Method Statement
Method Statement
Electrical Room
Table of content
1.0 Scope of work
2.0 Reference
3.0 Responsibilities
4.0 EH & SAFETY Contractor Requirements
5.0 Safety precaution
6.0 QA/QC Plan
7.0 Tools, Material & Equipments to be used
8.0 Work procedure for Construction of Electrical room
9.0 Quality Inspection
10.0 House-keeping & Closing of site
11.0 Documents (Attachments
2.0 Reference:
All referenced Standards, Specifications and similar material shall be the
latest issue (including all revisions, addenda and supplements) unless
stated otherwise.
3.0 Responsibilities:
Responsibilities of Project Manager/Construction Manager/Site Engineer/
Safety Personnel/QA-QC, Site Supervisor, etc. will be here.
Required PPE safety shoes, safety goggles inclusive of High visibility Vest
shall be strictly adhered for all working personnel at job site.
Prior to each construction activity, Job Safety Analysis (JSA) will be prepared
and issued to the concerned personnel.
The Job Safety Analysis (JSA) shall be clearly explained to every individual
involved.
Method Statement for Construction of
Electrical Room
The Job Safety Analysis (JSA) shall be signed by the involved personnel and
a copy to be kept at the work spot for any time verification.
10.0 House-keeping:
11.0 Documes:
Checklists, work permits, etc.