0% found this document useful (0 votes)
73 views23 pages

SMG-SI-10-DG-002-A3 - SHT 141-163 - Rev.1

The document appears to be an engineering alignment sheet for a 12" pipeline from Boyolali to Pengapon, Indonesia. It contains charts with kilometer points (KP) along the pipeline route from KP 70+000 to KP 71+500, and elevation information such as slope and curve data at each KP. The alignment sheet is one of 163 total sheets for the entire pipeline route, and was prepared by the consulting firm PT Surveyor Indonesia for client PT Pertamina for pipeline construction.

Uploaded by

aan zulwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views23 pages

SMG-SI-10-DG-002-A3 - SHT 141-163 - Rev.1

The document appears to be an engineering alignment sheet for a 12" pipeline from Boyolali to Pengapon, Indonesia. It contains charts with kilometer points (KP) along the pipeline route from KP 70+000 to KP 71+500, and elevation information such as slope and curve data at each KP. The alignment sheet is one of 163 total sheets for the entire pipeline route, and was prepared by the consulting firm PT Surveyor Indonesia for client PT Pertamina for pipeline construction.

Uploaded by

aan zulwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

KP KP KP KP KP KP

70+000 70+100 70+200 70+300 70+400 70+500

-2 -2
.3 .2
-2

-2
20 40
.4

.2 -2
70
20

.4
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 70+000 TO KP. 70+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 141 OF 163 1 A1
KP KP KP KP KP KP
70+500 70+600 70+700 70+800 70+900 71+000

-1 -6
-7 1. .8 -2
.0 -8 08 10 .1
70 -8 .7 0 60
.7 10
10
-2
.4
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 70+500 TO KP. 71+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 142 OF 163 1 A1
KP KP KP KP KP KP
71+000 71+100 71+200 71+300 71+400 71+500

-2
.1 -1
60 .8 -2
-1 80 .0
.9 80
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 71+000 TO KP. 71+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 143 OF 163 1 A1
KP KP KP KP KP KP
71+500 71+600 71+700 71+800 71+900 72+000

-2 -2
-2 .1 .2
.2 50 40
70
-2
.0
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 71+500 TO KP. 72+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 144 OF 163 1 A1
KP KP KP
KP KP KP 72+500
72+000 72+100 72+200 72+300 72+400

-7
.2
-3 10
-2 -3 .2
.2 .3 -2 10
40 30 .1 -1
50 .8
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 72+000 TO KP. 72+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 145 OF 163 1 A1
KP KP KP KP KP KP
72+500 72+600 72+700 72+800 72+900 73+000

-2
.4
-7 10
.4 -2
10 .3
20
-1 10
0. .1
20 00
0

-7
.2
10

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 72+500 TO KP. 73+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 146 OF 163 1 A1
KP KP KP KP KP KP
73+000 73+100 73+200 73+300 73+400 73+500

-1
.9
50

-2 -1
.1 .8
4 60
-3
.5
50
-2
.3
20
-2
.2
30

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 73+000 TO KP. 73+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 147 OF 163 1 A1
KP KP KP KP
KP KP 73+800 73+900 74+000
73+600 73+700
73+500

-1
.6
-2 10
.5
-2 20 -3
.0 .8
80 50
-1
.8
70

-1
.9
50

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 73+500 TO KP. 74+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 148 OF 163 1 A1
KP KP KP KP KP
74+100 KP 74+400 74+500
74+000 74+200 74+300

-2
.3
-2 90
.1
-2 30
.3
20
-1
.6
10

-1
.7
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 74+000 TO KP. 74+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 149 OF 163 1 A1
KP KP KP
74+600 KP KP
74+500 74+700 74+800 KP
74+900 75+000

-1
.7
00

-2
.3
90
-2
.2
90

-2
-1

.1
-2 .6

00
.7 10
10
-2
.0
10

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 74+500 TO KP. 75+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 150 OF 163 1 A1
KP KP KP KP
KP KP 75+200 75+300 75+400 75+500
75+000 75+100

-1
.9
50

-2

-1
.2

.9
40

50
-2
.0 -1
10 .9
20

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 75+000 TO KP. 75+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 151 OF 163 1 A1
KP KP KP KP
75+500 KP KP
75+600 75+700 75+800 75+900 76+000

-1
.9
50

-1
.7 -1
80 .6 -1
20 .7
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 75+500 TO KP. 76+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 152 OF 163 1 A1
KP KP KP KP KP KP
76+000 76+100 76+200 76+300 76+400 76+500

-2 -2
.5 .6
-1 30 60
.6
30 -1
.7
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 76+000 TO KP. 76+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 153 OF 163 1 A1
KP KP KP KP
KP KP 77+000
76+500 76+600 76+700 76+800 76+900

-2
.8
60
-2
.6 -2
00 .1
-2 50
.6
60

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 76+500 TO KP. 77+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 154 OF 163 1 A1
KP KP KP
KP KP KP 77+500
77+200 77+300 77+400
77+000 77+100

-2
-1 .6
.6 30
-2 80
.8
10

-3
.2
20

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 77+000 TO KP. 77+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 155 OF 163 1 A1
KP KP KP KP KP KP
77+500 77+600 77+700 77+800 77+900 78+000

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 77+500 TO KP. 78+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 156 OF 163 1 A1
KP KP KP
KP KP KP 78+500
78+200 78+300 78+400
78+000 78+100

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 78+000 TO KP. 78+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 157 OF 163 1 A1
KP KP
KP KP KP KP 79+000
78+500 78+600 78+700 78+800 78+900

-1
.2
00

-1
.7
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 78+500 TO KP. 79+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 158 OF 163 1 A1
KP KP KP
KP 79+100 79+200 79+300
79+000 KP
79+400
KP
79+500

-1
.2 -1 -2
00 .8 .2 -1
90 00 .8
20

-1
.8
70
-1
.2
60

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 79+000 TO KP. 79+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 159 OF 163 1 A1
KP
79+500 KP
79+600 KP
79+700 KP
79+800 KP KP
79+900 80+000

-1
.2
60

-1
.7
70

-4
.0
10

-3
.3
10

-1
.7
20

-1
.9
00

-1
.2 -1
00 .3
80

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 79+500 TO KP. 80+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 160 OF 163 1 A1
600
79+
900 80+

K KP 0
80+0P 50
80+
00

KP KP
00
80+100 80+4
-1.82
0

KP KP
80+200 80+300
-1.7
20

-2.4
00

-1.82
0

-2.37
0

-2.40
0

-2.10
0

-2.37
0
-2.35
0

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 80+000 TO KP. 80+500

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 161 OF 163 1 A1
80+4
00

81 KP
85
KP

+0
80+50
0
KP KP 00
80+600 KP KP KP 0
80+700 80+800 81+
80+900
00
-2.4

20
-1.8

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 80+500 TO KP. 81+000

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 162 OF 163 1 A1
PERTAMINA TBBM

81 KP
85
+0
PENGAPON
KP 00
0
81+

HOLD
REV. DATE DESCRIPTION PREP'D CHK'D APP'D CLIENT

REVISIONS
CLIENT :
PT PERTAMINA (PERSERO)
DIREKTORAT LOGISTIK, SUPPLY CHAIN
DAN INFRASTRUKTUR

CONSULTANT :
PT SURVEYOR INDONESIA
A WORLD CLASS INDEPENDENT
ASSURANCE COMPANY

PROJECT :

PEKERJAAN PENYUSUNAN ENGINEERING ALIGNMENT SHEET, ANALISA


METODE KONSTRUKSI, DAN SURVEY PEMETAAN JALUR AKSES MATERIAL
(INCLUDE STUDI ANALISA BIAYA MOBILISASI MATERIAL & PERALATAN)
DI JALUR PIPA BOYOLALI - PENGAPON

TITLE :
ALIGNMENT SHEET
12" PIPELINE BOYOLALI - PENGAPON
KP. 81+000 TO KP. 81+100

SCALE DRAWING NO. REV. SIZE


SHEET
AS SHOWN SMG-SI-10-DG-002-A3 163 OF 163 1 A1