BA PTM-FITTING ORIICE (1) - PCI Comment - OR

This document outlines work done by PT Persada Teknik Mandiri for Petrochina International Companies Jabung ltd. from October 8-10, 2022 installing instrumentation for allocating hydrocarbons from the West Area. Some issues were found including non-standard parts that needed replacing due to corrosion. Additional work is needed in November 2022 to complete installations on Streams A and B, including supplying new parts and calibration. Both companies signed acknowledging the work outlined on October 11, 2022.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

BA PTM-FITTING ORIICE (1) - PCI Comment - OR

This document outlines work done by PT Persada Teknik Mandiri for Petrochina International Companies Jabung ltd. from October 8-10, 2022 installing instrumentation for allocating hydrocarbons from the West Area. Some issues were found including non-standard parts that needed replacing due to corrosion. Additional work is needed in November 2022 to complete installations on Streams A and B, including supplying new parts and calibration. Both companies signed acknowledging the work outlined on October 11, 2022.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PT.

PERSADA TEKNIK MANDIRI


Jl. Malaka II No. 78 Roa Malaka
Tambora – Jakarta Barat
Phone : +62 2122522172 Faxs : +62 21 22522173
Email : [email protected]

BERITA ACARA PEKERJAAN


WA NO : PD-825-WA – Amend-1

Pada hari ini Selasa tanggal 11 bulan Oktober tahun 2022. Kami yang bertanda tangan dibawah ini :

Nama : Yuliana Lenny


Jabatan : Direktur
Perusahaan : PT. PERSADA TEKNIK MANDIRI
Selanjutnya disebut Pelaksana pekerjaan
dikosongkan
Nama : Fernando
Perusahaan : PETROCHINA INTERNATIONAL COMPANIES JABUNG ltd.
Selanjutnya disebut Pemberi Pekerjaan

PT. Persada Teknik Mandiri telah melakukan pekerjaan Installation of Instrument of Metering for
Allocating Hydrocarbon from West Area yang dilakukan pada tanggal 8 - 10 Oktober 2022. Detail
pekerjaan sesuai dengan Daily Activity Report yang terlampir: tidak perlu dimasukkan di keterangan karena
found some parts material are not daniel orifice standard an need to replace due to corrosion merupakan bagian dari pekerjaan CTR (kontrak) repair
(OR) daniel orifice B due to stuck (OR)
No. Deskripsi Pekerjaan Keterangan
1 Calculation of Orifice bore diameter of orifice plate Finish
2 Repair Daniel senior orifice line B due to stuck Line B - Need special customized tools to
open it due to Orifice badly corrosive,
3 Check all field instrument devices at skid (PI, PT, TI,
and found some spare part has been
TT, FT, and Barton recorder)
switch and replace from previous
4 Check and repair tubing installation at instrument
repairing process by others.
field devices (FT, PT & Barton Chart Recorder)
Wrong size of Material Teflon
5 Provide as build datasheet of above instrument
Not yet complete, please refer to Daily
equipment
Activity Report
6 Submit installation report or timesheet to company
for use and record PG Stream B, due to wrong connector,
7 Others work, materials and tools as required at site to PG Stream B has not completed
complete installation of above materials
yang tidak termasuk pada
lingkup kerja ini
Untuk menyelesaikan pekerjaan installation instrument metering di stream A dan stream B perlu
dilakukan tindak lanjut kembali. Tindak lanjut akan di lakukan pada periode November 2022. Detail
pekerjaan terlampir pada Penawaran Harga Continuation Installation of Instrument of Metering for
Allocating Hydrocarbon from West Area sebagai berikut : Service Repair of Metering at
NEB10
Error Drift Reading 25 inH2O

No. Material Needed to Supply Keterangan


Adapter Reducer 3/4" Male X 1/2" Female NPT For Connector Manifold 1/2" Lingkup
1
Stream A awal
2 Material Teflon Untuk Carrier Stream B & A - Re-supply Plate Orifice Daniel Pada Carrier
DP DPT (Scope PT. PTM) Lingkup
- Installation stream A (Service) awal
3 Temperature Transmitter Stream B complete with
5 way manifold
Existing TT - Error (Material supply)
4 Grease Gun Body Daniel Stream B Material Supply and Installation Service
Installation, Calibration,
5 Slide Valve Strip Stream B Material Supply and Installation Service
loop check up to DCS
6 Head Bolt ( L key ) Stream B Material Supply and Installation Service
Existing is broken due to Existing are not standard Required to complete
badly corrosion. and broken. after installation Slide
Demikianlah berita acara pekerjaan ini dibuat dengan sebenarnya untuk
Valve dapat
Strip. dipergunakan

sebagaimana mestinya.
Barton Timer & Timer Key Existing error (material supply, installation, calibration)

Jakarta, 11 Oktober 2022


Petrochina International Companies, Jabung ltd. PT Persada Teknik Mandiri,

dikosongkan

(Fernando) (Yuliana Lenny)


BCD Project Construction Direktur

menggunakan BCD Project


Construction