVC 2 1/2" X 4M WAVIN TIPE AW 2 BTG 1222 3/18/2021 SHIP KawatPLATE 10 MM Las LB52 x 6 FT Welding 3.2x mm 20 FT @ (Plate Marine) 5Kg, Brand: Kobe 14 LBR 1223 4/16/2021 4 BKS Steel 1224 4/16/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 12 BKS 1225 4/16/2021 Kawat Las RB26 Welding 3.2 mm, Brand: Kobe Steel 4 KG 1226 5/24/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 3 LBR 1227 6/17/2021 BESI BETON POLOS 12MMX12M SNI KS 1 BTG 1228 7/14/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 1229 1/19/2021 Zinc Anodes @ 11 Kg Tipe Welded 2 PCS 1230 2/15/2021 PAPAN MERANTI 1X8X5MTR 25 KPG 1231 3/18/2021 PLYWOOD 6MM 3 LBR 1232 3/18/2021 GALV PIPA 1/2" X 6M SCH 40 WELDED 2 BTG 1233 3/18/2021 Dempul Sanpolac + Hardener @ 1 Kg 4 TIN 1234 3/18/2021 Hardener Dempul Sanpolac 4 PCS 1235 4/16/2021 DIAMOND CUTTER 4" NIPPON RESIBON 1 PCS 1236 4/16/2021 KERAMIK UK.30CMX30CM (PUTIH) 2 KTK 1237 5/24/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 14 LBR 1238 6/17/2021 BESI BETON ULIR 16MMX12M 2 BTG 1239 7/15/2021 IRON NAILS 2" 5 KG 1240 1/19/2021 PIPA PVC 6" X 4M WAVIN TIPE AW 2 BTG 1241 2/15/2021 IRON NAILS 1 1/2" 1 KG 1242 2/15/2021 IRON NAILS 2" 1 KG 1243 2/15/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1244 2/15/2021 CAT PLATONE AZZURE BLUE 067 @ 3,785 LTR NIPPO 1 TIN 1245 3/18/2021 PAPAN MERANTI 3/4X8X5 5 KPG 1246 4/16/2021 EXHAUST FAN KDK 25 RUN 1 PCS 1247 5/24/2021 KERAMIK UK.40CMX40CM (PUTIH) 7 KTK 1248 6/17/2021 MS SIKU 65MM X 65MM X 6MM X 6MTR 1 BTG 1249 7/15/2021 BESI BETON POLOS 8MMX12M SNI KS 10 BTG 1250 7/15/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 1251 1/19/2021 CLOSET JONGKOK 2 PCS 1252 2/15/2021 CAT PLATONE MATT WHITE 66 @ 3,785 LTR NIPPON P 1 TIN 1253 3/18/2021 BESI BETON ULIR 13MMX12M SNI KS 3 BTG 1254 4/16/2021 BLOWER MERK LION UKURAN 600 MM (24") 10 UNIT 1255 5/24/2021 BROTI PUNAK 2X3X5MTR 12 BTG 1256 6/17/2021 PAPAN MERANTI 3/4X8X5 7 KPG 1257 6/17/2021 BROTI PUNAK 2X3X5MTR 4 BTG 1258 7/15/2021 PAPAN CAMPUR 3/4X8X5MTR 20 KPG 1259 1/19/2021 Kaca Hitam ( Riben ) Ukuran 5 MM x 105 CM x 120 CM 2 LBR 1260 2/15/2021 PIPA PVC 1 1/2" X 4M WAVIN TIPE AW 2 BTG 1261 3/18/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 1262 4/16/2021 PAPAN CAMPUR 3/4X8X5MTR 4 KPG 1263 5/24/2021 IRON NAILS 3" 2 KG 1264 5/24/2021 BROTI PUNAK 2X3X5MTR 8 BTG 1265 6/17/2021 BROTI PUNAK 2X3X5MTR 14 BTG 1266 6/17/2021 BROTI PUNAK 2X4X5MTR 3 BTG 1267 6/17/2021 TRIPLEK 4MMX4X8 12 LBR 1268 7/15/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 1269 1/19/2021 Kaca Hitam ( Riben ) Ukuran: 5mm x 135cm x 65cm 2 PCS 1270 2/15/2021 BROTI CAMPUR 2" X 3" X 5MTR 10 BTG 1271 2/15/2021 TRIPLEK 4MMX4X8 6 LBR 1272 3/18/2021 CAT AVITEX M WHITE 896 (5 KG) 2 TIN 1273 3/18/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1274 4/16/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 1275 5/24/2021 BESI BETON ULIR 13MMX12M SNI KS 4 BTG 1276 5/24/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 3 BTG 1277 6/18/2021 KAYU BAKAU 3" X 5 MTR 100 BTG 1278 7/16/2021 PLATE ALUMUNIUM 0,8 MM X 1 MTR X 2 MTR 48 LBR 1279 1/19/2021 SUPER POLY 122CMX244XM 2 LBR 1280 2/15/2021 IRON NAILS 2" 1 KG 1281 3/18/2021 MATA JIGSAW NO.3 MERK MAKITA 1 PCS 1282 4/16/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 1 BKS 1283 5/24/2021 PAPAN CAMPUR 3/4X8X5MTR 10 KPG 1284 6/18/2021 BROTI PUNAK 2X3X5MTR 20 BTG 1285 6/18/2021 TRIPLEK 4MMX4X8 15 LBR 1286 6/18/2021 BROTI MERANTI 2" X 2" X 5 MTR 10 BTG 1287 7/16/2021 PASIR 14 TON 1288 1/19/2021 KARET C - HITAM 1 ROLL 1289 2/15/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 1290 3/18/2021 PENSIL TUKANG Kawat Las MERK MAKITA RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe 1 PCS 1291 4/16/2021 1 BKS Steel 1292 5/24/2021 BROTI PUNAK 2X3X5MTR 4 BTG 1293 6/18/2021 KERAMIK UK.40CMX40CM (PUTIH) 7 KTK 1294 6/18/2021 KERAMIK UK.30CMX30CM (PUTIH) 2 KTK 1295 7/16/2021 IRON NAILS 1 1/2" 1 KG 1296 7/16/2021 PAPAN MERANTI 1X8X5MTR 6 KPG 1297 7/16/2021 BROTI MERANTI 2" X 4" X 5MTR 6 BTG 1298 1/19/2021 Kunci Pipa / Kunci Gastong 12", Brand: Tekiro 1 PCS 1299 2/15/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 1300 3/18/2021 Kikir Segitiga 3", Brand: Baut 1 PCS 1301 4/16/2021 PLYWOOD 6MM 1 LBR 1302 5/24/2021 KAWAT BETON @ 1 KG 3 ROLL 1303 6/18/2021 SCREW TRUS 10-16X16MM 200 PCS 1304 7/16/2021 DIAMOND CUTTER 4" NIPPON RESIBON 3 PCS 1305 1/20/2021 PAPAN CAMPUR 3/4X8X5MTR 4 KPG 1306 1/20/2021 BROTI PUNAK 2X3X5MTR 10 BTG 1307 2/15/2021 KAYU BAKAU 3" X 5 MTR 100 BTG 1308 3/18/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 1309 4/16/2021 BROTI PUNAK 2X3X5MTR 15 BTG 1310 5/24/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 4 LBR 1311 5/24/2021 Screw Roofing Drill 2 1/2" ( 5.5 - 24 x 70 ) @ 300pcs 2 KTK 1312 6/18/2021 PLYWOOD 9 MM 2 LBR 1313 7/16/2021 DIAMOND CUTTER 4" NIPPON RESIBON 5 PCS 1314 1/20/2021 IRON NAILS 2" 2 KG 1315 1/20/2021 IRON NAILS 2 1/2" 1 KG 1316 2/15/2021 BROTI PUNAK 2X3X5MTR 22 BTG 1317 3/18/2021 KAWAT BETON @ 1 KG 10 ROLL 1318 3/18/2021 BESI BETON ULIR 13MMX12M SNI KS 40 BTG 1319 3/18/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 40 BTG 1320 4/17/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 1321 5/24/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 1 BTG 1322 6/18/2021 PLYWOOD 15 MMSize Ban Luar Gerobak MERK FORTUNA 80/90-17 SB-128 Samurai, 1 LBR 1323 7/16/2021 2 PCS Brand: Swallow 1324 1/20/2021 BROTI PUNAK 2X4X5MTR 10 BTG 1325 2/15/2021 BROTI PUNAK 2X3X5MTR 6 BTG 1326 3/18/2021 IRON NAILS 4" 10 KG 1327 4/17/2021 BROTI MERANTI 2" X 2" X 5 MTR 28 BTG 1328 5/25/2021 PAKU RIVET 3,2 MM 1 KTK 1329 6/18/2021 PAPAN MERANTI 3/4X8X5 4 KPG 1330 6/18/2021 BROTI MERANTI 2" X 2" X 5 MTR 3 BTG 1331 7/16/2021 KAYU BAKAU 3" X 5 MTR 15 BTG 1332 7/16/2021 BESI BETON POLOS 8MMX12M SNI KS 4 BTG 1333 1/20/2021 PLATE ALUMUNIUM 0.8 MM X 120 CM X 19O CM 5 LBR 1334 2/16/2021 IRON NAILS 1 1/2" 1 KG 1335 2/16/2021 IRON NAILS 2" 2 KG 1336 3/18/2021 BROTI PUNAK 2X3X5MTR 20 BTG 1337 4/17/2021 IRON NAILS 2 1/2" 1 KG 1338 5/25/2021 PAKU RIVET 3,2 MM 1 KTK 1339 6/18/2021 BESI BETON ULIR 10MMX12M 3 BTG 1340 7/16/2021 DIAMOND PLASTIK UVCUTTER 4" NIPPON UKURAN LEBAR 6RESIBON M, TEBAL 200 2 PCS 1341 1/20/2021 28 MTR MICRON 1342 2/16/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 25 BTG 1343 3/18/2021 Ban Luar Gerobak Angkong 1 PCS 1344 3/18/2021 BAN DALAM GEROBAK ANGKONG 1 PCS 1345 4/17/2021 PIPA PVC 8" X 4M WAVIN TIPE AW 4 BTG 1346 5/25/2021 IRON NAILS 3" 3 KG 1347 5/25/2021 IRON NAILS 4" 3 KG 1348 5/25/2021 ROOFING NAILS 2" 3 KG 1349 6/18/2021 BROTI PUNAK 2X4X5MTR 9 BTG 1350 6/18/2021 TRIPLEK 4MMX4X8 10 LBR 1351 7/17/2021 SEMEN PUTIH MERK BITAGROUP 5 KGS 1352 7/17/2021 KERAMIK UK.40CMX40CM (PUTIH) 30 KTK 1353 1/20/2021 Amplas Bulat C411 Velcro G320 10 PCS 1354 1/20/2021 Velcro Backing Pad 4" ( Tatakan Amplas ) 1 PCS 1355 1/20/2021 Amplas Bulat Tempel Velcro 4" Gridt 60 10 PCS 1356 2/16/2021 IRON NAILS 2" 4 KG 1357 3/19/2021 BESI BETON ULIR 13MMX12M SNI KS 6 BTG 1358 4/17/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 6 BTG 1359 4/17/2021 MS PLATE 2MMX4FTX8FT 5 LBR 1360 5/25/2021 CAT NIPPELUX ANTI CORROSIVE 1101 @ 5 LTR NIPP 7 TIN 1361 5/25/2021 Nippelux Thinner 1901 @ 5 Ltr 12 TIN 1362 5/25/2021 Cat Nippelux Red Lead Primer 1601 @ 5 Ltr Nippon Paint 10 TIN 1363 6/18/2021 BROTI PUNAK 2X3X5MTR 9 BTG 1364 6/18/2021 TRIPLEK 4MMX4X8 10 LBR 1365 7/17/2021 PLATE ALUMUNIUM 0,8 MM X 1 MTR X 2 MTR 2 LBR 1366 1/20/2021 Casing Body Mesin Serut Makita N 1900 B, Ukuran: 3 Inchi N 1 PCS 1367 2/16/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1368 3/19/2021 Kain Pelapis ( No Drop ) 3 ROLL 1369 3/19/2021 AQUA PROOF @ 20 LTR 1 TIN 1370 4/18/2021 CUTTING WHEEL 4" MERK PROHEX 10 PCS 1371 5/27/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 1372 6/19/2021 KERAMIK UK.40CMX40CM (PUTIH) 17 KTK 1373 6/19/2021 CAT AVITEX S WHITE (5 KG) 2 TIN 1374 7/17/2021 KERAMIK UK.40CMX40CM (PUTIH) 30 KTK 1375 1/20/2021 ISI KUAS ROLL 4" MERK PROHEX 2 PCS 1376 2/16/2021 KAIN LAP KOTAK-KOTAK 12 PCS 1377 3/19/2021 BROTI 2" X 2" X 16 FIT CAMPUR 50 BTG 1378 4/19/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 4 BKS 1379 5/27/2021 IRON NAILS 1 1/2" 1 KG 1380 6/19/2021 PAPAN MERANTI 3/4X8X5 14 KPG 1381 6/19/2021 BROTI PUNAK 2X3X5MTR 6 BTG 1382 7/18/2021 CAT AVITEX M WHITE 896 (25 KG) 2 TIN 1383 7/18/2021 CAT AVITEX S WHITE (25 KG) 2 TIN 1384 1/20/2021 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 1 BKS 1385 2/16/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1386 3/20/2021 IRON KawatNAILS 2 1/2" Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe 10 KG 1387 4/19/2021 12 BKS Steel 1388 5/27/2021 BROTI PUNAK 2X4X5MTR 7 BTG 1389 5/27/2021 BROTI MERANTI 2" X 2" X 5 MTR 2 BTG 1390 6/19/2021 BESI BETON ULIR 10MMX12M 1 BTG 1391 7/19/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 1392 1/20/2021 PAPAN MERANTI 1X8X5MTR 3 KPG 1393 2/16/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1394 3/20/2021 ROOFING NAILS 2" 1 KG 1395 4/19/2021 BESI IWF MS 150 X 75 X 5 X 7 MM X 12 M 1 BTG 1396 5/27/2021 SEMEN PUTIH MERK BITAGROUP 1 KGS 1397 6/19/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 1398 7/21/2021 SEMEN PUTIH MERK BITAGROUP 3 KGS 1399 1/20/2021 RESIN FIBER / MINYAK FIBER @ 225 LTR 4 DRM 1400 1/20/2021 RESIN FIBER / MINYAK FIBER @ 225 LTR 2 DRM 1401 2/16/2021 CUTTING WHEEL 4" MERK PROHEX 25 PCS 1402 3/20/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1403 4/19/2021 BESI BETON ULIR 13MMX12M SNI KS 5 BTG 1404 4/19/2021 BESI BETON POLOS 8MMX12M SNI KS 3 BTG 1405 5/27/2021 KAWAT BETON @ 1 KG 5 ROLL 1406 5/27/2021 BESI BETON ULIR 16MMX12M 35 BTG 1407 5/27/2021 BESI BETON ULIR 13MMX12M SNI KS 30 BTG 1408 5/27/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 5 BTG 1409 6/19/2021 BESI BETON POLOS 8MMX12M SNI KS 4 BTG 1410 6/19/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 2 BTG 1411 7/21/2021 CUTTING WHEEL 4" MERK PROHEX 4 PCS 1412 1/20/2021 MS SIKU 75 X 75 X 6 MM X 6 M 4 BTG 1413 2/16/2021 CUTTING WHEEL 4" MERK PROHEX 75 PCS 1414 3/20/2021 IRON NAILS 4" 3 KG 1415 4/19/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 25 PCS 1416 5/27/2021 ARMAFLEX INSULATION 3/4" X 90CM X 120CM 1 PCS 1417 5/27/2021 Galvanis Hollow 30 mm x 30 mm x 1.2 mm x 6 mtr 3 BTG 1418 6/20/2021 SCREW TRUS 10-16X16MM 300 PCS 1419 6/20/2021 PAKU RIVET 3,2 MM 1 KTK 1420 7/21/2021 Plastik UV, Ukuran: Lebar 3mtr Tebal 0.8mm Panjang 1mt 10 MTR 1421 1/21/2021 CAT AVITEX M WHITE 896 (25 KG) 2 TIN 1422 1/21/2021 TRIPLEK 12MMX4X8 1 LBR 1423 2/16/2021 PENSIL TUKANG MERK MAKITA 1 PCS 1424 3/20/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 1425 4/19/2021 MINYAK BENSIN 6 LTR 1426 5/27/2021 ROOFING NAILS 2 1/2" 3 KG 1427 6/20/2021 GRANITE (BATU KORAL) 1 M3 1428 6/20/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 1429 6/20/2021 KAYU BAKAU 3" X 5 MTR 10 BTG 1430 6/20/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 1431 6/20/2021 PASIR 2.8 TON 1432 7/22/2021 TRIPLEK 4MMX4X8 5 LBR 1433 1/21/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 1434 2/16/2021 SEMEN PUTIH MERK BITAGROUP 6 KGS 1435 3/20/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 8 BTG 1436 3/20/2021 MS SIKU Kawat Las50 X 50Welding RB26 X 5 MM3.2X 6mm MTR @ 5Kg, Brand: Kobe 15 BTG 1437 3/20/2021 2 BKS Steel 1438 3/20/2021 CUTTING WHEEL 4" MERK PROHEX 25 PCS 1439 3/20/2021 MS WIREMESH M6X2.1MX54 MTR ULIR 3 PCS 1440 3/20/2021 MS SIKU 40 X 40 X 4 MM X 6 M 47 BTG 1441 4/19/2021 BAN DALAM GEROBAK ANGKONG 1 PCS 1442 5/27/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 10 BKS 1443 6/20/2021 USED CASING PIPE 95/8" X 11-12.6M 2 BTG 1444 7/22/2021 Selang Kompressor (Air Hose / High Pressure Hose For 25 MTR 1445 1/21/2021 BROTI 2" X 2" X 16 FIT CAMPUR 15 BTG 1446 2/16/2021 Pipa Ornamen 2" x 2mm x 6mtr 2 BTG 1447 3/20/2021 KAYU BAKAU 3" X 5 MTR 210 BTG 1448 4/19/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 25 PCS 1449 5/27/2021 IRON NAILS 1 1/2" 1 KG 1450 5/27/2021 PAPAN MERANTI 3/4X8X5 6 KPG 1451 5/27/2021 BROTI 2" X 2" X 16 FIT CAMPUR 5 BTG 1452 6/21/2021 IRON NAILS 1 1/2" 2 KG 1453 6/21/2021 KAWAT BETON @ 1 KG 2 ROLL 1454 6/21/2021 BESI BETON POLOS 8MMX12M SNI KS 5 BTG 1455 6/21/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 2 BTG 1456 7/22/2021 Ragum 4" Brand: Krisbow 1 PCS Adaptor Tang Rivet BENZ 9055 Adapter Ripet Gun 1457 7/22/2021 1 UNIT Elektrik 1458 1/21/2021 IRON NAILS 2" 3 KG 1459 2/16/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 15 BTG 1460 3/20/2021 PAPAN MERANTI 1X8X5MTR 8 KPG 1461 4/19/2021 Polyfloor Toap Coat PFT-253-2K-SB @ 20 Kg 6 TIN 1462 5/27/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 1463 6/21/2021 VELG JARI-JARI TIPE BEHEL + BAN GEROBAK 1 SET 1464 7/22/2021 IRON NAILS 3/4" 1 KG 1465 7/22/2021 IRON NAILS 2 1/2" 3 KG 1466 7/22/2021 TRIPLEK 4MMX4X8 13 LBR 1467 1/21/2021 BROTI PUNAK 2X3X5MTR 2 BTG 1468 2/16/2021 KAYU BAKAU 3" X 5 MTR 30 BTG 1469 3/20/2021 SEMEN PUTIH MERK BITAGROUP 1 KGS 1470 4/19/2021 Polyfloor Toap Coat PFT-253-2K-SB @ 20 Kg 2 TIN 1471 5/27/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 2 TIN 1472 6/21/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 1473 7/22/2021 BESI BETON ULIR 16MMX12M 1 BTG 1474 1/21/2021 PLATE ALUMUNIUM 0.8 MM X 120 CM X 19O CM 30 LBR 1475 2/16/2021 IRON NAILS 2 1/2" 1 KG 1476 3/20/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 1477 4/20/2021 PAPAN MERANTI 3/4X8X5 4 KPG 1478 4/20/2021 BROTI PUNAK 2X3X5MTR 5 BTG 1479 4/20/2021 BROTI MERANTI 2" X 4" X 5MTR 5 BTG 1480 5/28/2021 HACK ALKAN 3" (RING+KARET+BAUT) 50 SET 1481 6/21/2021 BROTI CAMPUR 2" X 3" X 5MTR 13 BTG 1482 6/21/2021 GRC BOARD 4 MM 6 LBR 1483 6/21/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1484 7/22/2021 MINYAK BENSIN 5 LTR 1485 1/21/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 1486 2/16/2021 GRANITE (BATU KORAL) 2 M3 1487 2/16/2021 PASIR 1.4 TON 1488 3/20/2021 Kawat Kawat Las Las RB26 Welding 3.2 LB52 Welding 3.2 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 1 BKS 1489 3/20/2021 1 BKS Steel 1490 4/20/2021 IRON NAILS 2" 3 KG 1491 4/20/2021 ROOFING NAILS 2" 3 KG 1492 5/28/2021 ROOFING NAILS 2 1/2" 5 KG 1493 6/21/2021 ROOFING NAILS 2" 1 KG 1494 7/22/2021 Amplas Bulat C411 Velcro G100 5 PCS 1495 7/22/2021 Amplas Bulat Tempel Velcro 4" Gridt 180 5 PCS 1496 7/22/2021 Epoxy RANGKAPrimer BAJASurfacer RINGAN Dana PaintTS CANAL Grey 150@- C75, 1 Ltr TEBAL 3 TIN 1497 1/22/2021 50 BTG 0,75MM, PANJANG 6M, MERK TASO 1498 1/22/2021 RANGKA BAJA RINGAN RENG TR 110 - R32.45, TEBAL 50 BTG 1499 2/16/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 1500 3/22/2021 BESI BETON ULIR 13MMX12M SNI KS 6 BTG 1501 4/20/2021 PAPAN MERANTI 3/4X8X5 30 KPG 1502 5/28/2021 ROOF ROOF DECK DECK ZINCALUM ZINCALUM AZ-150 AZ-150 SD-680/ SD-680/ 0.4MM 0.4MM X X 0.68 5 LBR 1503 5/28/2021 11 LBR 0.680MM X 6MTR 1504 6/21/2021 RESIN FIBER / MINYAK FIBER @ 225 LTR 1 DRM 1505 6/21/2021 Katalis 7 LTR 1506 7/22/2021 MINYAK BENSIN 5 LTR 1507 1/22/2021 IRON NAILS 2 1/2" 3 KG 1508 2/16/2021 PAPAN MERANTI 3/4X8X5 40 KPG 1509 2/16/2021 BROTI PUNAK 2X3X5MTR 10 BTG 1510 3/22/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1511 4/20/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 2 BTG 1512 5/28/2021 RANGKA BAJA RINGAN CANAL TS 150 - C75, TEBAL 0 3 BTG 1513 6/22/2021 Semen @ 50Kg, Brand: Merah Putih 25 ZAK 1514 7/23/2021 GRANITE (BATU KORAL) 1 M3 1515 7/23/2021 PASIR 4.2 TON 1516 1/22/2021 BROTI MERANTI 2" X 2" X 5 MTR 10 BTG 1517 2/16/2021 AQUAPROOF @ 1 kg 6 TIN 1518 3/22/2021 BROTI PUNAK 2X4X5MTR 2 BTG 1519 3/22/2021 BROTI PUNAK 2X4X5MTR 3 BTG 1520 4/20/2021 IRON NAILS 2" 5 KG 1521 5/28/2021 KERAMIK UK.40CMX40CM (PUTIH) 7 KTK 1522 6/22/2021 BROTI CAMPUR 2" X 3" X 5MTR 60 BTG 1523 7/23/2021 BROTI PUNAK 2X4X5MTR 1 BTG 1524 1/22/2021 PAPAN MERANTI Kawat Las 1X8X5MTR RB26 Welding 4.0 mm @ 5Kg, Brand: Kobe 2 KPG 1525 2/17/2021 2 BKS Steel 1526 3/22/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1527 3/22/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 1528 4/20/2021 Cat Avitex Pristine Blue B20-004 @ 5Kg 1 TIN 1529 5/28/2021 BROTI PUNAK 2X3X5MTR 4 BTG 1530 6/22/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 1531 7/23/2021 KAWAT BETON @ 1 KG 1 ROLL 1532 7/23/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 7 BTG 1533 7/23/2021 BESI BETON ULIR 10MMX12M 8 BTG 1534 1/22/2021 PAPAN MERANTI 1X8X5MTR 6 KPG 1535 2/17/2021 BROTI PUNAK 2X3X5MTR 6 BTG 1536 2/17/2021 BROTI MERANTI 2" X 4" X 5MTR 4 BTG 1537 3/22/2021 BESI BETON POLOS 8MMX12M SNI KS 40 BTG 1538 4/20/2021 Amplas Bulat C411 Velcro G80 10 PCS 1539 5/28/2021 PLATE ALUMUNIUM 0,8 MM X 1 MTR X 2 MTR 6 LBR 1540 6/22/2021 DINABOLT 1/2 X 4" 4 PCS 1541 7/23/2021 IRON NAILS 2" 5 KG 1542 1/22/2021 MINYAK BENSIN 12 LTR 1543 2/17/2021 IRON NAILS 3" 5 KG 1544 3/22/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 1545 4/20/2021 Polyfloor Toap Coat PFT-253-2K-SB @ 20 Kg 1 TIN 1546 5/28/2021 PENSIL TUKANG MERK MAKITA 2 PCS 1547 6/22/2021 BROTI PUNAK 2X3X5MTR 25 BTG 1548 7/23/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 1549 7/23/2021 KAYU BAKAU 3" X 5 MTR 50 BTG 1550 1/22/2021 MINYAK BENSIN 5 LTR 1551 2/17/2021 BROTI MERANTI 2" X 4" X 5MTR 50 BTG 1552 3/22/2021 KAWAT BETON @ 1 KG 5 ROLL 1553 4/20/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 1 TIN 1554 5/28/2021 Kikir Segitiga 3", Brand: Baut 1 PCS 1555 6/22/2021 DINABOLT 1/2 X 4" 176 PCS 1556 7/23/2021 KAWAT BETON @ 1 KG 2 ROLL 1557 1/22/2021 ROOFING NAILS 2" 2 KG 1558 2/17/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 50 BTG 1559 3/22/2021 IRON NAILS 1 1/2" 2 KG 1560 3/22/2021 IRON NAILS 2" 3 KG 1561 3/22/2021 ROOFING NAILS 2" 5 KG 1562 4/20/2021 IRON NAILS 2" 1 KG 1563 5/28/2021 MATA JIGSAW NO.3 MERK MAKITA 2 PCS 1564 6/23/2021 PLYWOOD 9 MM 1 LBR 1565 7/23/2021 MS WIREMESH ULIR M8X2.1MX5.4M MESH 150X150 1 LBR 1566 1/22/2021 IRON NAILS 2 1/2" 2 KG 1567 2/17/2021 KAWAT BETON @ 1 KG 20 ROLL 1568 3/22/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 1569 4/20/2021 PIPA PVC 4" X 4M WAVIN TIPE AW 1 BTG 1570 5/29/2021 BESI BETON POLOS 8MMX12M SNI KS 10 BTG 1571 5/29/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 1572 6/23/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 1573 7/23/2021 MS WIREMESH ULIR M8X2.1MX5.4M MESH 150X150 2 LBR 1574 1/22/2021 MS BOLT + NUT 5/8" X 2" DRATT FULL 46 PCS 1575 2/17/2021 WE HOLDER UPR 800 ULTRA PROHEX 10 PCS 1576 3/22/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 1 TIN 1577 4/20/2021 BROTI PUNAK 2X3X5MTR 2 BTG 1578 4/20/2021 GRC BOARD 4 MM 1 LBR 1579 5/29/2021 PAPAN CAMPUR 3/4X8X5MTR 7 KPG 1580 6/23/2021 CINCIN KERAMIK BAN DALAM WARNA GEROBAK PUTIH SIZE 2.50/2.75 - 17 MERK 1 KTK 1581 7/23/2021 2 PCS SWALLOW 1582 1/22/2021 Ban BANLuar Gerobak DALAM Size 80/90-17 GEROBAK SB-128- Samurai, SIZE 2.50/2.75 17 MERKBrand 2 PCS 1583 1/22/2021 2 PCS SWALLOW 1584 2/18/2021 IRON NAILS 3" 10 KG 1585 3/22/2021 OXIGEN REGULATOR MERK YAMATO 2 SET 1586 4/20/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 4 BKS 1587 5/29/2021 BESI BETON POLOS 8MMX12M SNI KS 6 BTG 1588 5/29/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 4 BTG 1589 6/23/2021 PAPAN CAMPUR 3/4X8X5MTR 4 KPG 1590 7/23/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 1591 7/23/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 5 TIN 1592 1/22/2021 BROTI MERANTI BAN DALAM 2" X 2" SIZE GEROBAK X 5 MTR 2.50/2.75 - 17 MERK 8 BTG 1593 2/18/2021 1 PCS SWALLOW 1594 2/18/2021 BAN DALAM GEROBAK ANGKONG 1 PCS 1595 2/18/2021 BAN DALAM GEROBAK ANGKONG 1 PCS 1596 3/22/2021 PAPAN MERANTI 3/4X8X5 20 KPG 1597 3/22/2021 BROTI PUNAK 2X3X5MTR 15 BTG 1598 4/21/2021 BESI BETON POLOS 8MMX12M SNI KS 3 BTG 1599 5/29/2021 MS WIREMESH M6X2.1MX54 MTR ULIR 1 PCS 1600 6/23/2021 Baterai Cas Kotak 9V 280mAh / Battery Rechargeable 9V, 1 PCS 1601 7/23/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 3 TIN 1602 7/23/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 5 TIN 1603 1/22/2021 TRIPLEK 4MMX4X8 2 LBR 1604 2/18/2021 MINYAK BENSIN 4 LTR 1605 2/18/2021 MINYAK BENSIN 3 LTR 1606 2/18/2021 MINYAK BENSIN 6 LTR 1607 3/22/2021 ROOFING NAILS 2" 2 KG 1608 4/21/2021 BROTI PUNAK 2X3X5MTR 60 BTG 1609 5/29/2021 DINABOLT 1/2 X 4" 20 PCS 1610 6/23/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1611 7/23/2021 KERAMIK UK.30CMX30CM (PUTIH) 2 KTK 1612 1/22/2021 PAKU GRC BOARD @ 6 Ons 1 KTK 1613 2/18/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 1614 3/22/2021 Kawat Kawat Las Las RB26 RB26 Welding Welding 4.0 4.0 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 4 BKS 1615 3/22/2021 4 BKS Steel 1616 4/21/2021 IRON NAILS 2" 2 KG 1617 4/21/2021 IRON NAILS 2 1/2" 2 KG 1618 5/30/2021 PAPAN RESAK 1" X 8" X 5 MTR 1 KPG 1619 6/23/2021 GRANITE (BATU KORAL) 20 M3 1620 6/23/2021 PASIR 42 TON 1621 7/23/2021 KAWAT BETON @ 1 KG 1 ROLL 1622 1/22/2021 SENG ALUMUNIUM (KULIT JERUK) 313 LBR 1623 1/22/2021 SENG ALUMUNIUM (KULIT JERUK) 7 LBR 1624 2/18/2021 IRON KawatNAILS 2 1/2" Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe 3 KG 1625 3/22/2021 2 BKS Steel 1626 4/21/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 20 LBR 1627 5/31/2021 MINYAK BENSIN 14 LTR 1628 6/23/2021 GRANITE (BATU KORAL) 3 M3 1629 6/23/2021 PASIR 14 TON 1630 7/23/2021 BESI BETON ULIR 10MMX12M 10 BTG 1631 1/23/2021 IRON NAILS 3" 2 KG 1632 2/18/2021 BAN DALAM GEROBAK SIZE 2.50/2.75 - 17 MERK SW 2 PCS 1633 3/22/2021 BROTI PUNAK 2X3X5MTR 1 BTG 1634 3/22/2021 CUTTING WHEEL 4" MERK PROHEX 5 PCS 1635 4/21/2021 CINCIN KERAMIK WARNA PUTIH 1 KTK 1636 5/31/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1637 6/23/2021 GRANITE (BATU KORAL) 10 M3 1638 6/23/2021 PASIR 28 TON 1639 7/23/2021 IRON NAILS 3/4" 1 KG 1640 7/23/2021 IRON NAILS 2 1/2" 1 KG 1641 7/23/2021 TRIPLEK 4MMX4X8 4 LBR 1642 7/23/2021 Kain Pelapis ( No Drop ) 1 ROLL 1643 7/23/2021 AQUAPROOF @ 1 kg 1 TIN 1644 1/23/2021 SEMEN PUTIH MERK BITAGROUP 3 KGS 1645 1/23/2021 KERAMIK UK.40CMX40CM (PUTIH) 15 KTK 1646 2/18/2021 PAPAN MERANTI 1X8X5MTR 8 KPG 1647 3/22/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 3 TIN 1648 3/22/2021 CAT MENI @ 5 KG NIPPON PAINT 4 TIN 1649 4/21/2021 PAPAN MERANTI 3/4X8X5 30 KPG 1650 5/31/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 1651 6/24/2021 ROOFING NAILS 2" 3 KG 1652 6/24/2021 PAPAN MERANTI 3/4X8X5 40 KPG 1653 6/24/2021 BROTI PUNAK 2X3X5MTR 30 BTG 1654 6/24/2021 TRIPLEK 4MMX4X8 28 LBR 1655 7/24/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1656 1/23/2021 THINNER @ 5 LTR CAT PLATONE EVERMERK LABA GREEN LABA 239 WARNA @ 3,785 LTRHIJAU 1 TIN 1657 1/23/2021 2 TIN NIPPON PAINT 1658 2/18/2021 IRON NAILS 2" 2 KG 1659 2/18/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 1660 3/23/2021 GRINDING WHEEL 7" MERK NIPPON RESIBON 25 PCS 1661 4/21/2021 IRON NAILS 2" 3 KG 1662 4/21/2021 IRON NAILS 2 1/2" 3 KG 1663 6/24/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1664 7/24/2021 IRON NAILS 4" 3 KG 1665 1/23/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 3 TIN 1666 1/23/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 10 TIN 1667 2/18/2021 KAWAT BETON @ 1 KG 2 ROLL 1668 3/23/2021 Kawat Kawat Las Las RB26 Welding 3.2 LB52 Welding 3.2 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 1 BKS 1669 3/23/2021 1 BKS Steel 1670 4/21/2021 Kain Pelapis ( No Drop ) 1 ROLL 1671 4/21/2021 AQUAPROOF @ 1 kg 4 TIN 1672 6/24/2021 SEMEN PUTIH MERK BITAGROUP 3 KGS 1673 7/24/2021 TRIPLEK 4MMX4X8 5 LBR 1674 1/23/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 1675 1/23/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 10 TIN 1676 2/18/2021 TRIPLEK 4MMX4X8 Cutting Nozzle No. 1 & 2, Brand: Sigma Untuk Cutting 15 LBR 1677 3/23/2021 1 PCS Torch Morris ST8 1678 4/21/2021 MS SIKU 50 X 50 X 5 MM X 6 MTR 2 BTG 1679 6/24/2021 PAKU GRC BOARD @ 6 Ons 1 KTK 1680 6/24/2021 SEMEN PUTIH ROOF DECK MERK BITAGROUP ZINCALUM AZ-150 SD-680/ 0.4MM X 1 KGS 1681 7/24/2021 1 LBR 0.680MM X 6MTR 1682 1/23/2021 Kawat Kawat Las Las RB26 Welding 4.0 LB52 Welding 4.0 mm mm @@ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 2 BKS 1683 1/23/2021 2 BKS Steel 1684 2/19/2021 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 8 BKS 1685 3/23/2021 GRANITE (BATU KORAL) 24 M3 1686 3/23/2021 PASIR 28 TON 1687 4/22/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1688 4/22/2021 Polyfloor Toap Coat PFT-253-2K-SB @ 20 Kg 1 TIN 1689 6/24/2021 SEMEN PUTIH MERK BITAGROUP 2 KGS 1690 7/25/2021 Baterai Sarung Cas Kotak Stang 9V 280mAh Sepeda Polygon /Material Battery Rechargeable 9V, : Silicone Rubber 2 PCS 1691 7/25/2021 2 PSG Warna : Hitam 1692 1/23/2021 Kawat Kawat Las Las RB26 Welding 4.0 LB52 Welding 4.0 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 2 BKS 1693 1/23/2021 2 BKS Steel 1694 2/19/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 1695 3/23/2021 GRANITE (BATU KORAL) 39 M3 1696 3/23/2021 PASIR Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe 42 TON 1697 4/22/2021 16 BKS Steel 1698 6/24/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1699 6/24/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 1700 7/25/2021 BROTI MERANTI 2" X 3" X 5MTR 26 BTG 1701 1/24/2021 GRC BOARD 4 MM 1 LBR 1702 1/24/2021 AQUAPROOF @ 1 kg 1 TIN 1703 2/19/2021 PAPAN MERANTI 1X8X5MTR 20 KPG 1704 3/23/2021 GRANITE (BATU KORAL) 8 M3 1705 3/23/2021 PASIR 11.2 TON 1706 4/22/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 4 BKS 1707 6/25/2021 PIPA PVC 4" X 4M WAVIN TIPE AW 1 BTG 1708 6/25/2021 ELBOW PVC 1 1/2" RUCIKA AW 2 PCS 1709 7/25/2021 CUTTING WHEEL 4" MERK PROHEX 4 PCS 1710 1/25/2021 PLATE ALUMUNIUM 0.8 MM X 120 CM X 19O CM 15 LBR 1711 1/25/2021 PLATE ALUMUNIUM 0.8 MM X 120 CM X 19O CM 25 LBR 1712 2/19/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 1713 3/23/2021 MINYAK BENSIN 2 LTR 1714 4/22/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1715 4/22/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 1716 6/25/2021 THINNER @ 5 LTR CAT PLATONE MERK MATT BLACKLABA 666LABA WARNA @ 3,785 LTR HIJAU 1 TIN 1717 6/25/2021 1 TIN NIPPON PAINT 1718 7/25/2021 CAT AVITEX S WHITE (25 KG) 1 TIN 1719 7/25/2021 Compound Gypsum @ 20 Kg 1 ZAK 1720 7/25/2021 Sikafloor Proseal Tali Tambang 2mm 22@ @100mtr, 25 Ltr Bahan: Nilon ( Benang 1 TIN 1721 1/25/2021 1 ROLL Nilon Tukang ) 1722 2/19/2021 SEMEN PUTIH MERK BITAGROUP 10 KGS 1723 3/23/2021 MINYAK BENSIN 2 LTR 1724 4/22/2021 BROTI MERANTI Kawat Las 2" X 2" X LB52 Welding 3.25 mm MTR@ 5Kg, Brand: Kobe 30 BTG 1725 6/25/2021 2 BKS Steel 1726 7/25/2021 SCREW TRUSS 12-14 X 20 MM 50 PCS Tali Tambang 2mm @ 100mtr, Bahan: Nilon ( Benang 1727 1/25/2021 1 ROLL Nilon Tukang ) 1728 2/19/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1729 2/19/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 2 TIN 1730 3/23/2021 OXIGEN REGULATOR MERK YAMATO 3 SET 1731 4/22/2021 IRON NAILS 3" 5 KG 1732 4/22/2021 ROOFING NAILS 2 1/2" 15 KG 1733 6/26/2021 MATEX WALL FILLER @ 4 KG 3 TIN 1734 7/25/2021 ROOF DECK ZINCALUM Tali Tambang AZ-150 2mm @ 100mtr, SD-680/ Bahan: Nilon0.4MM X 0.68 ( Benang 9 LBR 1735 1/25/2021 1 ROLL Nilon Tukang ) 1736 2/19/2021 BESI BETON ULIR 25MMX12 M 1 BTG 1737 3/23/2021 PAPAN MERANTI 3/4X8X5 2 KPG 1738 4/23/2021 MINYAK BENSIN 5 LTR 1739 6/26/2021 ROOFING NAILS 2" 3 KG 1740 7/25/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 9 LBR 1741 1/25/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 1742 1/25/2021 Kain Pelapis ( No Drop ) 4 ROLL 1743 1/25/2021 AQUAPROOF @ 1 kg 5 TIN 1744 2/20/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1745 2/20/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 1 TIN 1746 3/23/2021 CUTTING Kawat Las WHEEL 4" MERK RB26 Welding 3.2PROHEX mm @ 5Kg, Brand: Kobe 10 PCS 1747 4/23/2021 2 BKS Steel 1748 6/26/2021 BROTI PUNAK 2X4X5MTR 5 BTG 1749 7/25/2021 BROTI MERANTI 2" X 3" X 5MTR 6 BTG 1750 7/25/2021 PAPAN MERANTI 3/4X8X5 22 KPG 1751 1/25/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 1752 2/20/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1753 3/23/2021 BESI BETON ULIR 13MMX12M SNI KS 20 BTG 1754 4/23/2021 ROOFING NAILS 2" 3 KG 1755 6/26/2021 IRON NAILS 3" 3 KG 1756 7/25/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 5 LBR 1757 1/25/2021 ASPAL @ 155 KG 2 DRUM 1758 2/20/2021 CAT PLATONE AZZURE BLUE 067 @ 3,785 LTR NIPPO 2 TIN 1759 3/23/2021 GALV PIPA 1 1/2" X 6M SCH 40 WELDED 1 BTG 1760 4/24/2021 BROTI PUNAK 2X3X5MTR 15 BTG 1761 6/26/2021 IRON NAILS 2 1/2" 2 KG 1762 6/26/2021 IRON NAILS 3" 1 KG 1763 6/26/2021 ROOFING NAILS 2 1/2" 4 KG 1764 7/25/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 6 LBR 1765 1/25/2021 BATANG KELAPA 10 MTR 30 BTG 1766 2/20/2021 SENG ALUMUNIUM (KULIT JERUK) 100 LBR 1767 3/24/2021 KAYU BAKAU 3" X 5 MTR 90 BTG 1768 4/24/2021 IRON NAILS 1 1/2" 2 KG 1769 6/26/2021 BROTI PUNAK 2X3X5MTR 15 BTG 1770 6/26/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 1771 6/26/2021 SENG ALUMUNIUM (KULIT JERUK) 60 LBR 1772 6/26/2021 Seng Perabung 3 LBR 1773 7/25/2021 IRON NAILS 2 1/2" 3 KG 1774 1/25/2021 BROTI MERANTI 3" X 4" X 5MTR 7 BTG 1775 2/20/2021 DINABOLT 1/2 X 4" 8 PCS 1776 3/24/2021 PIPA PVC 16" X 6M SNI 06-0084-2002 3 BTG 1777 4/24/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 1778 6/26/2021 SENG ALUMUNIUM (KULIT JERUK) 60 LBR 1779 6/26/2021 Seng Perabung 3 LBR 1780 7/25/2021 CAT AVITEX M WHITE 896 (25 KG) 1 TIN 1781 1/26/2021 DIAMOND CUTTER 4" NIPPON RESIBON 3 PCS 1782 2/20/2021 BESI BETON ULIR 25MMX12 M 2 BTG 1783 3/25/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 1 TIN 1784 4/24/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 5 LBR 1785 6/26/2021 IRON NAILS 2 1/2" 10 KG 1786 7/26/2021 TRIPLEK 4MMX4X8 12 LBR 1787 1/26/2021 DIAMOND CUTTER 4" NIPPON RESIBON 1 PCS 1788 2/20/2021 Atap Spandek 0,8mm x 0,75mtr x 4,2mtr Warna Transpara 9 LBR 1789 2/20/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 10 LBR 1790 3/25/2021 MATEX WALL FILLER @ 4 KG 1 TIN 1791 4/25/2021 GRANITE (BATU KORAL) 1 M3 1792 4/25/2021 PASIR 1.4 TON 1793 6/26/2021 IRON NAILS 2 1/2" 2 KG 1794 7/26/2021 CLOSET JONGKOK 1 PCS 1795 1/26/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 7 PCS 1796 2/20/2021 Inverter Air Plasma Cutting Cutting 40 A 220V 1PH Krisbow 10 1 UNIT 1797 3/25/2021 BROTI CAMPUR 2" X 3" X 5MTR 22 BTG 1798 4/25/2021 BESI BETON POLOS 8MMX12M SNI KS 16 BTG 1799 6/26/2021 IRON NAILS 2 1/2" 4 KG 1800 7/26/2021 SIKA CHAPDUR NATURAL FLOOR HARDENER @ 25 K 10 ZAK 1801 1/26/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 3 PCS 1802 2/20/2021 SUPER POLY 122CMX244XM 1 LBR 1803 3/25/2021 DINABOLT 1/2 X 4" 40 PCS 1804 4/25/2021 PAPAN CAMPUR 3/4X8X5MTR 10 KPG 1805 4/25/2021 PAPAN MERANTI 3/4X8X5 15 KPG 1806 4/25/2021 BROTI PUNAK 2X3X5MTR 3 BTG 1807 4/25/2021 KAYU BAKAU 3" X 5 MTR 30 BTG 1808 6/27/2021 TRIPLEK 4MMX4X8 2 LBR 1809 7/26/2021 SEMEN PUTIH MERK BITAGROUP 3 KGS 1810 7/26/2021 CINCIN KERAMIK WARNA PUTIH 1 KTK 1811 1/27/2021 IRON NAILS 1 1/2" 2 KG 1812 2/20/2021 TRIPLEK 4MMX4X8 1 LBR 1813 3/25/2021 DINABOLT 1/2 X 4" 72 PCS 1814 4/25/2021 IRON NAILS 2 1/2" 3 KG 1815 6/27/2021 DIAMOND CUTTER 4" NIPPON RESIBON 1 PCS 1816 7/26/2021 IRON NAILS 1" 2 KG 1817 7/26/2021 PAKU GRC BOARD @ 6 Ons 1 KTK 1818 1/27/2021 GRANITE (BATU KORAL) 10 M3 1819 1/27/2021 PASIR 14 TON 1820 2/20/2021 Sika KawatGrout 215 (new) Las LB52 @ 25 Welding 3.2kgmm @ 5Kg, Brand: Kobe 15 ZAK 1821 3/25/2021 2 BKS Steel 1822 3/25/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 4 BKS 1823 4/25/2021 ROOFING NAILS 2 1/2" 10 KG 1824 6/27/2021 DIAMOND CUTTER 4" NIPPON RESIBON 1 PCS 1825 7/26/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 1 TIN 1826 1/27/2021 GRANITE (BATU KORAL) 20 M3 1827 1/27/2021 PASIR 28 TON 1828 2/21/2021 SEMEN PUTIH MERK BITAGROUP 7 KGS 1829 3/26/2021 BROTI CAMPUR 2" X 3" X 5MTR 20 BTG 1830 3/26/2021 BROTI MERANTI 3" X 4" X 5MTR 6 BTG 1831 3/26/2021 PAPAN MERANTI 3/4X8X5 20 KPG 1832 4/25/2021 IRON NAILS 2 1/2" 5 KG 1833 4/25/2021 IRON NAILS 3" 5 KG 1834 4/25/2021 IRON NAILS 5" 5 KG 1835 6/27/2021 ALUMINIUM PLATE 0,5MMX1X30M 1 ROLL 1836 7/27/2021 SEMEN PUTIH MERK BITAGROUP 5 KGS 1837 1/27/2021 GRANITE (BATU KORAL) 15 M3 1838 1/27/2021 PASIR 28 TON 1839 2/21/2021 IRON NAILS 2" 2 KG 1840 2/21/2021 IRON NAILS 2 1/2" 3 KG 1841 3/26/2021 IRON NAILS 2" 5 KG 1842 3/26/2021 IRON NAILS 2 1/2" 5 KG 1843 3/26/2021 IRON NAILS 3" 5 KG 1844 4/25/2021 BROTI PUNAK 2X4X5MTR 30 BTG 1845 6/28/2021 IRON NAILS 2" 2 KG 1846 6/28/2021 SENG ALUMUNIUM (KULIT JERUK) 8 LBR 1847 7/27/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 1848 7/27/2021 BESI BETON ULIR 10MMX12M 6 BTG 1849 1/27/2021 GRANITE (BATU KORAL) 10 M3 1850 1/27/2021 PASIR 7 TON 1851 2/21/2021 KAWAT BETON @ 1 KG 20 ROLL 1852 3/26/2021 IRON NAILS 3" 3 KG 1853 4/25/2021 ROOFING NAILS 2 1/2" 2 KG 1854 6/28/2021 Kikir RANGKASegitiga BAJA3",RINGAN Brand: Baut RENG TR 110 - R32.45, 2 PCS 1855 7/27/2021 10 BTG TEBAL 0,45MM, MERK TASO 1856 1/27/2021 GRANITE (BATU KORAL) 10 M3 1857 1/27/2021 PASIR 14 TON 1858 2/21/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Screw Roofing Drill 2" ( 5.5 - 24 x 50 ) @ 450pcs Brand: Ste 4 BKS 1859 3/26/2021 1 KTK Tako / Self Drilling Screw 1860 4/25/2021 SCREW TRUSS 12-14 X 20 MM 4300 PCS 1861 6/28/2021 IRON NAILS 2 1/2" 1 KG 1862 6/28/2021 ROOFING NAILS 2" 1 KG 1863 6/28/2021 SENG ALUMUNIUM (KULIT JERUK) 8 LBR 1864 7/27/2021 PAKU RIVET 3,2 MM 1 KTK 1865 1/27/2021 SEMEN PUTIH MERK BITAGROUP 5 KGS 1866 2/21/2021 BROTI MERANTI 3" X 4" X 5MTR 4 BTG 1867 2/21/2021 PAPAN MERANTI 3/4X8X5 10 KPG 1868 2/21/2021 BROTI PUNAK 2X3X5MTR 3 BTG 1869 2/21/2021 BROTI PUNAK 2X4X5MTR 4 BTG 1870 2/21/2021 TRIPLEK 4MMX4X8 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe 4 LBR 1871 3/26/2021 2 BKS Steel 1872 4/26/2021 Cat Nippenyl Wash Primer 6052 @ 5 Ltr, Brand: Nippon Pa 10 TIN 1873 4/26/2021 Cat Nippelux Metalic 1102 @ 5 Ltr, Brand: Nippon Paint 9 TIN 1874 6/28/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1875 7/28/2021 IRON NAILS 2 1/2" 2 KG 1876 7/28/2021 BROTI MERANTI 2" X 3" X 5MTR 5 BTG 1877 7/28/2021 PAPAN MERANTI 3/4X8X5 12 KPG 1878 1/27/2021 CAT PLATONE EVER GREEN 239 @ 3,785 LTR NIPPON 1 TIN 1879 2/21/2021 IRON NAILS 2 1/2" 2 KG 1880 2/21/2021 IRON NAILS 3" 1 KG 1881 3/26/2021 ROOFING NAILS 2" 4 KG 1882 3/26/2021 Screw Roofing Drill 2 1/2" ( 5.5 - 24 x 70 ) @ 300pcs 1 KTK 1883 4/26/2021 NEPPENYL THINNER 6951 @ 5 LTR 13 TIN 1884 4/26/2021 NIPPENYL THINNER 6901 @ 5 LTR 14 TIN 1885 6/29/2021 CLOSET JONGKOK 1 PCS 1886 7/28/2021 Electrode PT-31,L-38 Long Article No. 10196078 For Electrode PT-31,L-29 (Short) Article No. 10196079 For Plasma C 1 PCS 1887 7/28/2021 5 PCS Plasma Cut 40A Krisbow 1888 7/28/2021 Nozzle PT-31,L-16 Long 10196101 For Plasma Cut 40A Krisbow 5 PCS Nozzle PT-31 Short 10196102 For Plasma Cut 40A 1889 7/28/2021 3 PCS Krisbow 1890 7/28/2021 Torck Head PT-31 10196103 For Plasma Cut 40A Krisbowoven 1 PCS 1891 1/27/2021 MS Bolt + Nut 3/4" x 4" Dratt Full 8 PCS 1892 2/21/2021 PAPAN MERANTI 1X8X5MTR 20 KPG 1893 3/26/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 5 TIN 1894 4/26/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1895 6/29/2021 PAPAN RESAK 1" X 8" X 5 MTR 2 KPG 1896 7/28/2021 SEMEN PUTIH MERK BITAGROUP 5 KGS 1897 1/27/2021 BAN DALAM GEROBAK ANGKONG 2 PCS 1898 2/21/2021 IRON NAILS 2 1/2" 3 KG 1899 3/27/2021 PLYWOOD 9 MM 2 LBR 1900 3/27/2021 BROTI MERANTI 2" X 4" X 5MTR 3 BTG 1901 4/26/2021 PAPAN MERANTI 3/4X8X5 3 KPG 1902 6/29/2021 ROOFING NAILS 2" (Short) Article No. 10196079 For Electrode PT-31,L-29 3 KG 1903 7/28/2021 2 PCS Plasma Cut 40A Krisbow 1904 7/28/2021 Nozzle PT-31,L-16 Long 10196101 For Plasma Cut 40A Krisbow 2 PCS 1905 1/27/2021 PAPAN CAMPUR 3/4X8X5MTR 11 KPG 1906 1/27/2021 PAPAN MERANTI 1X8X5MTR 7 KPG 1907 2/21/2021 SENG ALUMUNIUM (KULIT JERUK) 9 LBR 1908 2/21/2021 SENG ALUMUNIUM (KULIT JERUK) 38 LBR 1909 3/27/2021 IRON NAILS 1" 1 KG 1910 4/26/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 1911 6/29/2021 GRANITE (BATU KORAL) 1 M3 1912 6/29/2021 PAPAN CAMPUR 3/4X8X5MTR 6 KPG 1913 6/29/2021 IRON NAILS 2" 2 KG 1914 6/29/2021 KAYU BAKAU 3" X 5 MTR 3 BTG 1915 6/29/2021 PASIR 1.4 TON 1916 7/28/2021 CLOSET DUDUK C704 L - SW 784 JP MERK TOTO 1 SET 1917 1/28/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 1918 2/22/2021 KERAMIK UK.40CMX40CM (PUTIH) 10 KTK 1919 3/27/2021 MATA JIGSAW NO.3 MERK MAKITA 1 PCS 1920 4/26/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 2 TIN 1921 6/29/2021 IRON NAILS 2 1/2" 3 KG 1922 6/29/2021 ROOFING NAILS 2" 5 KG 1923 6/29/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 3 TIN 1924 6/29/2021 SENG ALUMUNIUM (KULIT JERUK) 60 LBR 1925 7/28/2021 CAT AVITEX S WHITE (25 KG) 1 TIN 1926 7/28/2021 CAT AVITEX M WHITE 896 (5 KG) 1 TIN 1927 1/28/2021 PIPA PVC 1 1/2" X 4M WAVIN TIPE AW 1 BTG 1928 1/28/2021 ELBOW PVC 1 1/2" RUCIKA AW 1 PCS 1929 2/22/2021 KERAMIK UK.40CMX40CM (PUTIH) 45 KTK 1930 3/27/2021 KAWAT BETON @ 1 KG 1 ROLL 1931 3/27/2021 BESI BETON ULIR 13MMX12M SNI KS 20 BTG 1932 3/27/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 5 BTG 1933 4/26/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 1934 6/29/2021 Kain Pelapis ( No Drop ) 1 ROLL 1935 6/29/2021 AQUAPROOF @ 1 kg 1 TIN 1936 7/28/2021 BROTI MERANTI 2" X 3" X 5MTR 20 BTG 1937 1/28/2021 GRANITE (BATU KORAL) 4 M3 1938 1/28/2021 PASIR 5.6 TON 1939 2/22/2021 KERAMIK UK.40CMX40CM (PUTIH) 5 KTK 1940 2/22/2021 KERAMIK UK.40CMX40CM (PUTIH) 27 KTK 1941 2/22/2021 KERAMIK UK.40CMX40CM (PUTIH) 1 KTK 1942 3/27/2021 IRON NAILS 2" 3 KG 1943 3/27/2021 IRON NAILS 2 1/2" 3 KG 1944 3/27/2021 KAWAT BETON @ 1 KG 1 ROLL 1945 4/26/2021 PAPAN RESAK 1" X 8" X 5 MTR 3 KPG 1946 6/30/2021 PLINGKUT DEMPUL CAT PLATONE @ 1BLUE AZZURE KG NIPPON PAINTLTR 067 @ 3,785 1 TIN 1947 7/28/2021 1 TIN NIPPON PAINT 1948 1/28/2021 GRANITE (BATU KORAL) 4 M3 1949 1/28/2021 PASIR 5.6 TON 1950 2/22/2021 BROTI PUNAK 2X4X5MTR 45 BTG 1951 3/27/2021 IRON NAILS 3" 5 KG 1952 4/26/2021 PAPAN MERANTI 1X8X5MTR 5 KPG 1953 6/30/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 3 TIN 1954 7/28/2021 CAT AVITEX M WHITE 896 (5 KG) 2 TIN 1955 1/28/2021 PASIR 5.6 TON 1956 2/22/2021 BROTI PUNAK 2X4X5MTR 14 BTG 1957 3/27/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 1958 3/27/2021 BESI BETON POLOS 8MMX12M SNI KS 3 BTG 1959 4/26/2021 PAPAN MERANTI 1X8X5MTR 28 KPG 1960 6/30/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 1961 7/28/2021 ROOFING NAILS 2 1/2" 1 KG 1962 1/28/2021 IRON NAILS 2" 4 KG 1963 2/22/2021 IRON NAILS 2 1/2" 2 KG 1964 3/27/2021 GRANITE (BATU KORAL) 1 M3 1965 3/27/2021 KAWAT BETON @ 1 KG 1 ROLL 1966 3/27/2021 PASIR 1 TON 1967 4/27/2021 KAYU BAKAU 3" X 5 MTR 10 BTG 1968 7/28/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 1969 1/28/2021 IRON NAILS 2 1/2" 4 KG 1970 2/22/2021 IRON NAILS 2 1/2" 4 KG 1971 3/27/2021 BESI BETON ULIR 25MMX12 M 1 BTG 1972 4/27/2021 IRON NAILS 2" 3 KG 1973 4/27/2021 IRON NAILS 2 1/2" 1 KG 1974 7/28/2021 CUTTING WHEEL 4" MERK PROHEX 15 PCS 1975 1/29/2021 MINYAK BENSIN 12 LTR 1976 2/22/2021 IRON NAILS 2" 1 KG 1977 3/28/2021 ROOFING NAILS 2" 1 KG 1978 3/28/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 1 TIN 1979 4/27/2021 MS SIKU 40 X 40 X 4 MM X 6 M 20 BTG 1980 7/29/2021 PAPAN CAMPUR 3/4X8X5MTR 15 KPG 1981 7/29/2021 BROTI CAMPUR 2" X 3" X 5MTR 10 BTG 1982 7/29/2021 KAYU BAKAU 3" X 5 MTR 50 BTG 1983 7/29/2021 TRIPLEK 4MMX4X8 4 LBR 1984 1/29/2021 SIKA CHAPDUR NATURAL FLOOR HARDENER @ 25 K 2 ZAK 1985 2/22/2021 BROTI MERANTI 3" X 4" X 5MTR 2 BTG 1986 2/22/2021 PAPAN MERANTI 1X8X5MTR 10 KPG 1987 2/22/2021 BROTI PUNAK 2X4X5MTR 3 BTG 1988 3/29/2021 PAPAN MERANTI 1X8X5MTR 20 KPG 1989 4/28/2021 PAPAN CAMPUR 3/4X8X5MTR 16 KPG 1990 7/29/2021 DIAMOND CUP WHELL 7" MERK DMX 2 PCS 1991 1/29/2021 IRON NAILS 4" 3 KG 1992 2/22/2021 IRON NAILS 2" 4 KG 1993 3/29/2021 IRON NAILS 5" 10 KG 1994 4/28/2021 BROTI CAMPUR 2" X 3" X 5MTR 10 BTG 1995 7/29/2021 PAPAN MERANTI 3/4X8X5 6 KPG 1996 7/29/2021 TRIPLEK 4MMX4X8 4 LBR 1997 1/29/2021 BROTI PUNAK 2X4X5MTR 4 BTG 1998 1/29/2021 BROTI PUNAK 2X4X5MTR 6 BTG 1999 2/22/2021 BROTI MERANTI 2" X 2" X 5 MTR 10 BTG 2000 3/29/2021 ROOF DECK ZINCALUM AZ-150 SD-680/ 0.4MM X 0.68 70 LBR 2001 4/28/2021 IRON NAILS 3" 4 KG 2002 7/29/2021 IRON ROOFNAILS DECK2ZINCALUME 1/2" AZ-150 0,45 BMT BY 3 KG 2003 1/29/2021 25 LBR BLUESCOPE STELL ( 0,05M X 0,68M X 6M ) 2004 2/23/2021 CAT MENI @ 5 KG NIPPON PAINT 2 TIN 2005 3/29/2021 CUTTING WHEEL 4" MERK PROHEX 25 PCS 2006 4/28/2021 KAYU BAKAU 3" X 5 MTR 140 BTG 2007 7/29/2021 CUTTING WHEEL 4" MERK PROHEX 25 PCS 2008 1/29/2021 PAPAN MERANTI 1X8X5MTR 10 KPG 2009 2/23/2021 PAPAN MERANTI 3/4X8X5 20 KPG 2010 2/23/2021 BROTI PUNAK 2X3X5MTR 10 BTG 2011 2/23/2021 BROTI PUNAK 2X4X5MTR 2 BTG 2012 2/23/2021 KAYU BAKAU 3" X 5 MTR 15 BTG 2013 3/29/2021 BESI BETON ULIR 25MMX12 M 1 BTG 2014 4/28/2021 PIPA PVC 1" X 4M WAVIN TYPE AW 2 BTG 2015 7/29/2021 KERAMIK UK.40CMX40CM (PUTIH) 30 KTK 2016 1/29/2021 Screw Roofing Drill 2" ( 5.5 - 24 x 50 ) @ 450pcs Brand: Ta 2 KTK 2017 2/23/2021 TRIPLEK 4MMX4X8 20 LBR 2018 3/29/2021 PLYWOOD 6MM 2 LBR 2019 4/28/2021 Amplas Bulat Tempel Velcro 4" Gridt 180 2 PCS 2020 7/29/2021 Electrode PT-31,L-29 Nozzle PT-31,L-16 (Short) Long ArticleFor 10196101 No.Plasma 10196079 CutFor 40APlasm 2 PCS 2021 7/29/2021 2 PCS Krisbow 2022 1/29/2021 Atap Spandek 0,30mm x 0,75mtr x 3mtr Warna Biru 40 LBR 2023 2/23/2021 IRON NAILS 2 1/2" 1 KG 2024 2/23/2021 IRON KawatNAILS 3" Welding 3.2 mm @ 5Kg, Brand: Kobe Las RB26 1 KG 2025 3/29/2021 1 BKS Steel 2026 4/28/2021 PAPAN MERANTI 3/4X8X5 10 KPG 2027 7/29/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 2028 7/29/2021 BROTI PUNAK 2X4X5MTR CAT PLATONE EVER GREEN 239 @ 3,785 LTR 3 BTG 2029 1/29/2021 1 TIN NIPPON PAINT 2030 2/23/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 10 BTG 2031 3/29/2021 IRON NAILS 3" 10 KG 2032 4/28/2021 KAYU BAKAU 3" X 5 MTR 200 BTG 2033 7/29/2021 IRON NAILS 1 1/2" 1 KG 2034 7/29/2021 IRON NAILS 2" GOLDEN YELLOW @ 3,785 LTR CAT PLATONE 1 KG 2035 1/29/2021 1 TIN NIPPON PAINT 2036 2/23/2021 GRANITE (BATU KORAL) 4 M3 2037 2/23/2021 PASIR 4.2 TON 2038 3/29/2021 PAPAN MERANTI 3/4X8X5 30 KPG 2039 3/29/2021 PAPAN MERANTI 1X8X5MTR 6 KPG 2040 4/28/2021 MS CATWIREMESH M6X2.1MX54 PLATONE AZZURE BLUEMTR 067 ULIR @ 3,785 LTR 1 PCS 2041 7/29/2021 1 TIN NIPPON PAINT 2042 7/29/2021 Cat Avitex Spring Lake B21-004 @ 25 Kg 1 TIN 2043 1/29/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 2044 2/23/2021 IRON NAILS 5" 2 KG 2045 3/29/2021 ROOFING NAILS 2" 10 KG 2046 4/28/2021 KAYU BAKAU 3" X 5 MTR 300 BTG 2047 7/29/2021 CAT AVITEX S WHITE (5 KG) 1 TIN 2048 1/29/2021 MINYAK BENSIN 13 LTR 2049 2/23/2021 PAPAN MERANTI 1X8X5MTR 10 KPG 2050 3/29/2021 SENG ALUMUNIUM (KULIT JERUK) 300 LBR Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe 2051 4/29/2021 6 BKS Steel 2052 7/30/2021 PAKU GRC BOARD @ 6 Ons 3 KTK 2053 1/30/2021 IRON NAILS 2" 5 KG 2054 1/30/2021 IRON NAILS 2 1/2" 5 KG 2055 2/23/2021 Sika Grout 215 (new) @ 25 kg 20 ZAK 2056 3/29/2021 BROTI PUNAK Kawat Las LB522X3X5MTR Welding 4.0 mm @ 5Kg, Brand: Kobe 16 BTG 2057 4/29/2021 2 BKS Steel 2058 7/30/2021 PAKU GRC BOARD @ 6 Ons 1 KTK 2059 1/30/2021 KERAMIK UK.40CMX40CM (PUTIH) 20 KTK 2060 2/23/2021 SEMEN PUTIH MERK BITAGROUP 10 KGS 2061 3/29/2021 Seng Perabung 14 LBR 2062 4/29/2021 KERAMIK UK.30CMX30CM (PUTIH) 2 KTK 2063 7/30/2021 MINYAK BENSIN 5 LTR 2064 1/30/2021 CAT PLATONE MATT BLACK 666 @ CAT PLATONE GOLDEN YELLOW @ 3,785 LTR 3,785 LTR NIPPON 4 TIN 2065 1/30/2021 3 TIN NIPPON PAINT 2066 2/24/2021 IRON NAILS 2 1/2" 3 KG 2067 3/30/2021 IRON NAILS 1 1/2" 3 KG 2068 3/30/2021 IRON NAILS 2" 3 KG 2069 4/29/2021 BROTI PUNAK 2X3X5MTR 10 BTG 2070 7/30/2021 MINYAK BENSIN 5 LTR 2071 1/30/2021 PAPAN CAMPUR 3/4X8X5MTR 25 KPG 2072 2/24/2021 IRON NAILS 3" 1 KG 2073 3/30/2021 KAYU BAKAU 3" X 5 MTR 13 BTG 2074 3/30/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 2075 3/30/2021 BROTI MERANTI 2" X 4" X 5MTR 50 BTG 2076 4/29/2021 MINYAK BENSIN 5 LTR 2077 7/30/2021 MINYAK BENSIN 5 LTR 2078 1/30/2021 IRON NAILS 2 1/2" 3 KG 2079 2/24/2021 BESI BETON ULIR 16MMX12M 4 BTG 2080 3/30/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN 2081 4/29/2021 THINNER @ 5 LTR MERK LABA LABA WARNA HIJAU 1 TIN 2082 4/29/2021 CAT MENI @ 5 KG NIPPON PAINT 1 TIN 2083 7/30/2021 MINYAK BENSIN 4 LTR 2084 1/30/2021 CAT PLATONE EVER GREEN 239 @ 3,785 LTR NIPPON 1 TIN 2085 2/24/2021 BESI BETON ULIR 16MMX12M 414 BTG 2086 3/31/2021 Kawat Kawat Las Las RB26 RB26 Welding Welding 3.2 4.0 mm mm @ @ 5Kg, 5Kg, Brand: Brand: Kobe Kobe Ste 4 BKS 2087 3/31/2021 4 BKS Steel 2088 3/31/2021 Kawat Las LB52 Welding 4.0 mm @ 5Kg, Brand: Kobe Ste 4 BKS 2089 4/30/2021 Kain Pelapis ( No Drop ) 1 ROLL 2090 4/30/2021 AQUAPROOF @ 1 kg Electrode PT-31,L-29 (Short) Article No. 10196079 For 1 TIN 2091 7/30/2021 1 PCS Plasma Cut 40A Krisbow 2092 7/30/2021 Nozzle PT-31,L-16 Long 10196101 For Plasma Cut 40A Krisbow 1 PCS 2093 1/30/2021 BESI IWF MS 150 X 75 X 5 X 7 MM X 12 M 2 BTG 2094 2/24/2021 BESI BETON ULIR 13MMX12M SNI KS 3 BTG 2095 2/24/2021 MS WIREMESH ULIR M8X2.1MX5.4M MESH 150X150 10 LBR 2096 2/24/2021 MS WIREMESH ULIR M8X2.1MX5.4M MESH 150X150 5 LBR 2097 2/24/2021 MS WIREMESH M6X2.1MX54 MTR ULIR 1 PCS 2098 2/24/2021 BESI BETON POLOS 8MMX12M SNI KS 40 BTG 2099 3/31/2021 ASPAL @ 220 KG 3 DRUM 2100 4/30/2021 CAT PLATONE EVER GREEN 239 @ 3,785 LTR NIPPON 1 TIN 2101 4/30/2021 CAT AVITEX M WHITE 896 (5 KG) 2 TIN 2102 7/30/2021 CAT PLATONE MATT BLACK 666 @ 3,785 LTR NIPPON 1 TIN 2103 1/30/2021 PAKU RIVET 3,2 MM 2 KTK 2104 2/24/2021 Pipa Galvanis 1 1/4" X 6M Welded, Brand: BOS Bakrie Pip 15 BTG Pipa Galvanis 1" X 6M Welded, Brand: BOS Bakrie Pipe 2105 2/24/2021 10 BTG Indonesia (BPI) 2106 3/31/2021 Kawat Las RB26 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 2 BKS 2107 4/30/2021 BESI BETON POLOS 8MMX12M SNI KS 1 BTG 2108 7/30/2021 PAPAN CAMPUR 3/4X8X5MTR 5 KPG 2109 1/31/2021 BROTI PUNAK 2X4X5MTR 40 BTG 2110 2/24/2021 PAPAN MERANTI 1X8X5MTR 4 KPG 2111 2/24/2021 BROTI PUNAK 2X4X5MTR 1 BTG 2112 4/30/2021 MATEX WALL FILLER @ 4 KG 2 TIN 2113 7/31/2021 CUTTING WHEEL 4" MERK PROHEX 5 PCS 2114 7/31/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 10 PCS 2115 1/20/2021 PAPAN MERANTI 1X8X5MTR 15 KPG 2116 2/24/2021 GRANITE (BATU KORAL) 4 M3 2117 2/24/2021 PASIR 11.2 TON 2118 4/30/2021 AQUAPROOF @ 1 kg 2 TIN 2119 7/31/2021 MELAMIC @ 1 LTR 30 TIN 2120 2/24/2021 GRANITE (BATU KORAL) 4 M3 2121 2/24/2021 PASIR 11.2 TON 2122 4/30/2021 Seng Perabung 6 LBR 2123 7/31/2021 PENSIL TUKANG MERK MAKITA 2 PCS 2124 7/31/2021 MATA JIGSAW NO.3 MERK MAKITA 1 PCS 2125 7/31/2021 Kikir Segitiga 3", Brand: Baut 2 PCS 2126 2/24/2021 MS SIKU 75 X 75 X 6 MM X 6 M 15 BTG 2127 2/24/2021 MS PLATE 4 MM X 4 FT X 8 FT 31 LBR 2128 7/31/2021 Nozzle 220816 Plasma Cut Powermax85 1 PCS 2129 7/31/2021 Shield 220817 Plasma Cut Powermax 85 1 PCS 2130 2/24/2021 IRON NAILS 2 1/2" 1 KG 2131 7/31/2021 IRON NAILS 1 1/2" 1 KG 2132 2/24/2021 BROTI MERANTI 3" X 4" X 5MTR 2 BTG 2133 7/31/2021 PAPAN MERANTI 1X8X5MTR 2 KPG 2134 2/24/2021 ASPAL @ 155 KG 4 DRUM 2135 7/31/2021 KERAMIK UK.40CMX40CM (PUTIH) 30 KTK 2136 2/24/2021 BESI BETON ULIR 13MMX12M SNI KS 4 BTG 2137 7/31/2021 MATA JIGSAW NO.3 MERK MAKITA 2 PCS 2138 7/31/2021 Mata profil pintu EVER CAT PLATONE / routerGREEN / trimmer 2391 set (15 pcs) @ 3,785 LTR 1 SET 2139 2/24/2021 1 TIN NIPPON PAINT 2140 7/31/2021 Mata profil pintu / router / trimmer 1 set (15 pcs) 1 SET 2141 2/24/2021 KAWAT BETON @ 1 KG 5 ROLL 2142 7/31/2021 BESI BETON POLOS 8MMX12M SNI KS 13 BTG 2143 2/24/2021 BESI BETON ULIR 13MMX12M SNI KS 6 BTG 2144 2/24/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 3 BTG 2145 7/31/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 15 PCS 2146 2/24/2021 BESI BETON ULIR 13MMX12M SNI KS 12 BTG 2147 2/24/2021 BESI BETON POLOS 8MMX12M SNI KS 13 BTG 2148 7/31/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 10 PCS 2149 2/25/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 11 BTG 2150 7/31/2021 GRINDING WHEEL 4" MERK NIPPON RESIBON 8 PCS 2151 2/25/2021 TRIPLEK 4MMX4X8 1 LBR 2152 7/31/2021 BROTI MERANTI 2" X 3" X 5MTR 10 BTG 2153 7/31/2021 PAPAN MERANTI 3/4X8X5 8 KPG 2154 7/31/2021 PAPAN MERANTI 3/4X8X5 12 KPG 2155 7/31/2021 KAYU BAKAU 3" X 5 MTR 15 BTG 2156 2/25/2021 CAT PLATONE AZZURE BLUE 067 @ 3,785 LTR NIPPO 1 TIN 2157 7/31/2021 IRON NAILS 3/4" 1 KG 2158 7/31/2021 IRON NAILS 2 1/2" 4 KG 2159 7/31/2021 IRON NAILS 2 1/2" 1 KG 2160 2/25/2021 MS WIREMESH ULIR M8X2.1MX5.4M MESH 150X150 1 LBR 2161 7/31/2021 TRIPLEK 4MMX4X8 9 LBR 2162 7/31/2021 TRIPLEK 4MMX4X8 6 LBR 2163 2/25/2021 PIPA PVC 8" X 4M WAVIN TIPE AW 11 BTG 2164 7/31/2021 SENG ALUMUNIUM (KULIT JERUK) 13 LBR 2165 2/26/2021 PAPAN MERANTI 3/4X8X5 5 KPG 2166 7/31/2021 ROOFING NAILS 2" 3 KG 2167 2/26/2021 PAPAN MERANTI 3/4X8X5 5 KPG 2168 7/31/2021 CAT AVITEX M WHITE 896 (5 KG) 2 TIN 2169 2/26/2021 Triplek Second, Ukuran: 9 mm x 122 cm x 244 cm 25 LBR 2170 2/26/2021 PAPAN MERANTI 1X8X5MTR 12 KPG 2171 2/26/2021 IRON NAILS 2" 1 KG 2172 2/26/2021 IRON NAILS 1" 5 KG 2173 2/26/2021 IRON NAILS 2" 5 KG 2174 2/26/2021 IRON NAILS 3" 5 KG 2175 2/26/2021 BROTI 2" X 2" X 16 FIT CAMPUR 40 BTG 2176 2/26/2021 GRANITE (BATU KORAL) 21 M3 2177 2/26/2021 PASIR 30 TON 2178 2/26/2021 ROOFING NAILS 2 1/2" 4 KG 2179 2/26/2021 ROOFING NAILS 2 1/2" 5 KG 2180 2/26/2021 Triplek Second, Ukuran: 9 mm x 122 cm x 244 cm 15 LBR 2181 2/26/2021 IRON NAILS 1 1/2" 1 KG 2182 2/26/2021 IRON NAILS 2" 1 KG 2183 2/26/2021 PAPAN MERANTI 3/4X8X5 6 KPG 2184 2/26/2021 PAPAN MERANTI 1X8X5MTR 1 KPG 2185 2/26/2021 BROTI 2" X 2" X 16 FIT CAMPUR 5 BTG 2186 2/26/2021 BATANG KELAPA 10 MTR 15 BTG 2187 2/26/2021 BATANG KELAPA 10 MTR 45 BTG 2188 2/26/2021 BESI BETON POLOS 8MMX12M SNI KS 30 BTG 2189 2/26/2021 BESI BETON POLOS 6 MM X 12 M SNI KS 40 BTG 2190 2/27/2021 KAWAT BETON @ 1 KG 3 ROLL 2191 2/27/2021 BESI BETON ULIR 13MMX12M SNI KS 5 BTG 2192 2/27/2021 MS WIREMESH ULIR M8X2.1MX5.4M MESH 150X150 2 LBR 2193 2/27/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 2194 2/27/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 2195 2/27/2021 THINNER @ 1 LTR MERK LABA LABA WARNA HIJAU 2 TIN 2196 2/27/2021 CAT Kawat PLATONE Las RB26BLUE 0663.2 Welding @ mm 3.785 @LTR 5Kg,NIPPON PAINT Brand: Kobe 2 TIN 2197 2/27/2021 1 BKS Steel 2198 2/27/2021 Kawat Las LB52 Welding 3.2 mm @ 5Kg, Brand: Kobe Ste 1 BKS 2199 2/27/2021 BESI BETON ULIR 25MMX12 M 6 BTG 2200 2/27/2021 BESI BETON ULIR 13MMX12M SNI KS 2 BTG 2201 2/27/2021 BESI BETON ULIR 25MMX12 M 2 BTG 2202 2/28/2021 IRON NAILS 5"2mm @ 100mtr, Bahan: Nilon ( Benang Tali Tambang 3 KG 2203 2/28/2021 1 ROLL Nilon Tukang ) 2204 2/28/2021 Tali Tambang Cutting Nozzle1No. 1/4", 1& Warna: Putih 2, Brand: strip merah Sigma dan biru, P Untuk Cutting 200 MTR 2205 2/28/2021 10 PCS Torch Morris ST8 2206 2/28/2021 ROOFING NAILS 2" 10 KG 2207 2/28/2021 ROOFING NAILS 2 1/2" 10 KG 2208 2/28/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 2209 2/28/2021 CAT PLATONE BLUE 066 @ 3.785 LTR NIPPON PAINT 1 TIN 2210 2/28/2021 PLINGKUT DEMPUL @ 1 KG NIPPON PAINT 2 TIN Remark U/ Perbaikan mess GIN A2-4 Nurhidayati-A&F (Sri) Untuk pasang keramik dryer DC (Santoso) U/ Tiang dolphin dermaga export no 2 dan 4 (Tambi) Untuk dudukan crane HIAB 175 PHD (Amir) Untuk pekerjaan cat tiang bangunan gelondong (Amir) U/ Pengecatan bak lumpur di IPAL (F. Santoso) U/ Pengecatan bak lumpur di IPAL (F. Santoso) U/pek.ruang filling ROP(santoso) U/pek.ruang filling ROP(santoso) U/pek.ruang filling ROP(santoso) U/pek.ruang filling ROP(santoso) U/Cat support comvayer MP1 U/ Perbaikan mess GIN C3 - 3 an. Rahdial HSE(Sri) Untuk pasang keramik dryer DC (Santoso) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan Bor PLTR (Sri) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan Bor PLTR (Sri) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan Bor PLTR (Sri) U/Pek. Perbaikan dolphin an/Pak Tambi U/ Cat tiang conveyor Boiler (Usup) U/Cor tiang ROP(Santoso) U/Atap Chipper lama(surip) U/cat support comvayer Bolier(Yusup) Untuk cor cooling tower PWH (H. Tambir) Untuk pasang keramik dryer DC (Santoso) U/Pek. Perbaikan pintu toilet RMPr an/Yani U/Pek. Perbaikan pintu toilet RMPr an/Yani U/Pek. Perbaikan dolphin 4 an/Pak Tambi U/ Cat tiang conveyor RMPr (Usup) U/Cor tiang ROP U/buat meja makan MP1(ismail) U/buat meja makan MP1(ismail) U/buat meja makan MP1(ismail) U/Pengecatan ruang kabel E&I(eman) Untuk pagar bak Ipal (Amir) U/ Cat Pos Satpam Dermaga PLM (Eman) U/ Cat Pos Satpam Dermaga PLM (Eman) U/ Cat Pos Satpam Dermaga PLM (Eman) U/Pek. Perbaikan Meja lab uji QA an/Yani U/ Ganti plate Lantai bawah Ponton PBL-3 ALT 1 (Aceng) U/ Ganti plate Lantai bawah Ponton PBL-3 ALT 1 (Aceng) U/ Angkut material pos TNI dan Mess (Hendri) U/ Kosen pintu aluminium ROP (Mail) U/pembuatan meja MP1(Ismail) U/pembuatan meja MP1(Ismail) U/. Jalan conveyor loading UBK (Bpk Amir) Untuk pipa loading ROP (Amir) U/Pek. Perbaikan gerobak MP2 an/Yani Untuk lispalnk atap arang (Amir) Untuk pagar gerbang 2 (Amir) U/ Pompa air pekerjaan pondasi mesin ROTEX (H.tambir) U/ pebaikan Screw ROP u/kusen E&I di GW U/Perbaikan lantai filling 02 DC(Yusup) U/ Perbaikan mess GIN C3 - 3 an. Rahdial HSE (Sri) U/Pek. Perbaikan gerobak MP2 an/Yani U/Pek. Perbaikan gerobak MP2 an/Yani Untuk bak oil trap dan lantai pengisian BBM HE (H. Tambir) Untuk bak oil trap dan lantai pengisian BBM HE (H. Tambir) U/Pek. Perbaikan tangki hexane an/Pak Aceng U/ Insfeksi Pos TNI dan Mess Karyawan (Aliyas) U/Kebutuhan pekerjaan BKL-kayu an/Arif U/Kebutuhan pekerjaan BKL-kayu an/Arif U/perbaikan atap ex chipper(Surip) U/Perbaikan lantai MP2(Yusup) U/ Perbaikan mess GIN A2-4 Nurhidayati-A&F (Sri) Untuk pasang keramik DC (H. Tambir) U/Pek. Pembuatan atap tungku CCH an/Pak Amir Untuk pekerjaan emperan gudang Fly Ash (Aceng) U/ Pompa air bak penampung lumpur IPAL (F. Santoso) U/Pek. Perbaikan dinding seng belakang gudang fly ash an/Pak Tambi U/pembuatan ruang E & I (tambi) U/pembuatan ruang E & I (tambi) U/pembuatan ruang E & I (tambi) U/pembuatan ruang E & I (tambi) U/pembuatan ruang mesin Rotex(Aceng) U/pembuatan ruang mesin Rotex(Aceng) Untuk parit depan PHD (Santoso) Untuk pekerjaan perbaikan mess Arwan - COM (Sri) Untuk cor lantai curahan mobil RMPr (H. Tambir) U/Pek. Perbaikan pagar gerbang 2 an/Pak H. Suripto U/ Mesin trowel lantai bangunan MP2 (Usuf) U/Pek. Perbaikan dinding seng area belakang gudang fly ash an/Pak Tambi U/pos angkatan laut(Eman) U/pos angkatan laut(Eman) U/pos angkatan laut(Eman) U/pembuatan ATM Mandiri(Tambi) U/ Perbaikan kunci pintu gudang dokumen Dept.Accounting (Mail) U/ Penggantian atap atas Boiler (Tambi) U/ Penggantian atap atas Boiler (Tambi) Untuk lantai curahan mobil RMPr (H. Tambir) Untuk pekerjaan atap Fly Ash (WAHAB) U/ Pembuatan pintu Boiler biomassa (Aceng) U/dinding pucking ROP ( Santoso) U/dinding pucking ROP ( Santoso) U/pembuatan banguanan simulasi fire drill U/pembuatan banguanan simulasi fire drill U/Pembuatan lantai gudang SBE(Yususp) U/Pembuatan lantai gudang SBE(Yususp) U/ Cat lis dinding seng gudang WHS 02 an/ Usup U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan BOR PLTR (Sri) U/ Kursi ruang meeting CC (Yani) U/ Cremona gudang kelapa gelondongan (Amir) U/Pek. Plafon area ruang mesin Rotex an/Pak Aceng U/Ruang filling DC(Yusuf) U/Cor jalan masukEX-Chipper(Surip) U/Cor jalan masukEX-Chipper(Surip) U/ Cerucuk lantai MP2 (Usup) U/ Pemasangan instalasi pipa carbon RO (Amir) U/ Untuk bak IPAL bekas cooling tower (Tambi) U/ Untuk bak IPAL bekas cooling tower (Tambi) U/ Pembuatan Pagar Boiler Biomassa (Aceng) U/ Pembuatan Pagar Boiler Biomassa (Aceng) U/ Cat tiang conveyor RMPr (Usup) U/ Permohonan pembuatan hopper tempurung (Amir) U/Pagar dari F1 samapi arang(yusup) U/Pasang dinding TPLS B3(Pak Surip) U/ Pembuatan proyek tungku line 2 (Amir) U/ Pembuatan proyek tungku line 2 (Amir) U/Pek. Perbaikan mess Arwan COM an/Pak Sri Untuk bak IPALbekas cooling tower (Tambi) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) U/ Cat tiang conveyor Boiler (Usup) U/ Buat tangga filling ROP (Amir) U/Ruang flling ROP(Santoso) U/Pek.lantai gudang Fly Ash(Yusup) U/Pek.lantai gudang Fly Ash(Yusup) U/ Perbaikan atap gudang diarea hopper curah mobil (Tambi) U/ Perbaikan atap gudang diarea hopper curah mobil (Tambi) U/ Perbaikan atap gudang diarea hopper curah mobil (Tambi) U/ Perbaikan atap gudang diarea hopper curah mobil (Tambi) U/Pek. Pembuatran peti mati an/Pak Aliyas U/Pek. Pembuatran peti mati an/Pak Aliyas U/ Sekat rumah TPQ Mess Depan (F. Sanotoso) U/ Sekat rumah TPQ Mess Depan (F. Sanotoso) U/ Sekat rumah TPQ Mess Depan (F. Sanotoso) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/Pemindahan gudang ATK LCS untuk ruang filling 02 (H. Tambir) U/ Ganti plate Lantai bawah Ponton PBL-3 (Aceng) U/pos angkatan laut(Eman) U/pos angkatan laut(Eman) Untuk ponton UBK (Tambi) U/Pek. Pembuatan peti mati an/Pak Aliyas U/Pek. Pembuatan peti mati an/Pak Aliyas U/ Perbaikan rumah TPQ Mess Depan (Tambi) U/ Perbaikan rumah TPQ Mess Depan (Tambi) U/Pek. Perbaikan gerbang utama 02 an/Pak H. Suripto U/Angkut material setiap ada pekerjaan(Tambi) U/ Perbaikan TOP END (Atap tanki solar FT 04) an/Aceng U/ Perbaikan TOP END (Atap tanki solar FT 04) an/Aceng U/ Perbaikan TOP END (Atap tanki solar FT 04) an/Aceng U/Buat tangga E&I di GW(Amir) Untuk ponton UBK (Tambi) U/Pek. Perbaikan gerobak MP2 an/Yani U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/. Saluran parit MP2 (Bpk Masdar) U/ Pengecatan dinding toilet umum dept RMPr (F. Santoso) U/ Pengecatan dinding toilet umum dept RMPr (F. Santoso) U/ Mess Direksi kamar D-21 (Tambi) U/ Mess Direksi kamar D-21 (Tambi) U/ Mess Direksi kamar D-21 (Tambi) U/pagar mess pelantar(Sri) U/pagar mess pelantar(Sri) U/ Perbaikan rumah pompa blok.F (Amir) Untuk pekerjaan dinding packing ROP (Rustambi) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/ U/ Mencuci Mencuci dinding dinding dan dan cat cat semua semua bagian bagian luar luar gedung gedung QA QA (Lab. (Lab. Kalibrasi, Kalibrasi, Lab. Lab. Kimia Kimia dan dan Lab. Lab. Mikrobiol Mikrobiologi) (H.Tambir) U/ Pemindahan gudang ATK LCS untuk ruang filling 02 (H. Tambir) U/ Permohonan pembuatan hopper tempurung (Amir) U/Pos angkatan laut kuala enok (Eman) U/Pos angkatan laut kuala enok (Eman) U/Pos angkatan laut kuala enok (Eman) U/Pek. Pembuatan Proyek Arang an/Pak Amir Untuk perbaikan atap gudang 03 SEP (Tambi) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/ Perbaikan mess Cungkil E1- 1 an. E1-1 Ex Saleh- Bor PKB (Sri) U/Pek. Pembuatan bangunan MP2 an/Pak Yusuf U/Pek. Pembuatan bangunan MP2 an/Pak Yusuf U/ Pengecatan dinding toilet umum dept RMPr (F. Santoso) U/Pasang keramik DC (Aceng) U/pos AL di kuala Enok(Amir) U/pos AL di kuala Enok(Amir) U/pos AL di kuala Enok(Amir) U/pos AL di kuala Enok(Amir) U/pos AL di kuala Enok(Amir) U/pos AL di kuala Enok(Amir) U/ Jalan dryer intex DC (Amir) Untuk penggantian atap gudang 03 SEP (Tambi) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/Pek. Perbaikan dolphin 04 an/Pak Tambi U/Pek, Perbaikan atap tian gudang gelondong an/Pak Amir U/ Level jalan area MP1 (Tambi) U/pipa pemadam di arang(Amir) Untuk perbaikan ponton PBL 3 (Aceng) U/ Cat tiang conveyor Boiler (Usup) U/ Cat tiang conveyor Boiler (Usup) Untuk pembuatan atap tungku arang (Amir) U/Pek. Perbaikan Dolphin 04 an/Pak Tambi Untuk pekerjaan gudang MP2 (Yusuf) U/Tiang screw ROP(Aceng) U/Tiang screw ROP(Aceng) U/Tiang screw ROP(Aceng) U/buat ruang E&I di GW(Amir) Untuk perbaikan ponton PBL 3 (Aceng) U/ Cat tiang conveyor RMPr tahap 2 (Usup) U/ Cat tiang conveyor RMPr tahap 2 (Usup) Untuk pos angkatan laut (Eman) U/ Modifikasi bak mobil truk no. 23 (Amir) U/ Cat tiang conveyor Boiler (Usup) U/ Pondasi plang lama Polsek TM (Eman) U/ Pondasi plang lama Polsek TM (Eman) U/Pintu E&I di GW(Amir) U/ Perbaikan ponton 3 kopra (Aceng) U/ Perbaikan ponton 3 kopra (Aceng) U/Pek. Perbaikan keramik di area DC an/Pak H.Tambir U/. Proyek ponton 3 KP U/Pek. Perbaikan dolphin 04 an/Pak Tambi U/ Cat tiang conveyor RMPr (Usup) U/ Pemindahan plang lama dan atap pakiran TM (Eman) U/ Pemindahan plang lama dan atap pakiran TM (Eman) U/ Pemindahan plang lama dan atap pakiran TM (Eman) U/ Pemindahan plang lama dan atap pakiran TM (Eman) U/pembuatan ruang E&I di GW(Amir) U/pembuatan ruang E&I di GW(Amir) U/Pek. Pembuatan drainse jalan menuju dermaga PLM an/Pak Santoso U/Pek. Perbaikan keramik di area Washing an/Pak Santoso Untuk angkut material mess karyawan (Hendri) Untuk angkut material angkatan laut (Hendri) U/Pek. Pembuatan pagar depan mess direksi an/Pak Tambi U/Pek. Pembuatan pagar depan mess direksi an/Pak Tambi U/ Cremona gudang kelapa gelondongan (Amir) U/ Pemindahan plang lama Polsek TM. (Eman) U/pipa pemadam di area CCH(Amir) Untuk cor tiang pipa induk block M (Surif) U/ Perbaikan mess GIN C2 - 18 an. Arwan - COM (Sri) Untuk pekerjaan kuda-kuda gudang Fly Ash (Aceng) U/Pek. Pembuatan screw arang tempurung an/Pak Amir U/Pek. Pembuatan screw arang tempurung an/Pak Amir U/ Ruang Laundry Dapur Mess Direksi (F. Santoso) U/ Ruang Laundry Dapur Mess Direksi (F. Santoso) U/ Ruang Laundry Dapur Mess Direksi (F. Santoso) U/ Angkut material Polsek TM. (Hendri) U/Perbaikan gereja(Sri) U/Perbaikan gereja(Sri) U/Perbaikan gereja(Sri) Untuk cor tiang pipa induk block M (Surif) U/Pek. Pembuatan Kedudukan tangki dan bak equalisasi di area IPAL an/Pak Tambi U/Cor tapak tiang carbon filter Ro (F.Santoso) Untuk pekerjaan atap MP2 (Yusuf) U/Pek. Pengecatan ruang ATK LCS an/Pak H. Tambir U/ Pintu bangunan CWC (Mail) U/Perbaikan Gereja(Sri) U/Perbaikan Gereja(Sri) Untuk fender dermaga baru bara (PARMIN) Buat frame Covid-19 Uk. Tinggi 2 M x Lebar 1,5 M (Yani) U/Cor tapak tiang carbon filter Ro (F.Santoso) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) U/ Tambal ponton relasi di dermaga utama (Amir) U/. pagar jalan conv. baru proyek ponton 3 KP U/perbaikan ruang filling ROP(Santoso) Untuk cat pipa loading ROP (Amir) Buat frame Covid-19 Uk. Tinggi 2 M x Lebar 1,5 M(Yani) Untuk perbaikan ponton PBL 3 (Aceng) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) untuk pos TNI AL (Pak.Eman) U/ Pintu bangunan CWC (Yani) u/Perbaikan bangunan Exchipper(surip) Untuk pipa loading ROP (Amir) U/ Pemasangan instalasi pipa carbon RO (Amir) Untuk kerangka atap emperan bak CWC (Amir) U/ Cat Duduk Crane HIAB 175 di Dermaga PLM (Amir) Untuk pos TNI AL U/ Buat tangga filling ROP (Amir) U/pebaikan Gereja(Sri) U/perbaikan Gereja(Sri) Untuk aspal jalan depan bengkel konstruksi (Santoso) Untuk pasang keramik dryer DC (santoso) U/ Perbaikan tanki hexane penyok (Aceng) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) Untuk jalan masuk MP(Pak Usup) U/Proyek Ponton TK X PSK U/pek.pondasi server IT(Eman) U/pek.pondasi server IT(Eman) U/pek.pondasi server IT(Eman) U/pek.pondasi server IT(Eman) Untuk tiang pipa penyangga air mess GIN (Amir) Untuk pasang keramik lantai dryer DC (santoso) U/Pek. Buat frame dan pasang banner Peringatan HUT bulan K3 an/Pak Mail U/ Perbaikan mess GIN A2-1 Adi Candra - HRD Satpam (Sri) Plaste pagar turap depan mess DIREKSI(Tambi) U/ Pembuatan drainase gudang MP2 (Usup) U/pek.pondasi gudang server IT(Eman U/pek.pondasi gudang server IT(Eman U/Pek pondasi gudang server IT(Eman) U/pek.pondasi gudang server IT(Eman) Untuk drainase turap depan CO (Tambi) Untuk pekerjaan perbaikan mess GIN C2-18 Arwan-COM (Sri) Untuk pekerjaan perbaikan mess GIN C2-18 Arwan-COM (Sri) U/Pek. Buat frame dan pasang banner Peringatan HUT bulan K3 an/Pak Mail Untuk pekerjaan penambahan bangunan MP2 Tahap 3 (Yusuf) Pasang dinding sekat SBE(Tambi) U/ Cat Tanki Solar FT 04 Dept. CST U/pek.pondasi gudang listrik di gw(Eman) U/pek.pondasi gudang listrik di gw(Eman) U/pek.pondasi gudang listrik di gw(Eman) U/pek.pondasi gudang listrik di gw(Eman) u/ Limbah IPAL COM Untuk pekerjaan perbaikan mess GIN C2-18 Arwan-COM (Sri) U/ Perbaikan pos TNI AL 1 (Eman) U/ Ganti plate lantai bawah ponton PBL 3 (Aceng) Untuk plaster dinding luar bak IPAL(Tambi) U/ Cat bak penampung lumpur IPAL (F. Santoso) U/Pek. Pmbuatan ruang backup server IT an/Pak Eman U/Pek. Atap gudang 3 SEP an/Pak Tambi Pekerjaan perbaikan mess Wahyudi-BOD GIN C2-16 (Eman) Untuk kerangka atap bak air CWC (Amir) U/ Atap gudang MP2 (Usup) Untuk pekerjaan bak IPAL(Santoso) U/perbaikan cooling tower COM(H.tambi U/perbaikan cooling tower COM(H.tambir U/Pek. Pembuatan gudang listrik di area GW an/Pak Eman U/Pek. Cor Tapak pipa mess karyawan BTN an/Pak H.Suripto Untuk pekerjaan dinding packing ROP (Rustambi) U/Pek. Pembuatan sekat dinding di gudang fly ash an/Pak Tambi U/Pek. Pembuatan sekat dinding di gudang fly ash an/Pak Tambi U/Pek. Perbaikan silo boiler biomassa an/Pak Aceng U/Pek. Perbaikan silo boiler biomassa an/Pak Aceng Untuk pondasi Exan SEP Untuk pondasi exan SEP Untuk pondasi exan SEP U/pekerjaan plafon DC(Aceng) U/pek.tangga E&I di GW(Amir) U/Pek. Perbaikan jendela kamar D-25 & D-26 di Mess Direksi an/Pak Mail Untuk pekerjaan perbaikan mess Wahyudi-BOD GIN C2-16 U/ Pek. Pembuatan Dolphin an/Pak Tambi U/Pek. Perbaikan tangki penyok SEP an/Pak Aceng Untuk pekerjaan pondasi ROTEX(Surip) U/ Atap parkiran polsek TM (Eman) U/Transportasi material AL(Hendri) U/Pek.Pembuatan kenopi untuk kamar blok D-25 & D-26 di Mess Direksi U/Pek.Pembuatan kenopi untuk kamar blok D-25 & D-26 di Mess Direksi Untuk pekerjaan perbaikan mess GIN C3-10 Yudi Elendra-RMPr (Eman) Untuk pekerjaan perbaikan mess GIN C3-10 Yudi Elendra-RMPr (Eman) U/ Pasang tiang dan kuda-kuda MP2 (Usup) U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/grenda kramik mess DIREKSI(Tambi) U/ Tapak pondasi plang nama polsek TM (Eman) U/Pek. Perbaikan ruang area mesin rotex an/Pak Yusuf U/Pekerjaan Ponton X an/Aceng Untuk pekerjaan perbaikan mess GIN C3-10 Yudi Elendra-RMPr (Eman) Untuk mess CKL E1- 1 a/n. Saleh (Sri) Untuk pekerjaan perbaikan pagar didepan mess blok F sampai lokasi arang (Yusuf) Untuk pekerjaan perbaikan pagar didepan mess blok F sampai lokasi arang (Yusuf) Untuk pekerjaan perbaikan pagar didepan mess blok F sampai lokasi arang (Yusuf) U/peti jenazah U/peti jenazah U/ Pembuatan tiang penyangga untuk tangga menuju tempat laundry di Mess Direksi (M.Tambi) U/Atap pemasangan exchipper (Surip) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk pekerjaan perbaikan mess Wahyudi-BOD GIN C2-16 (Eman) Untuk pekerjaan perbaikan mess Wahyudi-BOD GIN C2-16 (Eman) Untuk mess CKL E1 - 1 a/n. Saleh (Sri) Untuk pekerjaan atap gelondong (Yusuf) Untuk pekerjaan atap gelondong (Yusuf) U/peti jenazah U/ MT LINA 101 (Bpk Wardono) U/ MT LINA 101 (Bpk Wardono) U/transportasi material gereja(Hendri) U/ Perbaikan mess Ex Faisal-QA Depan A14-B (Eman) U/ Perbaikan mess Ex Faisal-QA Depan A14-B (Eman) Pekerjaan perbaikan mess Akmaldi - RMPc GIN C3-5 (Eman) Untuk perbaikan mess Cungkil E1 - 1 a/n. Saleh (Sri) Untuk perbaikan mess Cungkil E1 - 1 a/n. Saleh (Sri) Untuk perbaikan mess Cungkil E1 - 1 a/n. Saleh (Sri) U/Pek. Pengecatan Lab QA an/Pak H. Tambir U/pondasi mesin ROTEX(surif) U/ Alat bantu pekerja (Tambi) U/ Alat bantu pekerja (Tambi) U/ Alat bantu pekerja (Tambi) U/tranportasi material IPAL(Hendri) Untuk pekerjaan perbaikan mess Depan A14-A Ex Irfan Mahyu (Sri Sudiyoko) Pekerjaan perbaikan mess Akmaldi - RMPc GIN C3-5 (Eman) U/Pek. Pembuatan bangunan MP 2 an/Pak Yusuf U/Pek. Pembuatan bak mobil ROP an/Pak Amir U/Pekerjaan tang gelondongan U/Pekerjaan tiang gelondngan U/Reamona tiang gelondongan U/ Pemasangan instalasi pipa dan hydrant pemadam kebakaran di lokasi tepi laut turap (Amir) U/ Pemasangan instalasi pipa dan hydrant pemadam kebakaran di lokasi tepi laut turap (Amir) U/ Pemasangan instalasi pipa dan hydrant pemadam kebakaran di lokasi tepi laut turap (Amir) U/ mess direksi(tambi) U/ Perbaikan mess Ex Faisal-QA Depan A14-B (Eman) Pekerjaan perbaikan mess Akmaldi - RMPc GIN C3-5 (Eman) U/ Pagar Mess Plantar (Sri) U/Pek. Pembuatan pintu gudang fly ash an/Pak Aceng U/Pek. Pembuatan pintu gudang fly ash an/Pak Aceng U/ Cat bangunan gudang kelapa gelondongan (Amir) U/pagar dinding drum(Sri) u/ Saluran WM MP1 (Pak Masdar) U/ Perbaikan mess Ex Faisal-QA Depan A14-B (Eman) Untuk atap dan kuda - kuda dearator PP (Aceng) U/ Perbaikan tanki hexane penyok (Aceng) U/Pek. Perbaikan gudang fly ash an/Pak Aceng U/ Cor lantai MP2 (Usup) U/ Pembuatan tiang penyangga untuk tangga mess direksi (Tambi) U/ Pembuatan tiang penyangga untuk tangga mess direksi (Tambi) U/atap ex chipper(Surip) Untuk pekerjaan perbaikan mess Rahdial HSE (C3-3) U/TB INDRA JAYA (U/ BUAT KAMAR MESIN) U/TB INDRA JAYA (U/ BUAT KAMAR MESIN) U/ Perbaikan Mess Cungkil E1-1 an/Saleh (Sri) U/. Perawatan MP2 (Bpk Rifai) U/ Cor lantai MP2 (Usup) U/Pek. Perbaikan pagar area belakang block f sampa ke arang an/Pak Sri U/. modif storage KB GLD U/ Alat bantu dalam pekerjaan mess (Eman) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) Untuk ganti pintu mess tamu B8 A/b (Tambi) U/Pek. Pembuatan jalan screw di area ROP Produksi an/Pak Aceng U/pondasi mesin ROTEX (SYARIF) U/Pek. Pembuatan atap parkiran Kantor Polsek Tanah Merah an/Pak Eman U/Pek. Pembuatan atap parkiran Kantor Polsek Tanah Merah an/Pak Eman U/Pek. Pembuatan atap parkiran Kantor Polsek Tanah Merah an/Pak Eman U/Peninggian lantai fly ash tahap 1(yusup) U/ Alat bantu pondasi lantai MP2 (Usup) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) Untuk ganti pintu mess tamu B8 - A/B (Tambi) U/Pek. Perluasan dan perbaikan ruang packing ROP an/Pak Tambi U/Pek. Perluasan dan perbaikan ruang packing ROP an/Pak Tambi U/Pek. Perluasan dan perbaikan ruang packing ROP an/Pak Tambi U/Pek. Perluasan dan perbaikan ruang packing ROP an/Pak Tambi U/ Alat bantu kerja pos TNI AL 1 (Eman) U/Pek. Pembuatan parkiran kantor Polsek an/Pak Eman Untuk pasang dinding kantor listrik di GW( Tambi) U/ Pembuatan Oil Trap di belakang QAD disamping Cooling Tower (Tambi) U/ Pembuatan Oil Trap di belakang QAD disamping Cooling Tower (Tambi) U/Pek. Penggantian dinding di area ROP an/Pak Tambi Untuk perbaikan mess tamu B8 A/B (Tambi) Untuk speed boat Compas CO (ISMAIL) U/pondasi tanki exsan(H.Tambir) U/pekerjaan dinding ROP(Santoso) U/Pek. Pemindahan bangunan E&I ke GW an/Pak Tambi U/Pek. Pemindahan bangunan E&I ke GW an/Pak Tambi U/Pembuatan Oil Trap di belakang QAD disamping Cooling Tower (Tambi) Untuk pekerjaan rumah pompa WT blok F (Surif) U/Pek. Perbaiakn gudang lantai 2 ROP Packing an/Pak Aceng U/ Tiang digudang GLD (Amir) U/ Lantai ponton relasi di dermaga utama (Amir) U/Pekerjaan Dinding Dan plafon DC(Aceng) U/Pek. Pemindahan Kantor E&I ke GW an/Pak Tambi U/Pek. Pemindahan Kantor E&I ke GW an/Pak Tambi U/Pek. Pemindahan Kantor E&I ke GW an/Pak Tambi U/Pek. Pemindahan Kantor E&I ke GW an/Pak Tambi U/Pek. Pemindahan Kantor E&I ke GW an/Pak Tambi U/Pek. Pemindahan Kantor E&I ke GW an/Pak Tambi U/ Pengecatan Ponton PSK X (Aceng) Untuk rumah pompa WT blok F (Surif) Untuk rumah pompa WT blok F (Surif) U/ Pintu Penambahan sekat rumah TPQ Mess Depan (Tambi) U/ Pintu Penambahan sekat rumah TPQ Mess Depan (Tambi) U/ Tiang digudang GLD (Amir) U/ Tiang digudang GLD (Amir) U/Pekerjaan bak IPAL(Santoso) U/Buat kotak sperpart WT(Ismail) U/Buat kotak sperpart WT(Ismail) U/Pek. Pemindahan kantor E&I ke GW an/Pak Tambi U/ Perbaikan mess Mahmudi-DC CWC GIN C3-11 (Eman) U/ Perbaikan mess Mahmudi-DC CWC GIN C3-11 (Eman) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk kuda-kuda gudang Fly Ash (Aceng) U/ Perbaikan atap seng gudang 03 SEP (Tambi) U/ Perbaikan atap seng gudang 03 SEP (Tambi) U/ Perbaikan atap seng gudang 03 SEP (Tambi) U/ Tiang digudang GLD (Amir) U/ Tiang digudang GLD (Amir) U/Nambal genteng gazebo(H.TAMBIR) U/ Buat papan tulis MP1 (Ismail) U/ Buat papan tulis MP1 (Ismail) U/ Buat papan tulis MP1 (Ismail) Untuk Petak licin MP 2 ( Pak Heriyan ) U/ Perbaikan mess Mahmudi-DC CWC GIN C3-11 (Eman) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) U/ Penambahan pintu TPQ Mess Depan (Tambi) U/ Mencuci dinding dan cat semua bagian luar gedung QA (H.Tambir) U/Pasang lantai keramik Mess Direksi D-18(TAMBI) U/Cor jalan dermaga PBL2 (Santoso) U/ Alat bantu kerja BKL-Kayu CC (Mail) U/ Alat bantu kerja BKL-Kayu CC (Mail) U/ Pengecoran tiang support pipa induk block M (Surif) U/Pek. Perbaikan tangki penyok SEP an/Pak Aceng U/Pek. Naik kan body conveyor Silo an/Pak Aceng U/Pek. Naik kan body conveyor Silo an/Pak Aceng Pekerjaan perbaikan mess PLTR BLOK E2-1 Sunarmo-Harian CC (Sri) Untuk sekat dinding gudang Fly Ash (Tambi) U/pekejaan dinding Chipper (Surif) U/perbaikan Gereja(sri) U/Pebaikan Gereja(Sri) U/ Pondasi lantai MP2 (Usup) U/Pek. Perbaikan lantai keramik DC an/Pak Santoso U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) Pekerjaan perbaikan mess PLTR BLOK E2-1 Sunarmo-Harian CC (Sri) Pekerjaan perbaikan mess PLTR BLOK E2-1 Sunarmo-Harian CC (Sri) Untuk pekerjaan aspal jalan PSK (SANTOSO) U/cor jalan dermaga PBL2(Santoso) U/kusen ROP(Ismail) Untuk pekerjaan rumah pompa blok F (Amiruddin) U/ Ponton apung CO (Amir) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) Pekerjaan perbaikan mess PLTR BLOK E2-1 Sunarmo-Harian CC (Sri) U/ Cor pondasi tangki SEP (H. Tambir) U/ Cor pondasi tangki SEP (H. Tambir) U/Pek. Perbaikan plafon mess direksi aea belakang blok b an/Pak Tambi U/buat tangga dan pintu E&I d GW(Amir) U/Pek. Pembuatan rumah pompa block f an/Pak Amir U/Pek. Pembuatan rumah pompa block f an/Pak Amir U/ Perbaikan tanki hexane penyok (Aceng) U/ Perbaikan mess Cungkil B2- 9 an. Saleh- bor PKB Cungkil E1-1 (Sri) U/. Dinding Conveyor MP2 (Bpk Rifai) U/ Untuk aktivitas transportasi pengawas (Alias) U/ Jalan Dermga PBL II ( Santoso ) U/filling ROP( santoso) Untuk kantor CC
Untuk screw conveyor limbah bleaching ROP (Aceng)
Untuk screw conveyor limbah bleaching ROP (Aceng) Untuk perbaikan pompa Axial (Parmin) U/ Pengecatan kamar A-3, B-09, B-10, D-18, D-19, D-20, D-21, D-23 & Lobby A di Mess Direksi (Aliyas) U/ Pengecatan kamar A-3, B-09, B-10, D-18, D-19, D-20, D-21, D-23 & Lobby A di Mess Direksi (Aliyas) U/ Untuk angkut material mess karyawan (Hendri) U/ Atap parkiran Polsek TM. (Eman) U/ Atap parkiran Polsek TM. (Eman) U/ruang sever IT U/ Perbaikan mess A14-A Irfan Mahyu - HRD (Sri) U/ Tangga dolphin PP Untuk alat angkut ponton PBL 3 (Aceng) Pekerjaan perbaikan mess PLTR BLOK E2-10 Sarnubi CC (Sri) Pekerjaan perbaikan mess PLTR BLOK E2-10 Sarnubi CC (Sri) Untuk angkut material angkatan laut (Hendri) U/ Atap parkir Polsek TM. (Eman) U/gudang kabel E&I d GW(Eman) U/Pek. Support pipa induk mess karyawan BTN an/Pak Amir Untuk pasang keramik dryer DC (Santoso) Untuk pasang keramik dryer DC (Santoso) Untuk pasang keramik dryer DC (Santoso) U/ Aktivitas pengawasan Mess Sambu (Aliyas) Pekerjaan perbaikan mess PLTR BLOK E2-10 Sarnubi CC (Sri) Pekerjaan perbaikan mess PLTR BLOK E2-10 Sarnubi CC (Sri) Pekerjaan perbaikan mess PLTR BLOK E2-10 Sarnubi CC (Sri) Pekerjaan perbaikan mess PLTR BLOK E2-10 Sarnubi CC (Sri) U/Pompa air Bak penampung lumpur IPAL (F.Santoso) U/Pompa air Bak penampung lumpur IPAL (F.Santoso) U/perbaikan mess pelantar A1(sri) U/perbaikan mess pelantar A1(sri) U/perbaikan mess pelantar A1(sri) U/Buat kusen pintu ROP(Ismail) U/Pek. Perbaikan pintu di area DWP PP an/Pak Mail Untuk pekerjaan dinding packing ROP (Rustambi) U/ Angkut Material Mess Sambu (Hendri) U/Pek. Pembuatan bak mobil ROP an/Pak Amir U/ Pompa air pondasi pemasangan mesin ROTEX (Surif) U/Karet Coupling pompa axial drainasse PSK (Parmin) U/Perbaikan Gereja(SRI) U/Perbaikan Gereja(SRI) U/ Perbaikan atap di Lobby atas Mess Direksi & kamar Staff Mess Direksi (Mail) U/ Perbaikan atap di Lobby atas Mess Direksi & kamar Staff Mess Direksi (Mail) Untuk pengecatan pipa WT (Amir) Untuk pengecatan pipa WT (Amir) Untuk pengecatan pipa WT (Amir) Untuk pekerjaan kuda-kuda gudang Fly Ash (Aceng) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) U/Cor pondasi mesin ROTEX DC U/Cor pondasi mesin ROTEX DC U/ Axial Flow Pump 14ZLB-70 (Parmin) U/perbaikan Gereja(SRI) Untuk pekerjaan rumah pompa mess blok F (Amiruddin) Untuk pekerjaan rumah pompa mess blok F (Amiruddin) U/Perbaikan mess GIN C2 - 16 an. Wahyudi BOD (Eman) Untuk buat rak dokumen accounting (YANI) U/ Cor balok pagar gerbang 02 (Surif) U/ Pembuatan atap untuk penempatan SB Fatimah (F. Santoso) U/ Pompa bak drainase PSK (Parmin) U/ Pompa bak drainase PSK (Parmin) U/Pagar dari mess F1 sampai Arang(Yusup) Untuk pekerjaan atap mess lobby mess direksi (Mail) Untuk pekerjaan dinding packing ROP (Rustambi) Untuk pekerjaan dinding packing ROP (Rustambi) Untuk pekerjaan dinding packing ROP (Rustambi) Untuk pekerjaan dinding packing ROP (Rustambi) Untuk buat rak dokumen accounting (YANI) Untuk buat rak dokumen accounting (YANI) U/Pek. Perluasan dan perbaikan ruang packing ROP an/Pak Tambi U/Pek. Perluasan dan perbaikan ruang packing ROP an/Pak Tambi U/ Pembuatan atap penempatan SB Fatimah (F. Santoso) U/ Pembuatan atap penempatan SB Fatimah (F. Santoso) U/ Pembuatan atap penempatan SB Fatimah (F. Santoso) U/pekerjaan plafon DC(Aceng) U/Pasang dinding keramik filling DC( Yusuf) U/Pek. Pembuatan ruangan ganti baju di area bricket an/Pak Tambi U/Pek. Pembuatan ruangan ganti baju di area bricket an/Pak Tambi U/Pek. Pembuatan ruangan ganti baju di area bricket an/Pak Tambi U/Pek. Pembuatan ruangan ganti baju di area bricket an/Pak Tambi U/Pek. Pembuatan ruangan ganti baju di area bricket an/Pak Tambi Service dan ganti keramik lantai area Paring dan Shelling (H. Tambir) Service dan ganti keramik lantai area Paring dan Shelling (H. Tambir) Untuk silo conveyor COM (Aceng) Untuk silo conveyor COM (Aceng) U/ Lantai dan dinding perbaikan pos TNI AL 1 (Eman) U/ Lantai dan dinding perbaikan pos TNI AL 1 (Eman) U/ Lantai dan dinding perbaikan pos TNI AL 1 (Eman) U/ Pompa air ponton Relasi (Amir) U/ Pintu ruang Filing 02 (Usup) U/Perbaikan exchipper(Surip) U/ Pemanas Air Di Bengkel Kayu (Aliyas) U/. Lantai Conveyor pengiriman kelapa MP1 (Bpk Masdar) U/ Cat kuda-kuda gudang Fly Ash (Aceng) U/Pengecatan kamar A-3, B-09, B-10, D-18, D-19, D-20, D-21, D-23 & Lobby A di Mess Direksi (Aliyas) U/Pengecatan kamar A-3, B-09, B-10, D-18, D-19, D-20, D-21, D-23 & Lobby A di Mess Direksi (Aliyas) U/Pengecatan kamar A-3, B-09, B-10, D-18, D-19, D-20, D-21, D-23 & Lobby A di Mess Direksi (Aliyas) U/Pek. Pembuatan pagar depan mess direksi an/Pak Tambi U/ Jendela pos angkatan laut (Ismail) U/ Pebaikan pagar dari depan mess sambu F1 sampai belakang Arang (Usup) U/ Pebaikan pagar dari depan mess sambu F1 sampai belakang Arang (Usup) U/ Alat bantu kerja Bkl-kayu (Aliyas) U/ Alat bantu kerja Bkl-kayu (Aliyas) Untuk Cerucuk area selang Isap pompa blok.F U/Pek. Pembuatan atap emperan di area CWC an/pak Amir U/Pek. Perluasan & Perbaikan ruang packing ROP an/Pak Tambi Untuk cor jalan gudang MP2 (Yusuf) Untuk cor jalan gudang MP2 (Yusuf) U/Perbaikan mess karyawan Akrimul-A&F GIN C3-21 (Eman) U/Perbaikan mess karyawan Akrimul-A&F GIN C3-21 (Eman) U/Pek. Pemindahan kantor E&I ke GW an/Pak Amir Untuk support pipa loading ROP (Amir) U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Pek. Perbaikan ponton PBL III an/Pak Aceng Untuk pekerjaan cat mesin roll plate CC (Parmin) U/Pek. Pintu gudang humas samping pos utama an/Yani U/ Permohonan pembuatan pondasi mesin ROTEX (Surif) U/ Permohonan pembuatan pondasi mesin ROTEX (Surif) U/Pek. Perbaikan mess karyawan Akrimul A&F an/Pak Eman U/ Perbaikan atap seng PWH 1 (Rizal) U/ Perbaikan atap seng PWH 1 (Rizal) Untuk cat rumah pompa blok F (Amir) Untuk pekerjaan keramik drayer (Santoso) Untuk ganti plat deck buritan MT LINA 101 (Amir) U/Perbaikan dan pengecatan lantai ruang packing (Tambi) U/Perbaikan dan pengecatan lantai ruang packing (Tambi) U/Pembuatan peti jenazah U/Pembuatan peti jenazah U/pekerjaan pelavon DC(Aceng) U/PEK.kusen Filling ROP(Amir) Untuk dudukan crane dermaga loading ROP (Amir) U/Pek. Perbaikan dolphin an/Pak Tambi U/ Penggantian skor jalan area pre Treatment (Amir) Untuk pekerjaan perbaikan mess Akrimul-A&F GIN C3-21 (Eman) Untuk pekerjaan perbaikan mess Akrimul-A&F GIN C3-21 (Eman) Untuk dinding FLY ASH(Tambi) Untuk dinding FLY ASH(Tambi)
U/Pek. Pembuatan pagar pemindahan kantor E&I ke GW an/Pak Amir
Untuk cor lantai samping oiltrap & curahan mobil MP I (Tambi) U/Pek. Pembuatan Proyek Arang an/Pak Amir Untuk pekerjaan pagar IPAL (Amir) Untuk pekerjaan pagar IPAL (Amir) Untuk pekerjaan pagar IPAL (Amir) Untuk pekerjaan pagar IPAL (Amir) Untuk pekerjaan perbaikan mess Akrimul-A&F GIN C3-21 (Eman) Untuk pekerjaan perbaikan mess Akrimul-A&F GIN C3-21 (Eman) Untuk tiang dinding FLY ASH(Tambi) Untuk tiang dinding FLY ASH(Tambi) U/Buat meja mp1(Ismal) U/Buat meja mp1(Ismal) U/Pembuatan jendela E&I di GW( Ismal) Untuk silo conveyor boiler kayu Biomassa (Aceng) U/Pengangkatan bodi convayer KC 002 di area MP 1 (Amir) Untuk cat pipa asap proyek Arang (amir) Untuk pekerjaan perbaikan mess Akrimul-A&F GIN C3-21 (Eman) Untuk mess DIREKSI(Tambi) U/ Buat dinding Dan plafon bangunan filling (Aceng) U/ Buat dinding Dan plafon bangunan filling (Aceng) U/Dinding Exchipper(Surif) Untuk silo conveyor boiler kayu Biomassa (Aceng) U/Pengangkatan bodi convayer KC 002 di area MP 1 (Amir) U/ Perbaikan pos TNI AL 1 (Eman) Untuk pekerjaan perbaikan mess Akrimul-A&F GIN C3-21 (Eman) Untuk ruang DECON DC(Ismail) Untuk ruang DECON DC(Ismail) U/ Cat parkiran Polsek TM (Eman) U/Pek.Tiang bangunan E&I di GW(Amir) U/Pek. Tambal dinding kamar D-25 & D-26 an/Pak Mail Untuk perbaikan mess CKL B1 - 1/5 dan perbaikan mess CKL B1 6/10 (sri) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan tanki hexane penyok (Aceng) Untuk pintu bangunan CWC (Ismail) Untuk pintu bangunan CWC(Ismail) U/Talang FLY ASH(AMiR) U/Pek. Perbaikan ruang filling ROP an/Pak Santoso U/Pek. Perbaikan ruang filling ROP an/Pak Santoso U/Pek. Perbaikan atap di Lobby atas Mess Direksi & kamar Staff Mess Direksi an/Pak Mail Untuk perbaikan mess CKL B1- 1/5 dan perbaikan mess CKL B1 - 6/10 (sri) U/ Pagar Paud Sambu di Mess Depan (Eman) U/ Perawatan bangunan Mess karyawan dan Mess Cungkil (Aliyas) U/ Perawatan bangunan Mess karyawan dan Mess Cungkil (Aliyas) U/ Cat tiang conveyor PP-BLR (Usup) U/Cooling tower COM(H.Tambir) U/Pek. Perbaikan runag filling ROP an/Pak Santoso U/Pek. Perbaikan runag filling ROP an/Pak Santoso Untuk perbaikan mess GIN C2 - 18 a/n. Arman COM (Sri) Untuk perbaikan mess GIN C2 - 18 a/n. Arman COM (Sri) Untuk atap dearator Turbin PP (Aceng) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk atap dearator Turbin PP (Aceng) U/Pek. Perbaikan TK Tadika puri Sambu an/Pak eman U/Pek. Perbaikan TK Tadika puri Sambu an/Pak eman U/Pek. Perbaikan TK Tadika puri Sambu U/Pek. Perbaikan TK Tadika puri Sambu an/Pak eman Untuk pekerjaan lantai bangunan MP2 Tahap 3 (Yusuf) U/. Instalasi Steam Trap diarea Mesin Dryer (Bpk Masropin) U/Pek. Perbaikan mess karyawan C3 No 21 Akrimul an/Pak Eman U/Pek. Perbaikan ruang filling ROP an/Pak Santoso Untuk perbaikan mess GIN C2 - 18 a/n. Arwan COM (Sri) Untuk perbaikan mess GIN C2 - 18 a/n. Arwan COM (Sri) Untuk atap seng gudang Fly Ash (Aceng) U/ Penggantian pintu kamar (bagian dalam) Bpk. Kundi di Mess Direksi (Yani) U/ Perbaikan dan pengecatan lantai ruang packing (Tambi) U/ Perbaikan dan pengecatan lantai ruang packing (Tambi) U/ Perbaikan dan pengecatan lantai ruang packing (Tambi) Untuk Tenda Boat(Fikri santoso) U/Dinding mess pelanta A1(Sri) U/Dinding mess pelanta A1(Sri) U/Pembuatan ruang Server IT(Eman) Untuk perbaikan mess GIN C2 - 18 a/n. Arwan COM (Sri) Untuk atap dearator turbin PP (Aceng) U/ Penggantian patok lama ke patok permanen di lahan 200 Ha (F. Santoso) U/ Penggantian patok lama ke patok permanen di lahan 200 Ha (F. Santoso) U/ Perbaikan mess Agustono PP GIN A4-3 (Sri) Untuk penggantian plafon CO(Santoso) Untuk penggantian plafon CO(Santoso) Untuk penngantian plafon CO(Santoso) U/Atap gudang chipper lama(Surif) U/Atap gudang chipper lama(Surif) U/Atap gudang chipper lama(Surif) U/Atap gudang chipper lama(Surif) U/Pembuatan Gudang listik di GW(Eman) Untuk perbaikan mess GIN C2 - 18 a/n. Arwan COM (Sri) U/ Bekisting cor dolphin dermaga expor no 2 & 4 (Tambi) U/ Bekisting cor dolphin dermaga expor no 2 & 4 (Tambi) U/ Bekisting cor dolphin dermaga expor no 2 & 4 (Tambi) U/ Bekisting cor dolphin dermaga expor no 2 & 4 (Tambi) Untuk pekerjaan kuda-kuda gudang Fly Ash (Aceng) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) Perbaikan plafon kayu dapur direksi(Santoso) Perbaikan plafon kayu dapur direksi(Santoso) Perbaikan plafon kayu dapur direksi(Santoso) Perbaikan plafon kayu dapur direksi(Santoso) U/pembuatan hopper tempurung (Amir) U/Pembuatan ruangan E&I di GW(Tambi) Untuk perbaikan mess GIN C2 - 16 a/n. Wahyudi BOD (Eman) Untuk perbaikan mess GIN C2 - 16 a/n. Wahyudi BOD (Eman) U/ Perbaikan mess CKL B1 - 15 (Sri) Untuk emperan atap gudang Fly Ash (Wahab) U/ Ruang meeting kantor (Riwanto) Untuk Mess Direksi D23 (Tambi) Untuk mess Direksi D23(Tambi) U/ Pembuatan peti jenazah (Mail) U/ Pembuatan peti jenazah (Mail) U/pembuatan filling ROp(Santoso) Untuk perbaikan mess GIN C2 - 16 a/n. Wahyudi BOD U/ Bekisting cor dolphin dermaga expor no 2 dan 4 (Tambi) Untuk perbaikan mess B2 - 4 a/n. Dety BUK (Sri) Untuk perbaikan mess B2 - 4 a/n. Dety BUK (Sri) Untuk screw conveyor limbah BE ROP (Aceng) Untuk screw conveyor limbah BE ROP (Aceng) Untuk pondasi ROTEX DC (Surif) Untuk pondasi ROTEX DC (Surif) Untuk peti jenazah (Mail) Untuk peti jenazah (Mail) Untuk peti jenazah (Mail) U/Mal pondasi Server IT(Eman) Untuk perbaikan mess GIN C2 - 16 a/n. Wahyudi -BOD (Eman) Untuk perbaikan mess GIN C2 - 16 a/n. Wahyudi -BOD (Eman) U/Pek. Perbaikan lantai gudang 2 ROP Packing an/Pak Aceng U/Pek. Perbaikan lantai gudang 2 ROP Packing an/Pak Aceng U/Pek. Perbaikan lantai gudang 2 ROP Packing an/Pak Aceng U/Pek. Perbaikan lantai gudang 2 ROP Packing an/Pak Aceng U/Pek. Perbaikan lantai gudang 2 ROP Packing an/Pak Aceng U/ Buat rak dokumen u/Gudang Dept.Accounting (Yani) Untuk pekerjaan kuda-kuda gudang Fly Ash (Aceng) Untuk pondasi mesin ROTEX(SURIF) Untuk pondasi mesin ROTEX(SURIF) U/pembuatan cerobong ROP(Amir) U/Pondasi ruang kabel listrik di GW( Eman) Untuk cor pipa support mess GIN (surif) Untuk pasang keramik decon DC (Santoso) Untuk pasang keramik decon DC (Santoso) Untuk Alat angkut ponton PBL 3 (Aceng) U/Pek. Pembuatan pagar depan mess direksi an/Pak Tambi Untuk bikin dinding exan SEP(H.Tambir) Untuk bikin dinding exan SEP(H.Tambir) U/Perbaikan ceobong ROP(Amir) U/Perbaikan ceobong ROP(Amir) U/Service pintu WC PP( Arif) Untuk mesin molen No.2 Untuk mesin molen No.3 Untuk conveyor silo COM (Aceng) Untuk conveyor silo COM (Aceng) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Mess Agustono PP (Sri) U/. Tutup bak air pendingin Press (Bpk Turmudi) U/. Tutup bak air pendingin Press (Bpk Turmudi) u/ Jalan Hopper Tempurung MP1 U/gudang exchipper(Pak Surip) Untuk mesin pump Axial No.2 (Parmin) U/Pek. Pembuatan Dolphin an/Pak Tambi U/ Perbaikan body SB Compass (Aliyas) U/ Perbaikan body SB Compass (Aliyas) U/ Perbaikan body SB Compass (Aliyas) U/ Perbaikan body SB Compass (Aliyas) U/ Perbaikan body SB Compass (Aliyas) U/ Perbaikan body SB Compass (Aliyas) U/ Perbaikan body SB Compass (Aliyas) Untuk silo conveyor COM (Aceng) Untuk silo conveyor COM (Aceng) U/ Perbaikan atap Mess Direksi blok C (Aliyas) U/ Perbaikan atap Mess Direksi blok C (Aliyas) u/ Input Steam DC u/ Rumah pompa cooling tower COM (Pak Abidin) U/Pek. Pembuatan pondasi tangki di area IPAL an/Pak Tambi U/Pek. Pembuatan pondasi tangki di area IPAL an/Pak Tambi U/Pek. Atap di area washing,dryer&paring an/Pak Tambi U/Perawatan AC mess Direksi (pak Isnadi) Untuk screw conveyor limbah BE ROP (Aceng) Untuk screw conveyor limbah BE ROP (Aceng) U/. menyambung rubber belt BC 003 Kopra U/pekerjaan plafon mess direksi(Tambi)_ U/Pekerjaan pintu direksi(Tambi) U/Pek.filling ROP(Santoso) U/Pek.filling ROP(Santoso) U/ Perbaikan mess GIN C3 - 9 dan Perbaikan mess GIN C3 - 3 ( Hendri ) Untuk pasang keramik dryer DC (Santoso) Untuk pasang keramik dryer DC (Santoso) Untuk pasang keramik dryer DC (Santoso) U/Pek. Pembuatan bangunan MP2 an/Pak Yusuf U/ Dolphin dermaga export no 2 dan 4 (Tambi) U/. menyambung rubber belt BC 003 Kopra U/. menyambung rubber belt BC 003 Kopra U/. menyambung rubber belt BC 003 Kopra U/ Plafon kamar C-16, C-21, C-22, Ruang Laundry & Dapur Mess Direksi (Tambi) U//Pembuatan gudang listrik E&I di GW(Eman) U/Pembuatan gudang listrik E&I di GW(Eman) Untuk lantai MP1 FFDC (Handri) U/ Pasang tiang dan kuda-kuda MP2 (Usup) U/Pek. Pembuatan bak equalisasi di area IPAL an/Pak Tambi U/Pembuatan drainase taman segitiga dan tebas rumput taman segitiga (Surif) Untuk tenda Boat(Santoso) U/ Pembuatan cerobong BTO dengan akses sampling emisi (Amir) U/Cor lantai gudang SBE(Yususf) U/Cor lantai gudang SBE(Yususf) Untuk pekerjaan rumah pompa blok f (Amiruddin) Untuk cat box screw Arang (Amir) U/Pek. Pembuatan bak equalisasi an/Pak Tambi Untuk Cerucuk area selang Isap pompa blok.F (Surif) Untuk Cerucuk area selang Isap pompa blok.F (Surif) Untuk Cerucuk area selang Isap pompa blok.F (Surif) Untuk Cerucuk area selang Isap pompa blok.F (Surif) Untuk pengelasan tanki solar(SYARIF) U/ Potong keramik ruang Filling 01 (Tambi) U/Dinding ruangan E&I di GW( Tambi) U/Dinding ruangan E&I di GW( Tambi) Untuk pekerjaan rumah pompa blok f(Amir) U/Pek. Cerucuk area selang Isap pompa blok.F an/Pak Surif U/Pek. Buat rak dokumen u/Gudang Dept.Accounting an/Yani Pekerjaan perbaikan mess PLTR BLOK E2-10 Sarnubi CC (Sri) Untuk Tanki solar CST(Syarif) U/perbaikan mess pelantar A3(Sri) U/Pembuatan ruang filling ROP( Santoso) U/ Inventaris (sampel batu dan pasir)CCD (Ucha) U/Pek. Perbaikan atap di area DC an/Pak Tambi U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/Pek. Perbaikan pagar gerbang 2 an/Pak H. Suripto Untuk tapak Hopper (Yusup) Untuk tapak Hopper (Yusup) Untuk tapak Hopper (Yusup) U/cooling tower ROP(H.tamb) u/ Atap rumah pompa cooling tower (Pak Juned) U/Pek. Atap area washing an/Pak Santoso U/Pek Perbaikan ponton PBL III an/Pak Aceng U/Pek Perbaikan ponton PBL III an/Pak Aceng U/Pek. Pembuatan bak equaliasi di area IPAL an/Pak Tambi U/Pek. Pos TNI AL an/Pak Eman U/Pek. Pos TNI AL an/Pak Eman U/. Tutup bak air pendingin Press (Bpk Turmudi) U/. Tutup bak air pendingin Press (Bpk Turmudi) U/Perbaikan Atap GW(H.Tambir) U/Pebaikan atap GW(H.Tambir) U/Meratakan lantai di gudang SBE(Yususf) U/Pek. Perbaikan atap mess direksi Block B an/Pak Mail U/. Proyek jalur 2 ponton 3 KP U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/Pek. Perbaikan pos TNI AL an/Pak Eman U/ Alat bantu kerja konstruksi CC (Parmin) U/. Pagar Hopper (Bpk Sudirman) U/ Atap kantor CCD (Tambi) U/ Pasang tiang dan kuda-kuda MP2 (Usup) U/ Pasang tiang dan kuda-kuda MP2 (Usup) Untuk pasang dinding bata area CWC (H. Tambir) U/Pek. Pembuatan dolphin an/Pak Tambi U/ Perbaikan plafond ruang meeting QS-HS (H.Tambir) U/ Pintu baja ringan CWC (Mail) U/ Cat Pemasangan instalasi pipa dan hydrant pemadam kebakaran di lokasi tepi laut turap (Amir) U/ Cat Pemasangan instalasi pipa dan hydrant pemadam kebakaran di lokasi tepi laut turap (Amir) u/ Pemasangan seng gudang penyimpanan barang rumah pompa (Miska) U/Pek. Pembuatan rumah pompa Block F an/Pak Amir U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) Untuk atap bak CWC (Amir) U/ Lantai ruang packing ROP (Tambi) Untuk dinding Fly Ash (Tambi) U/Pek. Perbaikan Ruangan ROP Packing an/Pak Santoso U/Pek. Perbaikan Ruangan ROP Packing an/Pak Santoso U/amplas dinding mess direksi(Tambi) U/ Pemasangan seng rumah pompa baru blok F (Amir) U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) Untuk pasang dinding bak air CWC (Amir) Untuk pekerjaan perbaikan mess Indra-HSE PLTR D2-1(Sri) Untuk pekerjaan perbaikan mess Indra-HSE PLTR D2-1(Sri) Untuk pekerjaan perbaikan mess Indra-HSE PLTR D2-1(Sri) Untuk pekerjaan perbaikan mess Indra-HSE PLTR D2-1(Sri) Untuk pintu CWC ( Ismail ) U/pekerjaan plafon DC(Aceng) U/pek.Ruangan E&I di GW (Eman) U/pek.Ruangan E&I di GW (Eman) U/pek.Ruangan E&I di GW (Eman) U/ Mesin molen CC Pembuatan rak dari kayu Untuk peralatan di IPAL ( Yani) Pembuatan rak dari kayu Untuk peralatan di IPAL ( Yani) U/ kuda-kuda gudang Fly Ash (Aceng) Untuk pekerjaan perbaikan mess Indra-Har. HSE PLTR D2-1 (Sri) Untuk kamar ganti DECON( ISMAIL) U/ Alat transportasi pengawas dalam pekerjaan (Aliyas) U/Pek.Ruangan server IT(Eman) U/Pek.Ruangan server IT(Eman) Untuk cat rumah pompa blok F (Amir) Pembuatan rak dari kayu Untuk peralatan di IPAL (Yani) Pembuatan rak dari kayu Untuk peralatan di IPAL (Yani) U/ Perbaikan atap gudang 03 (Tambi) Untuk pekerjaangerobak U/ Penggantian perbaikan danmess Indra-Har. pembuatan platHSE PLTR bentuk D2-1 T dari (Sri) besi untuk penguat pegangan dan kaki gerobak Mess Direksi (Mail) U/ U/ Penggantian Penggantian gerobak gerobak dan dan pembuatan pembuatan plat plat bentuk bentuk T T dari dari besi besi untuk untuk penguat penguat pegangan pegangan dan dan kaki kaki geroba gerobak Mess Direksi (Mail) U/. Pembuatan rak sepatu Dept DC (Bpk Siswanto) U/ Perbaikan mess pelantar A1 dan A5 (Sri) U/ Perbaikan mess pelantar A1 dan A5 (Sri) Untuk support tungku pembakaran arang (Amir) Pembuatan rak dari kayu Untuk peralatan di IPAL (Yani) U/Pek. Pembuatan pintu CWC an/H. Tambir Untuk pekerjaan perbaikan mess Asnida-RMPr KB PLTR D2-10 (Sri) Untuk pekerjaan perbaikan mess Asnida-RMPr KB PLTR D2-10 (Sri) U/ Perbaikan pintu ruang ganti Decon DC (Mail) U/. proyek jalur 2 ponton 3 KP U/Pek. Pemasangan plafon di area R.Filling ROP an/Pak Santoso U/Pek. Pemasangan plafon di area R.Filling ROP an/Pak Santoso U/Perbaikan Meja Analisa Pengujian (Mail) Buat rak dokumen u/Gudang Dept.Accounting (Yani) U/Pek. Balok dinding CWC an/H. Tambir Untuk pekerjaan perbaikan mess Asnida-RMPr KB PLTR D2-10 (Sri) Untu plafon mess Direksi (Santoso) Untu plafon mess Direksi (Santoso)
U/Pembuatan Ruangan E&I Ke GW(tambi)
Untuk kuda-kuda gudang Fly Ash (Aceng) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) Untuk kuda - kuda gudang Fly Ash (Aceng) Untuk pekerjaan perbaikan mess Asnida-RMPr KB PLTR D2-10 (Sri) U/ Bak cuci kaki Decon DC (Amir) U/perbaikan mess pelantar blok A U/perbaikan mess pelantar blok A U/perbaikan mess pelantar blok A U/Pergantian pipa saluran mess Dieksi(Tambi) Untuk cor tiang pipa air mess (Surif) Untuk perbaikan mess CKL D1 nomor 1 sampai 5 dan D1 nomor 6 sampai 10 (Sri) Untuk perbaikan mess CKL D1 nomor 1 sampai 5 dan D1 nomor 6 sampai 10 (Sri) Untuk perbaikan mess CKL D1 nomor 1 sampai 5 dan D1 nomor 6 sampai 10 (Sri U/ Cat dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Cat dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/Pek. Pengecatan dinding ruang Filling ROP an/Pak Tambi U/Pek. Pengecatan dinding ruang Filling ROP an/Pak Tambi U/. Dinding Conveyor tempurung MP1 (Bpk Sudirman) U/cor jalan dermaga pbl2(Santoso) U/ Pintu gerbang Mess Direksi (Aceng) U/ Pintu gerbang Mess Direksi (Aceng) U/ Pintu gerbang Mess Direksi (Aceng) U/ Pintu gerbang Mess Direksi (Aceng) U/Pek. Pengecatan ruang Ka.Div PRD an/Pak Mail Untuk pebaikan mess CKL D1 nomor 1 sampai 5 dan blok D1 nomor 6 sampai 10 (Sri) Untuk pebaikan mess CKL D1 nomor 1 sampai 5 dan blok D1 nomor 6 sampai 10 (Sri) U/ Perbaikan Perbaikan mess atap sengGIN areaB5-1 an. Joko samping Nugroho mesin (Eman) Press C, Samping Press A, Gudang PRD & area B3 Dept COM (H. Tambir) U/Pek. Pembuatan sekat dinding antara fly ash & Bleaching an/Pak Tambi U/Perbaikan gudang chiper lama(Suip) U/ Proyek Ponton PSK X U/ Proyek Ponton PSK X U/ Proyek Ponton PSK X U/Alat Bantu pekerjaan mess an/Pak Eman Untuk perbaikan mess CKL D1 nomor 1 sampai 5 dan mess CKL D1 nomor 6 sampai 10 U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) Untuk pekerjaan cat dinding CWC (H. Tambir) U/ Perbaikan atap gudang bleaching dan atap produksi ROP (Tambi) U/ Perbaikan atap gudang bleaching dan atap produksi ROP (Tambi) U/perbaikan chipper lama(Pak Surip) U/. sekat storage KB jambul U/. sekat storage KB jambul U/. sekat storage KB jambul U/ Alat bantu kerja rumah pompa blok.F (Amir) Untuk U/Pek.pasang keramikpipa Pemasangan dryer DC pembuangan untuk (Santoso) udara dari exhaust fan plafon kamar mandi di A1b an/Yani U/Pek. pemasangan terpal di area filling DC an/Pak Surif U/Pek. pemasangan terpal di area filling DC an/Pak Surif U/ Perbaikan atap gudang bleaching dan atap produksi ROP (Tambi) U/ Perbaikan atap gudang bleaching dan atap produksi ROP (Tambi) U/Perbaikan cerobong ROP(Amir) U/Perbaikan ppipa mess Direksi(Tambi) U/Pembuatan box peti mati an/Pak Aliyas Untuk angkut material mess karyawan (sri) Untuk perbaikan mess GIN B5 - 9 a/n. Supriadi COM (Surif) U/pek.pemasangan terpal diarea Filling DC an.Surip U/ Perbaikan atap bocor mess C15, C21C C22 an/ Fikri Santoso U/pekerjaan chipper lama(pak Surip) U/Pembuatan serve IT(Eman) U/Pekerjaan perbaikan mess an/Pak Eman Untuk angkut material bangunan MP 2 (hendri) Untuk perbaikan mess GIN B5 - 9 a/n. Supriadi COM (Surif) U/Pek.pemasangan terpal di area filling DC an.Surifp U/ Pondasi tangki SEP (H. Tambir) U/ Rangka dinding terpal Lab Monitoring (Eman) U/ Rangka dinding terpal Lab Monitoring (Eman) U/Pembuatan ruangan kabel E&I di GW(Eman) U/Pekerjaan perbikan mess an/Pak Sri Untuk atap bangunan DC (Tambi) Untuk perbaikan mess GIN B5 - 9 a/n. Supriadi COM (Surif) U/Pek. Pembuatan pagar depan mess direksi an/Pak Tambi U/Pek. Pembuatan pagar depan mess direksi an/Pak Tambi U/ Pondasi tangki SEP (H. Tambir) U/ Keperluan proyek ponton psk x U/ Keperluan proyek ponton psk x U/ Peninggian lantai Fly Ash (untuk limbah SBE) an/ Usup U/Pek. Perbaikan kedudukan popa di IPAL an/Pak Tambi U/Pek. Perbaikan ponton PBL III an/Pak Aceng Untuk perbaikan mess GIN B5 - 9 a/n. Supriadi COM (Surif) Untuk perbaikan mess GIN B5 - 9 a/n. Supriadi COM (Surif) Untuk perbaikan mess GIN B5 - 9 a/n. Supriadi COM (Surif) U/Pek. Perbaikan lantai gudang 02 SEP an/Pak H. Tambir U/Pek. Perbaikan lantai gudang 02 SEP an/Pak H. Tambir U/ Penambalan jalan samping SMA (Eman) U/ Penambalan jalan samping SMA (Eman) U/perbaikan mess pelantar blok A(Sri) U/perbaikan mess pelantar blok A(Sri) U/perbaikan mess pelantar blok A(Sri) U/perbaikan mess pelantar blok A(Sri) U/ Aktivitas pekerjaan lantai Fly Ash (untuk limbah SBE) an/Usup U/Pek. Cor lantai jalan area bak Trap MP1 an/Pak Tambi Untuk drainase taman segitiga (surif) Untuk perbaikan mess GIN b5 - 9 a/n. Supriadi COM (Surif) Untuk pekerjaan lantai bangunan MP2 (Yusuf) Untuk pekerjaan lantai bangunan MP2 (Yusuf) U/ Rencana buat ruang Filling RBD (F. Santoso) U/ Rencana buat ruang Filling RBD (F. Santoso) U/. Pembuatan tangga CWC (Bpk Sutik) U/Pebaikan lantai rumah gereja dan lantai kamar mandi (Sri) Untuk dudukan pondasi tanki Ipal (Tambi) Untuk plafon grinder DC (Aceng) Untuk Buat sekat untuk tempat peralatan cetak bata ringan di area gudang bata ringan (SURIF) Untuk Buat sekat untuk tempat peralatan cetak bata ringan di area gudang bata ringan (SURIF) U/ Perbaikan Jalan PSK (Santoso) U/ Perbaikan Jalan PSK (Santoso) U/ Perbaikan atap gudang bleaching dan atap produksi (Tambi) U/Pasang dinding bat Lab DC(Eman) Untuk pekerjaan perluasan gudang LB3 ex Briket (Surif) Untuk pekerjaan perluasan gudang LB3 ex Briket (Surif) Untuk pekerjaan perluasan gudang LB3 ex Briket (Surif) Untuk ponton kuala enok (AMIR) Untuk cat dinding DC (Santoso) Untuk Buat sekat untuk tempat peralatan cetak bata ringan di area gudang bata ringan (SURIF) Untuk Buat sekat untuk tempat peralatan cetak bata ringan di area gudang bata ringan (SURIF) Untuk Buat sekat untuk tempat peralatan cetak bata ringan di area gudang bata ringan (SURIF) U/ Pembuatan pondasi mesin ROTEX (Aceng) U/ Pembuatan pondasi pemasangan mesin ROTEX (Surif) U/ Pembuatan pondasi pemasangan mesin ROTEX (Surif) U/ Buat kusen pintu rumah ruang Filling RBD (Amir) Untuk pekerjaan perluasan gudang LB3 ex Briket (Surif) Untuk perbaikan mess GINC3 - 5 a/n. Akmaldi RMPc (Eman) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) Untuk pasang dinding CWC (H. Tambir) Untuk cor dolphin UBK No 2 dan 4 (Tambi) Untuk cor dolphin UBK No 2 dan 4 (Tambi) U/ Pasang plafon grinder (Aceng) U/ Pasang plafon grinder (Aceng) U/ Balok dinding di lab monitoring DC (Eman) U/ Balok dinding di lab monitoring DC (Eman) U/ Balok dinding di lab monitoring DC (Eman) U/ Plafon ruang Filling RBD Retail dan PRA (F. Santoso) Untuk perbaikan mess GIN a/n. Akmaldi (Eman) Untuk pekerjaan atap bangunan MP2 (Usup) Untuk silo conveyor COM (Wahab) Untuk silo conveyor COM (Wahab) U/Pembuatan pagar Mess Direksi (Tambi) U/ Pembuatan pondasi dan pemasangan mesin ROTEX (Usup) U/Buat dinding chipper lama(Pak Surip) U/Buat dinding chipper lama(Pak Surip) U/ Dinding GRC ruang filling 02 (Aceng) U/ Perbaikan talang air gedung PWH 1 (H. Tambir) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) U/Pek. Pembuatan peti Jenazah an/Pak Aliyas U/Pek. Pembuatan peti Jenazah an/Pak Aliyas U/Pek. Pembuatan peti Jenazah an/Pak Aliyas U/ Pagar Gerbang 2 (Surif) U/ Pagar Gerbang 2 (Surif) Untuk angkut material angkatan laut, jalan SMA, dan Mess Karyawan (Hendri) Untuk angkut material angkatan laut, jalan SMA, dan Mess Karyawan (Hendri) Untuk angkut material angkatan laut, jalan SMA, dan Mess Karyawan (Hendri) Untuk pekerjaan perbaikan mess Indra - HSE PLTR D2-1 (Sri Sudiyooko) U/Ruang filling DC(Aceng) U/ Alat bantu pekerjaan Mess Karyawan (Eman) Untuk ikat balok lantai CWC (TAMBI) U/Pek. Pembuatan peti jenazah an/Pak Aliyas U/Pek. Pembuatan peti jenazah an/Pak Aliyas U/Pek. Pembuatan peti jenazah an/Pak Aliyas U/ Rangka dinding terpal rencana Filing 02 (Surif) U/ Samblas ponton PBL 3 (Aceng) Untuk pekerjaan perbaikan mess Indra - HSE PLTR D2-1 (Sri Sudiyooko) U/Pondasi tiang listrik(H.Tambir) U/Pondasi tiang listrik(H.Tambir) U/Pondasi tiang listrik(H.Tambir) U/ Alat bantu pekerjaan pagar mess direksi (Tambi) U/. Perawatan Dept MP1 (Bpk Slamet) Untuk pipa solar jalur ke pump CST(Amir) U/ Pemasangan mesin ROTEX (Aceng) U/ Pondasi mesin ROTEX (Surif) U/perbaikan mess pelantar(Mas Sri) U/Angkut material Gereja(Hendri) U/ Perbaikan atap dan plafon di dept CO (Aliyas) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Pemasangan dinding bata filling 02 DC (Usup) U/Perbaikan atap ROP(Santoso) U/Angkut material bangunan server IT(Hendri) U/.Seng atas Silo Boiler Biomassa (Pak Templok) U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) Untuk cat dinding luar grinder DC (santoso) Untuk cat dinding luar grinder DC (santoso) Untuk cat dinding luar grinder DC (santoso) U/ Perbaikan pos TNI AL 1 (Eman) U/ Pintu emergency dryer (Amir) U/. meluruskan tiang pancang ponton 3 KP U/Angkut material Gudang listrik di GW(Hendri) Permohonan pembuatan Plangkan Bunner (Yani) U/ Plafon grinder DC (Aceng) Untuk pekerjaan cor bangunan bangunan MP2 Tahap 3 (Yusuf) U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/ Viar pekerjaan jalan samping SMA (Hendri) U/Bangunan mess pelantar(Mas Sri) U/Angkut bekas bobokan di DC(Hendri) Untuk atap gudang Fly Ash (Aceng) Untuk atap gudang Fly Ash (Aceng) Untuk pasang keramik dryer DC (Santoso) Untuk perbaikan ponton PBL 3 (Aceng) U/Pek. Perbaikan silo boiler an/Pak Aceng U/Pengecatan bak lumpur di IPAL (F.Santoso) U/ Pagar Polsek TM. (Aceng) U/ Pagar Polsek TM. (Aceng) U/ Pagar Polsek TM. (Aceng) U/Angkut bata dan pasir PRA ROP(Hendri) Untuk atap gudang Fly Ash (Aceng) Untuk atap gudang Fly Ash (Aceng) Untuk atap gudang Fly Ash (Aceng) U/ Instalasi pipa CWC (Ropin) Untuk perbaikan ponton PBL 3 (Aceng) U/Pek. Perbaikan potnon PBL III an/Pak Aceng U/Pek. Perbaikan potnon PBL III an/Pak Aceng U/Pek. Perbaikan potnon PBL III an/Pak Aceng U/ Penggantian atap seng area silo kopra COM (H. Tambir) U/ Pagar Polsek TM. (Aceng) U/ Plafon rumah Gereja (Sri) Untun bor lantai ponton kuala enok (AMIR) Untuk pekerjaan lisplang bangunan MP2 Tahap 3 (Yusuf) U/ Docking body speedboat Compass (Mail) U/ Docking body speedboat Compass (Mail) U/ Docking body speedboat Compass (Mail) U/ Docking body speedboat Compass (Mail) U/ Pasang keramik Mess Direksi (Tambi) U/ Pasang keramik Mess Direksi (Tambi) U/ Permohonan pemasangan dinding seng area perawatan COM (H. Tambir) U/. meluruskan pancang ponton 3 Kopra U/pembuatan Ruang Filling ROP(Santoso) U/ Service talang lapangan badminton dan area depan blok A Mess Depan (Eman) Untuk rak A&F (Yani) Untuk rak A&F (Yani) Untuk rak A&F (Yani) Untuk rak A&F (Yani) U/ Perbaikan dinding kelas dan pagar TK Tadika Puri Sambu (Eman) U/ Pemasangan exhausted fan automatic (F.Santoso) U/ Perbaikan ruangan Decon (Tambi) U/pekerjaan ruang BTO ROP(Amir) U/Pek. Perbaikan bangunan filling ROP Packing an/Pak Santoso U/Pek. Perbaikan bangunan filling ROP Packing an/Pak Santoso U/ Toilet bangunan MP2 (Usup) Untuk service meja LAB Uji (Yani) Untuk pasang rangka dinding CWC (Amir) U/ Pasang exhaust fan warehouse 03 DC (Yusuf) U/Pek. Pembuatan sekat dinding di gudang fly ash an/Pak Tambi U/Mess pelantar Blok A 2 (Mas Sri) U/Mess pelantar Blok A 2 (Mas Sri) U/Balok ruang filling ROP(Santoso) U/ Perbaikan jendela kaca di ruang ex kantin (Yani) U/ Instalsi pipa CWC (Ropin) Untuk pasang rangka dinding area CWC (Amir) Untuk pekerjaan kusen pintu DC (Surif) U/pasang dinding seng COM U/pasang dinding seng COM U/ Sekat dinding Mess Plantar A5 (Sri) U/ Sekat dinding Mess Plantar A5 (Sri) U/ Sekat dinding Mess Plantar A5 (Sri) U/Pek. Pemasangan keramik di area MP 2 an/Pak Yusuf U/ Kaca jendela kantor HUMAS (Yani) U/ Atap panel dryer dc (F. Santoso) U/ Atap panel dryer dc (F. Santoso) U/Pek. Perbaikan TPQ Mess Depan an/Pak Tambi U/Pek. Perbaikan TPQ Mess Depan an/Pak Tambi U/ Perbaikan dinding ruang filling ROP (Tambi) U/balok pagar belakang mess Direksi(tambi) U/balok pagar belakang mess Direksi(tambi) U/ Cerucuk pondasi mesin Rotap (Eman) U/DInding dan plafon Filling 02 DC(Aceng) U/ Papan info ruang meeting KB & KS Dept COM (Mail) U/ Atap panel dryer dc (F.Santoso) U/Alat kerja Bkl-Kayu an/Yani U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) U/mal dinding ROP (Santoso) U/Pek. Perbaikan ruang filling ROP Packing an/Pak Santoso U/Pek. Perbaikan ruang filling ROP Packing an/Pak Santoso U/Pek. Perbaikan ruang filling ROP Packing an/Pak Santoso U/pek.ruang filling ROP(Santoso) U/ Karet pintu/jendela alumunium DC (Mail) Untuk cat conveyor silo COM (Wahab) U/Alat kerja Bkl-Kayu an/Yani U/ Perbaikan talang gudang SEP (Amir) U/ Perbaikan atap gudang bleaching dan atap produksi (Tambi) U/ Pasang keramik D19 Mess Direksi (Tambi) U/ Pasang keramik D19 Mess Direksi (Tambi) UNTUK TB. NURHAYATI UNTUK TB. NURHAYATI UNTUK TB. NURHAYATI U/ Alat bantu kerja Bkl-konstruksi (Parmin) U/Pek. Perbaikan conveyor COM an/Pak Aceng U/Alat kerja Bkl-Kayu an/Yani Untuk pekerjaan plafond mess D-18 (Rustambi) U/ Balok dan kolom dinding filling 02 DC (Usup) Pek/ plafon dan dinding DC(Aceng) U/Perbaikan bak IPAL(Tambi) Untuk buat bak oil trap HE (H. Tambir) Untuk buat bak oil trap HE (H. Tambir) U/Pembuatan drainase taman segitiga dan tebas rumput taman segitiga (Surif) U/Pek. Atpa gudang 03 SEP an/Pak Tambi U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan atap gudang bleaching dan atap produksi (Tambi) U/ Perbaikan atap gudang bleaching dan atap produksi (Tambi) U/ Plafon ruangan Mess direksi D19 (Tambi) U/Potong keramik di ruang PRA(Santoso) Untuk buat bak oil trap HE (H. Tambir) Untuk buat bak oil trap HE (H. Tambir) U/Pek. Pembuatan Atap gudang MP2 an/Pak Yusuf U/ Pembuatan pagar Mess Direksi (Tambi) U/ Pembuatan pagar Mess Direksi (Tambi) U/ Pembuatan pagar Mess Direksi (Tambi) U/ Permohonan cat air 2 tin @ 20 ltr untuk mushola NTS (Mail NTS) U/Perbaikan pintu Emergancy dryer (Amir) U/ Buat Meja RMPC (Mail) U/Aktifitas pekerjaan sehari- sehari(Tambi) Untuk conveyor silo Boiler Biomassa (Aceng) U/Pek. Pembuatan atap gudang MP2 an/Pak Yusuf Untuk kuda-kuda gudang Fly Ash (Aceng) U/Pek. Pembuatan partisi meja pengupas DC an/Yani U/pitu rotex dan jendela DC(Aceng) U/ Papan nama TNI AL. (Mail) U/ Papan nama TNI AL. (Mail) U/Perbaikan mess depan C5-B(SRI) U/Perbaikan mess depan C5-B(SRI) Untuk dinding paring MP I (Aceng) Untuk Pembuatan Peti Jenazah (Yani) Untuk Pembuatan Peti Jenazah (Yani) Untuk pasang dinding seng CWC (H. Tambir) U/Pek. Pembuatan partisi meja pengupasan DC an/Yani Untuk pasang pintu decon DC (Hendri) U/pembuatan paga polsekTM(Aceng) U/Pek.potong keramik Filling 02 DC(Yusuf) Untuk atap gudang briket arang (Tambi) Untuk cor balok atas CWC (H. Tambir) U/ Alat bantu kerja Perbaikan dolphin ubk an/Pak Tambi U/ Alat bantu kerja Perbaikan dolphin ubk an/Pak Tambi U/ Perbaikan talang samping gudang 03 SEP (Amir) Untuk pekerjaan atap MP2 gudang 01 (Usup) Untuk pekerjaan atap MP2 gudang 01 (Usup) Untuk pekerjaan atap MP2 gudang 01 (Usup) U/ Dinding kamar Mess Plantar A4 dan A5 (Sri) U/ Dinding kamar Mess Plantar A4 dan A5 (Sri) U/ Pasang keramik letai bangunan MP2 no.5 (Usup) U/ Pasang keramik letai bangunan MP2 no.5 (Usup) U/ Docking body speedboat Compass (Mail) U/ Docking body speedboat Compass (Mail) U/ Docking body speedboat Compass (Mail) Untuk cor balok atas CWC (H. Tambir) U/ Emparan gudang fly ash an/Pak Aceng U/Pintu Warehouse 02 dan 03 (Amir) U/Pintu Warehouse 02 dan 03 (Amir) Untuk Pengecatan ponton PBL 3 (Aceng) Untuk Pengecatan ponton PBL 3 (Aceng) Untuk Pengecatan ponton PBL 3 (Aceng) U/ Perbaikan dinding kamar Mess Plantar (Sri) U/ Perbaikan dinding kamar Mess Plantar (Sri) U/Pek. Pembuatan WC di area IPAL an/Pak Mail U/ Peralatan kerja bengkel kayu CC (Mail) U/Pek. Perbaikan Perbaikan Meja Analisa Pengujian an/Yani U/ Perbaikan atap ROP ruang packing dan dinding rebesan (H. Tambir) U/ Perbaikan atap ROP ruang packing dan dinding rebesan (H. Tambir) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) U/cat pelavon CO (Santoso) U/Pek. Perbaikan ruang filling ROP Packing an/Pak Santoso U/Pek. Perbaikan ruang filling ROP Packing an/Pak Santoso U/ Pasang keramik letai bangunan MP2 no.5 (Usup) U/ Mengecat dinding bagunan blok D di Mess Direksi (Mail) U/ Alat kebersihan kantor CC (Ucha) U/Pek. Pembuatan Bak Equalisasi IPAL an/Pak Tambi U/ Penggantian plate dinding silo1 Boiler (Aceng) u/Mal dinding ROP (Santoso) U/mess pelantar A3 dan A4(Sri) U/mess pelantar A3 dan A4(Sri) U/Pek. Perbaikan bangunan filling ROP Packing an/Pak Santoso U/Pek. Perbaikan bangunan filling ROP Packing an/Pak Santoso Untuk ponton kuala enok (AMIR) U/Pek. Cat ruang packing ROP an/Pak Tambi Untuk bekisting balok oil trap IPAL (Tambi) U/ Ganti plate Lantai bawah Ponton PBL-3 ALT 1 (Aceng) U/gudang gelondongan (Usup) U/gudang gelondongan (Usup) U/pintu gerbang polsek(Aceng) U/Pek.pemasangan pipa steam CWC(Aceng) Untuk limbah BE (Teguh) U/Pek. Cat Pos depan Office an/Pak Tambi U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) U/ Pemasangan pondasi mesin ROTEX (Aceng) U/Perbaikan mess Direksi (Santoso) U/cat dinding filling ROP(Santoso) U/pek kerramik lantai ruang PRA(santoso) U/Pek. Pembuatan bak IPAL an/Pak Tambi U/Pek. Pembuatan bak IPAL an/Pak Tambi U/ Modifikasi Jacket ciller pada kerucut tanki produk CWC (Amir) Untuk dinding retak di kamar2 tamu Mess Direksi U/Pembuatan bak limbah IPAL U/Pembuatan bak limbah IPAL U/pondasi mesin Rotex ( Pask Surif) U/pondasi mesin Rotex ( Pask Surif) U/pondasi mesin Rotex ( Pask Surif) U/pondasi mesin Rotex ( Pask Surif) U/pekerjaan WC IPAL(H.Tambir) U/pekerjaan WC IPAL(H.Tambir) U/Pembuatan gerbang mess direksi(Aceng) U/ Skor tanki hexane penyok (Aceng) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) U/ Pekerjaan Kuda-kuda MP2 (Usup) U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/pintu emergency Rotex &dryer(Aceng) U/pintu emergency Rotex &dryer(Aceng) U/plafon dan dinding DC(Aceng) U/plafon dan dinding DC(Aceng) U/pembautan sekat meja (Arif) U/Pek. Pembuatan gudang di wc PRD an/Pak Tambi U/Pek. Pembuatan gudang di wc PRD an/Pak Tambi U/keperluan alat kerja bengkel kayu an/Mail Untuk perbaikan tangki hexane SEP (ACENG) U/Perbaikan Bak penampung lumpur IPAL (F.Santoso) U/pasang dinding seng COM (H.Tambir) U/perbaikan depan mess D5-J(EMAN) U/perbaikan depan mess D5-J(EMAN) U/perbaikan depan mess D5-J(EMAN) U/perbaikan depan mess D5-J(EMAN) U/perbaikan depan mess D5-J(EMAN) U/Perbaikan gereja(SRI) U/Pek. Pengecatan di area warehouse an/Pak Tambi Untuk pasang keramik dryer DC (Santoso) U/ Pembuatan pagar Untuk pagar Boiler biomassa (Aceng) U/ Pembuatan pagar Untuk pagar Boiler biomassa (Aceng) U/ Pembuatan pagar Untuk pagar Boiler biomassa (Aceng) U/ Pembuatan pagar Untuk pagar Boiler biomassa (Aceng) U/ Pembuatan pagar Untuk pagar Boiler biomassa (Aceng) U/ Pembuatan pagar Untuk pagar Boiler biomassa (Aceng) U/Pek. Pembuatan sekat dinding di gudang fly ash an/Pak Tambi U/Kedudukan sasis Rotex (Aceng) U/ Perbaikan Rell Docking Ponton (Aceng) U/ Mesin las MIG Konstruksi CC (Parmin) Untuk pasang terpal proyek Arang (santoso) Untuk instalasi pipa CWC (Ropin) U/ Pembuatan Oil Trap di belakang QAD disamping Cooling Tower (Tambi) U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Pembuatan peti jenazah (M.yani) U/Pembuatan peti jenazah (M.yani) U/Pembuatan peti jenazah (M.yani) U/Pembuatan WC IPAL(H.Tambir) U/Pembuatan WC IPAL(H.Tambir) U/Pembuatan WC IPAL(H.Tambir) U/Pembuatan WC IPAL(H.Tambir) U/ Alat bantu kerja BKL-Kayu CC (Ucha) U/ Alat bantu kerja BKL-Kayu CC (Ucha) Untuk pasang terpal proyek Arang (santoso) Untuk perbaikan mess CKL C1 1 sampai 5 dan mess CKL C1 6 sampai 10 (Sri) Untuk lisplang gudang Fly Ash (Aceng) U/ Pengecatan lantai ruang packing ROP (Tambi) U/pekerjaan kapal lina 101 (Amir) U/ Alat aktivitas angkut material (Tambi) U/Pembuatan ruang solat MP2 ( H.Tambir) U/Pembuatan ruang solat MP2 ( H.Tambir) U/Pembuatan ruang solat MP2 ( H.Tambir) Untuk buat bak oiltrap HE (H. Tambir) Untuk perbaikan mess CKl C1 1 sampai 5 dan mess CKl C1 6 sampai 10 (Sri) Untuk tutup dinding retak DC (Santoso) U/ Pengecatan lantai ruang packing (Tambi) U/pekerjaan tiang gelondonngan(Amir) U/sevice cooler(Amiuddin) U/Rell pintu ruang listrik(Amir) U/ Pasang plafon area grinder (Aceng) Untuk perbaikan mess CKl C1 1 sampai 5 dan mess CKl Ci 6 sampai 10 (Sri) U/ Baut gudang kuda-kuda MP2 (Usup) U/Pek. Pembuatan atap bak lumpur minyak an/Pak Tambi U/Pek. Pembuatan atap bak lumpur minyak an/Pak Tambi U/Pek. Pembuatan atap bak lumpur minyak an/Pak Tambi U/ Perbaikan atap seng atas petak licin RMPr (GLD) an/Usup U/Penyekat HRD(Rustambi) U/Penyekat HRD(Rustambi) U/Penyekat HRD(Rustambi) U/Antar material server IT(Hendri) Untuk pekerjaan cor lantai mesjid Al-Ishlah (Rustambi) Untuk perbaikan mess CKl C1 1 sampai 5 dan mess CKL C1 6 sampai 10 (Sri) Untuk perbaikan mess CKl C1 1 sampai 5 dan mess CKL C1 6 sampai 10 (Sri) U/ Mohon di buatkan Tapak/Duduk Crane HIAB 175 di dermaga PLM (Amir) U/ Mohon di buatkan Tapak/Duduk Crane HIAB 175 di dermaga PLM (Amir) U/Pek. Pembuatan atap bak tampung minyak an/Pak Tambi U/Pek. Pembuatan atap bak tampung minyak an/Pak Tambi U/Permohonan perbaikan atap gudang 03 (Bocor) an/Tambi U/. atap ponton 3 Kopra U/ Pembuatan pintu gerbang Mess Direksi (Aceng) U/ Pembuatan pintu gerbang Mess Direksi (Aceng) U/ Pembuatan pintu gerbang Mess Direksi (Aceng) U/Pek. Pembuatan plafon area grinder &washing an/Pak Aceng U/Pek. Pembuatan plafon area grinder &washing an/Pak Aceng Untuk cat lantai 2 gudang ROP (Wahab) Untuk ring balok cor gudang Fly Ash (Tambi) U/ Lantai dan dinding perbaikan pos TNI AL 1 (Eman) U/ Permohonan perbaikan atap gudang 03 (Bocor) an/Tambi U/ Permohonan perbaikan atap gudang 03 (Bocor) an/Tambi U/ Penambalan dinding bak IPAL yang bocor (Tambi) U/ Penambalan dinding bak IPAL yang bocor (Tambi) U/Antar material Mess(Hendri) U/Pek. pembuatan plafon area grinder & washing an/Pak Aceng U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) Untuk cat dinding DC (Santoso) U/Pek. Pembuatan atap bak penampung IPAL an/Pak Tambi U/Pek. Pembuatan kusen pintu ruang ganti pakaian di area DC an/Yani U/pebaikan jalan Demaga PBL(Santoso) U/pek.mess depan C5-B(SRI) U/pek.mess depan C5-B(SRI) U/Pek. pembautan dinding plastik di area bricket an/Pak Tambi U/Pek. Perbaikan atap di area Decon an/Pak Tambi U/ kuda-kuda gudang Fly Ash (Aceng) U/ kuda-kuda gudang Fly Ash (Aceng) U/ Lantai dan dinding perbaikan pos TNI AL 1 (Eman) U/ Perbaikan ruangan Decon (Tambi) U/Pekerjaan filling ROP(Santoso) U/Melapisi kusen pembuatan ATM(Yani) U/. List Belt Conveyor Silo Dept COM (Bpk Anto perawatan) U/Pek. Perbaikan ponton PBL IIIan/Pak Aceng Untuk pagar bak Ipal (Amir) Untuk pagar bak Ipal (Amir) U/ Pengecatan uang Filling packing terkait dengan Audit KKP (Tambi) U/dinding perawatan COM(H.Tambir) U/ dinding lab monitoring dc(eman) Pembuatan ruang ATM Mandiri (Rustambi) Pembuatan ruang ATM Mandiri (Rustambi) Pembuatan ruang ATM Mandiri (Rustambi) U/Pek. Lisplank rumah pompa blok f an/Pak Amir Untuk pebaikan dinding seng penutup BC 12 SEP (Tambi) Untuk pebaikan dinding seng penutup BC 12 SEP (Tambi) U/ Perbaikan pos TNI AL 1 (Eman) U/ Pengecatan ruang Filling packing terkait dengan Audit KKP (Tambi) U/ Pemasangan plafond panel Dryer (Aceng) U/ Ruang panel PRA (Marsiyo) Pembuatan ruang ATM Mandiri (Rustambi) Untuk angkut material mess karyawan (Hendri) Untuk perbaikan dinding seng penutup BC . 12 SEP (Tambi) Untuk dudukan crane HIAB 175 di dermaga PLM (Amir) U/ Lantai ruang Filling packing terkait dengan Audit KKP (Tambi) U/Alat bantu kerja BKL-Kayu CC an/Mail U/Mess pelantar A1-A5 (Sri) Pembuatan ruang ATM Mandiri (Rustambi) Pembuatan ruang ATM Mandiri (Rustambi) Untuk mesin pemadat tanah lantai bangunan MP 2 (Usup) U/Pek. Perbaikan atap gudang fly ash an/Pak Aceng U/ Perbaikan pos TNI AL 1 (Eman) U/ Dinding luar uang Filling packing terkait dengan Audit KKP (Tambi) U/Alat bantu kerja Bkl-Kayu an/Pak Mail U/Pasang pintu putar DC(amir) Pembuatan ruang ATM Mandiri (Rustambi) Untuk dinding seng bengkel HE (H. Tambir) U/Pek. Pembuatan dolphin an/Pak Tambi Untuk pasang dinding seng CWC (H. Tambir) Untuk pasang dinding seng CWC (H. Tambir) Untuk pasang dinding seng CWC (H. Tambir) Untuk keperluan perlengkapan mess karantina. U/Alat bantu kerja Bkl-Kayu an/Pak Mail U/Kursi meeting CC(Ismail) Pembuatan ruang ATM Mandiri (Rustambi) Untuk perbaikan mess GIN C2 - 18 a/n. Arwan COM (Sri) U/Pek. Perbaikan dolphin ubk an/Pak Tambi Untuk penguci besi bak equaliasasi IPAL (Rustambi) U/Pek. Perbaikan talang air di belakang kantor CCD an/Pak Tambi U/Pek. Perluasan & Perbaikan Ruang Packing ROP an/Pak Santoso U/Pek. Perluasan & Perbaikan Ruang Packing ROP an/Pak Santoso U/nut keramik lantai ruang lab.DC(Eman) U/Cor jalan masuk workshop chipper (Tambi) Untuk pekerjaan penambahan bangunan MP2 Tahap 3 (Riwanto) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) Untuk cat dinding dryer DC (Santoso) U/ Menutup jendela gudang alat2 kerja dengan GRC di Mess Direksi (Yani) U/ Menutup jendela gudang alat2 kerja dengan GRCdi Mess Direksi (Yani) U/ Level jalan area MP1 (Tambi) U/keramik mess tamu D19(Rustambi) U/ Aktivitas angkut material (Tambi) Untuk pengangkutan material & alat kerja PBR (ACENG) Untuk pengangkutan material & alat kerja PBR (ACENG) Untuk kuda - kuda Fly Ash (Amir) Untuk ponton PBL 3 (Aceng) U/ Perbaikan tiang bangunan gudang kelapa gelondongan (Amir) U/Pek. Perbaikan dinding bata gudang hexane an/Pak H. Tambir U/Pek. Perbaikan dinding bata gudang hexane an/Pak H. Tambir U/pembuatan WC IPAL(H.Tambir) U/Cat tiang support compeyor boiler(Yusup) U/Cat tiang support compeyor boiler(Yusup) Untuk pasang rangka plastik Briket (Tambi) Untuk pekerjaan bangunan MP 2 (Yusuf) Untuk pekerjaan bangunan MP 2 (Yusuf) Untuk pekerjaan bangunan MP 2 (Yusuf) Untuk pekerjaan perbaikan mess supriadi - COM (Surif) Untuk pekerjaan perbaikan mess supriadi - COM (Surif) Untuk sekat bak penampung lumpur IPAL (Santoso) U/ Level jalan area MP1 (Tambi) U/ Microphone wireles ruang meeting CC U/Cat suport compeyor MP1(Yusup) U/Cat suport compeyor MP1(Yusup) Untuk pasang rangka plastik Briket (Tambi) Untuk angkut material bangunan MP 2 (Hendri) Untuk angkut material pekerjaan pasang dinding bata CWC (Hendri) Untuk angkut material mess karyawan (Hendri) Untuk pekerjaan perbaikan mess supriadi - COM (Surif) Untuk meja makan DC (Ismail) U/ Perbaikan ruangan Pintu Decon (Amir) U/Penyekatan ruang HRD(tambi) U/ Dinding toilet mess D25 dan D26 direksi CO (Tambi) Untuk pasang rangka plastik Biket (Tambi) Untuk pasang keramik dryer DC (Santoso) Untuk ponton PBL 3 (Aceng) Untuk ponton PBL 3 (Aceng) Untuk meja makan DC (Ismail) Untuk meja makan DC (Ismail) U/ Pembuatan pasak condensor turbine PP U/pek.Ruang rotex DC(Santoso) U/pek.Ruang rotex DC(Santoso) Untuk instalasi jalur pipa steam ( Pak sidiq ) Untuk atap bangunan no. 5 MP 2 (Usup) Untuk atap bangunan no. 5 MP 2 (Usup) U/ Perbaikan talang samping gudang pellet 03 (Tambi) U/ Penggantian plate dinding silo1 Boiler (Aceng) Untuk atap COM (H. Tambir) U/ Alat angkut viar penambalan jalan samping SMA (Hendri) U/Pek.jalan dermaga PBL2(Santoso) U/Pek.jalan dermaga PBL2(Santoso) U/Pembuatan ruang ATM Mandiri(Tambi) Untuk pekerjaan perbaikan mess Arwan-COM (Sri) U/ Angkut material ponton 3 (Aceng) U/Pek. Pembuatan dinding seng di area CWC an/Pak H. Tambir U/Pek. Pembuatan dinding seng di area CWC an/Pak H. Tambir U/ Perbaikan kamar D-10 Mess Tamu Direksi (Tambi) U/Kebutuhan Bkl-Kayu an/Arif U/Ruang Filling ROP(Santoso) U/Ruang Filling ROP(Santoso) U/pembuatan plafon di gudang safety pemadam(Rustambi) U/pembuatan plafon di gudang safety pemadam(Rustambi) U/pembuatan plafon di gudang safety pemadam(Rustambi) U/pembuatan plafon di gudang safety pemadam(Rustambi) U/pembuatan plafon di gudang safety pemadam(Rustambi) U/ Ganti keramik lantai area Paring dan Shelling (H. Tambir) U/ Ganti keramik lantai area Paring dan Shelling (H. Tambir) Untuk kuda - kuda Fly Ash (Aceng) U/ Pembuatan Pagar Boiler Biomassa (Aceng) U/ Pembuatan Pagar Boiler Biomassa (Aceng) U/Pek. Perbaikan Mess B4-A an/Pak Santoso U/ Penggantian gerobak dan pembuatan plat bentuk T dari besi untuk penguat pegangan dan kaki geroba U/Pekerjaan mess D5 J(Eman) U/Pekerjaan mess D5 J(Eman) U/Pekerjaan mess D5 J(Eman) U/Pekerjaan mess D5 J(Eman) U/ Pembuatan ruang salat MP 1 (H. Tambir) Untuk cat ponton apung (Amir) Untuk cat ponton apung (Amir) Untuk pekerjaan rumah pompa blok f (Surif) Untuk pekerjaan rumah pompa blok f (Surif) Untuk perbaikan ponton PBL 3 (Aceng) U/Pek. Perbaikan Mess B4-A an/Pak Santoso U/Pek. Perbaikan Mess B4-A an/Pak Santoso U/penyekatan ruang meeting HRD untuk keperluan penyimpanan barang-barang HRD (Tambi) U/Pek. Pembuatan pagar mess direksi an/Pak Tambi U/ Cat tiang conveyor Boiler dan RMPr tahap 2 (Usup) U/ Cat tiang conveyor Boiler dan RMPr tahap 2 (Usup) Untuk pekerjaan rumah pompa blok f (Surif) U/ Ganti plate area pemadam MT. Lina 101 & pipa (Amir) U/ Ganti plate area pemadam MT. Lina 101 & pipa (Amir) U/Pek. Perbaikan Mess B4-A an/Pak Santoso U/Pek. Perbaikan Mess B4-A an/Pak Santoso U/Pasang keramik mess direksi (Tambi) Untuk pekejaan perbaikan gereja (Sri) U/ Cat tiang conveyor Boiler dan RMPr tahap 2 (Usup) U/ Cat tiang conveyor Boiler dan RMPr tahap 2 (Usup) U/ Perbaikan mess GIN B5-1 an. Joko Nugroho (Eman) U/ Ganti plate area pemadam MT. Lina 101 & pipa (Amir) U/ Pintu sliding warehouse 2 & 3 (Amir) U/paku plastik cartain ruang monitoring(Eman) U/Ruang monitoring(Eman) U/ Atap bangunan E&I (Bekas bangunan GW) an/Tambi U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) U/ Ganti plate lantai bawah ponton PBL-3 (Aceng) Untuk ponton PBL 3 (Aceng) Untuk cor lantai gudang MP 2 (Yusuf) Untuk cor lantai gudang MP 2 (Yusuf) U/Pek. Perbaikan lantai ROP Packing an/Pak Tambi U/Pek. Perbaikan lantai ROP Packing an/Pak Tambi U/Nut keramik ruang rotek(Usup) U/ Ruang miting CCD (Ucha) U/ Sarung Sep[eda 01 (Ucha) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk pemasangan kabel tray arang (Amir) Untuk cor dolphin dermaga Export 2 & 4 (Sumbiyan) Untuk cor dolphin dermaga Export 2 & 4 (Sumbiyan) U/Pek. Perbaikan ponton PBL III an/Pak Aceng U/Sekat dinding HRD(Tambi) U/Sekat dinding HRD(Tambi) U/Pembuatan ruang solat di MP1(H.Tambir) Untuk perbaikan atap di QA - Uji (tambi) Untuk perbaikan atap di QA - Uji (tambi) U/Pek. Perbaikan sirip cooling tower an/Pak Tambi Untuk pasang sekat gudang Fly Ash & Bleaching (Sumbiyan) Untuk pasang sekat gudang Fly Ash & Bleaching (Sumbiyan) U/Pek. Pembuatan mesin Rotex DC an/Pak Aceng U/ Perbaikan mess depan D10-J (Eman) U/ Perbaikan mess depan D10-J (Eman) U/Pek.Lantai teras bekas gudang listrik(Amir) U/Pek.Pembuatan plafond grinder an/Pak Aceng U/Pek.Pembuatan plafond grinder an/Pak Aceng Untuk pasang keramik lantai dryer DC (santoso) U/ Alat transportasi pos TNI AL 1 (Aliyas) U/Pek. Pengecatan pintu warehouse an/Pak Amir U/Pek. Pengecatan pintu warehouse an/Pak Amir U/ Cat pagar polsek TM (Aceng) U/ Cat pagar polsek TM (Aceng) U/ Ruang Filling RBD Retail dan PRA (F. Santoso) U/ Ruang Filling RBD Retail dan PRA (F. Santoso) U/ Ruang Filling RBD Retail dan PRA (F. Santoso) U/Pek. Alat bantu kerja pemborong an/Pak Eman Untuk pasang keramik lantai dryer DC (Santoso) U/ Dolphin dermaga export no 2 dan 4 (Tambi) U/ Ring dinding layar MP2 Untuk perbaikan pipa mesin induk MT. LINA 101 (AMIR) U/Pemasangan rangka baja (Eman) U/Pek. Alat bantu kerja pemborong an/Pak Amir U/Pek. Pembuatan atap tungku arang an/Pak Amir U/Pek. Pembuatan atap tungku arang an/Pak Amir Untuk ponton PBL 3 (Aceng) U/ Paku seng dinding layar MP2 an/ Pak Usup U/ Paku seng dinding layar MP2 an/ Pak Usup U/Pek. Perbaikan ruang filling ROP Packing an/Pak Santoso U/Atap bangunan gudang listik baru(Eman) U/Alat bantu kerja pemborong an/Pak Tambi U/Pasang Baut Pender dolphin an/Pak Amir Untuk bikin parit CWC (H. Tambir) U/ Bobok lantai pondasi pemasangan mesin ROTEX (Surif) U/Pek. Perbaikan bangunan gudang chipper an/Pak Suripto U/Atap ruangatap Penggantian server IT(Eman) seng untuk area spare part, chain 303, cooker, Press G, chain 152, samping niagara B, chain miring cooker J & perbaikan atap COM (Rustambi) Penggantian Penggantian atap atap seng seng untuk untuk area area spare spare part, part, chain chain 303, 303, cooker, cooker, Press Press G, G, chain chain 152, 152, samping samping niagara niagara B B, chain miring cooker J & perbaikan atap COM (Rustambi) U/ Cat dinding luar DC (Tambi) U/ Cat dinding luar DC (Tambi) U/Pek. Perbaikan atap ponton UBK an/Pak Tambi U/ Pondasi pompa drainase PSK (Amir) U/ Pek. Perbaikan bangunan gudang chipper an/Pak Surif U/Perbaikan mess depan C5-B(SRI) U/Perbaikan mess depan C5-B(SRI) Permohonan perbaikan atap pada kantor kepala Hanggar BC ( Rustambi) U/ Kamar mandi C-22 Mess Direksi (Mr. Zhao Ke Mou) an/Tambi U/Pek. Pembuatan balok & kolom di area Fly ash an/Pak Tambi U/Pek. Perbaikan dinding samping. Mess Depan B4-A an/Pak Santoso U/Pek. Perbaikan bangunan gudang chipper an/Pak Surif U/Pembuatan atap ruang server IT(Eman) Untuk pekerjaan aspal jalan PSK (Santoso) U/ Dinding luar banguan DC (Tambi) U/Pagar Sand filter (pak Suharyanto) U/Pek. Pembuatan meja makan di area MP 1 an/Pak Mail U/Pek. Perbaikan Mess Cungkil A-01 an/Sri U/Pek. Perbaikan Mess Cungkil A-01 an/Sri U/Pek. Perbaikan Mess Cungkil A-01 an/Sri U/Atap gudang kabel lstrik baru(Eman) U/ Perbaikan dan Pembersihan Kanal Ex. Sawah (Santoso) U/ Pekerjaan pasang atap gudang bangunan no 4 MP2 (Usup) Untuk dinding pagar gerbang 2 (Surif) U/Pek. Pembuatan meja makan di area MP 1 an/Pak Mail U/Pek. Perbaikan Mess A-01 Cungkil an/Sri U/Pek. Perbaikan Mess A-01 Cungkil an/Sri U/Pek. Perbaikan Mess A-01 Cungkil an/Sri U/Pek. Perbaikan Mess A-01 Cungkil an/Sri Mu/perbaikan mess depan C5-B(Sri) Untuk pekerjaan pagar mesjid (Rustambi) U/Pek. Pembuatan emperan CWC an/Pak Amir U/ Pembuatan gorong - gorong bendungan 1 NTS (Amir) U/ Pembuatan pagar Mess Direksi (Tambi) U/Pek. Perbaikan bangunan gudang chipper an/Pak Surif U/Pek. Perbaikan bangunan gudang chipper an/Pak Surif U/ Ruang Filling RBD Retail dan PRA (F.Santoso) Untuk pasang keramik decon DC (Santoso) U/Pek. Pembuatan dolphin 2 &4 an/Pak Amir Untuk cat dinding bangunan DC (Santoso) U/ Perbaikan atap seng area samping mesin Press C, Samping Press A, Gudang PRD & area B3 Dept C U/Pek. Perbaikan di area DC an/Pak Yusuf U/ Perbaikan mess ex Nukman Rmpr Kp Depan C5-B (Sri) U/Pek. Potong keramik di area Gazebo an/Pak H. Tambir Untuk pekerjaan dinding packing ROP (Rustambi) Untuk pekerjaan dinding packing ROP (Rustambi) Untuk cat dinding bangunan DC (Santoso) U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/Pek. Perbaikan di area fillig ROP Packing an/Pak Santoso U/ Perbaikan mess ex Nukman Rmpr Kp Depan C5-B (Sri) U/ Ganti plate Lantai bawah Ponton PBL-3 (Aceng) U/ Pekerjaan kontruksi CC an/Agus A Untuk pasang dinding CWC (H. Tambir) U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/Pek. Perbaikan Mess Depan an/Pak Eman U/Cor lantai Fly Ash (Yusup) Untuk Conveyor MP2 an/Amir U/Pek. Pembautan papan info WHS DC an/Yani U/Pek. Pembuatan pagar boiler biomasa an/Pak Aceng U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/ Pintu ruang meeting HRD untuk keperluan penyimpanan barang-barang HRD (Tambi) U/merapikan semen yg retak di mess direksi D25(Tambi) U/pek.Mess Direksi D25(Tambi) Untuk pekerjaan loyang briket (Yani) U/Pek. Pembuatan papan info WHS DC an/Yani Untuk pekerjaan pagar IPAL (Amir) U/ Perbaikan mess PLTR Herman RMPr KP C2-1 dan Tulus W. RMPr KB C2-10 (Eman) U/perbaikan Bak IPAL(Tambi) u/ Pembuatan Kotak kirim sampel eksternal u/ Pembuatan Kotak kirim sampel eksternal k aspal jalan dalam pabrik PSK (Sumbiyan) Untuk aspal jalan dalam pabrik PSK (Sumbiyan) U/Pek. Perbaikan lantai gudang 02 SEP an/Pak H. Tambir U/ Penggantian plate dinding silo1 Boiler (Aceng) U/ Penggantian plate dinding silo1 Boiler (Aceng) U/Atap bangunan gudang kelapa gelondongan (Amir) U/Lantai keramik ruang PRA ROP(Santoso) u/ Rumah pompa loading ROP Untuk cor tapak gudang MP 2 (Sumbiyan) Untuk cor tapak gudang MP 2 (Sumbiyan) U/ Perbaikan jalan masuk dan kantor NTS (Eman) U/Pek. Perbaikan dolphin 4 an/Pak Tambi U/Pek. Perbaikan dolphin 4 an/Pak Tambi U/Pek. Perbaikan dolphin 4 an/Pak Tambi U/ Atap bangunan gudang kelapa gelondongan (Amir) U/ Atap bangunan gudang kelapa gelondongan (Amir) U/ Atap bangunan gudang kelapa gelondongan (Amir) U/ Talang air gudang Fly Ash (Tambi) U/Pek lantai filling ROP(Santoso) Untuk cor bak Ipal baru (Sumbiyan) Untuk cor bak Ipal baru (Sumbiyan) U/ Service plant Pipa cooling tower dan buat jalan cooling tower SEP (Tambi) U/ Service plant Pipa cooling tower dan buat jalan cooling tower SEP (Tambi) U/Pek. Perbaikan dolphin 4 an/Pak Tambi U/Pek. Perbaikan dolphin 4 an/Pak Tambi U/Pek. Perbaikan dolphin 4 an/Pak Tambi U/ Atap gudang kelapa gelondongan (Amir) U/Pembuatan WC IPAL(H.tambir) U/Pembuatan WC IPAL(H.tambir) U/Buat baloan di Briket(Surip) U/Buat baloan di Briket(Surip) Untuk cor jalan belakang CST (Sumbiyan ) Untuk cor jalan belakang CST (Sumbiyan ) U/ Penggantian tiang dolphin dermaga export no 2 dan 4 (Tambi) Untuk pasang U/ erbaikan atapdinding seng seng CWC (H.mesin area samping Tambir) Press C, Samping Press A, Gudang PRD & area B3 Dept COM (H. Tambir) U/Alat bantu kerja BKL-Kayu an/Yani U/Pembuatan atap FIT END di Drayer DC(Aceng) Untuk cor jalan masuk gudang kopra lama (Sumbiyan) Untuk cor jalan masuk gudang kopra lama (Sumbiyan) U/ Modifikasi Jacket ciller pada kerucut tanki produk CWC (Amir) U/ Atap Perbaikan ponton UBK (Tambi) U/ pasang plafon Grinder (Aceng) U/Pembuatan WC IPAL(H.Tambir) U/Pembuatan WC IPAL(H.Tambir) U/Pembuatan WC IPAL(H.Tambir) U/pasang topi Feed end smentara DC(Aceng) U/Pek. Pasang keramik di area MP1 an/Pak H. Tambir U/Perbaikan mess GIN B7-16 an. Ex. Sadam (Sri) U/Perbaikan mess GIN B7-16 an. Ex. Sadam (Sri) U/Perbaikan mess GIN B7-16 an. Ex. Sadam (Sri) U/Perbaikan mess GIN B7-16 an. Ex. Sadam (Sri) U/Perbaikan mess GIN B7-16 an. Ex. Sadam (Sri) Untuk dudukan crane HIAB 175 PHD (Amir) U/ Cat ponton PBL 3 (Aceng) U/ Cat ponton PBL 3 (Aceng) u/Ruang penyekat HRD(tambi) U/Perbaikan mess depan C5-B(Sri) U/Perbaikan mess depan C5-B(Sri) U/Perbaikan mess depan C5-B(Sri) Untuk ponton dermaga apung CO (Amir) U/Perbaikan mess GIN B7-16 an. Ex. Sadam (Sri) U/Perbaikan mess GIN B7-16 an. Ex. Sadam (Sri) Untuk atap ponton UBK (Rustambi) Untuk atap ponton UBK (Rustambi) U/ Cat ponton PBL 3 (Aceng) U/ Cat ponton PBL 3 (Aceng) U/WC IPAL U/Pek,Pembuatan screw filling DC 02(Aceng) U/Pek,Pembuatan screw filling DC 02(Aceng) U/Pek,Pembuatan screw filling DC 02(Aceng) U/Pek,Pembuatan screw filling DC 02(Aceng) U/Pek,Pembuatan screw filling DC 02(Aceng) U/Pemasangan flow Steam PP (K Rizal) U/ Perbaikan sirip cooling tower ROP (Tambi) Untuk atap ponton UBK (Rustambi) U/Pek. Pengecatan meja makan di arae MP 1 an/Yani U/Ukur ketinggian Air kanal(Ismail) U/pek.Ruang Filling ROP(Santso) U/Alat bantu kerja pemborong an/Pak Aceng U/ Jalan Ipal pemasangan bata (Tambi) U/Pek. Perbaikan Perbaikan/docking body speedboat Compass an/Pak Mail U/Pek. Perbaikan Perbaikan/docking body speedboat Compass an/Pak Mail U/. Nyucuk Niagara Filter (Bpk Arba) U/Pek. Perbaikan bangunan di area chipper an/Pak Surif U/Pek.pembuatan screw Filling DC 02(Aceng) U/Pek.pembuatan screw Filling DC 02(Aceng) U/Pek. Pembuatan loyang bricket an/Pak Aliyas U/Pek. Pembuatan loyang bricket an/Pak Aliyas Untuk pekerjaan atap bangunan MP2 (Usup) Untuk pekerjaan atap bangunan MP2 (Usup) U/Pek. Pembuatan kursi ruang meeting CC an/Hendri U/Pek. Pengecatan tiang conveyor PP & MP1 an/Pak Yusuf U/pebaikan jalan mess depan(Eman) U/pebaikan jalan mess depan(Eman) U/pebaikan jalan mess depan(Eman) U/pebaikan jalan mess depan(Eman) U/pebaikan jalan mess depan(Eman) U/Mess Direksi Eks .kamar MR.Tay (Tambi) U/Pek. Perbaikan atap dan penggantian support an/Pak Aceng U/Pek. Perbaikan lantai di area dryer an/Pak Santoso U/Pek. Pembuatan kursi ruang meeting CC an/Hendri U/Pek. Pengecatan tiang conveyor PP & MP 1 an/Pak Yusuf U/perbaikan mess pelantar blok A1-5 U/perbaikan mess pelantar blok A1-5 U/perbaikan mess pelantar blok A1-5 U/perbaikan mess pelantar blok A1-5 U/Mess Direksi D25(Tambi) U/Mess Direksi D25(Tambi) Untuk perbaiki pipa buangan air akibat pembersihaan kelapa B (Rustambi) Untuk perbaiki pipa buangan air akibat pembersihaan kelapa B (Rustambi) Untuk pasang keramik dryer DC (Santoso) U/Pek. Perbaikan pagar gerbang 02 WT an/Pak H. Suripto U/Pek. Perbaikan pagar gerbang 02 WT an/Pak H. Suripto U/Pek. Perbaikan pagar gerbang 02 WT an/Pak H. Suripto U/Pek. Pembuatan bangunan MP 2 an/Pak Yusuf U/Perbaikan atap bocor ROP(Tambi) U/Perbaikan atap bocor ROP(Tambi) U/ utup dndng luar lantai 2 Filling 02 DC (H.Tambiar) Untuk cor tempat parkir Masjid Al - Islah (Tambi) Untuk cor tempat parkir Masjid Al - Islah (Tambi) baikan keramik di area DC an/Pak H.Tambir baikan keramik di area DC an/Pak H.Tambir baikan keramik di area DC an/Pak H.Tambir U/Pek. Perbaikan POS TNI AL an/Pak Eman U/Pek. Perbaikan POS TNI AL an/Pak Eman U/Pek. Perbaikan POS TNI AL an/Pak Eman U/. Aktifitas cucuk Residu BE (Bpk Arba) U/Pek. Perbaikan mess plantar blok A-15 an/Sri U/ Cat ruang salat MP 1 (H. Tambir) Untuk cor jalan menuju CWC Untuk cor jalan menuju CWC Untuk kerangka atap rumah - rumah arang CCH (Amir) Untuk pekerjaan bangunan MP2 Tahap 3 (Yusuf) U/Pek. Perbaikan dinding samping. Mess Depan B4-A an/Pak Santoso U/Pek. Perbaikan atap GW an/Pak H. Tambir U/Pek. Perbaikan runag filling ROP an/Pak Santoso Untuk cor lantai parit dan dudukan tempet Oli (H. Tambir) U/ Emperan bangunan CWC (Amir) U/ Cor sepatu beton tiang bangunan gudang kelapa gelondongan (H. Tambir) U/ Cor sepatu beton tiang bangunan gudang kelapa gelondongan (H. Tambir) U/Pek. Pembuatan meja makan di area MP1 an/Pak Mail u/cat pipa pemadam(Amir) U/Pek. Perbaikan gereja BTN an/Mas Sri U/Pek. Perbaikan mess GIN an/Arwan COM an/Pak Sri U/ Emperan bangunan CWC (Amir) U/ Cor sepatu beton tiang bangunan gudang kelapa gelondongan (H. Tambir) U/ Cor sepatu beton tiang bangunan gudang kelapa gelondongan (H. Tambir) U/ Cor sepatu beton tiang bangunan gudang kelapa gelondongan (H. Tambir) Untuk pekerjaan pemasangan turap mess PLTR Juli RMPr KP A2-10 (Eman) u/ Les Conveyor MP1 (Pak Masdar) U/Pek. Perbaikan Mess GIN Arwan COM an/Pak Sri Untuk kerangka atap rumah - rumah arang CCH (amir) U/Pek. Pembuatan Tapak/Duduk Crane HIAB 175 di Dermaga PLM an/Pak Amir U/ Pemindahan gudang ATK LCS untuk ruang filling 02 (H.Tambir) U/ Pemindahan gudang ATK LCS untuk ruang filling 02 (H.Tambir) U/Potong rangka lantai teras dan pagarEX-E&I (Amir) Untuk viar (angkut material mess karyawan) Hendri Untuk ganti kusen aluminium ruang timbang LAB MICRO (Santoso) Untuk perbaikan atap dan plafon diruang server dept IT (Tambi) Untuk perbaikan atap dan plafon diruang server dept IT (Tambi) U/ Pembuatan Pagar Boiler Biomassa (Aceng) U/Pembuatan ruang ATM Mandiri(tambi) U/Pembuatan ruang ATM Mandiri(tambi) U/Pembuatan ruang ATM Mandiri(tambi) U/Pembuatan ruang ATM Mandiri(tambi) Untuk pekerjaan cor jalan masuk CWC (Rustambi) U/ Perbaikan jalan masuk dan kantor NTS (Eman) U/ Perbaikan jalan masuk dan kantor NTS (Eman) U/ Perbaikan jalan masuk dan kantor NTS (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Pondasi mesin ROTEX (Surif) U/Perbaikan ruang filling ROP(Santoso) Untuk pekerjaan dinding packing ROP (Rustambi) U/ Perbaikan jalan masuk dan kantor NTS (Eman) Untuk pekerjaan emperan gudang Fly Ash ( Aceng) U/ pondasi mesin ROTEX (Surif) U/Perbaikan depan mess C5-B(SRI) U/Perbaikan depan mess C5-B(SRI) Untuk pekerjaan dinding packing ROP (Rustambi) Untuk pekerjaan dinding packing ROP (Rustambi) U/Perbaikan jalan masuk dan kantor NTS (Eman) Untuk pekerjaan emperan gudang Fly Ash ( Aceng) U/ Pondasi mesin ROTEX (Surif) U/Pasang dinding Rotex(H.Tambir) Perbaikan atap seng area produksi Dep ROP (Rustambi) Untuk silo conveyor COM (Aceng) Untuk pekerjaan emperan gudang Fly Ash ( Aceng) U/Pek. Cerucuk pondasi mesin Rotex an/Pak H. Suripto U/Pembuatan screw Mesin Rotex(Aceng) U/Keperluan perbaikan ganti atap TB Nurhayati Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan BOR PLTR (Sri) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan BOR PLTR (Sri) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan BOR PLTR (Sri) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan BOR PLTR (Sri) Untuk dudukan crane HIAB 175 PHD (Amir) U/Pek. Pembuatan pagar depan mess direksi an/Pak Tambi U/pasang keramik lantai MP2(Yususp) U/ Perbaikan atap seng area produksi Dep ROP (Tambi) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan Bor PLTR (Sri Untuk tempat peralatan cetak bata ringan di area gudang bata ringan (PARMIN) U/Kamar mandi A-7, B-12 & B-15 di Mess Direksi (Tambi) U/pembuatan screw mesin Rotex(Aceng) U/pembuatan screw mesin Rotex(Aceng) U/Pek. Perbaikan lantai 2 Gudang ROP Packing an/Pak Tambi Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan Bor PLTR (Sri) Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan Bor PLTR (Sri) U/Pek. Molen CC 02 an/Pak Parmin Untuk pekerjaan pagar TNI AL (Eman) U/Pek. Pembuatan gerobak kayu CCH an/Pak Mail U/Pek. Pembuatan gerobak kayu CCH an/Pak Mail U/Pek. Perbaikan ponton apung CO an/Pak Amir Untuk perbaikan mess pelantar B2 - 9 a/n. Ponijan Bor PLTR (Sri) Untuk pekerjaan gudang MP 2 (Yusuf) U/ Cerucup gorong-gorong NTS (Tambi) U/Pek. Pembuatan gerobak CCH an/Pak Mail U/Pek. Pembuatan gerobak CCH an/Pak Mail Untuk pagar bak Ipal (Amir) Untuk mess pelantar B2 - 9 a/n Ponijan Bor PLTR (Sri) Untuk mess pelantar B2 - 9 a/n Ponijan Bor PLTR (Sri) Untuk bangunan MP 2 (Yusuf) Untuk bangunan MP 2 (Yusuf) Untuk cor jalan gudang MP 2 (Yusuf) U/ Cat Back Up server IT (Eman) U/ Cat Back Up server IT (Eman) Untuk pagar bak Ipal (amir) Untuk emperan gudang CWC (Amir) Untuk bangunan MP 2 (Yusuf) U/ Cerucuk pondasi mesin ROTEX (Surif) U/ Cat plafon ruang backup server (Eman) U/ Angkut material mess dan material pos angkatan laut Kuala Enok (Hendri. S) U/ Perbaikan sirip cooling tower ROP (Tambi) Untuk pekerjaan bangunan MP 2 (Yusuf) U/Pek. Perbaikan silo boiler biomassa an/Pak Aceng U/ Dinding lantai dua pelapis luar Filling 02 (H. Tambir) Untuk pekerjaan pembuatan Oil Trap di belakang QAD disamping Cooling Tower (Rustambi) Untuk pekerjaan pembuatan Oil Trap di belakang QAD disamping Cooling Tower (Rustambi) Untuk lantai gudang 02 SEP (H. Tambir) Untuk proyek bangunan MP 2 (Yusuf) U/Pek. Perbaikan pagar boiler biomassa an/Pak Aceng U/ Plafon ruang Filling RBD Retail dan PRA (F. Santoso) Untuk pasang keramik DC (Santoso) Untuk pekerjaan keramik drayer (F. Santoso) Untuk pekerjaan MP2 (Usup) U/ Ganti keramik kamar B-15 Mess Direksi (Tambi) U/Angkut material pembuatan ATM Mandii(Tambi) U/ Cat dolphin dermaga export no 2 dan 4 (Tambi) U/ Cat dolphin dermaga export no 2 dan 4 (Tambi) U/Perbaikan jalan masuk dan kantor NTS (Eman) U/Pembuatan pagar Mess Direksi (Tambi) U/Pembuatan pagar Mess Direksi (Tambi) U/ Pemindahan gudang ATK LCS untuk ruang filling 02 (H.Tambir) U/Angkut materal gudang kabel E&I di GW(Hendri) U/ Perbaikan mess GIN C2 - 18 an. Arwan - COM (Sri) Untuk buat tangga perancah pengecatan DC (Santoso) U/ Pembuatan Peil Schaal (Yani) U/ Pembuatan Peil Schaal (Yani) U/ Pembuatan Peil Schaal (Yani) U/ Memadatkan bleaching gudang Fly Ash (Usup) U/Angkut material ke FLy ash(Hndri) U/ Perbaikan mess GIN C2 - 18 an. Arwan - COM (Sri) Untuk pekerjaan gudang Fly As (WAHAB) U/Pek. Cat dinding di area CWC an/Pak H. Tambir U/Pek. Pengecatan pompa axial an/Pak Amir U/Pek. Pengecatan pompa axial an/Pak Amir U/Transfortasi pengawasan pekerjaan di lapangan(Alias) U/Pek. Pengecatan lantai dermaga apung CO an/Pak Amir Untuk pekerjaan dolphin dermaga ekspor 2 dan 4 (RUSTAMBI) U/Pek. Ponton Replating ponton PBL III an/Pak Aceng U/Pek. Ponton Replating ponton PBL III an/Pak Aceng U/Pek. Ponton Replating ponton PBL III an/Pak Aceng U/Pek. Perbaikan atap seng tiang gelondong an/Pak Amir U/Pek. Perbaikan atap seng tiang gelondong an/Pak Amir U/Pembuatan screw filling 02 DC (Aceng) U/Pembuatan screw filling 02 DC (Aceng) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) U/ Pasang tiang dan kuda-kuda MP2 (Usup) U/ Pasang tiang dan kuda-kuda MP2 (Usup) U/ Pasang tiang dan kuda-kuda MP2 (Usup) U/ Pasang tiang dan kuda-kuda MP2 (Usup) U/ Pasang tiang dan kuda-kuda MP2 (Usup) Untuk aspal jalan area dermaga PLM (Santoso) U/Pek. Pengecatan ruang ATK LCS an/Pak H. Tambir U/Pek. Pengecatan ruang ATK LCS an/Pak H. Tambir U/Papan nama clinik (ISmail) U/ Plafon dryer dan Blancer (Aceng) Untuk pekerjaan pagar IPAL (Amir) Untuk pekerjaan pagar IPAL (Amir) Untuk modifikasi bak mobil truck 23 ROP (Amir) U/. U/. Perbaikan trafo las DC (Bpk Awan) U/Perbaikan ruang EX-E&I(H.Tambir) U/ Buat dan pasang atap deaerator 1 & 2 area turbine lantai 4 PP (Aceng) U/Pek. Pembuatan atap emperan di area CWC an/pak Amir U/Pek. Pembuatan atap emperan di area CWC an/pak Amir U/Pek. Perbaikan Mess D-23 an/Pak Tambi U/ Pembuatan Hopper filling 02 DC (Aceng) U/ Pembuatan Hopper filling 02 DC (Aceng) U/. Jalan conv. PKB Untuk pembuatan parit depan bkl CCD (SANTOSO) Untuk pembuatan parit depan bkl CCD (SANTOSO) U/Pek. Perbaikan atap mess Pak Agus an/Pak Aliyas U/ Pengecetan dinding dalam dan plafon ruang bliyar CO (Tambi) Untuk dinding gudang Fly Ash (SANTOSO) Untuk dinding gudang Fly Ash (SANTOSO) Untuk atap tiang glondongan (Amir) U/Kebutuhan alat kerja BKL-Kayu an/Arif U/Kebutuhan alat kerja BKL-Kayu an/Arif U/Kebutuhan alat kerja BKL-Kayu an/Arif U/ Perbaikan Gudang Lantai 2 ROP Packing (Aceng) U/ Perbaikan Gudang Lantai 2 ROP Packing (Aceng) U/Pek. Pembuatan screw filling 02 DC an/Pak Aceng U/Pek. Pembuatan screw filling 02 DC an/Pak Aceng Untuk Pek. Bongkar Pasang Atap MP.1 (Aceng) U/Pek. Perbaikan meja di Mess Direksi (untuk digunakan di ruang laundry HSE) an/Pak Mail U/Pek. Perbaikan Mesjid Al-Ishlah an/Pak tambi U/Pek. Perbaikan meja di Mess Direksi (untuk digunakan di ruang laundry HSE)an/Pak Mail U/Pek. Cor dan aspal lantai dermaga ponton 3 Kopra an/Pak H.Tambir U/ Pasang keramik lantai bangunan MP2 No.5 (Usup) U/Pek. Perbaikan atap gudang fly ash an/Pak Aceng U/ Perlengkapan bengkel kayu (Ismail) U/ Perlengkapan bengkel kayu (Ismail) U/Pek. Cat pagar Mesjid Al-Ishlah an/Pak Tambi U/ Perlengkapan bengkel kayu (Kayu) U/ Pondasi lantai MP2 (Usup) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) U/Pek. Cor dan aspal lantai dermaga ponton 3 Kopra an/Pak H. Tambir U/Pek. Cor dan aspal lantai dermaga ponton 3 Kopra an/Pak H. Tambir Untuk membuat body, tutup dan daun screw conveyor Filling 02 DC (Aceng) U/ Pembuatan bak tampungan minyak di samping bak ekualisasi di IPAL (Tambi) U/ Pembuatan bak tampungan minyak di samping bak ekualisasi di IPAL (Tambi) U/ Untuk Pembuatan Hopper Filling 02 DC (Aceng) U/Pek. Pembuatan dinding bata di area Bricket an/Pak Tambi U/ Bongkar WF dan pasang lantai gudang atas E&I (Bekas ruang GW) an/Amir U/Pek. Pembuatan bingkai photo Klinik an/Yani Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) U/Pek. 1. Buat sekat untuk tempat peralatan cetak bata ringan di area gudang bata ringan 2. Buat pint Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) U/Pek. Perbaikan lantai di depan Pump House an/Pak Santoso Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) U/. Jalur pipa air hujan dimasukkan ke Hotwell (Bpk Abidin) Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) U/Pek. Pembuatan dinding bata di area Bricket an/Pak Tambi Untuk pekerjaan perbaikan mess Ex. Giantra-PP B13-B(Sri Sudiyoko) U/Pek. Perbaikan dinding di gudang fly ash an/Pak Tambi U/Pek. Perbaikan filling ROP an/Pak Santoso U/Pek. Pembuatan bak equalisasi IPAL an/Pak Tambi U/Pek. Pembuatan jalan di Bak IPAL an/Pak Tambi U/Pek. Pembuatan dinding bata di area bricket an/Pak Tambi U/Pek. Pembuatan bak equalisas di IPAL an/Pak Tambi U/Pek. Pembuatan bak equalisas di IPAL an/Pak Tambi U/Pek. Pembuatan bak equalisas di IPAL an/Pak Tambi U/Pek. Pembuatan bak equalisasi di IPAL an/Pak Tambi U/Pek. Pembuatan bangunan MP2 an/Pak Yusuf U/Pek. Pembuatan bangunan MP2 an/Pak Yusuf U/ Emperan bangunan CWC (Amir) Untuk kerangka atap rumah - rumah arang CCH (Amir) U/Pek. Pembuatan dolphin an/Pak Tambi Untuk pembuatan peti orang meninggal (Sunar) Untuk pembuatan peti orang meninggal (Sunar) Untuk pembuatan peti mati orang tua karyawan (Sunar) Untuk pembuatan peti mati orang tua karyawan (Sunar) Untuk pembuatan peti mati orang tua karyawan (Sunar) Untuk matting pekerjaan tumbang sawit di lahan NTS (Santoso) Untuk pembersihan ex. Sawah (Santoso) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/ Perbaikan pos TNI AL 1 (Eman) U/Pek. Lantai gudang timbangan kopra an/Pak H. Tambir U/ Pembuatan support pipa induk di area depan bengkel Boiler Biomassa (Amir) U/Pek. Pembuatan atap emperan di area CWC an/pak Amir U/ Cat kuda-kuda gudang Fly Ash (Aceng) U/ Cat kuda-kuda gudang Fly Ash (Aceng) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk kuda-kuda gudang Fly Ash (Aceng) U/Perbaikan pagar dermaga loading BB (K3) (K Rizal) U/Pembuatan support pipa induk di area depan bengkel Boiler Biomassa (Amir) Untuk gantungan pipa blower bak Ipal (Amir) Untuk kerangka atap rumah - rumah arang CCH (Amir) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk kuda-kuda gudang Fly Ash (Aceng) Untuk training las (Parmin) Untuk atap bangunan MP 2 (Usup) Untuk pekerjaan atap fly ash (Aceng) U/Pek. Pembuatan atap emperan di area CWC an/pak Amir U/Pek. Pembuatan atap emperan di area CWC an/pak Amir U/Pek. Pembuatan atap emperan di area CWC an/pak Amir No. Rekening Nama Rekening 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PROYEKPERAWATAN BANGUNAN PEMBUATAN DOLPHIN D 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 51.01.012.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN PHD BANGUNAN 53.01.001.0005 KB GL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 51.01.001.0005 BLR 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 53.01.002.0005 KB 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.002.0005 PP 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 53.01.002.0005 KB 53.01.002.0005 BIAYA PROYEKPERAWATAN PEMBUATANBANGUNAN DOLPHIN K 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 15.02.002.0011 PEMBUATAN BAK PENAMPUNGAN 60.01.003.0011 BIAYA SATPAM 60.01.003.0011 BIAYA SATPAM 60.01.003.0011 BIAYA SATPAM 51.01.007.0004 BIAYA PROYEKPERAWATAN REPLATINGALAT LAB-UJI POTON 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.001.0005 WM 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.006.0005 SEP 15.02.002.0004 RENOVASI DERMAGA LOADING 50.01.004.0008 BIAYA UTILITY CKL 50.01.022.0005 BIAYA PERAWATAN BANGUNAN A 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.007.0005 ROP 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D BIAYA PERAWATAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.004.0008 BIAYA UTILITY CKL 50.01.004.0008 BIAYA BIAYA UTILITY CKL BANGUNAN PERAWATAN 51.01.005.0005 BKL-AB 51.01.005.0005 BIAYA PERAWATAN BANGUNAN B 50.01.006.0004 BIAYA PERAWATAN MESIN SEP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.002.0005 KB 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.022.0005 ATP 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN MESIN DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.005.0005 KP RMPR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.001.0005 BLR 53.01.005.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 K 60.01.005.0003 DAN IPAL 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.005.0002 BIAYA OPRASIONAL HSE 60.01.005.0002 BIAYA BIAYA OPRASIONAL PENGOLAHANHSE LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 51.01.011.0005 WHS 51.01.002.0005 BIAYA PERAWATAN BANGUNAN P 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.001.0005 KB GL 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 53.01.001.0005 BIAYA PERAWATAN BANGUNAN K BIAYA PERAWATAN BANGUNAN 53.01.001.0005 KB GL 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.021.0004 BIAYA PERAWATAN MESIN RO 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.001.0005 BLR 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 50.01.022.0008 BIAYA UTILITY ATP 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 15.02.001.0009 PEMBUATAN PEMBUATAN TUNGKU TUNGKU PEMBAKA 15.02.001.0009 PEMBAKARAN ARANG 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATINGBANGUNAN BIAYA PERAWATAN POTON PBL I 51.01.001.0005 BLR 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 53.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.005.0005 KP RMPR 53.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.005.0005 KP RMPR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PROYEK PERAWATAN REPLATINGBANGUNAN POTON D 15.02.002.0019 PBL III 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.006.0005 CST 51.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN C 51.01.006.0005 CST 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.006.0005 SEP 50.01.004.0008 BIAYA UTILITY CKL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.004.0005 CKL 53.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.002.0005 KB 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0006 PERAWATAN KANAL/TANGGUL 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN LA 51.01.007.0005 LAB-UJI 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 50.01.022.0008 BIAYA UTILITY ATP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN PEMBUATAN TUNGKUBANGUNAN 15.02.001.0009 PEMBAKARAN ARANG 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 53.01.002.0005 KB 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 53.01.001.0005 KB GL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 53.01.005.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN/ALAT BANGUNAN 51.01.001.0005 BLR 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 50.01.022.0005 ATP 15.02.002.0018 PROYEK PEMBUATAN DOLPHIN D 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R BIAYA PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 53.01.004.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN/ALAT BANGUNAN 50.01.001.0005 WM 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 51.01.001.0005 BLR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 53.01.005.0005 KP RMPR 53.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 50.01.002.0005 DC 15.02.001.0010 PEMBUATAN CONVEYOR PROYEK PEMBUATAN 2 JALUR D DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.001.0005 KB GL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.022.0005 ATP 50.01.022.0005 BIAYA PERAWATAN BANGUNAN A 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.021.0005 BIAYA PERAWATAN BANGUNAN R 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.003.0005 CWC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.002.0005 BIAYA PERAWATAN BANGUNAN P 60.01.005.0002 BIAYA OPRASIONAL HSE 50.01.021.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.001.0010 PEMBUATAN CONVEYOR BIAYA PERAWATAN 2 JALUR D BANGUNAN 50.01.007.0005 ROP 15.02.002.0004 RENOVASI DERMAGA LOADING 60.01.005.0002 BIAYA OPRASIONAL HSE 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 53.01.002.0005 BIAYA PERAWATAN RENOVASI DERMAGABANGUNAN LOADING K 15.02.002.0004 ROP 50.01.021.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN RO BANGUNAN 50.01.003.0005 CWC 51.01.012.0005 BIAYA PERAWATAN BANGUNAN P 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 50.01.006.0004 BIAYA PERAWATAN MESIN SEP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 52.01.002.0003 PONTON PSK X 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.005.0002 BIAYA OPRASIONAL HSE 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0002 BIAYA OPRASIONAL HSE 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PENGOLAHAN MP2B3 LIMBAH 60.01.005.0003 DAN IPAL 51.01.006.0005 BIAYA PERAWATAN BANGUNAN C BIAYA PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 50.01.005.0004 BIAYA PERAWATAN MESIN COM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0019 PROYEK REPLATING POTON BIAYA PENGOLAHAN LIMBAH PBL B3 I 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.005.0005 COM 50.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.001.0005 BLR 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 50.01.006.0005 SEP 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PROYEKPERAWATAN PEMBUATANBANGUNAN DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 50.01.006.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN SEP BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN PROYEK REPLATING MP2 POTON 15.02.002.0019 PBL III 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 15.02.002.0016 REPLANTING PONTON PSK X 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 53.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 K 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.002.0005 PP 51.01.002.0005 BIAYA PERAWATAN BANGUNAN P 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 52.01.001.0001 MT LINA 101 52.01.001.0001 MT LINA 101 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.007.0005 LAB-UJI 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.007.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN ROP BANGUNAN 53.01.001.0005 KB GL 53.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.001.0005 KB GL 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 53.01.001.0005 KB GL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.002.0005 PP 50.01.006.0004 BIAYA BIAYA PERAWATAN PENGOLAHANMESIN SEP LIMBAH B3 60.01.005.0003 DAN IPAL 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 53.01.002.0005 KB 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 52.01.001.0005 TB INDRA JAYA 52.01.001.0005 TB INDRA JAYA 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.004.0005 BIAYA PERAWATAN BANGUNAN C 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN MESIN/ALAT 53.01.002.0004 KB 60.01.007.0003 BIAYA PROYEKPERAWATAN BANGUNAN PEMBUATAN DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PROYEK PEMBUATAN PEMBUATAN DOLPHIN DOLPHIN D 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PEMBUATAN DOLPHIN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN ROP BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 15.02.002.0007 PEMBUATAN BANGUNAN PROYEK PEMBUATAN MP2 DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PEMBUATAN DOLPHIN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN SPEED 60.01.007.0005 BOOT 50.01.006.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN SEP BANGUNAN 50.01.007.0005 ROP 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0006 PERAWATAN KANAL/TANGGUL 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 53.01.001.0005 KB GL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 15.02.002.0016 REPLANTING PONTON PSK X 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.001.0005 KB GL 53.01.001.0005 BIAYA PERAWATAN PEMBUATAN BAK BANGUNAN K 15.02.002.0011 PENAMPUNGAN IPAL 50.01.020.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN P 50.01.020.0005 PWT 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.006.0005 SEP 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 50.01.006.0005 SEP 53.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.001.0005 KB GL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0008 BIAYA UTILITY WM 50.01.001.0008 BIAYA UTILITY WM 50.01.001.0008 BIAYA UTILITY WM 50.01.004.0005 BIAYA PERAWATAN BANGUNAN C 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0018 PROYEK PEMBUATAN DOLPHIN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.008.0005 BIAYA PERAWATAN BANGUNAN L 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 50.01.005.0004 BIAYA PERAWATAN MESIN COM 50.01.005.0004 BIAYA PERAWATAN MESIN COM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 53.01.002.0005 KB 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 50.01.006.0005 SEP 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.002.0005 DC 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0006 PERAWATAN KANAL/TANGGUL 50.01.006.0004 BIAYA PERAWATAN MESIN SEP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.004.0005 BIAYA PERAWATAN BANGUNAN C 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 A ROP 60.01.002.0001 BIAYA ALAT KANTOR R L 50.01.007.0005 BIAYA PERAWATAN BANGUNAN RA BIAYA PERAWATAN BANGUNAN N 50.01.007.0005 ROP 60.01.007.0002 BIAYA PERAWATAN MESIN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.002.0005 BIAYA PROYEKPERAWATAN REPLATINGBANGUNAN POTON P 15.02.002.0019 PBL III 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 51.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN P 50.01.007.0005 ROP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0004 BIAYA PERAWATAN MESIN ROP 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 50.01.020.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN P 50.01.020.0005 PWT 50.01.020.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 P 60.01.005.0003 DAN IPAL 15.02.002.0019 PROYEK REPLATINGBANGUNAN BIAYA PERAWATAN POTON PBL I 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0005 BIAYA BIAYA PERAWATAN PENGOLAHANSPEED BOOT LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN SPEED R 60.01.007.0005 BOOT 60.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN SPEED SPEED BOOT 60.01.007.0005 BOOT 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 15.02.001.0008 PEMBUATAN PEMBUATAN MESIN MESIN CETAK CETAK BRIK 15.02.001.0008 BRIKET 15.02.001.0008 PEMBUATAN PEMBUATAN MESIN MESIN CETAK CETAK BRIK 15.02.001.0008 BRIKET 15.02.001.0008 PEMBUATAN MESIN BANGUNAN BIAYA PERAWATAN CETAK BRIK 50.01.001.0005 WM 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 53.01.002.0005 BIAYA PERAWATAN BANGUNAN K 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0007 BIAYA SUPPORTING WM BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0002 BIAYA PERAWATAN MESIN 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN RENOVASI DERMAGABANGUNAN LOADING D 15.02.002.0004 ROP 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.003.0011 BIAYA BIAYA SATPAM PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN P 51.01.002.0005 PP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 52.01.001.0001 MT LINA BIAYA 101 PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.007.0005 BIAYA PERAWATAN RENOVASI DERMAGABANGUNAN LOADING R 15.02.002.0004 ROP 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 50.01.020.0005 PWT 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL BIAYA PERAWATAN BANGUNAN ARLAN 50.01.002.0005 DC 50.01.001.0005 BIAYA PERAWATAN PEMBUATAN BANGUNAN TUNGKU 15.02.001.0009 PEMBAKARAN ARANG 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 51.01.001.0005 BLR 50.01.001.0007 BIAYA BIAYA SUPPORTING WM PERAWATAN BANGUNAN 50.01.022.0005 ATP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 53.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 51.01.001.0005 BLR 50.01.001.0007 BIAYA SUPPORTING WM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PROYEKPERAWATAN BANGUNAN EXPANSI DC- 15.02.001.0004 PERBAIAKAN DRAYER EX PSG 15.02.001.0004 PROYEK EXPANSI DC- PERBAIAK 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN SEP BANGUNAN 50.01.003.0005 CWC 50.01.003.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.001.0005 BLR 50.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.003.0005 LST 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 51.01.003.0005 LST 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.002.0004 BIAYA PERAWATAN MESIN DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0005 BIAYA PERAWATAN SPEED BOOT 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.002.0005 PP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 53.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.002.0005 KB 53.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.002.0005 KB 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0018 PROYEK PROYEK PEMBUATAN PEMBUATAN DOLPHIN DOLPHIN D 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PROYEK PEMBUATAN PEMBUATAN DOLPHIN DOLPHIN D 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.022.0005 ATP 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0018 PROYEK PEMBUATAN DOLPHIN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.002.0005 DC 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA PROYEK PERAWATAN REPLATINGBANGUNAN POTON D 15.02.002.0019 PBL III 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.006.0005 SEP 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 51.01.002.0005 PP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 60.01.003.0013 BIAYA OPERASIONAL TK 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.002.0005 KB 60.01.007.0003 BIAYA PROYEKPERAWATAN PEMBUATANBANGUNAN DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 60.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN SPEED SPEED BOOT 60.01.007.0005 BOOT 60.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN SPEED SPEED BOOT 60.01.007.0005 BOOT 60.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN SPEED SPEED BOOT 60.01.007.0005 BOOT 60.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN SPEED BOOT BANGUNAN 50.01.005.0005 COM 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.005.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 DC 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN MESIN/ALATR 53.01.005.0004 KP RMPR 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 15.02.002.0007 PEMBUATAN BANGUNAN PROYEK PEMBUATAN MP2 DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 53.01.005.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN/ALAT MESIN/ALAT 53.01.005.0004 KP RMPR 53.01.005.0004 BIAYA PERAWATAN MESIN/ALAT 60.01.007.0001 BIAYA MESS DIREKSI 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0005 BIAYA PERAWATAN SPEED BOOT 60.01.007.0001 BIAYA MESS DIREKSI 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.007.0006 PERAWATAN KANAL/TANGGUL BIAYA PERAWATAN BANGUNAN 50.01.022.0005 ATP 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0002 BIAYA PERAWATAN MESIN 60.01.007.0002 BIAYA PERAWATAN MESIN 60.01.007.0002 BIAYA PERAWATAN MESIN 60.01.007.0002 BIAYA BIAYA PERAWATAN PERAWATAN MESIN BANGUNAN 51.01.006.0005 CST 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0002 BIAYA PERAWATAN MESIN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.006.0005 CST 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.003.0013 BIAYA OPERASIONAL TK 60.01.003.0013 BIAYA OPERASIONAL TK 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.022.0005 ATP 50.01.022.0005 BIAYA PERAWATAN BANGUNAN A BIAYA PERAWATAN BANGUNAN 50.01.022.0005 ATP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.005.0005 COM 50.01.001.0005 BIAYA PROYEK PERAWATAN REPLATINGBANGUNAN POTON 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATING POTON BIAYA PENGOLAHAN LIMBAH PBL B3 I 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 51.01.004.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.004.0005 BKL-U 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0001 BIAYA MESS DIREKSI 53.01.005.0004 BIAYA PERAWATAN MESIN/ALAT 60.01.003.0013 BIAYA OPERASIONAL TK 60.01.003.0013 BIAYA OPERASIONAL TK 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.003.0005 CWC 15.02.002.0018 PROYEK PEMBUATAN DOLPHIN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA PERAWATAN BANGUNAN 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.005.0001 BIAYA BIAYA SAFETY DAN PEMADAM PERAWATAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 50.01.007.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 R 60.01.005.0003 DAN IPAL 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0006 PERAWATAN KANAL/TANGGUL BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.006.0005 SEP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN PEMBUATAN TUNGKUBANGUNAN 15.02.001.0009 PEMBAKARAN ARANG 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.003.0005 CWC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN PEMBUATAN BANGUNAN CONVEYOR 2 D 15.02.001.0010 JALUR DMG. PBL III 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 51.01.008.0005 BIAYA PERAWATAN BANGUNAN L 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI A R ARLAN L A BIAYA PERAWATAN BANGUNAN ARLANN 50.01.002.0005 DC 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 51.01.002.0005 PP 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.003.0013 BIAYA OPERASIONAL TK 60.01.003.0013 BIAYA BIAYA OPERASIONAL TK PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R BIAYA PERAWATAN BANGUNAN 50.01.001.0005 WM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 53.01.001.0005 KB GL 15.02.001.0011 REPLANTING PONTON PSK X 15.02.001.0011 REPLANTING PONTON PSK X 15.02.001.0011 REPLANTING PONTON PSK X 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 53.01.002.0005 KB 53.01.002.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN/ALAT MESIN/ALAT 53.01.002.0004 KB 53.01.002.0004 BIAYA PERAWATAN MESIN/ALAT 60.01.007.0006 PERAWATAN KANAL/TANGGUL 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0001 BIAYA MESS DIREKSI 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 53.01.001.0005 KB GL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.006.0005 SEP 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 15.02.001.0011 REPLANTING PONTON PSK X 15.02.001.0011 REPLANTING PONTONLIMBAH BIAYA PENGOLAHAN PSK X B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PROYEK PENGOLAHAN LIMBAH B3 REPLATING POTON 15.02.002.0019 PBL III 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.006.0005 SEP 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.003.0005 CWC 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.007.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 R 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.002.0005 PP 51.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN P 51.01.002.0005 PP 50.01.003.0005 BIAYA PERAWATAN BANGUNAN PROYEK PEMBUATAN DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.005.0005 COM 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 53.01.012.0005 TPR 53.01.012.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN T 50.01.002.0005 DC 51.01.002.0008 BIAYA BIAYA UTILITY PP BANGUNAN PERAWATAN 51.01.002.0005 PP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.006.0005 CST 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.002.0005 PP 51.01.002.0005 BIAYA PROYEK PERAWATAN REPLATINGBANGUNAN POTON P 15.02.002.0019 PBL III 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D BIAYA PERAWATAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.001.0005 BLR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 53.01.005.0005 KP RMPR 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.004.0004 BIAYA CIP 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA PROYEK PERAWATAN REPLATINGBANGUNAN POTON D 15.02.002.0019 PBL III 51.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 P 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.003.0005 CWC 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 SPEED 60.01.007.0005 BOOT 60.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN SPEED SPEED BOOT 60.01.007.0005 BOOT 60.01.007.0005 BIAYA PERAWATAN SPEED BOOT 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.005.0005 COM 53.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 50.01.007.0005 ROP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.003.0013 BIAYA OPERASIONAL TK 60.01.005.0005 BIAYA BIAYA OPRASIONAL KLINIK PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 15.02.002.0007 PEMBUATAN BANGUNAN MP2 51.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN LA 50.01.003.0005 CWC 51.01.011.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.005.0005 COM 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.004.0005 BIAYA PERAWATAN BANGUNAN C 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.005.0005 COM 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.005.0005 COM 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.006.0005 SEP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 52.01.001.0002 TB NURHAYATI 52.01.001.0002 TB NURHAYATI 52.01.001.0002 TB NURHAYATI 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.002.0005 DC 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 51.01.005.0005 BKL-AB 51.01.005.0005 BIAYA PERAWATAN BANGUNAN B 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.007.0005 ROP 51.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.005.0005 BKL-AB 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 53.01.004.0009 BIAYA PENGURUSAN KP RMPC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.001.0005 BIAYA PERAWATAN BANGUNAN B 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN PEMBUATAN MESIN BANGUNAN CETAK D 15.02.001.0008 BRIKET 50.01.003.0005 BIAYA PROYEKPERAWATAN BANGUNAN PEMBUATAN DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 50.01.006.0005 SEP 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 51.01.011.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.011.0005 WHS 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.008.0005 LAB-MCR 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0001 BIAYA MESS DIREKSI 90.01.002.0002 ALAT BIAYAKANTOR PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 50.01.007.0005 ROP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.005.0003 BIAYA PROYEK PENGOLAHAN LIMBAH B3 REPLATING POTON 15.02.002.0019 PBL III 53.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.001.0005 KB GL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0004 BIAYA PERAWATAN MESIN CWC 50.01.007.0008 BIAYA UTILITY ROP 60.01.003.0011 BIAYA SATPAM 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 R 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.002.0005 DC 60.01.007.0001 BIAYA MESS DIREKSI BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0004 BIAYA PROYEKPERAWATAN REPLATINGMESIN POTONSEP 15.02.002.0019 PBL III 15.02.002.0007 PEMBUATAN BANGUNAN PROYEK REPLATING MP2 POTON 15.02.002.0019 PBL III 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0004 BIAYA BIAYA PERAWATAN PENGOLAHANMESIN SEP LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.011.0005 WHS 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 51.01.001.0005 BLR 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.001.0005 BLR 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.001.0005 BLR 51.01.001.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 B 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 15.02.001.0011 REPLANTING PONTON PSK X 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.022.0005 ATP 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.022.0005 BIAYA PERAWATAN BANGUNAN A 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.007.0005 ROP 52.01.001.0001 MT LINA 101 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.005.0005 BKL-AB 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 53.01.001.0005 KB GL 50.01.022.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN A 51.01.003.0005 LST 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PENGOLAHAN MP2B3 LIMBAH 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 53.01.001.0004 BIAYA PERAWATAN MESIN/ALAT 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.012.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN P 51.01.012.0005 PHD 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 53.01.005.0005 KP RMPR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.007.0005 ROP 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 50.01.006.0005 SEP 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.001.0008 PEMBUATAN MESIN BANGUNAN BIAYA PERAWATAN CETAK BRIK 50.01.002.0005 DC 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.005.0004 BIAYA PROYEKPERAWATAN REPLATINGMESIN POTONCOM 15.02.002.0019 PBL III 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.005.0005 COM 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0006 PERAWATAN KANAL/TANGGUL BIAYA PERAWATAN BANGUNAN 50.01.006.0005 SEP 50.01.006.0005 BIAYA PERAWATAN BANGUNAN S 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.002.0005 DC 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.006.0005 SEP 51.01.012.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN PHD BANGUNAN 50.01.007.0005 ROP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PENGOLAHAN MP2B3 LIMBAH 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.005.0005 BKL-AB 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 50.01.003.0005 CWC 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PROYEKPERAWATAN BANGUNAN PEMBUATAN DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.022.0005 ATP 15.02.002.0007 PEMBUATAN BANGUNAN PROYEK REPLATING MP2 POTON 15.02.002.0019 PBL III 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PROYEK PENGOLAHAN LIMBAH B3 REPLATING POTON 15.02.002.0019 PBL III 53.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 50.01.006.0005 SEP 50.01.006.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 S 60.01.005.0003 DAN IPAL 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.001.0005 BLR 15.02.001.0008 PEMBUATAN MESIN CETAK BRIK 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 90.01.002.0002 ALAT BIAYAKANTOR PERAWATAN BANGUNAN 50.01.001.0005 WM 50.01.001.0005 BIAYA PERAWATAN PEMBUATAN MESIN BANGUNAN CETAK 15.02.001.0008 BRIKET 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.003.0005 CWC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 15.02.001.0008 PEMBUATAN MESIN BANGUNAN BIAYA PERAWATAN CETAK BRIK 50.01.002.0005 DC 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 51.01.002.0004 BIAYA PERAWATAN MESIN PP BIAYA PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 51.01.001.0005 BLR 50.01.005.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0019 PROYEK REPLATINGBANGUNAN BIAYA PERAWATAN POTON PBL I 50.01.003.0005 CWC 50.01.003.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 51.01.001.0005 BLR 51.01.001.0005 BIAYA PERAWATAN BANGUNAN B 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0006 PERAWATAN KANAL/TANGGUL 15.02.002.0019 PROYEK REPLATING POTON PBL I 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0006 PERAWATAN KANAL/TANGGUL 52.01.001.0001 MT LINA 101 52.01.001.0001 MT LINA 101 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 51.01.001.0005 BLR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 52.01.001.0001 MT LINA 101 51.01.011.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 53.01.005.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN/ALAT MESIN/ALAT 53.01.005.0004 KP RMPR 15.02.002.0019 PROYEK REPLATING POTON PBL I 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.022.0005 BIAYA PROYEK PERAWATAN PEMBUATANBANGUNAN DOLPHIN A 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PROYEK PEMBUATAN DOLPHIN D REPLATING POTON 15.02.002.0019 PBL III 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN ALAT LAB- 51.01.007.0004 UJI 51.01.007.0004 BIAYA BIAYA PERAWATAN PERAWATAN ALAT LAB-UJI BANGUNAN 50.01.007.0005 ROP 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.011.0005 WHS 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.011.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.011.0005 WHS 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PROYEKPERAWATAN BANGUNAN PEMBUATAN DOLPHIN D 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0007 PEMBUATAN BANGUNAN MP2 52.01.001.0001 MT LINA 101 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.022.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN A 50.01.022.0005 ATP 15.02.002.0019 PROYEK REPLATING POTON PBL I 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.007.0005 ROP 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 50.01.003.0005 CWC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 53.01.002.0005 KB 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 50.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 53.01.001.0004 BIAYA PERAWATAN MESIN/ALAT 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 53.01.002.0005 BIAYA PERAWATAN BANGUNAN K 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA BIAYA MESS DIREKSI LIMBAH B3 PENGOLAHAN 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.002.0005 KB 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.020.0005 PWT 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0006 PERAWATAN KANAL/TANGGUL 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 53.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.002.0005 KB 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R BIAYA PERAWATAN BANGUNAN 50.01.002.0005 DC 15.02.002.0018 PROYEK PEMBUATAN BIAYA PERAWATAN DOLPHIN D BANGUNAN 50.01.002.0005 DC 50.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN MESIN/ALAT 53.01.005.0004 KP RMPR 60.01.007.0002 BIAYA BIAYA PERAWATAN PERAWATAN MESIN BANGUNAN 50.01.003.0005 CWC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 15.02.002.0007 PEMBUATAN BANGUNAN MP2 51.01.011.0006 BIAYA BIAYA ADMINISTRASI WHS PERAWATAN BANGUNAN 51.01.002.0005 PP 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI PEMBUATAN MESIN CETAK 15.02.001.0008 BRIKET 51.01.011.0006 BIAYA BIAYA ADMINISTRASI WHS PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 51.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN LA 51.01.007.0005 LAB-UJI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.006.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN S 51.01.001.0005 BLR 51.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN B 53.01.001.0005 KB GL 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 70.01.001.0003 HP / PENJPEMBUATAN PROYEK CST DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PROYEK PEMBUATAN PEMBUATAN DOLPHIN DOLPHIN D 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 53.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.001.0005 KB GL 53.01.001.0005 BIAYA PERAWATAN BANGUNAN K BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.007.0005 BIAYA PERAWATAN PEMBUATAN BAK BANGUNAN R 15.02.002.0011 PENAMPUNGAN IPAL 15.02.002.0011 PEMBUATAN BAK PENAMPUNGAN BIAYA PERAWATAN BANGUNAN 50.01.006.0005 SEP 50.01.006.0005 BIAYA PROYEKPERAWATAN PEMBUATANBANGUNAN DOLPHIN S 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 15.02.002.0018 PROYEK PROYEK PEMBUATAN PEMBUATAN DOLPHIN DOLPHIN D 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 53.01.001.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 K 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PROYEKPERAWATAN PEMBUATANBANGUNAN DOLPHIN 15.02.002.0018 DERMAGA EXPOR NO. 2 DAN 4 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.005.0005 KP RMPR 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.012.0005 PHD 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.006.0005 SEP 50.01.006.0005 BIAYA PROYEK PERAWATAN REPLATINGBANGUNAN POTON S 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATING POTON BIAYA PENGOLAHAN LIMBAH PBL B3 I 60.01.005.0003 DAN IPAL 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN MESIN DC 51.01.002.0004 BIAYA PERAWATAN MESIN PP 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.006.0005 SEP 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0006 PERAWATAN KANAL/TANGGUL 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN A 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 R L 60.01.007.0005 BIAYA PERAWATAN SPEED BOOTA BIAYA PERAWATAN BANGUNAN N 50.01.007.0005 ROP 53.01.002.0005 BIAYA PERAWATAN BANGUNAN K 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN PEMBUATAN MESIN MESIN CETAKDC 15.02.001.0008 BRIKET 15.02.001.0008 PEMBUATAN MESIN CETAK BRIK 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 51.01.002.0005 PP 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.002.0005 BIAYA PERAWATAN BANGUNAN P 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 15.02.001.0004 PROYEK EXPANSI DC- PERBAIAK 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN MESIN/ALAT 53.01.005.0004 KP RMPR 53.01.005.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN/ALAT MESIN/ALAT 53.01.005.0004 KP RMPR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.001.0005 WM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.022.0005 BIAYA PERAWATAN BANGUNAN A 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.004.0005 BKL-U 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 51.01.005.0005 BKL-AB 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.001.0005 KB GL 53.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 50.01.001.0005 WM 60.01.005.0001 BIAYA SAFETY DAN PEMADAM 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 53.01.001.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 53.01.001.0005 KB GL 53.01.001.0005 BIAYA PERAWATAN BANGUNAN K 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.022.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN A 51.01.012.0005 PHD 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 51.01.011.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 51.01.008.0004 BIAYA PERAWATAN ALAT LAB-M 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.001.0005 BLR 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 70.01.001.0003 HP / PENJ CST 70.01.001.0003 HP / PENJ CST 70.01.001.0003 HP / PENJ CST 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 70.01.001.0003 HP / PENJ BIAYA CST PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN BIAYA PERAWATAN BANGUNAN 50.01.007.0005 ROP 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 70.01.001.0003 HP / PENJ CST 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.007.0005 ROP 50.01.005.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 50.01.002.0004 BIAYA PERAWATAN MESIN DC 52.01.001.0002 TB NURHAYATI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.012.0005 PHD 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0001 BIAYA MESS DIREKSI 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.007.0005 BIAYA PERAWATAN BANGUNAN R 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0002 BIAYA PERAWATAN MESIN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.022.0005 ATP 50.01.022.0005 BIAYA PERAWATAN BANGUNAN A 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0006 PERAWATAN KANAL/TANGGUL BIAYA PERAWATAN BANGUNAN 50.01.022.0005 ATP 50.01.022.0005 BIAYA PERAWATAN PEMBUATAN BAK BANGUNAN A 15.02.002.0011 PENAMPUNGAN IPAL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN PEMBUATAN BAK BANGUNAN 15.02.002.0011 PENAMPUNGAN IPAL 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.007.0005 ROP 15.02.002.0007 PEMBUATAN BANGUNAN MP2 BIAYA PERAWATAN BANGUNAN 51.01.001.0005 BLR 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 50.01.006.0005 SEP 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PERAWATAN MP2 BANGUNAN 51.01.001.0005 BLR 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.002.0005 DC 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0017 PROYEK PROYEK PEMBUATAN PEMBUATAN DOLPHIN DOLPHIN 15.02.002.0017 UBK 70.01.001.0003 HP / PENJ CST 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.003.0005 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PROYEKPERAWATAN BANGUNAN PEMBUATAN DOLPHIN 15.02.002.0017 UBK 15.02.002.0019 PROYEK PROYEK REPLATING REPLATING POTON POTON PBL I 15.02.002.0019 PBL III 15.02.002.0019 PROYEK REPLATINGBANGUNAN BIAYA PERAWATAN POTON PBL I 53.01.001.0005 KB GL 53.01.001.0005 BIAYA PERAWATAN BANGUNAN K 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA BIAYA PERAWATAN PERAWATAN MESIN DC BANGUNAN 51.01.002.0005 PP 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN D 50.01.002.0005 DC 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.002.0005 DC 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 BIAYA PENGOLAHAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.007.0004 BIAYA PERAWATAN MESIN ROP 50.01.005.0004 BIAYA PERAWATAN MESIN COM 51.01.011.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 51.01.002.0005 PP 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 60.01.007.0001 BIAYA BIAYA MESS DIREKSI PERAWATAN BANGUNAN 50.01.002.0005 DC 50.01.002.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN MESIN/ALATD 53.01.002.0004 KB 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0001 BIAYA MESS DIREKSI 60.01.007.0001 BIAYA MESS DIREKSI 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 53.01.001.0005 BIAYA PERAWATAN BANGUNAN K 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 50.01.007.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN R 50.01.007.0005 ROP 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.002.0004 BIAYA PERAWATAN MESIN DC 50.01.001.0005 BIAYA PERAWATAN BANGUNAN 60.01.005.0002 BIAYA OPRASIONAL HSE 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0002 BIAYA OPRASIONAL HSE 53.01.005.0005 BIAYA PERAWATAN BANGUNAN K 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN MP2 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 53.01.005.0005 KP RMPR 53.01.005.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN K 50.01.002.0005 DC 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 D 60.01.005.0003 DAN IPAL 50.01.002.0005 BIAYA PERAWATAN BANGUNAN D 60.01.005.0005 BIAYA OPRASIONAL KLINIK 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.005.0005 COM 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.007.0003 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 50.01.007.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 R 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 15.02.002.0007 PEMBUATAN BANGUNAN MP2 15.02.002.0007 PEMBUATAN BANGUNAN MP2 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.022.0005 ATP 15.02.002.0018 PROYEK PEMBUATAN DOLPHIN D 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 70.01.001.0003 HP / PENJ CST 60.01.007.0006 PERAWATAN KANAL/TANGGUL 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 53.01.005.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 K 60.01.005.0003 DAN IPAL 50.01.003.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA BIAYA PENGOLAHAN LIMBAH B3 PERAWATAN BANGUNAN 51.01.002.0005 PP 60.01.005.0003 BIAYA BIAYA PENGOLAHAN PENGOLAHAN LIMBAH LIMBAH B3 B3 60.01.005.0003 DAN IPAL 50.01.022.0005 BIAYA BIAYA PERAWATAN PENGOLAHANBANGUNAN LIMBAH B3 A 60.01.005.0003 DAN IPAL 60.01.005.0003 BIAYA PENGOLAHAN LIMBAH B3 60.01.007.0003 BIAYA PERAWATAN BANGUNAN 15.02.002.0007 PEMBUATAN BANGUNAN BIAYA PENGOLAHAN MP2B3 LIMBAH 60.01.005.0003 DAN IPAL 50.01.003.0005 BIAYA BIAYA PERAWATAN PERAWATAN BANGUNAN BANGUNAN 50.01.003.0005 CWC 50.01.003.0005 BIAYA PERAWATAN BANGUNAN