Progress No 1 Last Revision Commented and Approved

This document provides a summary progress certificate for the first monthly period (August 29, 2014 to March 20, 2015) of the GABES GTP PROJECT contract between ABB Process Automation S.p.A. and an unspecified contractor. It shows that 2.36% of the total contract value has been completed so far, with civil works and construction facilities accounting for most of the progress and a total of $1,213,283.02 paid to the contractor for work performed in this period.

Uploaded by

wassim nasri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views

Progress No 1 Last Revision Commented and Approved

This document provides a summary progress certificate for the first monthly period (August 29, 2014 to March 20, 2015) of the GABES GTP PROJECT contract between ABB Process Automation S.p.A. and an unspecified contractor. It shows that 2.36% of the total contract value has been completed so far, with civil works and construction facilities accounting for most of the progress and a total of $1,213,283.02 paid to the contractor for work performed in this period.

Uploaded by

wassim nasri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

ABB Process Automation S.p.A.

GABES GTP PROJECT - CONTRACT/PO No.: 4580061059

SUMMARY PROGRESS CERTIFICATE


Monthly Progress No. 1
PERIOD: 29-August-2014 Up to March-20-2015

PREVIOUS MONTHLY CUMULATIVE PREVIOUS MONTHLY CUMULATIVE


NO DESIGNATIONS Contract Value ($) PROGRESS PROGRESS PROGRESS AMOUNT AMOUNT AMOUNT
[%] [%] [%] ($) ($) ($)

SUMMARY 51 501 024,00 0,00% 2,36% 2,36% 0,00 1 213 283,02 1 213 283,02

1 Site preparation 5 520 975,70 0,00% 0,00% 0,00% 0,00 0,00 0,00

2 Civil works 13 527 946,48 0,00% 1,18% 1,18% 0,00 159 120,00 159 120,00

3 Buildings (lump sum price) 8 361 884,31 0,00% 0,83% 0,83% 0,00 69 228,00 69 228,00

3-1 Building civil work 5 717 350,31 0,00% 0,00% 0,00% 0,00 0,00 0,00

3-2 Electrical works for building 551 164,00 0,00% 0,00% 0,00% 0,00 0,00 0,00

3-3 engineering for building 180 000,00 0,00% 38,46% 38,46% 0,00 69 228,00 69 228,00

3-4 HVAC installation 86 670,00 0,00% 0,00% 0,00% 0,00 0,00 0,00

3-5 HVAC supply-without GTS 1 826 700,00 0,00% 0,00% 0,00% 0,00 0,00 0,00

3-5 bis HVAC supply-with GTS 0,00 0,00% 0,00% 0,00% 0,00 0,00 0,00

4 Electrical works for building 1 487 741,21 0,00% 0,00% 0,00% 0,00 0,00 0,00

5 I&C works 1 325 907,52 0,00% 0,00% 0,00% 0,00 0,00 0,00

6 insulation works 206 740,00 0,00% 0,00% 0,00% 0,00 0,00 0,00

Steel structure works (including


7 6 903 344,42 0,00% 0,00% 0,00% 0,00 0,00 0,00
supply)

8 piping works 4 547 868,68 0,00% 0,00% 0,00% 0,00 0,00 0,00

9 mechanical works (ABB equipment) 678 772,13 0,00% 0,00% 0,00% 0,00 0,00 0,00

10 mechanical works (TDE equipment) 2 326 573,48 0,00% 0,00% 0,00% 0,00 0,00 0,00

11 painting works 464 826,31 0,00% 0,00% 0,00% 0,00 0,00 0,00

12 construction facilities (lump sum) 1 705 772,80 0,00% 36,24% 36,24% 0,00 618 172,06 618 172,06

13 security (lump sum) 0,00 0,00% 0,00% 0,00% 0,00 0,00 0,00

14 Commissioning (provisional sum) 0,00 0,00% 0,00% 0,00% 0,00 0,00 0,00

15 Management 3 345 944,16 0,00% 1,46% 1,46% 0,00 48 799,93 48 799,93

16 mob/demob 1 096 726,80 0,00% 28,99% 28,99% 0,00 317 963,03 317 963,03

MONTHLY CUMULATIVE
PREVIOUS MONTHLY CUMULATIVE PREVIOUS
SUMMARY PROGRESS [%] PROGRESS [%] PROGRESS [%] AMOUNT($)
AMOUNT AMOUNT
($) ($)

SUMMARY 0,00% 2,36% 2,36% 0,00 1 213 283,02 1 213 283,02

1054163,02
SUBCONTRACTOR CONTRACTOR

CERI ABB

DATE: DATE: 02 April 2015


RESPONSABLE: RESPONSABLE:
Construction Manager
SIGNATURE: SIGNATURE:

Page 1 de 1
Status as of: PHYSICAL PROGRESS BY Area
20-Mar-15
Estimated Weighting Factor for Weighting Factor for Physical Weighted Progress for
Area P6 Activity ID Description Weighted Progress for Phase
MHRS Discipline Phase Progress Discipline
Access Roads 59,30%
TW0AX003 Construction of Main E - W Internal Road 56,48 14,05% 0,16% 90,00% 12,64% 0,15%
TW0AX004 Repairing of Temporary Fence 26,58 6,61% 0,08% 100,00% 6,61% 0,08%
TW0AX007 Arrangement of Entrance from Route 934 69,77 17,36% 0,20% 0,00% 0,00% 0,00%
TW0AX008 Installation of Signs at Site Entrance 59,80 14,88% 0,17% 0,00% 0,00% 0,00%
TW0AX033 Construction of Internal Construction Roads 189,37 47,11% 0,55% 85,00% 40,04% 0,47%
Electrical / IT Systems 77,63%
TW0AX005 Installation of Electrical Generator 352,65 33,90% 1,03% 100,00% 33,90% 1,03%
TW0AX0060 Electrical Connection to Network (installation of 2 Transformers 120-160 kVA 211,59
fixed to towers) 20,34% 0,62% 65,00% 13,22% 0,40%
TW0AX0090 Pioneer Office Telecom Connection 317,38 30,51% 0,92% 100,00% 30,51% 0,92%
TW0AX023 TCF - Installation of Communication Network 158,69 15,25% 0,46% 0,00% 0,00% 0,00%
TW0AX028 Installation of Camera Poles 0,00 0,00% 0,00% 0,00% 0,00%
Equipped Area #DIV/0!
TW0AX026 Final Fence - Construction of Foundations and Basewall 0,00 #DIV/0! 0,00% #DIV/0! 0,00%
TW0AX027 Final Fence - Installation of Fence 0,00 #DIV/0! 0,00% #DIV/0! 0,00%
Laydown & Painting Area 75,00%
Earth Movements and Plant Levelling (for temporary works - NOT for
TW0AX024
construction permanent works) 6 958,00 100,00% 20,23% 75,00% 75,00% 15,17%
Sewage & Rain water Systems 0,00%
TW0AX009 Installation of Sanitary Network and Septic Tank 1 044,00 100,00% 3,04% 0,00% 0,00% 0,00%
Site Temporary Offices 27,87%
TW0AX001 Installation of Early Security Guard House 226,00 1,02% 0,66% 100,00% 1,02% 0,66%
TW0AX002 Installation of Pioneer Office 226,00 1,02% 0,66% 100,00% 1,02% 0,66%
TW0AX010 TCF - Foundations of CONTRACTOR Office 2 166,00 9,74% 6,30% 100,00% 9,74% 6,30%
TW0AX011 TCF - Foundations of CERI Office 2 707,50 12,17% 7,87% 0,00% 0,00%
TW0AX012 TCF - Foundations of COMPANY Office 2 527,00 11,36% 7,35% 75,00% 8,52% 5,51%
TW0AX013 TCF - Foundations of Guard House 141,25 0,63% 0,41% 0,00% 0,00%
TW0AX014 TCF - Construction of U/G Services 60,17 0,27% 0,17% 0,00% 0,00%
TW0AX017 TCF - Installation of CONTRACTOR Office 3 249,00 14,60% 9,45% 42,50% 6,21% 4,01%
TW0AX018 TCF - Installation of CERI Office 2 707,50 12,17% 7,87% 0,00% 0,00% 0,00%
TW0AX019 TCF - Installation of Guard House 84,75 0,38% 0,25% 20,00% 0,08% 0,05%
TW0AX020 TCF - Installation of COMPANY Office 2 888,00 12,98% 8,40% 10,00% 1,30% 0,84%
TW0AX021 TCF - Installation of HVAC 120,33 0,54% 0,35% 0,00% 0,00%
TW0AX022 TCF - Installation of Furniture 180,50 0,81% 0,52% 0,00% 0,00%
TW0AX031 Construction of Foundations of Canteen & Shops 2 632,53 11,83% 7,65% 0,00% 0,00%
TW0AX032 Installation of Canteen & Shops 2 329,47 10,47% 6,77% 0,00% 0,00%
Warehouse 0,00%
TW0AX029 Construction of Foundations of Warehouse 1 623,60 60,00% 4,72% 0,00% 0,00%
TW0AX030 Installation of Warehouse 1 082,40 40,00% 3,15% 0,00% 0,00%
Temporary Works - Total 34 396 100,00% 36,24%
P.O.: 4580061059

0,37% 1 1 1 1 0,00% 0,37%


0,37% 1 1 1 0 0,11% 0,30%
0,31% 1 1 1 1 0,00% 0,31%
0,31% 1 1 1 1 0,00% 0,31%
0,31% 1 1 1 1 0,15% 0,31%
0,31% 1 1 1 1 0,31% 0,31%
1 1 1 1 0,00% 0,00%
C01 0,31% 1 1 1 0 0,25% 0,25%
C02 1 1 1 0 0,00% 0,00%
0,09% 1 1 1 0 -0,02% 0,07%
0,09% 1 1 1 1 0,00% 0,09%
0,09% 1 1 1 1 0,00% 0,09%
0,09% 1 1 1 1 0,05% 0,09%
0,09% 1 1 1 0 0,07% 0,07%
C01 0,09% 1 1 0 0 0,05% 0,05%
C01 0,34% 1 1 0 0 -0,17% 0,17%
C02 0,34% 1 1 1 0 0,27% 0,27%
C02 1 1 1 0 0,00% 0,00%
0,15% 1 1 1 1 0,07% 0,15%
C02 0,15% 1 1 1 0 0,12% 0,12%
0,15% 1 1 1 1 0,00% 0,15%
0,15% 1 1 1 1 0,15% 0,15%
1,32% 1 1 1 1 0,00% 1,32%
C01 1,32% 1 1 0 0 0,00% 0,66%
C01 1,32% 1 1 0 0 0,66% 0,66%
C02 1,32% 1 1 1 0 1,06% 1,06%
1,32% 1 1 0 0 -0,66% 0,66%
0,64% 0 0 0 0 -0,32% 0,00%
C01 0,64% 1 1 0 0 0,00% 0,32%
C01 0,64% 1 1 0 0 0,00% 0,32%
1,01% 1 1 1 1 0,51% 1,01%
1,01% 1 1 1 1 1,01% 1,01%
1,01% 1 1 1 1 1,01% 1,01%
C01 1,01% 1 1 0 0 0,00% 0,51%
C01 0,77% 1 1 0 0 0,00% 0,38%
C01 0,77% 1 1 0 0 0,00% 0,38%
C01 0,77% 1 1 0 0 0,38% 0,38%
C01 0,77% 1 1 0 0 0,38% 0,38%
C02 0,24% 1 1 1 0 0,07% 0,19%
C02 1 1 1 0
0,24% 1 1 1 1 0,24% 0,24%
C01 1 1 0 0 0,00% 0,00%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,37% 1 1 0 0 0,19% 0,19%
0,37% 0 0 0 0 0,00% 0,00%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,37% 1 1 0 0 0,19% 0,19%
0,37% 0 0 0 0 0,00% 0,00%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 0,31% 1 1 0 0 0,15% 0,15%
0,31% 1 1 0 0 0,15% 0,15%
0,31% 0 0 0 0 0,00% 0,00%
C01 0,31% 1 1 0 0 0,15% 0,15%
0,09% 0 0 0 0 -0,05% 0,00%
C01 0,09% 1 1 0 0 0,00% 0,05%
0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,05% 0,05%
C01 0,09% 1 1 0 0 0,05% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
C01 0,09% 1 1 0 0 0,00% 0,05%
0,09% 1 1 0 0 0,00% 0,05%
0,09% 0 0 0 0 -0,05% 0,00%
0,09% 0 0 0 0 -0,05% 0,00%
0,09% 0 0 0 0 0,00% 0,00%
0,09% 0 0 0 0 -0,05% 0,00%
0,09% 0 0 0 0 -0,05% 0,00%
0,09% 0 0 0 0 0,00% 0,00%
0,09% 0 0 0 0 0,00% 0,00%
C01 0,34% 1 1 0 0 0,00% 0,17%
C01 0,34% 1 1 0 0 0,00% 0,17%
C01 0,34% 1 1 0 0 0,00% 0,17%
C01 0,15% 1 1 0 0 0,00% 0,07%
C01 0,15% 1 1 0 0 0,00% 0,07%
C01 0,15% 1 1 0 0 0,00% 0,07%
C01 0,15% 1 1 0 0 0,00% 0,07%
C01 1,32% 1 1 0 0 0,00% 0,66%
C01 1,32% 1 1 0 0 0,00% 0,66%
C01 1,01% 1 1 0 0 0,00% 0,51%
C01 1,01% 1 1 0 0 0,00% 0,51%
C01 0,24% 1 1 0 0 0,00% 0,12%
C01 0,24% 1 1 0 0 0,00% 0,12%
C01 0,24% 1 1 0 0 0,00% 0,12%
C01 0,24% 1 1 0 0 0,00% 0,12%
C01 0,37% 1 1 0 0 0,00% 0,19%
C02 0,31% 1 1 1 0 0,09% 0,25%
0,31% 1 1 1 1 0,15% 0,31%
C01 0,31% 1 1 0 0 0,00% 0,15%
C02 0,09% 1 1 1 0 0,03% 0,07%
0,09% 1 1 1 1 0,05% 0,09%
0,15% 1 1 1 1 0,07% 0,15%
0,15% 1 1 1 1 0,07% 0,15%
C01 0,24% 1 1 0 0 0,00% 0,12%
C02 0,24% 1 1 1 0 0,07% 0,19%
0,34% 1 1 1 1 0,17% 0,34%
C02 0,34% 1 1 1 0 0,10% 0,27%
C01 1,32% 1 1 0 0 0,00% 0,66%
C02 1,01% 1 1 1 0 0,30% 0,81%
C01 1,01% 1 1 0 0 0,00% 0,51%
C01 1 1 0 0 0,00% 0,00%
C01 1 1 0 0 0,00% 0,00%
C01 1 1 0 0 0,00% 0,00%
0,19% 1 1 1 1 0,19% 0,19%
0,19% 1 1 1 1 0,19% 0,19%
0,21% 1 1 1 1 0,21% 0,21%
C02 0,21% 1 1 1 0 0,17% 0,17%
C01 1 1 0 0 0,00% 0,00%
C02 0,28% 1 1 1 0 0,22% 0,22%
C01 0,28% 1 1 0 0 0,14% 0,14%
C02 0,35% 1 1 1 0 0,28% 0,28%
C02 0,35% 1 1 1 0 0,28% 0,28%
C02 0,35% 1 1 1 0 0,28% 0,28%
C02 0,35% 1 1 1 0 0,28% 0,28%
C02 0,70% 1 1 1 0 0,56% 0,56%
C02 0,70% 1 1 1 0 0,56% 0,56%
C02 0,57% 1 1 1 0 0,46% 0,46%
C02 0,57% 1 1 1 0 0,46% 0,46%
C01 0,16% 1 1 0 0 0,08% 0,08%
C02 0,16% 1 1 1 0 0,13% 0,13%
C02 0,08% 1 1 1 0 0,07% 0,07%
C02 0,08% 1 1 1 0 0,07% 0,07%
C02 0,37% 1 1 1 0 0,30% 0,30%
C02 0,37% 1 1 1 0 0,11% 0,30%
C02 0,37% 1 1 1 0 0,11% 0,30%
C02 0,37% 1 1 1 0 0,11% 0,30%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,37% 1 1 0 0 0,19% 0,19%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 0,31% 1 1 0 0 0,15% 0,15%
C01 1,19% 1 1 0 0 0,59% 0,59%
C01 1,19% 1 1 0 0 0,59% 0,59%
C01 1,19% 1 1 0 0 0,59% 0,59%
C01 0,34% 1 1 0 0 0,17% 0,17%
0,15% 0 0 0 0 -0,07% 0,00%
0,64% 0 0 0 0 -0,32% 0,00%
0,64% 0 0 0 0 0,00% 0,00%
C01 0,77% 1 1 0 0 0,38% 0,38%
C01 1,01% 1 1 0 0 0,51% 0,51%
C01 0,15% 1 1 0 0 0,00% 0,07%
C01 1,32% 1 1 0 0 0,00% 0,66%
1,01% 1 1 0 0 0,51% 0,51%
C01 0,24% 1 1 0 0 0,12% 0,12%
C01 1 1 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,21% 1 1 0 0 0,10% 0,10%
0,21% 1 1 0 0 0,10% 0,10%
0,21% 0 0 0 0 0,00% 0,00%
0,21% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
1,19% 0 0 0 0 0,00% 0,00%
0,19% 1 1 0 0 0,10% 0,10%
0,19% 1 1 0 0 0,10% 0,10%
0,19% 1 1 0 0 0,10% 0,10%
0,19% 1 1 0 0 0,10% 0,10%
0,19% 1 1 0 0 0,10% 0,10%
0,19% 1 1 0 0 0,10% 0,10%
0,19% 0 0 0 0 0,00% 0,00%
0,19% 0 0 0 0 0,00% 0,00%
3,42% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
3,42% 0 0 0 0 0,00% 0,00%
0,70% 0 0 0 0 0,00% 0,00%
0,70% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,70% 0 0 0 0 0,00% 0,00%
0,57% 0 0 0 0 0,00% 0,00%
0,57% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,57% 0 0 0 0 0,00% 0,00%
0,35% 0 0 0 0 0,00% 0,00%
0,35% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,35% 0 0 0 0 0,00% 0,00%
0,28% 0 0 0 0 0,00% 0,00%
0,28% 0 0 0 0 0,00% 0,00%
1,58% 0 0 0 0 0,00% 0,00%
1,58% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
1,58% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
1,44% 0 0 0 0 0,00% 0,00%
1,44% 0 0 0 0 0,00% 0,00%
1,44% 0 0 0 0 0,00% 0,00%
1,44% 0 0 0 0 0,00% 0,00%
0 0 0 0 0,00% 0,00%
0 0 0 0 0,00% 0,00%
1,44% 0 0 0 0 0,00% 0,00%
0,16% 0 0 0 0 0,00% 0,00%
0,16% 0 0 0 0 0,00% 0,00%
0,16% 0 0 0 0 0,00% 0,00%
0,16% 0 0 0 0 0,00% 0,00%
1,20% 0 0 0 0 0,00% 0,00%
1,20% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
1,20% 0 0 0 0 0,00% 0,00%
0,35% 0 0 0 0 0,00% 0,00%
0,35% 0 0 0 0 0,00% 0,00%
0,00% 0,00%
0,00% 0,00%
0,35% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 0 0 0 0 0,00% 0,00%
0,21% 1 1 0 0 0,10% 0,10%
0,19% 1 1 0 0 0,10% 0,10%
0,19% 0 0 0 0 0,00% 0,00%
0,70% 1 1 0 0 0,35% 0,35%
0,57% 1 1 0 0 0,28% 0,28%
0,35% 1 1 0 0 0,17% 0,17%
0,28% 1 1 0 0 0,14% 0,14%
0,08% 1 1 0 0 0,04% 0,04%
0,16% 1 1 0 0 0,08% 0,08%
0,35% 1 1 0 0 0,17% 0,17%
0,08% 0 0 0 0 0,00% 0,00%
0,08% 1 1 1 0 0,07% 0,07%
%
ABB Process Automation S.p.A.

GABES GTP PROJECT - CONTRACT/PO No.: 4580061059

MOBILIZATION / DEMOBILIZATION

Monthly Progress No. 1 - PERIOD: 29-August-2014 Up to March-20-2014

WEIGHT PREVIOUS MONTHLY CUMULATIVE


NO DESIGNATIONS FACTOR PROGRESS PROGRESS PROGRESS
[%] [%] [%] [%]

17 MOB/DEMOB 100,00% 0,00% 28,99% 28,99%

17.1 Mobilization 80,0% 0,00% 36,24% 36,24%

17.2 Demobilization 20,0% 0,00% 0,00% 0,00%

PREVIOUS MONTHLY CUMULATIVE


SUMMARY PROGRESS [%] PROGRESS [%] PROGRESS [%]
not acceptable- topographic report done by surveyor awaited

17 Mobilization / Demobilization 0,00% 28,99% 28,99%

SUBCONTRACTOR CONTRACTOR

CERI ABB

DATE: DATE:

RESPONSABLE: RESPONSABLE:

SIGNATURE: SIGNATURE:

Page 1 de 1
ABB Process Automation S.p.A.

GABES GTP PROJECT - CONTRACT/PO No.: 4580061059

MANAGEMENT

Monthly Progress No. 1 - PERIOD: 29-August-2014 Up to March-20-2014

WEIGHT PREVIOUS MONTHLY CUMULATIVE


NO DESIGNATIONS FACTOR PROGRESS PROGRESS PROGRESS
[%] [%] [%] [%]

16 MANAGEMENT 100,00% 0,00% 1,46% 1,46%

16.1 Engineering management 0,4% 0,00% 38,46% 38,46%

16.2 Temporary works management 3,6% 0,00% 36,24% 36,24%

16.3 Procurement (HVAC,Tanks,Steel structures,etc) 4,9% 0,00% 0,00% 0,00%

16.4 Construction of building 13,5% 0,00% 0,00% 0,00%

16.5 Construction general works 77,60% 0,00% 0,00% 0,00%

PREVIOUS MONTHLY CUMULATIVE


SUMMARY PROGRESS [%] PROGRESS [%] PROGRESS [%]

16 Management 0,00% 1,46% 1,46%

SUBCONTRACTOR CONTRACTOR

CERI ABB

DATE: DATE:

RESPONSABLE: RESPONSABLE:

SIGNATURE: SIGNATURE:

Page 1 de 1
ABB Process Automation S.p.A.

GABES GTP PROJECT - CONTRACT/PO No.: 4580061059

CIVIL WORKS

Monthly Progress No. 1 - PERIOD: 29-August-2014 Up to March-20-2014

NO DESIGNATIONS quantity unit price Total Amount

2 CIVIL WORKS

Grubbing and Scrubbing (quantity done at 30/03: 102 000m² according


2.1 102 000 m² 1,56 $ 159 120,00
to daily report)

TOTAL CIVIL WORKS 159 120,00

PREVIOUS MONTHLY CUMULATIVE


SUMMARY PROGRESS [%] PROGRESS [%] PROGRESS [%]

2 CIVIL WORKS $0,00 $159 120,00 $159 120,00

SUBCONTRACTOR CONTRACTOR

CERI ABB

DATE: DATE:

RESPONSABLE: RESPONSABLE:

SIGNATURE: SIGNATURE:

Page 1 de 1