Sample PDD
Sample PDD
[Process Name]
CONTENTS
1. Purpose of the Document.....................................................................................................3
2. PROCESS Overview.............................................................................................................. 4
2.1 Process Summary............................................................................................................... 4
2.2 Process Attributes................................................................................................................ 4
2.3 Current Manual Effort.......................................................................................................... 4
2.4 Service Level Agreements...................................................................................................5
3. Automation Scope and Limitations.....................................................................................5
3.1 Systems in scope................................................................................................................. 5
3.2 Bot Input(s).......................................................................................................................... 5
3.3 Bot Validation(s).................................................................................................................. 5
4. Future State Process............................................................................................................ 6
4.1 Future State Process Flow...................................................................................................6
4.2 Detailed Process Steps........................................................................................................6
5. Bot Complexity Matrix.......................................................................................................... 6
5.1 Complexity Matrix Diagram..................................................................................................6
6. Exception Handling............................................................................................................... 6
6.1 Business Exceptions............................................................................................................ 6
7. Test data................................................................................................................................ 6
7.1 Requirements...................................................................................................................... 6
8. Reporting and metrics requirements...................................................................................7
8.1 Reporting............................................................................................................................. 7
9. Notes...................................................................................................................................... 7
9.1 Notes................................................................................................................................... 7
Document History
1.0
AUTHORIZATION
Process Name
Process SME
Process Architect
APPROVALS
MM/DD/YYYY
The flowchart contained within the document captures, at a high level, the business process to be automated,
the target systems used within the process and any assumptions that have been considered.
Once agreed as the basis for the automation of the target process, the flowchart and assumptions will be used
as a platform from which the automated solution will be designed.
2. PROCESS OVERVIEW
[…]
Business Unit/Regions
covered
Frequency
Maximum Transaction
Volume (Per Run)
Average Transaction
Volume (Per Run)
Time Sensitivity/Service
Level Agreement (SLA)
Dependencies
Moratorium Periods
Failure Implications
Output
How many FTE hours are currently required to perform the X hours - The team processes
process manually? on average y account per
month, z per day @n minutes
per account (z*n minutes)
List any Service Level I.e. The restriction is it must finish by 4pm. M-F
Agreement (SLA) for the
process – EX: How much
time does the bot have to
process the transactions
SAMPLE:
5.2
6. EXCEPTION HANDLING
Can’t access
1 systems or file Email SMEs No access to xyz In scope
folders
Processing not
In sufficient
2 completed by Email SMEs In scope
processing time
HH:MM CST
BOT error
Any other error in message. Couldn’t
3 Log file SMEs In scope
processing complete
processing
7.1 Requirements
Validation checks
Files presenting:
Accounts that can
be verified
Incorrect account
number
Incorrect Address
Incorrect Apt #,
Excel file examples Unit #, or Location Insert Name Y/N
Incorrect
Company Name –
or – Apartment
Name
Incorrect Last
Name a match
Incorrect First
name
Containing both
attachments
Sample Emails Insert Name Y/N
Missing Excel file
Missing pdf file
Corresponding
Sample reports Insert Name Y/N
output files
8.1 Reporting
Excel Email
Excel Email
9.1 Notes