DR - MAJID AL-BANA KARADA Structural-1 - 221108 - 213032
DR - MAJID AL-BANA KARADA Structural-1 - 221108 - 213032
[email protected]
+9647702724811
job title
Apartment complex
DR-Majid Albana
job title
Apartment complex
DR-Majid Albana
15
CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet x MECH MECHANICAL
Nylon Sheet
0
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615 & A616 OR A617 BARS SHOULD BE GRADE x x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). x SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORT PREPARED BY THE 2Ø10
& RESEARCH ( (Report No) 2022 \ 2 \ \ 4 ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS (15K/ m²) AT DEPTH OF (-4.00m) ON GROUND SLAB
BELOW THE EXISTING N.G.L. MEMBER (mm) Typical Sec. Of Ramp
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK AS INDICATED IN THE DWG. SLABS 25
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :- BEAMS & GIRDERS 40
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF COLUMNS 40
THE FOUNDATION FROM ALL SIDES BY 0.25m.
INTERIOR WALLS 25
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D)
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557. EXTERIOR FACE OF WALL 40
FORMED FOUNDATION 50
LIQUID LIMIT ≤ 25%.
NON-FORMED FOUNDATION 75
PLASTICITY INDEX ≤ 6%. 2-Ø16(typ.)
ORGANIC MATERIAL ≤ 2%. T&B
6. MINIMUM BARS SPACING :-
SO3 ≤ 5%. 2-Ø10
CLEAR SPACING BETWEEN PARALLEL BARS SHALL NOT BE LESS THAN BAR DIAMETER Ø10@200
OR 4/3 OF MAXIMUM AGGREGATE SIZE BUT NOT LESS THAN 25mm.
TOTAL SOLUBLE SALTS ≤ 5%.
CLEAR SPACING BETWEEN LAYERS OF BARS TO BE NOT LESS THAN 25mm AND THE
GYPSUM CONTENT ≤ 10.75%.
UPPER BARS SHOULD BE OVER THE LOWER BARS .
RELATIVE COMPACTION 95% ( MODIFIED PROCTOR).
IN COLUMNS CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHOULD BE NOT LESS TYPICAL REINF. AROUND TYPICAL UP STAND DETAIL
4. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN THAN 1.5 BAR DIAMETER NOR LESS THAN 40mm.
CONTACT WITH EARTH OR BELOW D.P.C. LEVEL.
OPENNINGS UP TO 600 ROOF OPENNINGS
7. MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
5. BACKFILL AROUND FOOTINGS AND UTILITY TRENCH WITHIN THE BUILDING AREA SHOULD
BE DONE WITH APPROVED SELECTED CLASSIFIED MATERIAL FREE OF CLAY AND SHOULD
BE MECHANICALLY COMPACTED IN LAYERS, NOT EXCEEDING 250mm LOOSE THICKNESS BAR DIA.(mm) 10 12 16 18 20 22 25
TO 90% OF MAXIMUM PROCTOR DENSITY. LAP LENGTH (mm) IN 400 500 600 650 700 800 900
COLUMNS
LAP LENGTH (mm) IN PROVID 2-Ø6 PLATE (300 * 250 * 3 )
400 600 700 800 900 1000 1250
ELSE WHERE AT EVERY 5TH COURSE OF BRICK AT EVERY 5TH COURSE OF BRICK
CONSTRUCTION JOINT AND WATERPROOFING :-
1. CONSTRUCTION JOINT :- LAP LOCATION IN SLABS AND BEAMS :-
CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS ,BEAMS & GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.
AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB / FOUNDATION / WALLS ETC. AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED, ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARATE DOWELS OVER LAP AS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS,CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURAL DRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND. A
WATER STOPS SHOULD BE FACTORY MOLDED.
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B
h
(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B
11. IN ONE-WAY SLAB, SHRINKAGE & TEMPERATURE REINF. STEEL EXTENDING IN THE LONG
. all dim. from ARCH D.W.G. DIRECTION SHALL BE PLACED IN THE PLACE OF, AND TIED TO THE MAIN REINF.
EXTENDING IN THE SHORT DIRECTION.
L<2000, h=200 , A=B=2-Ø12
SEC. ( a - a )
designed
GENERAL NOTES
project manager
L<5000, h=400 , A=2-Ø12 , B=2-Ø16 ENG : Majid Albana
checked scale date
12. MIXING & PLACING CONCRETE SHOULD BE DONE ACCORDING TO ACI - 318M - 95 (CHAPTER 5)
CONDUIT OR PIPE SIZE SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESS SPECIFICALLY LINTEL REINFORCEMENT ENG : DR-Majid Albana job no. sheet no.
2
drawn
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
EXCAVATION, BACK FILLING & FOUNDATION THE DESIGN LOADS
2) LIVE LOADS:
3) WIND LOADS:
GENERAL NOTES :-
4) SEISMIC LOADS:
job title
(A)
drawing title
approved
3 ST/D/03
ADDITIONAL
Ø20@135 mm
BOTTOM L=3m
3.00
3.00
Ø25@270 B. MESH
BOTTOM L=3m BOTTOM L=3m BOTTOM L=3m BOTTOM L=3m
3.00
3.00
3.00
3.00
Ø20@180 T. MESH
3.00 3.00 3.00 3.00
3.00
3.00
3.00
3.00 3.00 3.00 3.00
Ø25@270 B. MESH
Ø20@180 T. MESH
ADDITIONAL ADDITIONAL ADDITIONAL
Ø20@135 mm Ø20@135 mm ADDITIONAL Ø20@135 mm
BOTTOM L=3m BOTTOM L=3m Ø20@135 mm BOTTOM L=3m
BOTTOM L=3m
3.00
3.00
3.00
3.00
3.00
3.00
Ø20@180 T. MESH
ADDITIONAL
Ø20@135 mm
BOTTOM L=3m
6.00
3.00
3.00
ADDITIONAL
Ø20@135mm no. date initials revision
BOTTOM L=3m
BOT. REINFORCEMENT
TOP REINFORCEMENT job title
(A)
drawing title
3.0
Foundation Plan
PLAN OF FOUNDATION
REINFORCEMENT&SEC.
designed project manager
ENG : Majid Albana
checked scale date
3.0
3.09 A
300
6.09
4.31 4.07
A Ø12@200 E.F
5.85 3.00
2.13
6.72 Ø12@200 E.F
3.99
900
screed 5cm
3.00 6.60 3.16
6.60 Lean Conc.
Well compacted subbase 95 % blinding
10cm
4.08 4.00
6.48 4.75
4.78
2.60
900
1.30
3.30
43.84
B
1.30
2.60
4.71 3.14
2.45 3.94
4.08 4.00
1.16 1.13
5.32 5.15
5.47
1.41
1.97
no. date initials revision
6.35 6.35
5.45 2.00
job title
1.45 1.45
(A)
drawing title
approved 5 ST/D/05
10 - Ø16 10 - Ø16
0.30
3.12
0.5 0.5
3.12
Ø16@150 MESH
2.0
W3
:
B
B
Lift
WALL REINFORCEMENT
300
4 Ø16 A. D.D
3Ø16 arround
door opening
VERTICAL REINFORCEMENT
300
: :
3Ø16
DETAIL A
900
'(7$,/$
Ø20mm@175cm c/c
Top (Y-Direction)
: 5HLQI
B-B (A)
drawing title
250
12 No. Ø12
0
2/15
Ø1
00
2/2
1.3
1.3
0.500
Ø1
900
Slab Reinf.
250
250
Ø12@150
50 Slab Reinf.
2/1
250
Ø1
Ø12/200 00 Slab Reinf.
2/2
Ø1 00
2/2
Ø1
Ø12/200
job title
(A)
drawing title
Stairs detail
. all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 10 /2022
drawn job no. sheet no.
approved
7 ST/D/07
Notes
C1
C1
C1 C1
C1
C4 C4 C4 C1
C1
C3
C1 C4 C4 C2 C1
C4
C1 C1 W3 300 2000
W4 300 just in basement
C1 C4 C4 C4 C1
C1 C1
W3 W3 W3 W3
W3 no. date initials revision
W4 job title
(A)
drawing title
COLUMNS & WALL KEY PLAN COLUMNS & WALL KEY PLAN
designed
ENG : DR-Majid Albana
checked
project manager
scale date
approved 8 ST/D/08
6 - Ø25 8 - Ø25 12- Ø25 14- Ø25 16- Ø25
Ø10@200 Ø10@200 Ø10@200 Ø10@200 Ø10@200
Main Bar Roof Floor 2Ties/Set 2Ties/Set 2Ties/Set 3Ties/Set 4Ties/Set
Column Reinf.
Ties
Rest See
1000
900
C 50 800
700
700
Section
2 rd Floor
Main Bar 2 rd Floor 6 - Ø25 8 - Ø25 12- Ø25 14- Ø25 16- Ø25
1000
Section 900
800
700
700
Ground Level
foundation
level
job title
(A)
drawing title
SCHEDULE OF COLUMN
Typ. Sec. For Column
designed project manager
ENG : DR-Majid Albana
TYPICAL INTERNAL COLUMN TO BEAM DETAIL TYPICAL EDGE COLUMN TO BEAM DETAIL checked scale date
1-100 10/2022
drawn job no. sheet no.
5$)75(,1)
8
1
0.90
f16/200 f16/200
0.4
0.4
90 cm Reinf. conc. Raft
foundation 30 Mpa min.
0.4
5 cm plain concrete
W4
OD\HUV%LWXPHQ FPWKLFN PLQ
ZLWKELWXPHQIHOWVEHWZHHQWKHP
(1:2:4) 10cm Blinding Ø12@20 cm C/C
w/c = 0.45 , coarse agg. 5-19 mm Ø25@27cm C/C
25cm Sub base 95% comp. bott.
Ø12@20 cm C/C
25cm Bolder Ø20@18cm C/C
Sub grade ( stiff & stable ) Top . Protection Wall
VAR.
0.21
-2.70 1.89
Ø16@20
cm C/C
0.90
0.19
0.4 4.00 0.4 0.32
0.10
0.25
0.25
job title
approved
10 ST/D/10
B1
25 mm
camber
25 mm
25 mm camber
camber
25 mm 25 mm
A
25 mm camber camber
A
camber
2.0
B1 3.0
B1
2-16 2-25 2-25
25 mm
camber
25 mm
camber
4-12
0.7 0.7 0.5
Ø12@125 B. MESH
Ø12@200 T. MESH
4-12 4-12
3-25
0.30
25 mm
camber 3-16 3-25
0.30 0.30
B4
B1 B3 B4
B1 B1
Ø12@200 T. MESH
3X3m drop panle Ø12@200 . MESH
Ø12@170 B. MESH
220
320
100
3.00 25 mm 3000
25 mm 25 mm
Camber Ø12@150 B. MESH
camber camber
B3
SLAB REINFORCEMENT (BASEMENT )
SLAB THICKNESS = 220 mm no. date initials revision
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 (A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
. all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 10 /2022
drawn job no. sheet no.
approved
11 ST/D/11
ADDITIONAL
ADDITIONAL
Ø12@200 mm
BOTTOM L=3m
Ø12@200 mm
BOTTOM L=3m
B1
ADDITIONAL
Ø12@200 mm
B1 ADDITIONAL
Ø12@200 mm
TOP L=3m
TOP L=3m
25 mm
camber
25 mm
25 mm camber
camber
25 mm 25 mm
A
25 mm camber camber
A
camber
2.0
B1 3.0 2-25
B1
25 mm
25 mm 250
camber
camber 3-16
0.7
25 mm 10@250 mm
Camber 500
10
4-12
Ø12@125 B. MESH
Ø12@200 T. MESH
3-16
3-25
SEC A-A Edge beem
25 mm 0.30
camber
B4
B1
B1 B1
Ø12@200 T. MESH
Ø12@200 . MESH
Ø12@170 B. MESH
220
320
100
3000
3.00
Ø12@150 B. MESH
25 mm 25 mm
camber camber
ADD Ø12@200 T
4.00
SLAB REINFORCEMENT (GROUN FLOOR )
SLAB THICKNESS = 220 mm
B2
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 (A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
. all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 10 /2022
drawn job no. sheet no.
approved
11 ST/D/11
ADDITIONAL
Ø12@200 mm
B1
TOP L=3m
B1
25 mm
camber
25 mm
25 mm camber
camber
2.0
25 mm 25 mm
2-16
3.0
A
25 mm camber camber
A
camber
0.4
B1 2-25
B1
1.0
250
6-12
3-16
25 mm
25 mm
camber
camber
0.7
10@250 mm
0.4
10@250 mm
600
10
4-12
3-16
Ø12@125 B. MESH
Ø12@200 T. MESH
3-16
0.30
3-25
SEC A-A Edge beem
25 mm 0.30
camber
B4
B2 B1
B1 B1
Ø12@200 T. MESH
3X3m drop panle Ø12@200 . MESH
Ø12@170 B. MESH
220
25 mm 320
Camber 100
3000
3.00
Ø12@150 B. MESH
25 mm 25 mm
camber camber
ADD Ø12@200 T
4.00
SLAB REINFORCEMENT (ROOFING FLOOR )
SLAB THICKNESS = 220 mm
B2
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 (A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
. all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 10 /2022
drawn job no. sheet no.
approved
13 ST/D/13
ADDITIONAL
Ø12@200 mm
B1
TOP L=3m
B1
25 mm
camber
25 mm
25 mm camber
camber
2.0
25 mm 25 mm
2-16
3.0
A
25 mm camber camber
A
camber
0.4
B1 2-25
B1
1.0
250
6-12
3-16
25 mm
25 mm
camber
camber
0.7
10@250 mm
0.4
10@250 mm
600
10
4-12
3-16
Ø12@125 B. MESH
Ø12@200 T. MESH
3-16
0.30
3-25
SEC A-A Edge beem
25 mm 0.30
camber
B4
B2 B1
B1 B1
Ø12@200 T. MESH
3X3m drop panle Ø12@200 . MESH
Ø12@170 B. MESH
220
25 mm 320
Camber 100
3000
3.00
Ø12@150 B. MESH
25 mm 25 mm
camber camber
ADD Ø12@200 T
4.00
SLAB REINFORCEMENT (ROOFING FLOOR )
SLAB THICKNESS = 220 mm
B2
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 (A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
. all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 10 /2022
drawn job no. sheet no.
approved
13 ST/D/13