0% found this document useful (0 votes)
191 views6 pages

Al Masaood SoW - 13-3.8" Casing TRS Tools From Al Masaood Oil & Gas - BV Recom.

The document lists various 13-3/8 inch casing running tools and equipment from Al Masaood Oil & Gas including top drive casing running tools, elevators, slips, tongs, drifts, and other accessories. Quality assurance and quality control requirements are also outlined.

Uploaded by

Eduard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views6 pages

Al Masaood SoW - 13-3.8" Casing TRS Tools From Al Masaood Oil & Gas - BV Recom.

The document lists various 13-3/8 inch casing running tools and equipment from Al Masaood Oil & Gas including top drive casing running tools, elevators, slips, tongs, drifts, and other accessories. Quality assurance and quality control requirements are also outlined.

Uploaded by

Eduard
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

13-3/8” Casing TRS Tools from Al Masaood Oil & Gas (Musaffah workshop)

Equipment Qty

13-3/8” top drive casing running tool


c/w auto single joint elevators
1
(Casing Running Tool with Internal
Grip – Tool Model CRTi2-8.63)

13-3/8” Side door Elevator (150ton) 2

13-3/8” slip type elevators – BVE / S- 1


500 Elevator/Spider 4.1/2” - 14”

13-3/8” single joint elevators c/w


pick up slings (Type SJS - 5T – Collar 2
type with safety latch pin)

Fill up and circulator double packer


1
cup d/w 13-3/8” adaptor kit

13-3/8” casing manual tongs 1

# Schlumberger-Private
13-3/8” flush mounted spider (FMS- 1
375)

Hydraulic power tong c/w hydraulic


back up system for 13-3/8” casing - 2
50,000 ft.lb torque capacity (14”
CLE14000UHT)

13-3/8” thread protectors (Type


5
HDH)

13-3/8” stabbing guide 2

13-3/8” rotary hand slips (Type CMS


2
-XL Extra Long Casing Hand Slips)

13-3/8” safety clamps c/w hydraulic


adaptor (Type ‘C”-safety clamps air
2
with over hydraulic + hammer
wrench)

13-3/8” casing API nylon drift 2

# Schlumberger-Private
Thread running compound - API
Modified (Chemola™ ThredOn™ 303 1
API Modified)

Thread lock compound (Chemola™


1
ThredOn™ T-Lok 900)

Tubular pick up / lay down machine –


Truck mounted (BC 30 Cable Type 1
Truck mounted)

Hydraulic power unit 3

Torque / Turn monitoring system


(SystemModel CT3000 Pop up Host
laptop, Toughbook complete with 2
remote , Dump Valve , CT Cable,
Transducer and other accessories)

# Schlumberger-Private
TRS Tools from Al Masaood Oil & Gas (Musaffah workshop) BV Comments

QA QC Requirements
1. Visual body inspection
2. NDT inspection reports review. If brand new COC
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. NDT inspection reports review. If brand new COC
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. NDT inspection reports review. If brand new COC required
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. NDT inspection reports review. If brand new COC
3. All applicable functional tests and certificates Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. NDT inspection reports review. If brand new COC
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. NDT inspection reports review. If brand new COC
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

# Schlumberger-Private
1. Visual body inspection
2. NDT inspection reports review. If brand new COC
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. NDT inspection reports review. If brand new COC
3. All applicable functional tests and certificates Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. NDT inspection reports review. If brand new COC
3. All applicable functional tests and certificates Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. Dimensional inspection reports review.
3. Manufacturing certificates Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Physically checking
2. Condition verification Standard DS-1
3. Quantity API RP 8B
4. Packing Internal
Specifications
1. Physically checking
2. Condition verification
3. Quantity Standard DS-1
4. Packing API RP 8B
Internal
Specifications

1. Visual body inspection Standard DS-1


2. Dimensional inspection reports review. If brand new COC API RP 8B
3. Serial number and quantity confirmation Internal
4. Packing Specifications

# Schlumberger-Private
1. Physically checking
2. Condition verification (Expired date) Standard DS-1
3. Certificates (MSDS…) API RP 8B
4. Quantity Internal
5. Packing Specifications

1. Physically checking
2. Condition verification (Expired date) Standard DS-1
3. Certificates (MSDS…) API RP 8B
4. Quantity Internal
5. Packing Specifications

1. Visual body inspection


2. Calibration reports review or any available
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. Calibration reports review or any available.
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications

1. Visual body inspection


2. Calibration reports review or any available.
3. All applicable functional tests Standard DS-1
4. Part condition verification API RP 8B
5. Serial number and quantity confirmation Internal
6. Packing Specifications