This document provides dimensions, quantities, and assumptions for various elements of a construction project including a car park, truck parking apron, lawn and landscaped areas, warehouse, office, and more. It includes excavation depths, concrete slab thicknesses, dimensions of driveways, footpaths, buildings, doors, windows, and other structural elements. Off-cut allowances and unit weights of various materials are also specified. The document appears to be collecting relevant data and assumptions to inform quantity take-offs and cost estimating for the project.

Uploaded by

we have
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views

Assignment 2

This document provides dimensions, quantities, and assumptions for various elements of a construction project including a car park, truck parking apron, lawn and landscaped areas, warehouse, office, and more. It includes excavation depths, concrete slab thicknesses, dimensions of driveways, footpaths, buildings, doors, windows, and other structural elements. Off-cut allowances and unit weights of various materials are also specified. The document appears to be collecting relevant data and assumptions to inform quantity take-offs and cost estimating for the project.

Uploaded by

we have
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

DATA & ASSUMPTIONS

Topsoil excavation depth 0.1 m


Sandy clay excavation depth 0.2 m
FCR refill depth 0.2 m
Construction clearence 2 m
Mesh 0.2 m
Width of gutter 0.125 m
Gradient of fall 0.05

Off-Cut and Overlap


Formwork 1.05 %
Reinforcement 1.05 %

Dimensions of Car Park


Length 17.6 m
Width 17.2 m
Concrete Slab thickness 0.15 m

Dimensions of Truck Parking Apron


Length 30 m
Width 10 m
Concrete Slab thickness 0.2 m

Dimesions of Lawn & Landscaped Area


Section 1
Length 7.3 m
Width 2.2 m
Area 16.06 m2
Section 2
Length 24.9 m
Width 7.8 m
Area 194.22 m2
Section 3 (to be excluded)
Length 3 m
Width 3 m
Area 4.5 m2
Total Area 205.78 m2
Area Depth 0.35 m

Dimesions of Kerb
Side 1 length 10 m
Side 2 length 17.6 m
Side 3 length 21.5 m
Side 4 length 4.2 m
Side 5 length 2.2 m
Side 6 length 7.8 m
Width 0.15 m
Height 0.35 m

Dimensions of Driveway Crossovers


Large Driveway
Top length 30 m
Bottom length 32.1 m
Side length 1.83 m
Width 1.5 m
Small Driveway
Top length 6 m
Bottom length 8.1 m
Side length 1.83 m
Width 1.5 m
Cut-out triangle bottom length 1.05 m
Concrete Slab thickness 0.2 m

Dimesions of Footpath
Width 1.5 m
Height 0.1 m

Dimension of Warehouse
Length: 25 m
Width: 15 m
Height: 6.5 m
Brick Wall thickness: 0.15 m
Thickness of 460UB75: 0.547 m
Unit Weight of 460UB75 74.6 kg/m
Unit Weight of 165 CHS 5 19.74 kg/m
Unit weight of 20 mm rod 2.46 kg/m
Lysaght C20019 5.74 kg/m
250 PFC 35.5 kg/m
Base Plate thickness: 0.03 m
Base Plate length: 0.675 m
Base Plate width: 0.4 m
Base Plate Unit weight: 236 kg/m
Slab Thickness: 0.2 m
Length of downpipe 6 m
Length of gutter 25 m
Length of ridge flashing 25 m
Width of ridge flashing 0.31 m
Run of roof 7.22 m
Rise of roof 0.361 m

Dimension of Roller Shutter Doors


Length: 3.6 m
Height: 4.6 m
Area: 16.56 m2

Dimension of Truck Washdown Bay


Length: 15 m
Wifth: 5 m
Height: 4.5 m
Brick Wall thickness: 0.15 m
Concrete Slab thickness 0.2 m

Dimension of Office
Length: 7.3 m
Width: 15 m
Height: 4.5 m
Brick Wall thickness: 0.125 m
310UB32 rafters 32 kg/m
Lysaght C15015 3.59 kg/m
200PFC 22.9 kg/m
150PFC 17.7 kg/m
Unit weight of 20 mm rod 2.47 kg/m
Unit Weight of 165 CHS 5 19.74 kg/m
Slab Thickness: 0.15 m
Length of downpipe 4 m
Run of roof 7.175 m
Rise of roof 0.359 m
Length of gutter 15 m

Dimension of Office Door


Outside Door
Height: 2.1 m
Width: 0.95 m
Area: 1.995 m2
Door from office to warehouse
Height: 2.1 m
Width: 1 m
Area: 2.1 m2

Dimension of Aluminium framed windows


Height: 3 m
Width: 3.7 m
Area: 11.1 m2
Dimension of Aluminium framed door & glazing
Height: 3 m
Width: 2.25 m
Area: 6.75 m2

Potal Frame Footing Details


Length: 2 m
Width: 2 m
Height: 1 m
Diameter of HD Bolts: 0.03 m
Number of HD Bolts per footings: 4 nr
Distance from rebar to formwork: 0.1 m
Unit weight of 20 mm deformed bar: 2.47 kg/m

Warehouse Edge Beam Details


Top Width 0.925 m
Bottom Width 0.6 m
Height: 0.3 m
Slope: 4.2 m
Unit weight of 20 mm deformed bar: 0.62 kg/m
Unit weight of 20 mm deformed bar: 2.47 kg/m

Footing Beam between Office & Warehouse


Width: 0.6 m
Height: 0.3 m
Slope: 4.2 m

Office Edge Beam Details


Width: 0.6 m
Height: 0.3 m
Slope: 4.2 m

Verandah
Length 1.2 m
Width 3.25 m
Run of roof 1.075 m
Rise of roof 0.054 m
Length of faschia 3.25 m
Length of flashing 25 m
Length of downpipe at verandah 3.5 m
Length of gutter 3.25 m

Quantity Take-Off
No. Length Height
Item Description Unit off (m) Width (m) (m)
1 Site Cearence, Excavation & Backfilling
Excavation of existing vegetation & rubbish
1.1 from site and cart to spoil ha 1
Car Park m2 1 17.6 17.2 0.1
Office m 2
1 7.3 15 0.1
Warehouse m2 1 25 15 0.1
Truck Washdown Bay m 2
1 15 5 0.1
Truck Parking Apron m2 1 30 10 0.1
Section 1 m 2
1 7.3 2.2 0.1
Section 2 m2 1 24.9 7.8 0.1
Section 3 (to be excluded) m 2
1 3 3 0.1
Lawn & Landscaped Area m2
1.2 Excavation of topsoil (100 mm) m2 1
Cart excess topsoil to retain for Lawn &
1.3 Landscaped area filling (350 mm) m3 1 0.35
1.4 Cart excess topsoil to Council depot m 3
1
Large driveway crossover m3 1 35.05 5.5 0.1
Small driveway crossover m 3
1 11.05 5.5 0.1
1.5 Removal of concrete footpath m3
Car Park m3 1 17.6 17.2 0.2
Office m3 1 7.3 15 0.2
Warehouse m 3
1 25 15 0.2
Truck Washdown Bay m3 1 15 5 0.2
Truck Parking Apron m 3
1 30 10 0.2
1.6 Excavation of natural ground (sandy clay) m3
1.7 Cart excavated sandy clay to spoil m3 1
Car Park m3 1 17.6 17.2 0.2
Truck Washdown Bay m 3
1 15 5 0.2
Truck Parking Apron m3 1 30 10 0.2
Large driveway crossover m 3
1 35.05 5.5 0.2
Small driveway crossover m3 1 11.05 5.5 0.2
Refill 20 mm FCR & compact to 200 mm under
1.8 all concrete slabs m3 1
1.9 Excavation for portal frame footings m3 8 6 6 0.8
Excavation for footing beam between
1.10 warehouse and office m3 1 19 0.925 0.1
Excavation for warehouse and office edge
1.11 beams m3 2 19
Total m2
m3
ha

2 Formwork
2.1 Car park slab m2 2 17.6 17.2 0.15
2.2 Truck parking apron slab m 2
2 30 10 0.2
2.3 Truck washdown slab m2 2 15 5 0.2
Top length m 30
Bottom length m 32.1
Side length m 2 1.83
Large driveway crossover m2 0.2
Top length m 6
Bottom length m 8.1
Side length m 2 1.83
Small driveway crossover m 2
0.2
2.4 Driveway crossover m2
2.5 F1: rough finish to footings.
For Portal Frame Footing m2 8 2 2 1
For Warehouse Edge Beam m2 2 4.2 0.6 0.3
Footing Beam between Office & Warehouse m2 1 4.2 0.6 0.3
Office Edge Beam m2 2 4.2 0.6 0.3
2.6 Kerb
Side 1 m2 2 10 0.35
Side 2 m2 2 17.6 0.35
Side 3 m2 2 21.5 0.35
Side 4 m2 2 4.2 0.35
Side 5 m2 2 2.2 0.35
Side 6 m2 2 7.8 0.35
Edge m2 1 0.15 0.35
Total Kerb m2
2.7 Reinstate Existing Concrete Footpath
Side length m2 4 1.5 0.1
Bottom length m2 4 1.05 0.1
Total Concrete Footpath Reinstated m2
Total: m2

3 Concrete
In Situ Concrete Design Mix
Car park slab reinforced with one layer of SL72
3.1 mesh m3 1 17.6 17.2 0.15
Truck parking apron reinforced with two layers
3.2 of SL92 mesh m3 1 30 10 0.2
Truck washdown slab reinforced with one layer
3.3 of SL92 mesh m3 1 15 5 0.2
Large driveway crossover reinforced with SL92
mesh m3 1 31.05 1.5 0.2
Small driveway crossover reinforced with SL72
mesh m3 1 7.05 1.5 0.2
3.4 Driveway crossover m 3

Total: m3
3.5 Footings to [Warehouse and Office].
30 Mpa Concrete for Portal Frame Footing: m3 8 2 2 1
30 MPa for Warehouse Edge Beam: m3 1 63.8 0.6 0.3
30 MPa for Foorting Beam between Office &
Warehouse: m3 1 13.2 0.6 0.3
30 MPa for Office Edge Beam: m3 1 28.4 0.6 0.3
Total m3
3.6 Ground Slab to [Warehouse and Office].
30 MPa for Warehouse Slab: m3 1 25 15 0.2
30 MPa for Office Slab: m3 1 15 7.3 0.15
Total m3
3.7 Kerb
Side 1 m3 1 10 0.15 0.35
Side 2 m3 1 17.6 0.15 0.35
Side 3 m3 1 21.5 0.15 0.35
Side 4 m3 1 4.2 0.15 0.35
Side 5 m3 1 2.2 0.15 0.35
Side 6 m3 1 7.8 0.15 0.35
Total m3
3.8 Reinstate Existing Concrete Footpath
Replacing footpath that have been removed m3 4 1.05 1.5 0.1
Total m3

4 Reinforcement
For Portal Frame Footing
Nominal diameter: 20 mm.
Direction 1: t 64 5.4
Direction 2: t 64 5.4
Perimeter 1: t 8 7.4
Perimeter 2: t 8 7.4
Total Portal Frame Footing Reinforcement: t
For Warehouse Edge Beam
Nominal diameter: 20 mm.
Direction 1 (20mm diameter): t 6 79.2
Nominal diameter: 10 mm.
Perimeter 1 (10mm diameter): t 130 1.6

Footing Beam between Office & Warehouse


Nominal diameter: 20 mm.
Direction 1 (20mm diameter): t 6 15
Nominal diameter: 10 mm.
Perimeter 1 (10mm diameter): t 30 1.6

Office Edge Beam


Nominal diameter: 20 mm.
Direction 1 (20mm diameter): t 6 29
Nominal diameter: 10 mm.
Perimeter 1 (10mm diameter): t 58 1.6
4.1 Total 20mm diameter: t
4.2 Total 10mm diameter: t

5 Metal Work
Supply and Erection of Structural Members
For warehouse
Pre- engineered steel portal frame as shown in
5.1 Drawing No. (C14004)
Beam 460UB75 t 4 14.72
Column 460UB75 t 8 6.077
Total: t
[165.1 mm OD × 5.0 mm thick × 19.74 kg/m]
circular hollow section to portal frame as
shown in Drawing No. (C14002)
5.2 165 CHS 5 strut braces t 10 5
5.3 20mm rod cross bracing t 14 7.07
[250 × 90 × 15 mm thick] C-section as
5.4 horizontal wall framing.
250 PFC t 2 14.7
HSFG bolts to [BS 4604], nominal diameter
5.5 (30mm] with proof load of [850 Ig]
30mm × 850 HD Bolts nr 8
For Office
Pre- engineered steel portal frame as shown in
5.6 Drawing No. (C14004)
Beam 310UB32 t 4 7.184
[200 × 75 × 12 mm thick] C-section as
5.7 horizontal wall framing.
200PFC t 2 7.175
[150 × 75 × 9.5 mm thick] C-section as
5.8 horizontal wall framing.
150PFC t 2 2.25
150PFC t 2 3.25
Total: t
[165.1 mm OD × 5.0 mm thick × 19.74 kg/m]
circular hollow section to portal frame as
5.9 shown in Drawing No. (C14002)
165 CHS 5 strut braces t 5 2.95
5.10 20 mm rod cross bracing t 12 4.645
5.11 Total SL72 mesh
Car park mesh m2 1 17.6 17.2
Small Driveway Crossover m2 1 7.05 1.5
Office m2 2 15.2 7.32
Total m2
Miscellaneous Metalwork
5.12 Total SL92 mesh
Truck parking apron m2 1 30 10
Truck washdown bay m2 1 15 5
Large Driveway Crossover m2 1 31.05 1.5
Warehouse m2 2 25.2 15.2
Total m2
5.13 400 × 675 × 30mm × 236kg/m plate m2 16 0.675 0.4 0.03

6 Roofing Work
For Warehouse
[203 × 76 × 1.9 mm] thick cold formed
6.1 galvanised mild steel C-channel as purlins.
Lysaght C20019 Purlin t 10 24.7
For Office
[152 × 64 × 1.5 mm] thick cold formed
6.2 galvanised mild steel C-channel as purlins.
Lysaght C15015 Purlin t 5 15
Lysaght C15015 Purlin t 2 3.25
Total: C15015 t
6.3 ROOF COVERING
Roof of warehouse m2 2 25 7.229
Roof of office m2 1 15 7.184
Roof of verandah m2 1 3.25 1.076
Roofing
Total m2
Roof Covering
6.4 Fascia m 1 3.25
6.5 Flashing m 1 25
Profile sheet component
6.6 Ridge capping m 1 25
Gutters and Downpipes
Gutter 1 m 2 25
Gutter 2 m 1 15
Gutter 3 m 1 3.25
6.7 Total: Rainwater gutter m
Downpipe 1 m 4 6
Downpipe 2 m 2 4
Downpipe 3 m 1 3.5
6.8 Total: Downpipe (150mm) m
6.9 Total: Downpipe (100mm) m

7 Brickwork
7.1 For Warehouse
[150 mm] thick [common brickwork] laid in
stretcher bind, jointed in [1:3] cement mortar.
150mm Brickwall (North) m2 1 25 6.5
150mm Brickwall (South) m2 1 25 6.5
150mm Brickwall (East) m2 1 14.7 6.5
150mm Brickwall (West) m2 1 14.7 6.5
Total: m2
7.2 For Truck washing Bay
[150 mm] thick [common brickwork] laid in
stretcher bind, jointed in [1:3] cement mortar.
150mm Brickwall m2 1 5 4.5
Total: m2
7.3 For Office
[125 mm] thick [common brickwork] laid in
stretcher bind, jointed in [1:3] cement mortar.
125mm Brickwall (North) m2 1 7.3 4.5
125mm Brickwall (South) m2 1 7.3 4.5
125mm Brickwall (West) m2 1 14.75 4.5
Total: m2

8 WINDOWS AND DOORS


8.1 Aluminium framed windows nr 2
8.2 Aluminium framed door nr 1
8.3 Roller shutter doors nr 3
8.4 Staff access door nr 1

9 GLAZING
Panel 1 m2 1 0.8 2.25
Panel 2 m2 2 2.2 0.5
Panel 3 m2 1 2.2 1.25
Clear float glass for aluminium framed
9.1 entrance door m2
Total: m2
Unit Weight Volume
(kg/m) Area (m2) (m3) Total

0.0028
302.72 30.27
109.5 10.95
375 37.5
75 7.5
300 30
16.06 1.61
194.22 19.42
4.5 0.45
205.78 20.58
1368 136.8

205.78 72.02
64.78
19.28
6.08
25.36
60.54
21.9
75
15
60
232.44
232.44
60.54
15
60
38.56
12.16

186.26
230.4

1.76

0.11 4.18
1368
680.4
0.0028

10.96
16.8
8.4

13.81

3.73
17.54

33.66
299.19
116.42
135.89

7.35
12.94
15.8
3.09
1.62
5.73
0.06
46.59

0.63
0.44
1.07
686.52

45.41
60

15

9.32

2.12
11.44
131.85

32
14.36

3.56
6.39
56.31

75.00
16.43
91.43

0.53
0.92
1.13
0.22
0.12
0.41
3.33

0.63
0.63

2.47 0.85
2.47 0.85
2.47 0.15
2.47 0.15
2.00
2.47 1.17

0.62 0.13

2.47 0.22

0.62 0.03

2.47 0.43

0.62 0.06
3.83
0.22

74.6 4.39
74.6 3.63
8.02

19.74 0.99
2.46 0.24

35.5 1.04

32

32 0.92

22.9 0.33
17.7 0.08
17.7 0.12
0.19

6.75 0.10
2.47 0.14

325.21
12.94
233.65
571.8

323.44
82.99
9.84
804.38
1220.65
4.32

5.74 1.42

3.59 0.27
3.59 0.02
0.29

361.45
107.76
3.497

472.707

3.25
25
25

50
15
3.25
68.25
24
8
3.5
32
3.5

162.5
112.82
95.55
93.45
464.32

22.5
22.5

32.85
21.75
48.38
102.98

2
1
3
1

1.8
2.2
2.75

6.75
6.75
Bill of Quantities
Item Code Description Unit Quantity
1 SITE CLEARENCE, EXCAVATION & BACKFILLING
1.1 E110.1 Excavation of existing vegetation and rubbish ha 0.0028
1.2 F111.2 Excavation of topsoil (100mm) m2 1368
Excavation of topsoil to place and lightly consolidate it to 350
1.3 F211 mm over Lawn & Landscaped area m3 72.02
1.4 F131.1 Excavation of topsoil to be disposed to Council Depot m3 1162.2
1.5 F144 Removal of concrete footpath m3 25.36
1.6 F121.2 Excavation of natural ground (sandy clay) m3 232.44
1.7 F131.1 Cart excavated sandy clay to spoil m3 232.44
Refill 20 mm FCR & compact to 200 mm under all concrete
1.8 F334 slabs m3 186.26
1.9 F141 Excavation for portal frame footings m3 230.4
1.10 F141 Excavation for footing beam between warehouse and office m3 1.76
1.11 F141 Excavation for warehouse and office edge beams m3 4.18
Total
2 I500 FORMWORK
2.1 I511.4 Rough finish to car park ground slab m2 10.96
2.2 I511.4 Rough finish to truck parking apron slab m2 16.8
2.3 I511.4 Rough finish to truck washdown slab m2 8.4
2.4 I511.4 Rough finish to driveway crossovers m2 17.54
2.5 I511.2 Rough finish to footings. m2 686.52
2.6 I514.1 Kerb m2 46.59
2.7 I511.4 Reinstated existing concrete footpath m2 1.07
Total
3 CONCRETE
I100 In Situ Concrete Design Mix
3.1 I142.4 Car park slab reinforced with one layer of SL72 mesh m3 45.41
Truck parking apron slab reinforced with two layers of SL92
3.2 I142.4 mesh
Truck washdown slab reinforced with two layers of SL92 m3 60
3.3 I142.4 mesh m3 15
3.4 I142.4 Driveway crossovers reinforced with SL92 and SL72 mesh m3 11.44
3.5 I142.2 Footings to [Warehouse and Office]. m3 56.31
3.6 I142.4 Ground Slab to [Warehouse and Office]. m3 91.43
3.7 I148 Kerb around Lawn & Landscaped area m3 3.33
3.8 I142.4 Reinstate existing concrete footpath m3 0.63
Total
4 I600 REINFORCEMENT
4.1 I616 Nominal diameter: 20 mm. t 3.83
4.2 I613 Nominal diameter: 10 mm. t 0.22
Total
5 METAL WORK
L100 Supply and Erection of Structural Members
For warehouse
Pre- engineered steel portal frame as shown in Drawing No.
5.1 L133 (C14004) t 8.02
[165.1 mm OD × 5.0 mm thick × 19.74 kg/m] circular hollow
5.2 L143 section to portal frame as shown in Drawing No. (C14002) t 0.99
5.3 20mm rod cross bracing t 0.24
5.4 L122.1 [250 × 90 × 15 mm thick] C-section as horizontal wall framing. t 1.04
L164 HSFG bolts to [BS 4604], nominal diameter (30mm] with
5.5 proof load of [850 Ig] nr 32
For Office
Pre- engineered steel portal frame as shown in Drawing No.
5.6 L133 (C14004) t 0.92
5.7 L122.1 [200 × 75 × 12 mm thick] C-section as horizontal wall framing. t 0.33
[150 × 75 × 9.5 mm thick] C-section as horizontal wall
5.8 L122.1 framing. t 0.19
[165.1 mm OD × 5.0 mm thick × 19.74 kg/m] circular hollow
5.9 L143 section to portal frame as shown in Drawing No. (C14002) t 0.10
5.10 20 mm rod cross bracing t 0.14
L200 Miscellaneous Metalwork
5.11 L263 Welded mesh paneling SL72 m2 571.80
5.12 L263 Welded mesh paneling SL92 m2 1220.65
L300 Miscellaneous Metalwork
5.13 L315 400 × 675 × 30mm × 236kg/m plate m2 4.32
Total
6 M100 ROOFING WORK
For Warehouse
M113.4 [203 × 76 × 1.9 mm] thick cold formed galvanised mild steel
6.1 C-channel as purlins. t 1.42
For Office
M113.4 [152 × 64 × 1.5 mm] thick cold formed galvanised mild steel
6.2 C-channel as purlins. t 0.29
Roof Covering
Roofing work; Roof covering; Profile sheet [0.30m Spandek
zincalume corrugated roofing laid at 2.86 degrees to the
6.3 M122 horizontal as show in Drawing No. C14004] m2 472.707
6.4 Roofing Ancillaries
6.4 M152.2 Fascia; [3250mm × 25mm thick] m 3.25
6.5 M153.2 Flashing; [20 SWG thick galvanised mild steel ; 310mm girth] m 25
Profiled Sheet Components
Ridge capping; [0.48mm thick; galvanised mild steel 600mm
6.6 M172.1 girth] m 25
Gutters and Downpipes
6.7 M211 Rainwater gutters; [125mm half round] m 68.25
6.8 M213 Downpipes; [150 diameter] m 32
6.9 Downpipes; [100 diameter] m 3.5
Total
7 J100 BRICKWORK
7.1 For Warehouse
J110.1 [150 mm] thick [common brickwork] laid in stretcher bind,
jointed in [1:3] cement mortar. m2 464.32
7.2 For Truck washing Bay
J110.1 [150 mm] thick [common brickwork] laid in stretcher bind,
jointed in [1:3] cement mortar. m2 22.5
7.3 For Office
J110.1 [125 mm] thick [common brickwork] laid in stretcher bind,
jointed in [1:3] cement mortar. m2 102.98
Total
8 M500 WINDOWS AND DOORS
Natural anodised windows to suit; [size 3000mm × 3750mm;
side hung casement window; shape rectangular; complete
with 6mm thick clear float glass as shown in Drawing No.
8.1 M522 A14003] nr 2
Natural anodised doors sub-frames to suit; [size 3000mm ×
2250mm; side hung; shape rectangular as shown the Drawing
8.2 M523 No. A14003] nr 1
Natural anodised motorised aluminium roller shutter door
complete with rollers, guide, pelmet, and locks; [4600mm ×
8.3 M524.2 3600mm] as shown in Drawing No. A14003] nr 3
Door sub-frames; [Grade A timber; size 2100mm × 950mm;
8.4 M513 shape rectangular as shown in Drawing No. A14003] nr 1
Total
9 M600 GLAZING
9.1 M610.2 10mm tinted glass; fixed with putty m2 6.75
Total
Grand Total
Rate Amount (RM)

RM25.10 RM702.80
RM19.30 RM26,402.40

RM19.30 RM1,389.99
RM19.30 RM22,430.46
RM19.30 RM489.45
RM19.30 RM4,486.09
RM19.30 RM4,486.09

RM19.30 RM3,594.82
RM19.30 RM4,446.72
RM19.30 RM33.97
RM19.30 RM80.67
RM68,543.46

RM15.30 RM167.69
RM15.30 RM257.04
RM15.30 RM128.52
RM15.30 RM268.36
RM15.30 RM10,503.76
RM15.30 RM712.83
RM15.30 RM16.37
RM12,054.56

RM215.00 RM9,763.15

RM215.00 RM12,900.00
RM215.00 RM3,225.00
RM215.00 RM2,459.60
RM215.00 RM12,107.51
RM215.00 RM19,656.38
RM215.00 RM715.95
RM215.00 RM135.45
RM60,963.04

RM9,303.80 RM35,592.01
RM2,280.00 RM493.06
RM36,085.08

RM7,390.08 RM59,262.54

RM2,788.00 RM2,751.76
RM55,535.29 RM13,522.33
RM8,562.25 RM8,936.42

RM125.60 RM4,019.20

RM8,660.63 RM7,963.90
RM8,458.52 RM2,779.60

RM8,418.08 RM1,639.00

RM2,788.00 RM277.58
RM55,535.29 RM7,645.98

RM7.55 RM4,317.09
RM12.47 RM15,221.51

RM9.50 RM41.04
RM128,377.94

RM33,652.71 RM47,712.13

RM36,418.99 RM10,655.65

RM131.27 RM62,052.25

RM51.94 RM168.81
RM57.57 RM1,439.25

RM105.73 RM2,643.25
RM18.17 RM1,240.10
RM24.90 RM796.80
RM11.38 RM39.83
RM126,748.07

RM28.89 RM13,414.20

RM28.89 RM650.03

RM28.89 RM2,975.09
RM17,039.32

0
0

0
0
RM449,811.46