SOP 2 - SOP For Sealant Application-1
SOP 2 - SOP For Sealant Application-1
3. After sealant application minimum 30 min curing time to be allowed before engine firing
4. Both Joint face flange surfaces to be cleaned, free from dirt & ensure no oil traces on the matting
faces
6. Bead application should be uniform at the center of the flange ±0.5 mm, as shown below
7. Bead overlap of Min 5 mm ±1.0 mm length to be maintained at the start & end of the profile.
STANDARD OPERATING PROCEDURE
Application Procedure:
2. Before applying the sealant in Cylinder head cambore U shape area, it should free from moisture,
oil and other foreign particles
Application Procedure:
2. Before applying sealant, Ensure Cover LH & Stator coil grommet (U-Shape areas) should be free
from dirt, moisture & oil traces
4. After sealant application minimum 15 min curing time to be allowed before engine firing
5. Sealant to be applied in grommet U-Shape area as shown in image below