50% found this document useful (2 votes)
12K views4 pages

Electrical Installation Labour Charges

The document provides a breakdown of costs for electrical installation labor and materials for several projects. It includes costs for wiring installation, distribution wiring, electrical accessories, main switches and distribution boards, air conditioner installation, and materials. The total labor cost for electrical installation is 282,360 MMK. Additional costs include 1,011,300 MMK for air conditioner materials and labor and 1705300 MMK for electrical materials.

Uploaded by

sisnaingaung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
12K views4 pages

Electrical Installation Labour Charges

The document provides a breakdown of costs for electrical installation labor and materials for several projects. It includes costs for wiring installation, distribution wiring, electrical accessories, main switches and distribution boards, air conditioner installation, and materials. The total labor cost for electrical installation is 282,360 MMK. Additional costs include 1,011,300 MMK for air conditioner materials and labor and 1705300 MMK for electrical materials.

Uploaded by

sisnaingaung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Electrical Installation Labour Charges

SR.N
UNIT QTY RATE AMOUNT(MMK)
O DESCRIPTION
A Wiring for electrical installation point
1 Labour charges for fixing,PVC trunking for wiring point among wall and ceiling Point 12 2500 30,000
2 labour charges for installation of wiring point in PVC trunking Point 12 2500 30,000
B Wiring for distribution
1 Labour charges for installation of distribution main wiring in PVC trunking
(a) 1C x 1.5 sqmm PVC wire Rft 900 40 36,000
(b) 1C x 2.5sqmm PVC wire Rft 900 50 45,000
2 labour charges for fixing surface PVC trunking for distribution main wiring among wall and ceiling
(a) 1" PVC trunking Rft 180 75 13,500
(b) 1-1/2" PVC trunking Rft 60 150 9,000
(c) 2" PVC trunking Rft 78 225 17,550
(d) 3" x 1-1//4" PVC trunking Rft 6 275 1,650
C Electrical accessories and light fitting
1 labour charges for installation of socket outlet with mounting box
(a) 13A 2 pin, 3 pin- socket outlet Nos 10 2000 20,000
(a) 15A 3 pin- socket outlet Nos 2 2000 4,000
2 labour charges for installation of switch surface type with mounting box
(a) 5A , 1way Nos 3 2000 6,000
3 labour charges for installation of fluorensent lamp fitting Nos 10 2000 20,000
4 labour charges for installation of exhaust ventilation fan (excluding frame work) Nos 2 4000 8,000
D Main Switches and distribution boards
1 Labour charges for installation of breaker (MCB, and MCCB)
(a) Breaker MCB, 1P, 10A,16A Nos 8 1000 8,000
(b) Breaker MCB, 2P, 40A Nos 1 2000 2,000
(c) Breaker MCCB, 2P, 40A Nos 1 2500 2,500
2 Labour charges for installation of distribution board 0
(a) 10 - way DB Nos 1 4000 4,000
3 Labour charges for installation of 20kVA, stabilizer (sigle Phase) Nos 1 5000 5,000
E Incomming main wire installation 1C x 7/052 Rft 168 120 20,160
Total Cost 282,360
Electrical Materials Cost
No. Particular Unit Qty Rate Amount(MMK)
1 1" Trunking Nos 30 600 18000
2 1.5" Trunking Nos 10 900 9000
3 2" Trunking Nos 13 1300 16900
4 3"x1x1/4" Trunking No 1 2500 2500
5 1.5 sqmm single wire Coils 3 21200 63600
6 2.5 sqmm single wire Coils 3 34000 102000
7 Fluorescent Lamp 4' (LED) Nos 10 4500 45000
8 One Gang Switch (Opple) No 1 1700 1700
9 Two Gang Switch (Opple) No 1 2300 2300
10 Three Gang Switch (Opple) NO 1 2900 2900
11 Multi Switch Socket 13Amp (Opple) Nos 10 3900 39000
12 Switch Socket 15Amp (Opple) Nos 2 4700 9400
13 Base Cup Nos 15 400 6000
14 M6-Wallplus doz 50 200 10000
15 M8x1" steel screw doz 50 200 10000
16 Main Breaker 2P MCCB 40A (Mitsubishi) NO 1 43000 43000
17 Breaker RCCB-2P -40A (Legrand) NO 1 52000 52000
18 Breaker MCB-1P-16A (Legrand) Nos 4 4500 18000
19 Breaker MCB-1P-10A (Legrand) Nos 4 4500 18000
20 10-way DB (SCT) No 1 15000 15000
21 Exhaust Fan Nos 2 23000 46000
22 15kva stabilizer No 1 1086000 1086000
23 7/044 single wire for stablizer Yds 12 800 9600
24 1C x 7/052 single wire yds 56 1400 78400
25 Shackler insulator Nos 2 500 1000
Total 1705300
AIR-CON INSTALLATION CHARGES
SR.N
UNIT QTY RATE AMOUNT(MMK)
O DESCRIPTION
Material Cost
1 Air-Con 1.5HP (AUX) Nos 2 360,000 720,000
2 Frame for outdoor Nos 2 7,500 15,000
3 Copper pipe Rft 40 4,500 180,000
4 Safe guard 15Amp Nos 2 12,500 25,000
5 3" x 2" diameter PVC trunking Nos 6 3,000 18,000
6 1/2" diameter PVC conduit pipe for drain Nos 2 1,800 3,600
7 1/2" diameter PVC pipe socket Nos 2 150 300
8 1/2" diameter Elbow (90 degree) Nos 6 150 900
9 1/2" diameter Elbow (45 degree) Nos 2 250 500
Total Cost 963,300
Labour Cost
1 Labour charges for Air-con installation Nos 2 15,000 30,000
Labour charges for fixing PVC conduit pipe
2 Rft 40 150 6,000
(a) 1/2" diameter PVC conduit pipe
Labour charges for fixing PVC trunking
3 Rft 36 250 9,000
(a) 3" x 2" PVC trunking
4 Labour charges for installation of safeguard 15A Nos 2 1,500 3,000
Total Cost 48,000
Aircon Material &Labour Charges Total TOTAL 1,011,300
Quotation for JICA Office Electrical installation

Date : 6-3-2019

SR.N
DESCRIPTION AMOUNT(MMK)
O
1 Electrical Installation Labour Charges 282,360
2 Electrical Materials Cost 1,705,300
3 Aircon Material Charges 963,300
4 Aircon Labour Charges 48,000
Total 2,998,960

U Soe Lwin

Electrical Engineer